ML120620082: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML120620082
| number = ML120620082
| issue date = 03/05/2012
| issue date = 03/05/2012
| title = Davis-Besse Nuclear Power Station, Unit No. 1 - Correction of Typographical Error Amendment Adoption of Technical Specifications Task Force Change Traveler 513, Revision to Technical Specification 3.4.14.[Reactor Coolant System]
| title = Correction of Typographical Error Amendment Adoption of Technical Specifications Task Force Change Traveler 513, Revision to Technical Specification 3.4.14.(Reactor Coolant System)
| author name = Mahoney M
| author name = Mahoney M
| author affiliation = NRC/NRR/DORL/LPLIII-2
| author affiliation = NRC/NRR/DORL/LPLIII-2
| addressee name = Allen B S
| addressee name = Allen B
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000346
| docket = 05000346
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 March 5, 2012 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1-CORRECTION OF TYPOGRAPHICAL ERROR RE: AMENDMENT RE: ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE CHANGE TRAVELER 513, REVISION TO TECHNICAL SPECIFICATION 3.4.14, "[REACTOR COOLANT SYSTEM] LEAKAGE DETECTION INSTRUMENTATION" (TAC NO. ME8073)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 5, 2012 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
 
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1-CORRECTION OF TYPOGRAPHICAL ERROR RE: AMENDMENT RE: ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE CHANGE TRAVELER 513, REVISION TO TECHNICAL SPECIFICATION 3.4.14, "[REACTOR COOLANT SYSTEM]
LEAKAGE DETECTION INSTRUMENTATION" (TAC NO. ME8073)


==Dear Mr. Allen:==
==Dear Mr. Allen:==
The U.S. Nuclear Regulatory Commission (NRC, the Commission) issued the enclosed Amendment No. 284 to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No.1 (DBNPS) on December 9, 2011 (Agencywide Documents Access and Management System Accession No. ML 112590431), in response to FirstEnergy Nuclear Operating Company's (FENOC's) application dated April 29, 2011. The amendment revised the DBNPS Technical Specifications (TS) to define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and establish alternate methods of monitoring RCS leakage when one or more required monitors are inoperable. The amendment also made TS Bases changes which reflect the proposed TS changes and more accurately reflect the contents of the facility design basis related to operability of the RCS leakage detection instrumentation. FENOC's staff subsequently identified that in a retyped TS page provided to the NRC, there was a typographical error and subsequently the amendment was issued with that error. FENOC when sending in the retyped page inadvertently inserted the word "required" at the beginning of Condition C, which should read "Containment sump monitor inoperable." The NRC staff determined that this typographical error was inadvertently introduced. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public.
 
B. Allen Corrected TS page 3.4.15-2 is enclosed. If you or your staff have any questions. please call me at 301-415-3867 Michael Mahoney. Project anager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346  
The U.S. Nuclear Regulatory Commission (NRC, the Commission) issued the enclosed Amendment No. 284 to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No.1 (DBNPS) on December 9, 2011 (Agencywide Documents Access and Management System Accession No. ML112590431), in response to FirstEnergy Nuclear Operating Company's (FENOC's) application dated April 29, 2011.
The amendment revised the DBNPS Technical Specifications (TS) to define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and establish alternate methods of monitoring RCS leakage when one or more required monitors are inoperable. The amendment also made TS Bases changes which reflect the proposed TS changes and more accurately reflect the contents of the facility design basis related to operability of the RCS leakage detection instrumentation.
FENOC's staff subsequently identified that in a retyped TS page provided to the NRC, there was a typographical error and subsequently the amendment was issued with that error. FENOC when sending in the retyped page inadvertently inserted the word "required" at the beginning of Condition C, which should read "Containment sump monitor inoperable." The NRC staff determined that this typographical error was inadvertently introduced.
The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public.
 
B. Allen                                   -2 Corrected TS page 3.4.15-2 is enclosed. If you or your staff have any questions. please call me at 301-415-3867 Michael Mahoney. Project anager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346


==Enclosures:==
==Enclosures:==
As Stated cc w/encls: Distribution via Listserv
 
-------------------------------------3.4.15 RCS Leakage Detection Instrumentation ACTIONS (continued) COMPLETION TIME REQUIRED ACTION CONDITION ---------------NO Not required until 12 hours after establishment of steady state operation. B. (continued) Perform SR 3.4.13.1. Once per 24 hours AND Restore required 30 days containment atmosphere radioactivity monitor to OPERABLE status. ---_....... -NOTE-Only applicable when the containment atmosphere gaseous radiation monitor is the only OPERABLE monitor. ---------...--_... _--....C.1 Analyze grab samples of Once per 12 hours monitor inoperable. C. Containment sump the containment atmosphere. AND C.2 Restore containment sump 7 days monitor to OPERABLE status. D.1 Be in MODE 3. 6 associated Time of Condition A, D. Required Action and or C not Be in MODE 5. 36 hours E. Both required monitors E.1 Enter LCO 3.0.3. 3.4.15-2 Amendment 284 B. Allen Corrected TS page 3.4.15-2 is enclosed. me at 301-415-3867 Docket No. 50-346  
As Stated cc w/encls: Distribution via Listserv
 
RCS Leakage Detection Instrumentation 3.4.15 ACTIONS (continued)
CONDITION                              REQUIRED ACTION                        COMPLETION TIME B. (continued)                                    B.1.2 ---------------NOTE-------------
Not required until 12 hours after establishment of steady state operation.
Perform SR 3.4.13.1.                 Once per 24 hours AND B.2  Restore required                     30 days containment atmosphere radioactivity monitor to OPERABLE status.
                    - NOTE-Only applicable when the containment atmosphere gaseous radiation monitor is the only OPERABLE monitor.
C. Containment sump                                C.1   Analyze grab samples of             Once per 12 hours monitor inoperable.                             the containment atmosphere.
AND C.2   Restore containment sump             7 days monitor to OPERABLE status.
D. Required Action and                            D.1   Be in MODE 3.                         6 hours associated Completion Time of Condition A, B,                  AND or C not met.
D.2  Be in MODE 5.                         36 hours E. Both required monitors                         E.1   Enter LCO 3.0.3.                     Immediately inoperable.
Davis-Besse                                                  3.4.15-2                                 Amendment 284
 
B. Allen                                     -2 Corrected TS page 3.4.15-2 is enclosed. If you or your staff have any questions, please call me at 301-415-3867 Sincerely, IRAJ Michael Mahoney, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346


==Enclosures:==
==Enclosures:==
As Stated cc w/encls: Distribution via Listserv DISTRIBUTION: PUBLIC LPL3-2 RlF RidsNrrPMDavis-Besse Resource RidsNrrDirsltsb Resource RidsOgcRp Resource RidsRgn3MaiiCenter Resource RidsNrrLAKGoldstein Resource RidsNrrDorllpl3-2 Resource RidsNrrDoriDpr Resource RidsAcrsAcnw_MaiiCTR Resource Accession No ML120620082 If you or your staff have any questions, please call Sincerely, IRAJ Michael Mahoney, Project Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor NRR-058 OFFICE LPL3-2/PM LPL3-2/LA LPL3*21BC LPL3*2/PM NAME MMahoney KGoldstein JZimmerman MMahoney DATE 03/05/12 03/05/12 03/05/12 03/05/12 OFFICIAL RECORD
 
}}
As Stated cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-2 RlF RidsNrrPMDavis-Besse Resource RidsNrrDirsltsb Resource RidsOgcRp Resource RidsRgn3MaiiCenter Resource RidsNrrLAKGoldstein Resource RidsNrrDorllpl3-2 Resource RidsNrrDoriDpr Resource RidsAcrsAcnw_MaiiCTR Resource Accession No ML120620082                                                   NRR-058 OFFICE LPL3-2/PM               LPL3-2/LA             LPL3*21BC     LPL3*2/PM NAME     MMahoney             KGoldstein             JZimmerman     MMahoney DATE     03/05/12                   03/05/12       03/05/12             03/05/12 OFFICIAL RECORD COPY}}

Latest revision as of 17:42, 6 February 2020

Correction of Typographical Error Amendment Adoption of Technical Specifications Task Force Change Traveler 513, Revision to Technical Specification 3.4.14.(Reactor Coolant System)
ML120620082
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/05/2012
From: Michael Mahoney
Plant Licensing Branch III
To: Allen B
FirstEnergy Nuclear Operating Co
Mahoney, M NRR/DORL/LPLIII- 2 415-3867
References
TAC ME8073
Download: ML120620082 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 5, 2012 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1-CORRECTION OF TYPOGRAPHICAL ERROR RE: AMENDMENT RE: ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE CHANGE TRAVELER 513, REVISION TO TECHNICAL SPECIFICATION 3.4.14, "[REACTOR COOLANT SYSTEM]

LEAKAGE DETECTION INSTRUMENTATION" (TAC NO. ME8073)

Dear Mr. Allen:

The U.S. Nuclear Regulatory Commission (NRC, the Commission) issued the enclosed Amendment No. 284 to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No.1 (DBNPS) on December 9, 2011 (Agencywide Documents Access and Management System Accession No. ML112590431), in response to FirstEnergy Nuclear Operating Company's (FENOC's) application dated April 29, 2011.

The amendment revised the DBNPS Technical Specifications (TS) to define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and establish alternate methods of monitoring RCS leakage when one or more required monitors are inoperable. The amendment also made TS Bases changes which reflect the proposed TS changes and more accurately reflect the contents of the facility design basis related to operability of the RCS leakage detection instrumentation.

FENOC's staff subsequently identified that in a retyped TS page provided to the NRC, there was a typographical error and subsequently the amendment was issued with that error. FENOC when sending in the retyped page inadvertently inserted the word "required" at the beginning of Condition C, which should read "Containment sump monitor inoperable." The NRC staff determined that this typographical error was inadvertently introduced.

The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public.

B. Allen -2 Corrected TS page 3.4.15-2 is enclosed. If you or your staff have any questions. please call me at 301-415-3867 Michael Mahoney. Project anager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

As Stated cc w/encls: Distribution via Listserv

RCS Leakage Detection Instrumentation 3.4.15 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.1.2 ---------------NOTE-------------

Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

Perform SR 3.4.13.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.2 Restore required 30 days containment atmosphere radioactivity monitor to OPERABLE status.

- NOTE-Only applicable when the containment atmosphere gaseous radiation monitor is the only OPERABLE monitor.

C. Containment sump C.1 Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> monitor inoperable. the containment atmosphere.

AND C.2 Restore containment sump 7 days monitor to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, B, AND or C not met.

D.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> E. Both required monitors E.1 Enter LCO 3.0.3. Immediately inoperable.

Davis-Besse 3.4.15-2 Amendment 284

B. Allen -2 Corrected TS page 3.4.15-2 is enclosed. If you or your staff have any questions, please call me at 301-415-3867 Sincerely, IRAJ Michael Mahoney, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

As Stated cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL3-2 RlF RidsNrrPMDavis-Besse Resource RidsNrrDirsltsb Resource RidsOgcRp Resource RidsRgn3MaiiCenter Resource RidsNrrLAKGoldstein Resource RidsNrrDorllpl3-2 Resource RidsNrrDoriDpr Resource RidsAcrsAcnw_MaiiCTR Resource Accession No ML120620082 NRR-058 OFFICE LPL3-2/PM LPL3-2/LA LPL3*21BC LPL3*2/PM NAME MMahoney KGoldstein JZimmerman MMahoney DATE 03/05/12 03/05/12 03/05/12 03/05/12 OFFICIAL RECORD COPY