ML19331D056: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:E    c.
STONE TJ YlEBSTER ENGINEERING CORPORATION 245 SuMutn SrREET. B O STON. MASSACHUSETTS                                            ,;
AD DRE S S ALL CORRE S POND EN CE TO P.O. B OX 2.325. BOSTON. M A SS. 02107
: w. U. T E y E M-44 0009                      ,
oma sfeucTiose
  ,          o    y a E  ne avions usvom
                              "'' "                                                                              Emo = ta no
                ".'o',^ 1*:i msn. .oTo . o c.
Mr. Victor Stello, Director                                                          July 23, 1980 Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555                                            -
{g J $~f, o c) 3
 
==Dear Mr. Stello:==
NOTIFICATION OF DEFECT, 10CFR21 SHOREHAM NUCLEAR POWER STATION - UNIT I LONG ISLAND LIGHTING COMPAST Stone & Webster Engineering Corporation (S&W), pursuant to the provisions of 10CFR21, hereby provides notification of a " defect" concerning the Shoreham Nuclear Power Station, Unit 1, owned by Long Island Lighting Company (LILCO) and for which S&W provided both engineering and construc-tion services.
In accordance with 'the requirements of Section 21.21(b)(3), the followini; information is submitted:
: 1. Name and address of the individual informing the Commission:
Mr. P. A. Wild, Director of Engineering                                            ,
Stone & Vebster Engineering Corporation Post Office Box 2325 Doston, MA 02107
: 2. Identification        '
the facility, or the basic component supplied for such facilia , which contains a defect:
j                                        Shoreham Nuclear Power Station, Unit 1 General Electric Company (GE) 4 kV switchgear circuit breaker - Snap Rings
: 3.      Identification of firm constructing facility or supplying basic component which contains a defect:
Basic Component supplied by GE                          ,
8008270/fd
 
y          -
    "b - -  .
VS                                  2            July 23, l930            .
4  Nature o_f the defect and the safety harard which could be        .
created by such defect:                        '.,
  ' ^                                              '
There exists a depa *"- #--- -' * -' # al require ents of a procure =ent docu=ent in that breakers could have          .
failed to cperate as specified.
The defective circuit breakers are basic cc:pe:ents in GE metal-clad switchgear (4 kV) and the switchgear has been delivered to a purchaser.
As a result of loose breaker =ain output cracks, other links in the breaker =echanis eved cut of alig=:ent and i=pacted ' the prep pin snap ring. The effect of these i= pacts def =:ed the snap ring sufficiently to allcw it to fall off the prep pin. This could result in the failure of the-breaker to operate properly.
The breakers are required tader design basis events to assure the capability to shut down the reactor and
                              =aintain it in a safe shutd:w cceditice. Degradatics of such essential safety-related equipment rep' resents a
                              =ajor reductic: in the degree cf protection provided to the public health and safety and results in a substantial safety harard.
: 5. Date on dhich infor:stic of such defect was obtained:
July 23, 1930
: 6. In the case of a basic co:ponent which ccatsics a defect, the number and location of all such ce=penents in use at, supplied for, or being supplied for facilities subject to the regulatica:
Shoreham Nuclear Power Statics 4 kV sdithgear circuit breakers of which 29 are used in safe'ty-related applicacica.
: 7. The corrective action which has been, is being, or will be
          ,            taken; name of individual or crganization respensible; and length of time taken to co=plete the action:
All 65 breakers at the Shoreham site were returned to GE for corrective work. Corrective actie censisted of cc:plete disasse=bly of.each breaker =echanis: for inspectics with replace =ent of parts as necessary.
GE factory engineering and Quality Assurance grcups have l                            been apprised of this preble: to prevent recurrence.
The ide=tified corrective actica has been c epleted.
a
                                                                                  =
 
~ 1 f-.,
VS                                      3                      July 23, 1980
: 8. Advice related to the defect that has been given to purchasers or, liceitsees :      ;p-  .
No other actica apart frem that specified under the previous section.
Identification of this defect and the filing of this report are results of a review of 10CFR50.55(e) Reports and Licensee Event Report,s filed by S&W clients since January 6, 1978. This review, committed to.in our letter to NRC of September 6, 1979, resulted from the NRC special inspection of May 1-4, 1979. NRC has been previously advised of this problem by LILCO n:tification on November 17, 1978, in accordance with 10CFR50.55(e).
If you require any further infor=ation, please contact S. B. Jacobs at 617-973-5264.
Very truly yours, e
          ~ .y          b        .
P. A. Wild Director of Engineering PAS:mra
                                    ~
4 t
e
                                                                                                .m-}}

Latest revision as of 12:28, 18 February 2020

Part 21 Rept Providing Notification of Defective Circuit Breakers in GE metal-clad Switchgear.Caused by Degradation of Essential safety-related Equipment.All Breakers Were Returned to GE for Corrective Work
ML19331D056
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/23/1980
From: Wild P
STONE & WEBSTER ENGINEERING CORP.
To:
References
REF-PT21-80-258-002 NUDOCS 8008270190
Download: ML19331D056 (3)


Text

E c.

STONE TJ YlEBSTER ENGINEERING CORPORATION 245 SuMutn SrREET. B O STON. MASSACHUSETTS ,;

AD DRE S S ALL CORRE S POND EN CE TO P.O. B OX 2.325. BOSTON. M A SS. 02107

w. U. T E y E M-44 0009 ,

oma sfeucTiose

, o y a E ne avions usvom

" " Emo = ta no

".'o',^ 1*:i msn. .oTo . o c.

Mr. Victor Stello, Director July 23, 1980 Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 -

{g J $~f, o c) 3

Dear Mr. Stello:

NOTIFICATION OF DEFECT, 10CFR21 SHOREHAM NUCLEAR POWER STATION - UNIT I LONG ISLAND LIGHTING COMPAST Stone & Webster Engineering Corporation (S&W), pursuant to the provisions of 10CFR21, hereby provides notification of a " defect" concerning the Shoreham Nuclear Power Station, Unit 1, owned by Long Island Lighting Company (LILCO) and for which S&W provided both engineering and construc-tion services.

In accordance with 'the requirements of Section 21.21(b)(3), the followini; information is submitted:

1. Name and address of the individual informing the Commission:

Mr. P. A. Wild, Director of Engineering ,

Stone & Vebster Engineering Corporation Post Office Box 2325 Doston, MA 02107

2. Identification '

the facility, or the basic component supplied for such facilia , which contains a defect:

j Shoreham Nuclear Power Station, Unit 1 General Electric Company (GE) 4 kV switchgear circuit breaker - Snap Rings

3. Identification of firm constructing facility or supplying basic component which contains a defect:

Basic Component supplied by GE ,

8008270/fd

y -

"b - - .

VS 2 July 23, l930 .

4 Nature o_f the defect and the safety harard which could be .

created by such defect: '.,

' ^ '

There exists a depa *"- #--- -' * -' # al require ents of a procure =ent docu=ent in that breakers could have .

failed to cperate as specified.

The defective circuit breakers are basic cc:pe:ents in GE metal-clad switchgear (4 kV) and the switchgear has been delivered to a purchaser.

As a result of loose breaker =ain output cracks, other links in the breaker =echanis eved cut of alig=:ent and i=pacted ' the prep pin snap ring. The effect of these i= pacts def =:ed the snap ring sufficiently to allcw it to fall off the prep pin. This could result in the failure of the-breaker to operate properly.

The breakers are required tader design basis events to assure the capability to shut down the reactor and

=aintain it in a safe shutd:w cceditice. Degradatics of such essential safety-related equipment rep' resents a

=ajor reductic: in the degree cf protection provided to the public health and safety and results in a substantial safety harard.

5. Date on dhich infor:stic of such defect was obtained:

July 23, 1930

6. In the case of a basic co:ponent which ccatsics a defect, the number and location of all such ce=penents in use at, supplied for, or being supplied for facilities subject to the regulatica:

Shoreham Nuclear Power Statics 4 kV sdithgear circuit breakers of which 29 are used in safe'ty-related applicacica.

7. The corrective action which has been, is being, or will be

, taken; name of individual or crganization respensible; and length of time taken to co=plete the action:

All 65 breakers at the Shoreham site were returned to GE for corrective work. Corrective actie censisted of cc:plete disasse=bly of.each breaker =echanis: for inspectics with replace =ent of parts as necessary.

GE factory engineering and Quality Assurance grcups have l been apprised of this preble: to prevent recurrence.

The ide=tified corrective actica has been c epleted.

a

=

~ 1 f-.,

VS 3 July 23, 1980

8. Advice related to the defect that has been given to purchasers or, liceitsees : ;p- .

No other actica apart frem that specified under the previous section.

Identification of this defect and the filing of this report are results of a review of 10CFR50.55(e) Reports and Licensee Event Report,s filed by S&W clients since January 6, 1978. This review, committed to.in our letter to NRC of September 6, 1979, resulted from the NRC special inspection of May 1-4, 1979. NRC has been previously advised of this problem by LILCO n:tification on November 17, 1978, in accordance with 10CFR50.55(e).

If you require any further infor=ation, please contact S. B. Jacobs at 617-973-5264.

Very truly yours, e

~ .y b .

P. A. Wild Director of Engineering PAS:mra

~