(4 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 12/27/2013 | | | issue date = 12/27/2013 |
| | title = 2013-12 Seabrook SAMA RAI | | | title = 2013-12 Seabrook SAMA RAI |
| | author name = James L J | | | author name = James L |
| | author affiliation = NRC/NRR/DLR | | | author affiliation = NRC/NRR/DLR |
| | addressee name = Walsh K | | | addressee name = Walsh K |
Line 14: |
Line 14: |
| | page count = 4 | | | page count = 4 |
| | project = TAC:ME3959 | | | project = TAC:ME3959 |
| | stage = RAI | | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Kevin Walsh Site Vice President NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 December 27, 2013 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 27, 2013 Mr. Kevin Walsh Site Vice President NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| | REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION LICENSE RENEWAL APPLICATION-SEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW (TAC NO. ME3959) |
|
| |
|
| REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION LICENSE RENEWAL APPLICATION-SEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW (TAC NO. ME3959)
| | ==Dear Mr. Walsh:== |
|
| |
|
| ==Dear Mr. Walsh:==
| | By letter dated May 25, 2010, NextEra Energy Seabrook, LLC (NextEra), submitted an application to renew the operating license for Seabrook Station, Unit 1 (Seabrook), for an additional 20 years. In support of the application and in accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) Part 51 and 10 CFR Part 54, NextEra also submitted an environmental report for Seabrook. During the intervening year, NextEra updated their probabilistic risk assessment (PRA) and by letter dated March 19, 2012, provided a supplemental severe accident mitigation alternatives (SAMA) analysis based on a PRA update. |
| By letter dated May 25, 2010, NextEra Energy Seabrook, LLC (NextEra), | | The staff is reviewing the information contained in the license renewal application, the associated environmental report, and the supplemental SAMA analysis, and has identified, in the enclosure, an area where additional information is needed to complete the SAMA review. |
| submitted an application to renew the operating license for Seabrook | | The item in the enclosure was discussed with your staff and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3306 or by e-mail at lots.iames@nrc.gov. |
| : Station, Unit 1 (Seabrook),
| | Sincerely, Lois J. James, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443 |
| for an additional 20 years. In support of the application and in accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) Part 51 and 10 CFR Part 54, NextEra also submitted an environmental report for Seabrook. | |
| During the intervening year, NextEra updated their probabilistic risk assessment (PRA) and by letter dated March 19, 2012, provided a supplemental severe accident mitigation alternatives (SAMA) analysis based on a PRA update. The staff is reviewing the information contained in the license renewal application, the associated environmental report, and the supplemental SAMA analysis, and has identified, in the enclosure, an area where additional information is needed to complete the SAMA review. The item in the enclosure was discussed with your staff and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3306 or by e-mail at lots.iames@nrc.gov. | |
| Docket No. 50-443 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| As stated cc w/encl: Listserv Sincerely, Lois J. James, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Mr. Kevin Walsh Site Vice President NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 December 27, 2013 | | As stated cc w/encl: Listserv |
| | |
| ==SUBJECT:==
| |
| | |
| REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION LICENSE RENEWAL APPLICATION-SEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW (TAG NO. ME3959)
| |
| | |
| ==Dear Mr. Walsh:==
| |
| By letter dated May 25, 2010, NextEra Energy Seabrook, LLC (NextEra),
| |
| submitted an application to renew the operating license for Seabrook
| |
| : Station, Unit 1 (Seabrook),
| |
| for an additional 20 years. In support of the application and in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 51 and 10 CFR Part 54, NextEra also submitted an environmental report for Seabrook.
| |
| During the intervening year, NextEra updated their probabilistic risk assessment (PRA) and by letter dated March 19, 2012, provided a supplemental severe accident mitigation alternatives (SAMA) analysis based on a PRA update. The staff is reviewing the information contained in the license renewal application, the associated environmental report, and the supplemental SAMA analysis, and has identified, in the enclosure, an area where additional information is needed to complete the SAMA review. The item in the enclosure was discussed with your staff and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3306 or by e-mail at lois.james@nrc.gov.
| |
| Docket No. 50-443
| |
| | |
| ==Enclosure:==
| |
|
| |
|
| As stated cc w/encl: Listserv DISTRIBUTION:
| | ..* ML13353A536 *via email OFFICE LA:DLR PM:RPB2:DLR BC:AADB:DRA BC:RPB2:DLR PM:RPB2:DLR NAME IKing* LJames JDozier* BWittick LJames DATE 12/20/2013 12/24/2013 12/13/2013 12/26/2013 12/27/2013 Letter to Kevin Walsh from Lois James dated December 27, 2013 |
| See following pages ADAMS Accession No
| |
| * ML 13353A536
| |
| .. OFFICE LA:DLR PM:RPB2:DLR NAME I King* LJames DATE 12/20/2013 12/24/2013 Sincerely, IRA/ Lois J. James, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation | |
| *via email BC:AADB:DRA BC:RPB2:DLR JDozier*
| |
| BWittick 12/13/2013 12/26/2013 OFFICIAL RECORD COPY PM:RPB2:DLR LJames 12/27/2013 Letter to Kevin Walsh from Lois James dated December 27, 2013
| |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| | REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION LICENSE RENEWAL APPLICATION-SSEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW (TAC NO. ME3959) |
| | DISTRIBUTION: |
| | HARD COPY: |
| | DLRRF E-MAIL: |
| | PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrDirRerb Resource RidsNrrDraApla Resource Listserv Lois.James@nrc.gov Richard. Plasse@nrc.gov Brian.Wittick@nrc.gov Yoira. Diaz-Sanabria@nrc.gov John. Lamb@nrc.gov David. Mel ntyre@n rc. gov Eugene. Dacus@nrc.gov Brian. Harris@nrc.gov Glenn. Dental@nrc.gov Paul. Cataldo@nrc.gov Chris. Newport@nrc.gov Jasmine.Gilliam@nrc.gov Nancy. McNamara@nrc.gov Doug. Tiff@nrc.gov Neil. Sheehan@nrc.gov Diane.Screnci@nrc.gov |
|
| |
|
| REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION LICENSE RENEWAL APPLICATION-SSEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW (TAC NO. ME3959) DISTRIBUTION:
| | Request for Additional Information Regarding the Analysis of Severe Accident Mitigation Alternatives For the Seabrook Station License Renewal Review In order to support the staff analysis of conservatisms in the NextEra Energy Seabrook, LLC (NextEra}, severe accident mitigation alternatives (SAMA) analysis, the following information is needed. |
| HARD COPY: DLRRF E-MAIL: PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrDirRerb Resource RidsNrrDraApla Resource Listserv Lois.James@nrc.gov Richard.
| | A. Weather Files: The SAMA analysis included in the weather file for the year 2005. |
| Plasse@nrc.gov Brian.Wittick@nrc.gov Yoira. Diaz-Sanabria@nrc.gov John. Lamb@nrc.gov David. Mel ntyre@n rc. gov Eugene. Dacus@nrc.gov Brian. Harris@nrc.gov Glenn. Dental@nrc.gov Paul. Cataldo@nrc.gov Chris. Newport@nrc.gov Jasmine.Gilliam@nrc.gov Nancy. McNamara@nrc.gov Doug. Tiff@nrc.gov Neil. Sheehan@nrc.gov Diane.Screnci@nrc.gov Request for Additional Information Regarding the Analysis of Severe Accident Mitigation Alternatives For the Seabrook Station License Renewal Review In order to support the staff analysis of conservatisms in the NextEra Energy Seabrook, LLC (NextEra},
| | Weather files for all 5 years are needed to support the analysis of conservatisms. |
| severe accident mitigation alternatives (SAMA) analysis, the following information is needed. A. Weather Files: The SAMA analysis included in the weather file for the year 2005. Weather files for all 5 years are needed to support the analysis of conservatisms. | | Provide the remaining 4 years of weather data. |
| Provide the remaining 4 years of weather data. B. Dose Conversion Coefficient File: NextEra implemented what appears to be a custom dose conversion file in the SAMA analysis. | | B. Dose Conversion Coefficient File: NextEra implemented what appears to be a custom dose conversion file in the SAMA analysis. The exact version of the dose conversion factor file used by Next Era in the SAMA analysis is needed to support our evaluation of conservatisms. Provide the exact version of the dose conversion factor file. |
| The exact version of the dose conversion factor file used by Next Era in the SAMA analysis is needed to support our evaluation of conservatisms. | | ENCLOSURE}} |
| Provide the exact version of the dose conversion factor file. ENCLOSURE}} | |
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement
|
MONTHYEARML1006401882010-03-0505 March 2010 Charter for the Groundwater Contamination Task Force Project stage: Request SBK-L-10077, Application for Renewed Operating License2010-05-25025 May 2010 Application for Renewed Operating License Project stage: Request ML1016203312010-06-0101 June 2010 Drawing LR-001 Through Drawing PID-1-CO-LR20423, Rev. 14 Project stage: Request ML1016203332010-06-0101 June 2010 Drawing PID-1-CO-LR20426, Rev. 30, Through Drawing PID-1-DW-LR20600, Rev. 11 Project stage: Request SBK-L-10095, Drawing PID-1-MAH-LR20497, Rev. 9, Through Drawing PID-1-SF-LR204822010-06-0101 June 2010 Drawing PID-1-MAH-LR20497, Rev. 9, Through Drawing PID-1-SF-LR20482 Project stage: Request ML1016203342010-06-0101 June 2010 Drawing PID-1-DW-LR20601, Rev. 1, Through Drawing PID-1-MAH-LR20496, Rev. 12 Project stage: Request ML1016203292010-06-0101 June 2010 Drawing PID-1-SF-LR20483, Rev. 15, Through Drawing PID-1-WT-LR20041, Rev. 7 Project stage: Request ML1016803692010-06-17017 June 2010 Commission Memorandum and Order (CLI-10-14) Project stage: Request ML1022205712010-08-10010 August 2010 License Renewal Process Overview and Scoping Public Meeting Slides Project stage: Meeting ML1024200372010-08-19019 August 2010 Comment (1) of Maggie Hassan on Behalf of Constituents Different Opinion on the Relicensing of Seabrook Nuclear Power Plant Project stage: Request ML1025202072010-08-19019 August 2010 Transcript for Evening Public Scoping Meeting ISO Seabrook LRA SEIS Project stage: Request ML1025201832010-08-19019 August 2010 Transcript for Afternoon Public Scoping Meeting ISO Seabrook LRA SEIS, August 19, 2010. Pp 1-88 Project stage: Request ML1025002712010-08-23023 August 2010 Comment (2) of William R. Harris, on Behalf of Self, on Nextera Energy Seabrook, LLC Application for Renewal of License for Seabrook Project stage: Request ML1024200432010-08-25025 August 2010 Comment (3) of William Harris, Additional Reference Document for Seabrook Relicensing Environmental Review - Threat Assessment of Emp for Critical Infrastructure Project stage: Request ML1024505252010-09-0101 September 2010 Comment (4) of Geordie Vining on Behalf of Himself Opposing Relicensing Seabrook Plant for the Years 2030-2050 Project stage: Request ML1026504862010-09-20020 September 2010 Comment (6) of Joseph W. Fahey on Behalf of Amesbury on Environmental Impact & Mitigation Scoping for Relicensing of the Seabrook Nuclear Plant Project stage: Request ML1026403712010-09-20020 September 2010 Comment (6) of Joyce Kemp, Opposing NRC-2010-0206-0002, Environmental Impact Statements; Availability, Etc.: Nextera Energy Seabrook; Seabrook Station (Unit 1) Project stage: Request ML1026603312010-09-20020 September 2010 Comment (7) of Andrew R. Port on Behalf of City of Newburyport Office of Planning & Development on Environmental Scoping Review Regarding Application for an Operating License Extension for Seabrook, Unit 1 from Year 2030 to Year 2050 Project stage: Request ML1025202222010-09-20020 September 2010 Summary of Public License Renewal Overview and Environmental Scoping Meeting Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959 and ME4028) Project stage: Meeting ML1028612172010-10-29029 October 2010 Request for Additional Information for the Review of the Seabrook Station License Renewal Application Environmental Review Project stage: RAI ML1030808802010-11-0404 November 2010 Letter from Nhdes to NextEra Energy Seabrook Czma Compliance for the Seabrook LRA Project stage: Request ML1030700562010-11-0808 November 2010 Environmental Project Manager Change for the License Renewal of Seabrook Station, Unit 1 Project stage: Other ML1029502712010-11-10010 November 2010 10/05-07/2010-Summary of Site Audit Related to the Review of the License Renewal Application for Seabrook Station, Unit 1 Project stage: Approval ML1030902152010-11-16016 November 2010 Request for Additional Information for the Review of the Seabrook Station License Renewal Application-SAMA Review Project stage: RAI ML1033701692010-11-23023 November 2010 Attachment 2, Vol. 2, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033603262010-11-23023 November 2010 Attachment 2, Vol. 6, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI SBK-L-10185, Attachment 1 to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report.2010-11-23023 November 2010 Attachment 1 to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report. Project stage: Response to RAI SBK-L-10190, Response to Request for Additional Information, Submittal of Cultural Resource Plan in Accordance with 36 CFR 800.11 (C)2010-11-23023 November 2010 Response to Request for Additional Information, Submittal of Cultural Resource Plan in Accordance with 36 CFR 800.11 (C) Project stage: Response to RAI ML1033506392010-11-23023 November 2010 Seabrook Station - Response to Request for Additional Information - NextEra Energy Seabrook License Renewal Environmental Report Project stage: Response to RAI ML1101003122010-11-23023 November 2010 Attachment 2, Vol. 1, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1101003112010-11-23023 November 2010 Attachment 2, Vol. 1, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033701672010-11-23023 November 2010 Attachment 3 to SBK-L-10185 -Seabrook Station Response to Request for Additional Information, NextEra Energy Seabrook License Renewal Environmental Report Project stage: Response to RAI ML1033700922010-11-23023 November 2010 Attachment 2, Vol. 3, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033603112010-11-23023 November 2010 Attachment 2, Vol. 2, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033603062010-11-23023 November 2010 Attachment 2, Vol. 4, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033603002010-11-23023 November 2010 Attachment 2, Vol. 7, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1033602982010-11-23023 November 2010 Attachment 2, Vol. 5, to SBK-L-10185, Seabrook Station Response to Request for Additional Information NextEra Energy Seabrook License Renewal Environmental Report, References Requested for Docketing at the Seabrook Station Environmental Sit Project stage: Response to RAI ML1029806932010-12-21021 December 2010 Summary of Telephone Conference Call Held on 10/21/10 Btw the USNRC and NextEra Energy Seabrook, LLC, Concerning the Request for Additional Information Pertaining to the Seabrook Station License Renewal Application Project stage: RAI ML1033602122010-12-31031 December 2010 NUREG-1437 Supplement 38 Vol 2, (3:3) Appendix A-761 - End Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3 Public Comments Project stage: Other ML1033602092010-12-31031 December 2010 NUREG-1437 Supplement 38 Vol 2, (2:3) Appendix A-454 - A-760 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3 Public Comments Project stage: Other ML1033504382010-12-31031 December 2010 NUREG-1437 Supplement 38 Vol 2, (1:3) Cover - Appendix A-453 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3 Public Comments Project stage: Acceptance Review ML1033504422010-12-31031 December 2010 NUREG-1437 Supplement 38 Vol 3 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Public Comments Continued, Appendices Project stage: Acceptance Review ML1035704012011-01-0303 January 2011 12/21/2010-Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Nextera Energy Seabrook, LLC, Concerning the RAI Pertaining to the Seabrook Station, License Renewal Application Project stage: RAI SBK-L-11001, Response to Request for Additional Information, NextEra Energy License Renewal Application2011-01-13013 January 2011 Response to Request for Additional Information, NextEra Energy License Renewal Application Project stage: Response to RAI SBK-L-11031, Environmental Permit Renewals2011-02-18018 February 2011 Environmental Permit Renewals Project stage: Request ML1104901652011-02-28028 February 2011 02/15/2011 Summary of Telephone Conference Call with the USNRC and NextEra Energy Seabrook, LLC, to Clarify the Responses to the RAIs Pertaining to the SAMA Review of the Seabrook Station License Renewal Application Project stage: RAI ML1105603622011-03-0101 March 2011 2/3/11 Summary of Telephone Conference Calls Held Between the USNRC and Nextera Energy Seabrook, LLC, to Clarify Information Pertaining to the Review of the Seabrook Station License Renewal Application Project stage: Approval ML1101001132011-03-0101 March 2011 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by Nextera Energy Seabrook, LLC for Renewal of the Operating License for Seabrook Station Project stage: Approval ML1105906382011-03-0404 March 2011 Schedule Revision and Request for Additional Information for the Review of the Seabrook Station License Renewal Application Environmental Review Project stage: RAI SBK-L-11044, Response to Request for Additional Information Regarding License Renewal Environmental Report2011-03-16016 March 2011 Response to Request for Additional Information Regarding License Renewal Environmental Report Project stage: Response to RAI 2010-08-10
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, “Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, “Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, “Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, “Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2892024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 2024-08-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML21245A4382021-10-0505 October 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Revise 120-Volt AC Vital Instrument Panel Technical Specification Requirements ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20204A5422020-07-21021 July 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding Degraded Voltage Time Delay Setpoint ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML18163A0352018-06-11011 June 2018 Requests for Additional Information for the Review of the Seabrook Station License Renewal Application ML18121A3992018-05-0101 May 2018 NRR E-mail Capture - Request for Additional Information Regarding ASR Amendment Request ML18113A5292018-04-18018 April 2018 NRR E-mail Capture - Draft - Request for Additional Information Regarding ASR Amendment Request ML18058A0522018-02-27027 February 2018 Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2) ML18026A8792018-01-29029 January 2018 Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application Docket No. 05-443 ML17332A3412017-11-29029 November 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Delete Operator Action and Request for Exemption ML17261B2172017-10-11011 October 2017 Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007) ML17276B7572017-10-0202 October 2017 NRR E-mail Capture - Draft - Request for Additional Information Regarding ASR Amendment Request ML17214A0852017-08-0404 August 2017 Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction ML17201Q1072017-07-18018 July 2017 NRR E-mail Capture - Draft - Request for Additional Information Regarding ASR Amendment Request ML17139B8352017-05-24024 May 2017 Final Request for Additional Information Regarding Seabrook License Renewal Application - Set 26 ML17150A2862017-05-0505 May 2017 NRR E-mail Capture - Draft - Request for Additional Information Regarding ASR Amendment Request ML17088A6142017-03-29029 March 2017 Request for Additional Information for the Review of the Seabrook Station License Renewal Application ML16341B9022017-03-0707 March 2017 03/07/2016 Summary of Telecon Held on Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Request for Additional Information Pertaining to the Seabrook Station License Renewal Application ML16342C4672017-03-0101 March 2017 12/01/2016 Summary of Teleconference Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Requests for Additional Information Pertaining to the Seabrook Station License Renewal Application ML16337A0082016-12-0101 December 2016 NRR E-mail Capture - Need for Supplement to ILRT License Amendment Seabrook Station, License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency ML16326A0372016-11-30030 November 2016 Requests for Additional Information for the Review of the Seabrook Station License Renewal Application ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16301A4282016-11-14014 November 2016 Requests for Additional Information for the Review of the License Renewal Application ML16319A4222016-11-10010 November 2016 NRR E-mail Capture - Need for Supplement to ILRT License Amendment ML16319A4212016-11-10010 November 2016 NRR E-mail Capture - Need for Supplement to EAL License Amendment ML16230A1062016-10-0303 October 2016 Request for Additional Information Request to Extend Containment Leakage Test Frequency ML16230A5332016-09-22022 September 2016 Request for Additional Information Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 ML16258A0222016-09-19019 September 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Alkali-Silica Reaction ML16187A2032016-07-0808 July 2016 Requests For Additional Information For The Severe Accident Mitigation Alternatives (SAMA) Review Of The Seabrook Station License Renewal Application (TAC No. Me3959)- Enclosure ML15328A1392015-12-0404 December 2015 November 23, 2015, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Nextera Energy Seabrook, LLC, Concerning Requests for Additional Information Pertaining to the Seabrook Station ML15251A3332015-10-0202 October 2015 Request for Additional Information Related to the Review of the Seabrook Station, Unit 1, License Renewal Application-SET 25 ML15224A5662015-08-28028 August 2015 Request for Additional Information Related to the Review of the Seabrook Station License Renewal Application-Set 24 ML15131A3382015-06-0505 June 2015 Request for Additional Information Regarding License Amendment 14-03, Changes to Technical Specification 3.3.3.1,Radiation Monitoring for Plant Operations ML15043A2212015-02-24024 February 2015 Request for Additional Information for the Spring 2014 Steam Generator Tube Inspections ML14363A3672015-01-0909 January 2015 Request for Additional Information Regarding the License Amendment Request to Revise the Technical Specification Pressure-Temperature Limits and Request for Exemption from 10 CFR Part 50, Appendix G Minimum Tempt Requirements ML14358A0732014-12-24024 December 2014 Request for Additional Information for License Amendment Request 13-05. Fixed Incore Detector System Analysis Methodology 2024-07-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 27, 2013 Mr. Kevin Walsh Site Vice President NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION LICENSE RENEWAL APPLICATION-SEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW (TAC NO. ME3959)
Dear Mr. Walsh:
By letter dated May 25, 2010, NextEra Energy Seabrook, LLC (NextEra), submitted an application to renew the operating license for Seabrook Station, Unit 1 (Seabrook), for an additional 20 years. In support of the application and in accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) Part 51 and 10 CFR Part 54, NextEra also submitted an environmental report for Seabrook. During the intervening year, NextEra updated their probabilistic risk assessment (PRA) and by letter dated March 19, 2012, provided a supplemental severe accident mitigation alternatives (SAMA) analysis based on a PRA update.
The staff is reviewing the information contained in the license renewal application, the associated environmental report, and the supplemental SAMA analysis, and has identified, in the enclosure, an area where additional information is needed to complete the SAMA review.
The item in the enclosure was discussed with your staff and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3306 or by e-mail at lots.iames@nrc.gov.
Sincerely, Lois J. James, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
As stated cc w/encl: Listserv
..* ML13353A536 *via email OFFICE LA:DLR PM:RPB2:DLR BC:AADB:DRA BC:RPB2:DLR PM:RPB2:DLR NAME IKing* LJames JDozier* BWittick LJames DATE 12/20/2013 12/24/2013 12/13/2013 12/26/2013 12/27/2013 Letter to Kevin Walsh from Lois James dated December 27, 2013
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION LICENSE RENEWAL APPLICATION-SSEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW (TAC NO. ME3959)
DISTRIBUTION:
HARD COPY:
DLRRF E-MAIL:
PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrDirRerb Resource RidsNrrDraApla Resource Listserv Lois.James@nrc.gov Richard. Plasse@nrc.gov Brian.Wittick@nrc.gov Yoira. Diaz-Sanabria@nrc.gov John. Lamb@nrc.gov David. Mel ntyre@n rc. gov Eugene. Dacus@nrc.gov Brian. Harris@nrc.gov Glenn. Dental@nrc.gov Paul. Cataldo@nrc.gov Chris. Newport@nrc.gov Jasmine.Gilliam@nrc.gov Nancy. McNamara@nrc.gov Doug. Tiff@nrc.gov Neil. Sheehan@nrc.gov Diane.Screnci@nrc.gov
Request for Additional Information Regarding the Analysis of Severe Accident Mitigation Alternatives For the Seabrook Station License Renewal Review In order to support the staff analysis of conservatisms in the NextEra Energy Seabrook, LLC (NextEra}, severe accident mitigation alternatives (SAMA) analysis, the following information is needed.
A. Weather Files: The SAMA analysis included in the weather file for the year 2005.
Weather files for all 5 years are needed to support the analysis of conservatisms.
Provide the remaining 4 years of weather data.
B. Dose Conversion Coefficient File: NextEra implemented what appears to be a custom dose conversion file in the SAMA analysis. The exact version of the dose conversion factor file used by Next Era in the SAMA analysis is needed to support our evaluation of conservatisms. Provide the exact version of the dose conversion factor file.