ML12156A334: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/30/2012 | | issue date = 03/30/2012 | ||
| title = 2012 Fermi Power Plant Initial License Examination Administered Written Exam Handouts | | title = 2012 Fermi Power Plant Initial License Examination Administered Written Exam Handouts | ||
| author name = Bielby M | | author name = Bielby M | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Fermi 2 Power-Flow Map 10 20 30 40 50 60 70 80 90 100 110 Scram Region - IF OPRM is INOP 110 110 Exit Region - IF OPRM is INOP RR Oscillation (49.0% to 54.0% Speed) 81% Flow 100 100 90 90 80 80 70 70 ICF 60 Region 60 MELLL - | ||
: a. Radioactivity Rate (Step 5): | 50 100% RL - 50 90% RL - | ||
D11-K601A Conversion Factor Offgas | 40 80% RL - 40 70% RL - | ||
30 30 20 20 Nat Circ Min Speed Percent Power (Approx) 10 10 10 20 30 40 50 60 70 80 90 100 110 Percent Core Flow (based on Process Computer point) | |||
D11-K601B Conversion Factor Offgas | Approved by: | ||
Supervisor, Reactor Engineering / Date | |||
OFFGAS LOG RADIATION MONITORS CONVERSION FACTORS FOR TECHNICAL SPECIFICATIONS Date Time | |||
: 1. Obtain the following information from Attachment 1: | |||
: a. Radioactivity Rate (Step 5): mCi/sec | |||
: b. Offgas Flow Rate (Step 1c): cfm | |||
: c. Rad Monitor Readings (Step 1b) | |||
D11-K601A mr/hr D11-K601B mr/hr | |||
: 2. Perform the following conversion factor calculations: | |||
D11-K601A Conversion Factor Offgas D11-K601A mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr) | |||
= / ( x ) | |||
D11-K601B Conversion Factor Offgas D11-K601B mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr) | |||
= / ( x ) | |||
Detach bottom portion and post on Control Room Panel H11-P601 next to Offgas Log Radiation Monitors Recorder D11-R601. | Detach bottom portion and post on Control Room Panel H11-P601 next to Offgas Log Radiation Monitors Recorder D11-R601. | ||
CONVERSION FACTOR l mCi/sec | CONVERSION FACTOR l mCi/sec l mCi/sec Rad Monitor l mr/hr x cfm Rad Monitor lmr/hr x cfm D11-K601A l 3.15 X 10-3 D11-K601B l 3.01 X 10-3 THESE CONVERSION FACTORS ARE TO BE USED TO OBTAIN A mCi/sec RELEASE RATE FROM OFFGAS LOG RADIATION MONITORS. | ||
TO USE CONVERSION FACTORS, MULTIPLY FACTOR BY CURRENT OFFGAS LOG RADIATION MONITOR READING (mr/hr) AND CURRENT OFFGAS FLOW RATE (cfm): | TO USE CONVERSION FACTORS, MULTIPLY FACTOR BY CURRENT OFFGAS LOG RADIATION MONITOR READING (mr/hr) AND CURRENT OFFGAS FLOW RATE (cfm): | ||
mCi/sec = FACTOR x MONITOR READING x OFFGAS FLOW* | |||
* Flow as read from N62-R808, O/G Outlet Flow Rec pen labeled Charcoal Unit 1-6. | * Flow as read from N62-R808, O/G Outlet Flow Rec pen labeled Charcoal Unit 1-6. | ||
Performed By Date | Performed By Date Approved By Date Chemist/designee Noted By Date SM Form 78.000.09 Att 3 P1/1 082905 IP: I DTC: TGCHEM File: 1327.01 | ||
MODES 1, 2. and 3.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One battery charger A.1 Restore battery 4 hours inoperable, charger to OPERABLE status.B. One DC electrical B.1 Restore DC electrical 2 hours power subsystem power subsystem to inoperable for reasons OPERABLE status.other than Condition A.C. Required Action and C.1 Be in MODE 3. 12 hours Associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours FERMI UNIT 2 3.8-16 Amendment No. 134 DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 7 days 125.7 V on float charge.SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors. | |||
OR Verify each battery cell-to-cell and terminal connection resistance is 5 1.5E-4 ohm.SR 3.8.4.3 Verify battery cells, cell plates, and 18 months racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance. | DC Sources-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources-Operating LCO 3.8.4 The Division I and Division II DC electrical power subsystems shall be OPERABLE. | ||
SR 3.8.4.4 Remove visible corrosion and verify battery 18 months cell to cell and terminal connections are coated with anti-corrosion material.SR 3.8.4.5 Verify each battery cell-to-cell and 18 months terminal connection resistance is< 1.5E-4 ohm.SR 3.8.4.6 Verify each required battery charger 18 months supplies 2 100 amps at | APPLICABILITY: MODES 1, 2. and 3. | ||
FERMI -UNIT 2 3.8-17 Amendment No. lgl, 136 DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued) | ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One battery charger A.1 Restore battery 4 hours inoperable, charger to OPERABLE status. | ||
SURVEILLANCE FREQUENCY SR 3.8.4.7 ------------------. | B. One DC electrical B.1 Restore DC electrical 2 hours power subsystem power subsystem to inoperable for reasons OPERABLE status. | ||
NOTE-------------- | other than Condition A. | ||
The performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months. | C. Required Action and C.1 Be in MODE 3. 12 hours Associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours FERMI UNIT 2 3.8-16 Amendment No. 134 | ||
NOTE-------------- | DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 7 days | ||
-. | Ž 125.7 V on float charge. | ||
SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors. | |||
Verify battery capacity is | OR Verify each battery cell-to-cell and terminal connection resistance is 5 1.5E-4 ohm. | ||
SR 3.8.4.3 Verify battery cells, cell plates, and 18 months racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance. | |||
SR 3.8.4.4 Remove visible corrosion and verify battery 18 months cell to cell and terminal connections are coated with anti-corrosion material. | |||
SR 3.8.4.5 Verify each battery cell-to-cell and 18 months terminal connection resistance is | |||
< 1.5E-4 ohm. | |||
SR 3.8.4.6 Verify each required battery charger 18 months supplies 2 100 amps at Ž 124.7 V for | |||
> 4 hours. | |||
(continued) | |||
FERMI - UNIT 2 3.8-17 Amendment No. lgl, 136 | |||
DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued) | |||
SURVEILLANCE FREQUENCY SR 3.8.4.7 ------------------. NOTE-------------- | |||
The performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months. | |||
Verify battery capacity is adequate to 18 months supply, and maintain in OPERABLE status, the actual or simulated emergency loads for the design duty cycle when subjected to a battery service test. | |||
SR 3.8.4.8 ------------------- NOTE-------------- -. | |||
This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR. | |||
Verify battery capacity is 80% | |||
M of the 60 months manufacturer's rating when subjected to a performance discharge test. AND 18 months when battery shows degradation or has reached 85% | |||
of expected life FERMI UNIT 2 3.8-18 Amendment No. 134}} |
Latest revision as of 14:59, 6 February 2020
ML12156A334 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 03/30/2012 |
From: | Bielby M Operations Branch III |
To: | Detroit Edison |
Shared Package | |
ML11354A133 | List: |
References | |
Download: ML12156A334 (5) | |
Text
Fermi 2 Power-Flow Map 10 20 30 40 50 60 70 80 90 100 110 Scram Region - IF OPRM is INOP 110 110 Exit Region - IF OPRM is INOP RR Oscillation (49.0% to 54.0% Speed) 81% Flow 100 100 90 90 80 80 70 70 ICF 60 Region 60 MELLL -
50 100% RL - 50 90% RL -
40 80% RL - 40 70% RL -
30 30 20 20 Nat Circ Min Speed Percent Power (Approx) 10 10 10 20 30 40 50 60 70 80 90 100 110 Percent Core Flow (based on Process Computer point)
Approved by:
Supervisor, Reactor Engineering / Date
OFFGAS LOG RADIATION MONITORS CONVERSION FACTORS FOR TECHNICAL SPECIFICATIONS Date Time
- 1. Obtain the following information from Attachment 1:
- a. Radioactivity Rate (Step 5): mCi/sec
- b. Offgas Flow Rate (Step 1c): cfm
- c. Rad Monitor Readings (Step 1b)
D11-K601A mr/hr D11-K601B mr/hr
- 2. Perform the following conversion factor calculations:
D11-K601A Conversion Factor Offgas D11-K601A mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr)
= / ( x )
D11-K601B Conversion Factor Offgas D11-K601B mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr)
= / ( x )
Detach bottom portion and post on Control Room Panel H11-P601 next to Offgas Log Radiation Monitors Recorder D11-R601.
CONVERSION FACTOR l mCi/sec l mCi/sec Rad Monitor l mr/hr x cfm Rad Monitor lmr/hr x cfm D11-K601A l 3.15 X 10-3 D11-K601B l 3.01 X 10-3 THESE CONVERSION FACTORS ARE TO BE USED TO OBTAIN A mCi/sec RELEASE RATE FROM OFFGAS LOG RADIATION MONITORS.
TO USE CONVERSION FACTORS, MULTIPLY FACTOR BY CURRENT OFFGAS LOG RADIATION MONITOR READING (mr/hr) AND CURRENT OFFGAS FLOW RATE (cfm):
mCi/sec = FACTOR x MONITOR READING x OFFGAS FLOW*
- Flow as read from N62-R808, O/G Outlet Flow Rec pen labeled Charcoal Unit 1-6.
Performed By Date Approved By Date Chemist/designee Noted By Date SM Form 78.000.09 Att 3 P1/1 082905 IP: I DTC: TGCHEM File: 1327.01
DC Sources-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources-Operating LCO 3.8.4 The Division I and Division II DC electrical power subsystems shall be OPERABLE.
APPLICABILITY: MODES 1, 2. and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One battery charger A.1 Restore battery 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable, charger to OPERABLE status.
B. One DC electrical B.1 Restore DC electrical 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem power subsystem to inoperable for reasons OPERABLE status.
other than Condition A.
C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> FERMI UNIT 2 3.8-16 Amendment No. 134
DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 7 days
Ž 125.7 V on float charge.
SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.
OR Verify each battery cell-to-cell and terminal connection resistance is 5 1.5E-4 ohm.
SR 3.8.4.3 Verify battery cells, cell plates, and 18 months racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.
SR 3.8.4.4 Remove visible corrosion and verify battery 18 months cell to cell and terminal connections are coated with anti-corrosion material.
SR 3.8.4.5 Verify each battery cell-to-cell and 18 months terminal connection resistance is
< 1.5E-4 ohm.
SR 3.8.4.6 Verify each required battery charger 18 months supplies 2 100 amps at Ž 124.7 V for
> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
(continued)
FERMI - UNIT 2 3.8-17 Amendment No. lgl, 136
DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.4.7 ------------------. NOTE--------------
The performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.
Verify battery capacity is adequate to 18 months supply, and maintain in OPERABLE status, the actual or simulated emergency loads for the design duty cycle when subjected to a battery service test.
SR 3.8.4.8 ------------------- NOTE-------------- -.
This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is 80%
M of the 60 months manufacturer's rating when subjected to a performance discharge test. AND 18 months when battery shows degradation or has reached 85%
of expected life FERMI UNIT 2 3.8-18 Amendment No. 134