Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 1999-09-08
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210H7591999-07-30030 July 1999 Submits Rept of Seal Entrapment at Seabrook Station,Iaw Paragraph 6(i) of Natl Marine Fisheries Svc (NMFS) Ltr of Authorization to Take Small Number of Seals Incidental to Intake Cooling Water Sys Operations at Plant ML20195D8451999-06-0707 June 1999 Submits Correction to Minor Error in One Comment Provided in Re North Atlantic Comments on Rept & Order for Ndfc 98-01 & Provides Addl Comment to Resolve Potential Problem with Funding Schedule for Yr 2000 ML20195D5551999-06-0202 June 1999 Forwards Original & 10 Copies of Affidavit of Publication ML20195C0431999-05-25025 May 1999 Describes Util Plans to Install Seal Deterrent Barrier on Seabrooks Station Three Offshore Intake Structure Summer of 1999 to Preclude Entrapment of Seals ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML20206E3951999-04-26026 April 1999 Forwards Revised Funding Schedule That Provided Info,Per First Suppl Order ML18152B5991999-01-0808 January 1999 Confirms That Util Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste (Rcaw),Acceptable for Maintaining Compliance with Natl Emissions Stds for Hazardous Air Pollutants (Neshap) Regulations ML20196E5871998-11-25025 November 1998 Repts Discovery of Seal Remains at Seabrook Station.Remains Were Removed from Station Screen Wash Debris on 981124 & Consisted of About Ten Pounds of Hide,Flesh & Bones.Encl Contains Seal Entrapment Rept as Requested ML18153A2671998-09-22022 September 1998 Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 Vac 25-91-130,Pollution Prevention Requirements) for Surry Nuclear Power Station ML20197C2721998-09-0808 September 1998 Forwards Order of Notice Specifying Times & Locations of Upcoming Hearings Before Nuclear Decommissioning Financing Commission ML20151U8551998-09-0202 September 1998 Forwards Rebuttal Testimony by Callendrello,Rebuttal Testimony by Laguardia & Opening Statement of North Atlantic ML20236T2291998-07-20020 July 1998 Forwards Testimony of Js Robinson on Behalf of intervenor- Applicant New England Power Co in Captioned Proceeding. Copies of Filing Have Been Served on All Parties on Attached Svc List ML20236U5031998-07-20020 July 1998 Forwards Direct Testimony Submitted on Behalf of Campaign for Ratepayer Rights for Presentation Before Decommissioning Finance Committee in Ndfc 98-1 ML20236Q1251998-07-13013 July 1998 Forwards New England Power Co'S Motion to Intervene Separately in Seabrook Nuclear Decommissioning Fund ML18152B8171998-05-18018 May 1998 Discusses Results of Data Contained in Discharge Monitoring rept-QA (Dmr/Qa) Dtd 980114 ML20217H7361998-04-23023 April 1998 Forwards Application for Renewal of NPDES Permit NH0020338 for Seabrook Station.Application Contains Completed EPA Forms 3510-1,3540-2C & 3510-2F & Other Supporting Info. Page 2-2 in Tab 6 Section of Incoming Submittal Not Included ML18153A2161998-01-23023 January 1998 Notifies That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 35 Days Since Waste Was Shipped off- Site & Will Not Receive in 45 Days ML20199E9511997-11-18018 November 1997 Informs That G Gram Will Replace B Romer as North Atlantic'S Representative on Nuclear Decommissioning Financing Committee.Resume of G Gram,Encl ML20199E9551997-11-18018 November 1997 Provides Clarification to Response Stated at 971106 Meeting of Nuclear Decommissioning Financing Committee on Impact of Proposed Decommissioning Funding Schedule on 1998 Funding ML20140H7711997-06-13013 June 1997 Submits Application Requesting Small Take Exemption Permit for Incidental Lethal Taking of Small Number of Seals as Result of Plant Operations ML20137N2011997-04-0101 April 1997 Forwards Tables I & II of Seabrook Station Annual Decommissioning Update,March 1997 Which Were Inadvertently Omitted at Time of Printing ML18153A1171997-03-19019 March 1997 Discusses Discharge Monitoring report-quality Assurance (DMR-QA) Results for VA Power Facilities ML18153A1111997-02-14014 February 1997 Confirms 970214 Telcon Re Location of Radiologically Contaminated Asbestos Waste Shipment S-96-1005 ML20116A3301996-07-19019 July 1996 Provides Set of Matls in Support of Project W/Gds Assoc in Marietta,Ga ML18151A1871996-03-20020 March 1996 Forwards Application for Reissuance of Vpdes Permit VA0004090 for Plant.W/One Oversize Map ML18153A5301996-03-18018 March 1996 Confirms That Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste Acceptable for Maintaining Compliance W/Natl Emissions Stds for Hazardous Air Pollutants Regulations ML18153A5561995-12-11011 December 1995 Requests Approval for Proposed Minor Change in Nature of Internal Discharge at Plant ML18153A6821995-11-29029 November 1995 Responds to 951114 Lab & Technical Insps at Plant on 950928. Submits Actions Taken to Address Items Noted During Insp & Reflected in Lab Rept ML18153A6721995-11-22022 November 1995 Requests That Vmrc Permit 92-1347 Be Extended to Allow Continued Maint Dredging Activity in Future ML18153A7801995-10-10010 October 1995 Responds to Concerns Re Leak Detection Sys in Facilities in Jurisdiction ML18153A7461995-08-30030 August 1995 Notifies of Minor Change in Discharge or Mgt of Pollutants at Surry Power Station ML18153A7311995-08-0909 August 1995 Forwards Mixing & Dilution of Surry Nuclear Power Plant Cooling Water Discharge Into James River. ML18152A4011995-05-11011 May 1995 Responds to Telcons W/Eh Greene of VA Power'S Air Quality E Dept Re Use of Methylene Chloride in Paint Shop of Surry Power Station.Requests Confirmation That Painting Operation Exempt from Toxics Regulations ML18153A8081995-04-28028 April 1995 Provides Comments on EPA Pr Re Criteria for Certification & Determination of Waste Isolation Pilot Plant Compliance W/ Environ Standards for Mgt & Disposal of SF,high-level & Transuranic Radwastes.Guidance Re Categorization Needed ML18153A7921995-04-12012 April 1995 Submits Comments Re Proposed Revs to Guidance Provided to Federal Agencies on Radiation Protection ML18153B2351995-02-17017 February 1995 Informs of Receipt of NOV in Ref to Dec 1994 Excursion of Total Suspended Solids Limitations of Vpdes Permit for Plant ML18153B2161995-02-0101 February 1995 Advises That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 45 Days Since Waste Shipped off-site ML18153B2181995-01-23023 January 1995 Informs That Scientific Ecology Group,Inc Received Shipment S-94-14 Which Consists of 3 B-25 Boxes of Asbestos ML18153B2021995-01-0303 January 1995 Submits Follow Up to Telephone Notification Re Excursion of Total Suspended Solids Limitations at Plant Outfall 181 ML18153B0611994-08-30030 August 1994 Requests 60-day Extension for Submittal of Initial Abatement Rept & SCR ML18153B0261994-07-25025 July 1994 Forwards Update on Containment & Accumulator Initial Temp Assumptions for LB-LOCA Analysis ML18153A9891994-07-0101 July 1994 Responds to VEPCO 940614 Ltr Re Proposed Procedure for Disposing of Low Level Radioactive Contaminated Asbestos Waste from Surry & North Anna Power Stations ML18153A9681994-06-14014 June 1994 Confirms Agreements Reached During 940419 Telcon Re Util Proposed Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste Once Shipped to Interim Processor for Vol Reduction ML18153A9671994-06-13013 June 1994 Requests 60 Day Extension to Initial Abatement Rept Deadline of 940613.Util Has Not Yet Completed Investigation of Underground Oil Lines & Would Prefer to Include More Investigative Detail Before Submitting Subj Rept ML20069L1341994-05-31031 May 1994 Submits Update of Decommissioning Study for Seabrook Station Unit 1,in Accordance W/Requirements of Procedural Order 6 ML20065C9501994-03-31031 March 1994 Forwards North Atlantic Energy Svc Corp Seabrook Nuclear Decommissioning Financing Fund Investment Performance Summary for Yr Ending 931231, Dtd 940328.W/o Encl 1999-09-14
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20006D3031990-01-26026 January 1990 Forwards Addl City of Newburyport Brief on Appeal of Partial Initial Decision of Spmc LBP-89-32 & Statement of Issues Presented Re Appeal of LBP-89-32.W/o Encls.Related Correspondence ML20012E1631989-12-26026 December 1989 Forwards Results of Evaluation of Corporate Support & Monitoring of Facility Conducted on 891002-06.Written Status Rept Requested by June 1990 ML20005G1211989-12-0404 December 1989 Forwards Commonwealth of Ma,Necnp & Seacoast Anti-Pollution League Petition for Review of ASLB 891113 Order LBP-89-32. Svc List Encl ML20248J0161989-09-27027 September 1989 Expresses Displeasure W/Actions Taken by Recipient Clients at Newington Town Hall on 890927.Restricting Access to Public Facility Deemed Inappropriate & Discriminatory. Related Correspondence ML18153B8491989-07-26026 July 1989 Informs of 890711 Discovery of die-off of Approx 200 Fish in Uppermost End of Discharge Canal.Possibly Caused by Fish Being Trapped in Discharge Canal & Dying from Temp Shock at Time of Startup of Plant ML20248B5671989-05-30030 May 1989 case-returning Commuters.* Forwards Work Place Table from Adler to Aid Kld in Further Assessment of Returning Commuters within EPZ from Work Places within Epz. Related Correspondence ML20246J4021989-05-11011 May 1989 Requests Confirmation,As Followup to 890510 Telcon,That Town of Newbury No Longer Asserting Listed Bases & Still Intends to Litigate Basis H in Light of Fact That Map Objected to Has Been Withdrawn from Spmc.Related Correspondence ML20246J4391989-05-10010 May 1989 Confirms That Town of Amesbury Does Not Intend to Litigate Joint Intervenor Contention 2 as Long as Applicant Adheres to Present Plan of Not Routing Traffic Across grassy-median at I-95/Route 110.Related Correspondence ML20246J4961989-05-0909 May 1989 Advises That Matl Requested in Re Applicant Rebuttal Testimony 16 Has Been Assembled & Sent to Adler as Requested.Related Correspondence ML20246H2211989-05-0808 May 1989 Confirms 890505 Telcon Re Applicant Incorrect Impression That Seacoast Anti-Pollution Leauge (Sapl) Was Withdrawing Testimony of C Breton & J Van Gelder Re Sapl Contention EX-12.Related Correspondence ML20246H7141989-05-0404 May 1989 Informal Discovery Request Re Applicant 16.* Requests Computer Readable Listings & Paper Copies of All Idynev Assignment,Evacuation Time Estimates & Sensitivity Runs Mentioned in Testimony 16.Related Correspondence ML20246H2251989-05-0303 May 1989 Forwards 10 of 16 Documents Sought by Commonwealth of Ma 890405 Motion to Compel Production of Documents.Brief Accounting of Documents in Dispute Also Encl.W/O Documents. Certificate of Svc Encl.Related Correspondence ML20244C9281989-04-14014 April 1989 Confirms That Commonwealth of Ma Atty General Will Withdraw Joint Intervenor Contention 38,MAG EX-17 & Ji 27,Basis E Which Were Omitted from Commonwealth 890411 Trial Brief,Per 890412 Conversation.Related Correspondence ML20246M4751989-03-17017 March 1989 Supplemental Response to Commonwealth of Ma Atty General Informal Request for Production of Documents Re 1988 Seabrook Graded Exercise.* W/O Stated Exercise Evaluation Documents.Certificate of Svc Encl.Related Correspondence ML20236D8381989-03-16016 March 1989 Confirms That Author Will Depose N Pishon,Employee of State of Nh,On 890320 at State of Nh Ofc.Related Correspondence ML18153B5781989-01-13013 January 1989 Informs That on 890109,discovered Small Oil Sheen in Upper End of Station Discharge Canal Attributed to Parking Lot Runoff Involving Less than 1 Pint of Oil Flowing Into Storm Drain & Discharge Canal.James River Believed Unaffected ML20206N0341988-11-23023 November 1988 Forwards Documents Ref in RW Donovan 881109 & 10 Deposition, Including Forms on Which Results of Interviews Verifying Ltrs of Agreement Recorded.W/O Stated Documents.Certificate of Svc Encl.Related Correspondence ML20154A0551988-09-0101 September 1988 Offsite Emergency Planning Issues.* Advises That FEMA Will Respond to Applicant First Set of Interrogatories & First Request for Production of Documents Re Seabrook Plan After 881014.Related Correspondence ML20207E3831988-08-10010 August 1988 Lists Corrections to Applicant Response to New England Coalition on Nuclear Pollution (Necnp) Third Set of Interrogatories on Necnp Contention I.B.2.W/Certificate of Svc.Related Correspondence ML20151M7321988-07-25025 July 1988 Demands That Massachusetts Municipal Wholesale Electric Co, to Rescind Votes Not to Make Payments to Facility Project & Take Firm Steps Towards Reducing Debt Burden on Participants & Consumers ML20151N9901988-04-0707 April 1988 Forwards Exhibit 1,consisting of Transmittal Ltr That Accompanied Amend 3 to Seabrook Plan for Ma Communities. Timely Notification of Parties Re Major Revs Requested. W/O Encl.Related Correspondence ML20147H8721988-03-0303 March 1988 Forwards Comments of Commonwealth of Ma Attorney General Jm Shannon in Opposition to NUREG-0654/FEMA/REP-1 Rev 1, Suppl 1, Criteria for Util Offsite Planning.... Certificate of Svc Encl.Related Correspondence ML20196G5421988-03-0303 March 1988 Ack Receipt of Strong Ltr to Vickers Transmitting Document Supplemental Analysis of Potential Shelter Capacity of Seabrook EPZ Beach Areas, for Review.W/O Encl ML20012E1571988-03-0202 March 1988 Forwards Trip Rept of 880125-29 Site Visit Providing Technical Expertise During Emergency Preparedness Performance Assessment.Briefing Scheduled for 900309 to Discuss Visit ML20149N0661988-02-23023 February 1988 FEMA Evaluation of State of Nh Response to FEMA Supplemental Testimony.* Urges FEMA to Consider New Info Developed During Hearings on State of Nh Radiological Emergency Response Plan Re Evacuation Time Estimates.Related Correspondence ML20236W3611987-10-20020 October 1987 Expresses Concern Re Use of Premises as Shelter in Support of Plant Emergency Response Planning.Requests That Premises Be Removed from List of Shelters Developed as Part of Emergency Response Plans.Served on 871028 ML20237J3831987-08-20020 August 1987 Clarifies Apparent Misunderstanding as to Atty of Record for State of Vt,Dept of Public Svc in Facility Decommissioning Fund.Author Should Be Listed as Atty of Record,Not K Janson ML20234D0461987-06-17017 June 1987 Requests Withdrawal from Participation in Development of Plant Evacuation Plan & Deletion from Publications Outlining Emergency Plan.Desire to Participate W/State of Ma Ofc of Civil Defense & FEMA in Disasters Noted.Served on 870630 ML20234D0251987-06-16016 June 1987 Forwards Order Voted Unanimously by Board of Selectmen on 870614.Decision May Be Appealed within 14 Days of Receipt. Served on 870630 ML20215D6601987-06-10010 June 1987 Confirms That Deposition of E Thomas Scheduled for 870615, Will Be Postponed Until Later in Summer ML20214W5561987-06-0303 June 1987 Advises That Deposition of a Calandrello Changed from 870609 to 870612.Related Correspondence ML20214W5261987-06-0303 June 1987 Advises That Deposition of D Laughton of Teamsters Local 633 Will Be Taken on 870616.Certificate of Svc Encl.Related Correspondence ML20214P3281987-05-29029 May 1987 Public Svc Co of Nh (Offsite Emergency Planning) Depositions of D Mileti & E Lieberman.* Confirms 870528 Telcon Re Depositions of D Mileti & E Lieberman on 870611 & 29, Respectively.Certificate of Svc Encl.Related Correspondence ML20214S0581987-05-28028 May 1987 Confirms Results of 870528 Telcon Re Deposition of Rh Stone. Commonwealth Agrees to Postpone Deposition Indefinitely to Date After 870620.Certificate of Svc Encl.Related Correspondence ML20214S1441987-05-26026 May 1987 Confirms Discussion Indicating Author Requesting Dates for Deposition of a Calandrello.Suggests 870609 at Author Ofc. Certificate of Svc/Svc List Encl ML20213A4601986-12-15015 December 1986 Discusses 861212 Visit to Plant Re 861209 Piping Failure. Addition of Snubber or Piping Changes May Be Necessary.Addl Info from Util Needed ML20214J1331986-11-21021 November 1986 Confirms Recent Oil Spill at Facilities,Previously Reported on 861118.Complete Info Being Assembled & Full Rept Will Be Provided by 861125 ML20215B2871986-09-18018 September 1986 Objects to Violation of State Law Re Lack of Scheduled Payments Into Decommissioning Fund & Relevant Info Available for Public Review ML20199G5111986-06-0404 June 1986 Forwards Rev 1 to State of Nh Radiological Emergency Response Plan & E Lieberman Re Differences Between Encl Draft Final Rept & Seven Progress Repts of Evacuation Time Estimates & Mgt Plan Update.W/O Plan ML20198E0391986-05-13013 May 1986 Forwards Town of Exeter,Nh Answer to Interrogatories & 1980 Civil Defense Basic Master Emergency Plan.Firm Has Not Filed Appearance for Town But Assisted in Preparing Encl Answers. Related Correspondence ML20203Q1601986-04-29029 April 1986 Discusses Support for Plant,Emergency Evacuation Planning & Storage of Spent Nuclear Fuel ML20140B1621986-01-16016 January 1986 Informs of Concerns Re Emergency Evacuation Plans for Facility.As Plans Were Sent W/O Local Board Approval,Return for Further Work Requested.Served on 860122 ML20137H9021986-01-0909 January 1986 Requests That FEMA Be Notified That Local Emergency Plan Submitted to Hg Vickers on 851209 Was Not Authorized or Approved by Hampton Falls Community.Explanation Re Submittal Also Requested.Served on 860117 ML20137H9031986-01-0707 January 1986 Advises That Radiological Emergency Response Plan Submitted by Rh Strome on 851209,purportedly on Behalf of State of Nh & Local Communities,Is Not Recognized by Rye,Nh.No Plan Exists That Can Assure Resident Safety.Served on 860117 ML20140A9501985-12-0606 December 1985 Responds to Re Preparation of Radiological Emergency Response Plan.Attachment Addresses Each Question Raised.First Draft of Plan Submitted in 1983 & Updated in 1984.Served on 860122 ML20140B1721985-12-0202 December 1985 Ack Receipt of Ltr Re Details of Planning Effort within Emergency Planning Zone.R Strome Will Respond Directly to Questions.Served on 860122 ML20138B4371985-11-25025 November 1985 Ack Receipt of 851119 Request for Disclosure of Confidential Privileged Data Re Facility OL Proceeding.Request Denied Based on Confidential Nature of Info.Related Correspondence ML20140B1681985-10-29029 October 1985 Expresses Opposition to Radiological Emergency Response Plan.Plan Inadequate & Makes No Serious Attempt to Evacuate Endangered Citizenry ML20129A1291985-06-28028 June 1985 Discusses Concerns Which Costello Communicated to NRC Chairman,Nrc & Governor of State of Ma Re Indictment of J Padavano & Discrepancies in Summer Evacuation Time Estimates.Served on 850712 ML20092K5571984-06-20020 June 1984 Submits Addl Info Re 840616 Possible Oil Spill Previously Reported by Telephone.Util Unable to Confirm or Deny Original Rept of Spill.Level Control Sys for Unit 1 Turbine Sump Tested & Found Operating Satisfactorily 1990-01-26
[Table view] |
Text
-
. n _ _. . ..~
,.m.a :.u.a 'Q.,
I c/. .. .~ .,, .,, , *r.v s.o.t uoL f/A 9 $$s/bDCUMENT CONTAlHS P00R QUALITY PAGES fl5 APR 61977 .s A
9 w tt:a.;ES G:- eeu
% a.. S g s ,,.. ....
- ra & UTIL fA9. O ~M'd ' "" S 95tl,'LL[ 6 6
., . . . .. m
'oil ?p[k m c.5u%F.'1(#d-@3[330 yv.
4'750 Cove Circle. Apt. Col hdcira Beach IJarch 25. 19'/'/' Florida 33703 Proci&nt Jaecs E. Carter; Th0 li t9 }IouCe
- aci;ing; ton , D.C.
Dear Jr. President.
YOU /.PPEAL FOR CONSERVATIOI;"0F EIGRC': Ai:D BETTER SOU'tCES OF PC'.MR.
Yet your administration, by delays, indecision, ha as tringing, P.nd red tape is in eficct rejecting one of our grantest, cheapest, cleanest, most iney.auctable ocurces of power - !?UCLEAll EIER0Y.
~
Three cases in noint *
- 1. The Public Service Company of iiew }?anpahire has underway a major ..
nuclear power plant at Seabroof, II.E. The Atomic Energy Ccad.csion
has, by sucpcnding previously granted p'ermits and posing interr..inatcle delays on the iscuance of new approvalc, so stymied the conctructica of this plant that all activitf has ceased and the Co7.pany han prac-tically given up on the project.
- 2. The Virginia Electric and Power Company Ioard of Directors recently voted to stop construction on two important nuclear units at Surrey, Va. and to abandon thiJ: project, primarily becauce of the delays and difficultiec encountered with the A.E.C. *
. 3 The Consumers Power Company has been so obstructed in its construc-tion of a nuclear power plant at Midland, IJich. that it has practi-cally given up on the project, and the principal contractor for power from this potential source has decided to turn elscuhore.
. Q.E.D.
l IJr. Carter, you are scheduled to introduce a new proposed enarg/
program on April 20,'. Unlocs scmc positive anL constructive action 10 taken by the A.E.Ci before then, I shall at that tine enke an effort to see that widespread publicity is given to the above three situatio.'.s and to the negative general policy that they illustrate, pointing out to fellcw Americans that they owe the administraticn no cacrifice or cocnerr.-
tion in energy concarvation while the adninistration itselfac effectiecl,- '
neutralicing the growth of one of our Createst cources of chcap energy.
The voters of several states voted by substantial margins in favor of the continuance of nuclear power plant construction. Yet a high p.r-cent ge of the projected progress in thic ficid, so vital to our energy conservation progran, ic being fructrated by a handfull of willful; environmentalists and the inefficiency and indifference of your Atomic ,
Energy Com:ission.
'k flcte
_ SincQ rc.,1Y 500 f.' e Y
" .L g;b. a;;p.
8oon 8o p<.. h..~.. "6ce ' '
%c b."cu- Re.wla torace "A""
'*=" """ '"="
,3 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
)
In the Matter of )
)
CONSUPERS POWER COMPANY ) Docket No. (s) 50-329
) 50-330 (Midland Plant, Units 1 and 2) )
)
SERVICE LIST Frederic J. Coufal, Esq. , Chairman Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Emmeth A. Luebke James A. Kendall, Esq.
Atomic Safety and Licensing Board Currie and Kendall U.S. Nuclear Regulatory Commission 135 North Saginaw Road Washington, D.C. 20555 Midland, Michigan 48640 Dr. J. Venn Leeds , Jr. Judd L. Bacon, Esq.
10807 Atwell Consu=ers Power Company Houston, Texas 77096 212 West Michigan Avenue Jackson, Michigan 49201 Office ef the Executive Legal Director Counsel fer NRC Staf f William J. Ginster, Esq.
U.S. Nuclear Regulatory Commission Merrill Building, Suite 4 ,
Washington,-D.C. 20555- Saginaw, Michigan 48602 Myron M. Cherry, Esq.
One IBM Plaza Chicago, Illinois 60611 ,
Harold F. Reis, Esq.
Lowenstein, Newman, Reis-& Axelrad- Honorable-Curtis G. Beck 1025 Connecticut Avenue, N.W. Assistant Attorney General Washington, D.C. 20036 State of Michigan Seven Story Office Building Honorable Charles A. Briscoe 525 West Ottawa Assistant Attorney General Lansing, Michigan 48913 State of Kansas Topekc, Kansas 66612 Lee Nute, Esq.
Michigan Division Irving Like, Esq. The Dow Chemical Company Reilly, Like and Schneider 47 Building 200 West Main-Street Midland, Michigan 48640-Babylon, New York 11702
~
. m UNITED STATES OF AMERICA NUCLEAR REGULATORY COSDIISSION In the Matter of )
)
CONSUMERS POWER COMPANY ) Docket No. (s) 50-329
) 50-330 (Midland Plant, Units 1 and 2) ) -
)
) .
)
)
CERTIFICATE OF SERVICE I hereby certify that I have this day served the foregoing document (s) upon each person designated on the official service list compiled by the Of fice of the Secretary of the Commission in this proceeding in accordance with the requirements of Section 2.712 of 10 CFR Part 2-
' Rules of Practice, of the Nuclear Regulatory Commission's Rules and Regulations.
Dated at Washington, D.C. this ~
day of br 197 .
~
Officeof,theSecretaryoftheCommission L
j- .
. - . - . . -- ,