ML13354B850: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Exelon Nuclear Job Performance Measure
{{#Wiki_filter:Exelon Nuclear Job Performance Measure DETERMINE GENERATOR OPERATING LIMITS JPM Number: A-N-1-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


DETERMINE GENERATOR OPERATING LIMITS JPM Number:
Job Performance Measure (JPM)
A-N-1-R  Revision Number: 0 0  Date: 0 8/13    EXAM MATERIAL
Revision Record (Summary)
 
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.
Developed By:
A-N-1-R                                                Page 2 of 8
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-1-R  Page 2 of 8  Revision Record (Summary)
Revision 0 0 New JPM for ILT 12
-1 (2013-301) NRC Exam.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC with Turbine load at 900 MW and Turbine Reactive load at 200 MVAR. NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 1. Reset the simulator to any IC with Turbine load at 900 MW and Turbine Reactive load at 200 MVAR.
NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a clean copy of DOP 6400-08.
: 1. Provide a clean copy of DOP 6400-08.
A-N-1-R                                                                      Page 3 of 8
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 Generator is operating at 900 MWe and 200MVARs.
: 2. Unit 2 Generator is operating at 900 MWe and 200MVARs.
Line 44: Line 44:
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-R                                                                        Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOP 6400-08. 1. Maintain system parameters within stability and operability curves for existing hydrogen pressure. Verifies TSO request can be performed within limits of Figure 2 or 4.
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                 SAT NOTE:
_____         _____         _____
Provide the examinee with the supplied copy of DOP 6400-08.
* 2. Use AUTO VOLTAGE ADJUST control switch to control system voltage within the "Target Voltage Schedule & Voltage Range" OR as directed by TSO.
: 1. Maintain system parameters         Verifies TSO request can within stability and operability   be performed within limits curves for existing hydrogen       of Figure 2 or 4.
Places the AUTO VOLTAGE ADJUST C/S to RAISE to raise MVAR to 350 MVAR. _____        _____        _____
pressure.                                                        _____   _____     _____
CUE: After MVARs adjusted, a local operator on rounds informs the control room that the pressure regulator malfunctioned and H 2 pressure is now 50 PSIG.
* 2. Use AUTO VOLTAGE                   Places the AUTO ADJUST control switch to          VOLTAGE ADJUST C/S to control system voltage within     RAISE to raise MVAR to        _____    _____      _____
* 3. Ensure loading on Unit 2 is within Figure 2, Dresden Unit 2 Generator Capability Curves and Under Excitation Limiter Settings, Regulator In Service, AND/OR Figure 4, Dresden Unit 2 Generator Capability Curves (Expanded View) Regulator In Service. Verifies that current conditions are not within the limits of figure 2 or 4 and recommends lowering MVARs to < 300 MVAR
the Target Voltage Schedule       350 MVAR.
. _____        _____        _____
          & Voltage Range OR as directed by TSO.
CUE: If required, As SRO, ask the examinee where they should leave MVARs, and verify their response is within the capability curve limits (JPM COMPLETE)
CUE:
: 4. Informs Unit Supervisor task is complete.
After MVARs adjusted, a local operator on rounds informs the control room that the pressure regulator malfunctioned and H 2 pressure is now 50 PSIG.
Examinee notifies the Unit Supervisor.
* 3. Ensure loading on Unit 2 is       Verifies that current within Figure 2, Dresden Unit     conditions are not within 2 Generator Capability             the limits of figure 2 or 4 Curves and Under Excitation       and recommends lowering Limiter Settings, Regulator In     MVARs to < 300 MVAR.
_____        _____        _____
Service, AND/OR Figure 4, Dresden Unit 2 Generator Capability Curves (Expanded                                     _____    _____      _____
CUE: Acknowledge report of task completion.
View) Regulator In Service.
CUE:
If required, As SRO, ask the examinee where they should leave MVARs, and verify their response is within the capability curve limits (JPM COMPLETE)
: 4. Informs Unit Supervisor task       Examinee notifies the Unit is complete.                      Supervisor.
CUE:
Acknowledge report of task completion.
A-N-1-R                                                                      Page 5 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  END  JPM Stop Time
UNSAT  Comment PERFORMANCE CHECKLIST          STANDARDS          SAT END JPM Stop Time:_________
:_________
A-N-1-R                                               Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:    RO JPM Title: Determine Generator Operating Limits Revision Number: 00
Job


JPM Number:
==Title:==
A-N-1-R Task Number and Title: 299L029 , Conduct Shift Operations K/A Number and Importance: Generic 2.1.25    3.9/ 4.2
RO JPM


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
Determine Generator Operating Limits Revision Number: 00 JPM Number: A-N-1-R Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
299L029, Conduct Shift Operations K/A Number and Importance: Generic 2.1.25      3.9/ 4.2 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete:       minutes         Actual Time Used:           minutes
Yes No Estimated Time to Complete:
minutes Actual Time Used:
minutes


==References:==
==References:==
DOP 6400-08, rev 30 EVALUATION


DOP 64 00-08 , rev 30  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-1-R                                                                    Page 7 of 8


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 Generator is operating at 900 MWe and 200MVAR
: 2. Unit 2 Generator is operating at 900 MWe and 200MVARs.
: s. 3. Unit 2 Generator voltage regulator in service in automatic.
: 3. Unit 2 Generator voltage regulator in service in automatic.
: 4. Unit 2 Generator H 2 pressure is 59 psig.
: 4. Unit 2 Generator H 2 pressure is 59 psig.
: 5. TSO has requested Unit 2 raise MVARs to 350 MVAR.
: 5. TSO has requested Unit 2 raise MVARs to 350 MVAR.
Line 107: Line 111:
: 1. The Unit supervisor has directed you to raise Unit 2 MVARs to 350 MVAR.
: 1. The Unit supervisor has directed you to raise Unit 2 MVARs to 350 MVAR.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
A-N-1-R                                                            Page 8 of 8


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 01 Date: 08/13 EXAM MATERIAL Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


REPORTABILITY DETERMINATION  JPM Number:
Job Performance Measure (JPM)
A-N-1-S Revision Number: 0 1  Date: 0 8/13  EXAM MATERIAL
Revision Record (Summary)
Revision 00 Bank JPM.
Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam.
A-N-1-S                                                   Page 2 of 7


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-1-S  Page 2 of 7  Revision Record (Summary)
Revision 0 0 Bank JPM. Revision 0 1 Revised for ILT 1 2-1 (201 3-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. None Job Performance Measure (JPM)
: 1. None A-N-1-S                                                   Page 3 of 7
A-N-1-S Page 4 of 7 INITIAL CONDITIONS
 
: 1. You are the Unit 2 Unit Supervisor
Job Performance Measure (JPM)
. 2. An event has occurred resulting in the following conditions:
INITIAL CONDITIONS
Unit 2 is at 95% power.
: 1. You are the Unit 2 Unit Supervisor.
The seven-day Tech Spec time clock is about to expire for the Unit 2 EDG being degraded.
: 2. An event has occurred resulting in the following conditions:
Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours. INITIATING CUE
* Unit 2 is at 95% power.
* The seven-day Tech Spec time clock is about to expire for the Unit 2 EDG being degraded.
* Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours.
INITIATING CUE
: 1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
: 1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
: 2. Inform the Shift Manager when the task is complete.
: 2. Inform the Shift Manager when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the  
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
 
local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-S                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT NOTE:
* 1. Determines the event is reportable per SAF 1.2 Determines the event is reportable per SAF 1.2, Plant Shutdown Required by Technical Specifications
Provide the examinee with the supplied copy of
_____         _____         _____
* 1. Determines the event is          Determines the event is reportable per SAF 1.2           reportable per SAF 1.2, Plant Shutdown Required by Technical Specifications   _____     _____     _____
* 2. Determines the time limit to report via ENS as soon as practicable, and in all cases within four hour of initiating the shutdown that is required by TS. Determines the time limit to report via ENS as soon as practicable, and in all cases within four hour of initiating the shutdown that is required by TS.
* 2. Determines the time limit to     Determines the time limit report via ENS as soon as        to report via ENS as practicable, and in all cases   soon as practicable, and within four hour of initiating   in all cases within four the shutdown that is required   hour of initiating the by TS.
_____         _____         _____
shutdown that is required by TS.               _____     _____     _____
: 3. Determines if plant shutdown is completed, submit a Licensee Event Report to the NRC within 60 days of discovery of the event.
: 3. Determines if plant shutdown     Determines a LER is is completed, submit a           required to the NRC within Licensee Event Report to the     60 days of discovery of the NRC within 60 days of           event if plant shutdown is   _____     _____     _____
Determines a LER is required to the NRC within 60 days of discovery of the event if plant shutdown is completed.
discovery of the event.          completed.
_____         _____         _____
: 4. Informs Shift Manager task is   Examinee notifies the Shift complete.                        Manager.
: 4. Informs Shift Manager task is complete. Examinee notifies the Shift Manager. _____        _____        _____
CUE:
CUE: Acknowledge report of task completion.
Acknowledge report of task completion.
END   JPM Stop Time
END JPM Stop Time:_________
:_________
A-N-1-S                                                                      Page 5 of 7
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 6 of 7  Operator's Name:
Operators Name:
Job Title:
Job
SRO      JPM Title: Reportability Determination Revision Number: 0 1
JPM Number:
A-N-1-S Task Number and Title: 299L001, Determine Reportability requirements as outlined in station Reportability manual
. K/A Number and Importance: Generic 2.1.10    2.7 / 3.9


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
SRO JPM
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
Reportability Determination Revision Number: 01 JPM Number: A-N-1-S Task Number and
Yes No Estimated Time to Complete:
 
10 minutes Actual Time Used:
==Title:==
minutes
299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: Generic 2.1.10      2.7 / 3.9 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 10 minutes           Actual Time Used:           minutes


==References:==
==References:==
Reportability Manual LS-AA-1110, rev 19 EVALUATION


Reportability Manual LS
==SUMMARY==
-AA-1110 , rev 19  EVALUATION
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-1-S                                                                    Page 6 of 7


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Y es  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Prin t):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 7 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Unit Supervisor.
: 1. You are the Unit 2 Unit Supervisor.
: 2. An event has occurred resulting in the following conditions:
: 2. An event has occurred resulting in the following conditions:
Unit 2 is at 95% power.
* Unit 2 is at 95% power.
The seven-day Tech Spec time clock is about to expire for the Unit 2 ED G being degraded.
* The seven-day Tech Spec time clock is about to expire for the Unit 2 EDG being degraded.
Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours.
* Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours.
INITIATING CUE
INITIATING CUE
: 1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports. 2. Inform the Shift Manager when the task is complete.
: 1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
: 2. Inform the Shift Manager when the task is complete.
A-N-1-S                                                                  Page 7 of 7


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure DETERMINE HEAT STRESS ACTIONS JPM Number: A-N-2-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


DETERMINE HEAT STRESS ACTIONS  JPM Number:
Job Performance Measure (JPM)
A-N-2-R Revision Number: 0 0  Date: 0 8/13    EXAM MATERIAL
Revision Record (Summary)
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.
A-N-2-R                                                 Page 2 of 9


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-2-R  Page 2 of 9  Revision Record (Summary)
Revision 0 0 New JPM for ILT 12
-1 (2013-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 3 of 9  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a clean copy of SA-AA-111 Job Performance Measure (JPM)
: 1. Provide a clean copy of SA-AA-111 A-N-2-R                                                   Page 3 of 9
A-N-2-R Page 4 of 9 INITIAL CONDITIONS 1. You are the Unit 2 Aux NSO.
 
Job Performance Measure (JPM)
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 2. The following conditions exist in the Drywell where work is being performed:
: 2. The following conditions exist in the Drywell where work is being performed:
Dry Bulb Temperature is 110
* Dry Bulb Temperature is 110&deg;F
&deg;F Wet Bulb Globe Temperature (WBGT) is 101
* Wet Bulb Globe Temperature (WBGT) is 101&deg;F
&deg;F Single PC's and scrubs are required The work involves inspections and moderate climbing The duration of the work will be 10 minutes
* Single PCs and scrubs are required
: 3. The WBGT in the area outside the Drywell bullpen is 78
* The work involves inspections and moderate climbing
&deg;F INITIATING CUE
* The duration of the work will be 10 minutes
: 1. The Unit Supervisor has directed you to complete attachment 4 of SA
: 3. The WBGT in the area outside the Drywell bullpen is 78&deg;F INITIATING CUE
-AA-111 for the work to be performed in the Drywell.
: 1. The Unit Supervisor has directed you to complete attachment 4 of SA-AA-111 for the work to be performed in the Drywell.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
A-N-2-R                                                                    Page 4 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 5 of 9  Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-R                                                                        Page 5 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 6 of 9  JPM Start Tim e: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of   1. Record the dry bulb temperature From initial conditions, dry bulb temp is 110&deg;F. _____        _____        _____
JPM Start Time: _________
: 2. Record the Wet Bulb Globe Temperature (WBGT)
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT NOTE:
From initial conditions, WBGT temp is 101&deg;F. _____        _____        _____
Provide the examinee with the supplied copy of
* 3. Classify the work environment (HT, VHT, EHT)
: 1. Record the dry bulb           From initial conditions, dry temperature                    bulb temp is 110&deg;F.
Determines the environment is HT based on an action time being calculated.
: 2. Record the Wet Bulb Globe     From initial conditions, Temperature (WBGT)             WBGT temp is 101&deg;F.
_____         _____         _____ 4. Record the metabolic rate (Low, Moderate, High)
* 3. Classify the work             Determines the environment (HT, VHT, EHT)     environment is HT based on an action time being calculated.                   _____     _____     _____
Determines the metabolic rate is moderate per attachment 2.
: 4. Record the metabolic rate     Determines the metabolic (Low, Moderate, High)         rate is moderate per attachment 2.                 _____     _____     _____
_____         _____         _____
: 5. Record the clothing ensemble   From initial conditions, Single PCs and scrubs are required.                     _____     _____     _____
: 5. Record the clothing ensemble From initial conditions, Single PC's and scrubs are required. _____         _____         _____
* 6. Record the Action Time         Determines the action time is 20 minutes from per attachment 3.                 _____     _____     _____
* 6. Record the Action Time Determines the action time is 20 minutes from per attachment 3.
: 7. Record Check Time             Determines the check time Frequency                      frequency to be 5-10 min.
_____         _____         _____
: 8. Record the Maximum            Determines Maximum Extended Action Time           Extended Action Time is 30 min.                       _____     _____     _____
: 7. Record Check Time Frequency Determines the check time frequency to be 5
* 9. Record the Recovery Time       Calculates the Recovery time is 30 min.
-10 min. _____        _____        _____
: 10. Record the Cool Area             Determines that the area location                      outside the Drywell Bullpen meets the requirements for     _____    _____      _____
: 8. Record the Maximum Extended Action Time Determines Maximum Extended Action Time is 30 min. _____         _____         _____
a cool area.
* 9. Record the Recovery Time Calculates the Recovery time is 30 min.
A-N-2-R                                                                    Page 6 of 9
_____        _____        _____
: 10. Record the Cool Area location Determines that the area outside the Drywell Bullpen meets the requirements for a cool area.
_____        _____        _____


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 7 of 9  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  11. Informs Unit Supervisor task is complete.
UNSAT    Comment PERFORMANCE CHECKLIST                   STANDARDS                 SAT
Examinee notifies the Unit Supervisor.
: 11. Informs Unit Supervisor task   Examinee notifies the Unit is complete.                Supervisor.
_____        _____        _____
CUE:
CUE: Acknowledge report of task completion.
Acknowledge report of task completion.
END   JPM Stop Time
END JPM Stop Time:_________
:_________
A-N-2-R                                                                Page 7 of 9
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 8 of 9  Operator's Name:
Operators Name:
Job Title:    RO JPM Title:
Job
Determine Heat Stress Actions Revision Number: 00


JPM Number:
==Title:==
A-N-2-R Task Number and Title: 299l029 , Conduct Shift Operations.
RO JPM
 
==Title:==
Determine Heat Stress Actions Revision Number: 00 JPM Number: A-N-2-R Task Number and
 
==Title:==
299l029, Conduct Shift Operations.
K/A Number and Importance: Generic.
K/A Number and Importance: Generic.
 
Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete:       minutes         Actual Time Used:           minutes
Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method: Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:   minutes Actual Time Used:
minutes


==References:==
==References:==
procedure, rev ##
EVALUATION


procedure , rev ##  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-2-R                                                                    Page 8 of 9


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 9 of 9  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The following conditions exist in the Drywell where work is being performed:
: 2. The following conditions exist in the Drywell where work is being performed:
Dry Bulb Temperature is 110
* Dry Bulb Temperature is 110&deg;F
&deg;F Wet Bulb Globe Temperature (WBGT) is 101
* Wet Bulb Globe Temperature (WBGT) is 101&deg;F
&deg;F Single PC's and scrubs are required The work involves inspections and moderate climbing The duration of the work will be 10 minutes
* Single PCs and scrubs are required
: 3. The WBGT in the area outside the Drywell bullpen is 78
* The work involves inspections and moderate climbing
&deg;F INITIATING CUE
* The duration of the work will be 10 minutes
: 1. The Unit Supervisor has directed you to complete attachment 4 of SA
: 3. The WBGT in the area outside the Drywell bullpen is 78&deg;F INITIATING CUE
-AA-111 for the work to be performed in the Drywell.
: 1. The Unit Supervisor has directed you to complete attachment 4 of SA-AA-111 for the work to be performed in the Drywell.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
A-N-2-R                                                              Page 9 of 9


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number: A-N-2-S Revision Number: 01 Date: 08/13 EXAM MATERIAL Developed By:
Instructor                  Date Approved By:
Facility Representative        Date


AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS  JPM Number: A
Job Performance Measure (JPM)
-N-2-S  Revision Number: 0 1  Date: 08/13  EXAM MATERIAL
Revision Record (Summary)
 
Revision 00 Bank JPM.
Developed By:
Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam.
Instructor Date    Approved By:
A-N-2-S                                                  Page 2 of 8
Facility Representative Date Job Performance Measure (JPM)
A-N-2-S    Page 2 of 8  Revision Record (Summary)
Revision 0 0 Bank JPM. Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam
.   


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S    Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures
: 1. This is a tabletop JPM utilizing simulator procedures.
. 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Clean copy of LS-AA-119.
: 1. Clean copy of LS-AA-119.
A-N-2-S                                                    Page 3 of 8
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S    Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Shift Manager.
: 1. You are the Shift Manager.
: 2. Both units are operating at near rated power.
: 2. Both units are operating at near rated power.
: 3. It is Monday 10/21/13 @ 0 6 00 4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
: 3. It is Monday 10/21/13 @ 0600
: 5. Another SRO will not be able to come in until 1 300. 6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
: 4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
: 5. Another SRO will not be able to come in until 1300.
: 6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
: 7. No other Licensed individual is available to fill the Safety Related position.
: 7. No other Licensed individual is available to fill the Safety Related position.
: 8. The Unit 2 SRO working shift 1 is Steve Smith
: 8. The Unit 2 SRO working shift 1 is Steve Smith.
. 9. Steve is ready and willing to work the overtime and will work until 1 3 00. 10. Steve is NOT fatigued and IS mentally alert.
: 9. Steve is ready and willing to work the overtime and will work until 1300.
: 11. Steve's Employee ID# is: 987654.
: 10. Steve is NOT fatigued and IS mentally alert.
: 12. Safety-related work WILL be performed by Steve during the shift
: 11. Steves Employee ID# is: 987654.
. 13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13. 14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:
: 12. Safety-related work WILL be performed by Steve during the shift.
Shift Tue 10/15/13 Wed 10/16/13 Thu 10/17/13 Fri 10/18/13 S at 10/19/13 Sun 10/20/1 3 Mon 10/21/13 1   (2300-0700) 8 8 8 8 8 8 8 2   (0700-1500) 4 4 3    (1500-2300)         INITIATING CUE
: 13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13.
: 1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith
: 14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:
. 2. The Operations Director will complete sections 2  
Tue      Wed        Thu          Fri        Sat        Sun      Mon Shift 10/15/13 10/16/13 10/17/13 10/18/13 10/19/13 10/20/13 10/21/13 1   (2300-0700)         8         8         8           8         8           8         8 2   (0700-1500)         4                   4                       4 3   (1500-2300)
- 4 of LS-AA-119.
INITIATING CUE
: 1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
: 2. The Operations Director will complete sections 2 - 4 of LS-AA-119.
A-N-2-S                                                                  Page 4 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S    Page 5 of 8    Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-S                                                                        Page 5 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S    Page 6 of 8  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of LS
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS               SAT NOTE:
-AA-119.
Provide the examinee with the supplied copy of LS-AA-119.
* 1. Reviews procedure to determine what limits will be exceeded. Determines that overtime would exceed:
* 1. Reviews procedure to           Determines that overtime determine what limits will be   would exceed:
exceeded.
72 hours in any 7 days.
72 hours in any 7 days.
_____        _____        _____
* 2. Properly fills out Attachment   Critical areas are:
* 2. Properly fills out Attachment 1 , Section 1  
1, Section 1 - Request portion.                       Planned Waiver Start:
- Request portion. Critical areas are:
10/21/13 / 1100 Planned Waiver End:
Planned Waiver Start:       10/21/13 / 11 00 Planned Waiver End:
10/21/13 / 1300 Planned Waiver Duration:
10/21/13 / 1 3 00 Planned Waiver Duration:
2 hours
2 h our s > 72 in any 7 days.
                                          > 72 in any 7 days.
checked Submitted by
checked Submitted by: name, signature, date, and time. _____      _____      _____
: name, signature, date, and time.
: 3. Forwards paperwork to the      Forwards paperwork to the Operations Director.            Operations Director or designee.                    _____      _____      _____
END JPM Stop Time:_________
A-N-2-S                                                                  Page 6 of 8


_____        _____        _____
: 3. Forwards paperwork to the Operations Director.
Forwards paperwork to the Operations Director or designee. _____        _____        _____
END  JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S    Page 7 of 8  Operator's Name:       Job Title:
Operators Name:
SRO       JPM Title: AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS Revision Number: 0 1
Job
JPM Number: A-N-2-S Task Number and Title:
 
299L057 , Perform administrative duties to ensure overtime restrictions are not exceeded. K/A Number and Importance: Generic.1.5     2.9 / 3.9 Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
SRO JPM
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS Revision Number: 01 JPM Number: A-N-2-S Task Number and
Yes No Estimated Time to Complete:
 
15 minutes Actual Time Used:
==Title:==
minutes
299L057, Perform administrative duties to ensure overtime restrictions are not exceeded.
K/A Number and Importance: Generic.1.5       2.9 / 3.9 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes             Actual Time Used:         minutes


==References:==
==References:==
LS-AA-119, rev 10 EVALUATION


LS-AA-119 , rev 10  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-2-S                                                                    Page 7 of 8


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S    Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Shift Manager.
: 1. You are the Shift Manager.
: 2. Both units are operating at near rated power.
: 2. Both units are operating at near rated power.
: 3. It is Monday 10/21/13 @ 0 6 00 4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
: 3. It is Monday 10/21/13 @ 0600
: 5. Another SRO will not be able to come in until 1 300. 6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
: 4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
: 5. Another SRO will not be able to come in until 1300.
: 6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
: 7. No other Licensed individual is available to fill the Safety Related position.
: 7. No other Licensed individual is available to fill the Safety Related position.
: 8. The Unit 2 SRO working shift 1 is Steve Smith
: 8. The Unit 2 SRO working shift 1 is Steve Smith.
. 9. Steve is ready and willing to work the overtime and will work until 1 3 00. 10. Steve is NOT fatigued and IS mentally alert.
: 9. Steve is ready and willing to work the overtime and will work until 1300.
: 11. Steve's Employee ID# is: 987654.
: 10. Steve is NOT fatigued and IS mentally alert.
: 12. Safety-related work WILL be performed by Steve during the shift
: 11. Steves Employee ID# is: 987654.
. 13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13. 14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:
: 12. Safety-related work WILL be performed by Steve during the shift.
Shift Tue 10/15/13 Wed 10/16/13 Thu 10/17/13 Fri 10/18/13 Sat 10/19/13 Sun 10/20/13 Mon 10/21/13 1   (2300
: 13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13.
-0700) 8 8 8 8 8 8 8 2   (0700
: 14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:
-1500) 4 4 4   3   (1500
Tue      Wed        Thu          Fri        Sat        Sun        Mon Shift 10/15/13 10/16/13 10/17/13 10/18/13 10/19/13             10/20/13   10/21/13 1 (2300-0700)         8         8         8           8         8         8         8 2 (0700-1500)         4                   4                       4 3 (1500-2300)
-2300)         INITIATING CUE
INITIATING CUE
: 1. Complete LS
: 1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
-AA-119, attachment 1, section 1  
: 2. The Operations Director will complete sections 2 - 4 of LS-AA-119.
- Request paperwork for Steve Smith. 2. The Operations Director will complete sections 2  
A-N-2-S                                                                  Page 8 of 8
- 4 of LS-AA-119.
 
Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure PERFORM APRM FLOW BIAS CALIBRATION CHECK JPM Number: A-N-3-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


PERFORM APRM FLOW BIAS CALIBRATION CHECK JPM Number:
Job Performance Measure (JPM)
A-N-3-R Revision Number: 0 0  Date: 0 8/13    EXAM MATERIAL
Revision Record (Summary)
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.
A-N-3-R                                                 Page 2 of 8


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-3-R  Page 2 of 8  Revision Record (Summary)
Revision 0 0 New JPM for ILT 12
-1 (2013-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a clean copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74
: 1. Provide a clean copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74 A-N-3-R                                                          Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 is at full power.
: 2. Unit 2 is at full power.
: 3. The plant process computer is currently unavailable.
: 3. The plant process computer is currently unavailable.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to perform DOS 0500
: 1. The Unit Supervisor has directed you to perform DOS 0500-26, APRM FLOW BIAS CALIBRATION CHECK.
-26, APRM FLOW BIAS CALIBRATION CHECK.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R                                                                        Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74 CUE: When the examinee states they will check FI 2-260-5A(B) and RBM 7/8 provide them with the appropriate supplied picture
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS               SAT NOTE:
.
Provide the examinee with the supplied copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74 CUE:
* 1. IF the process computer is NOT available, THEN obtain recirc pump flow for each loop from 2 A(B) PP FLOW, FI 2-260-5A(B) AND calculate Total Drive Flow Determines that A and B recirc pump flows are 16 Mlbm/hr and calculated total drive flow is 32 Mlbm/hr. _____         _____         _____
When the examinee states they will check FI 2-260-5A(B) and RBM 7/8 provide them with the appropriate supplied picture.
: 2. Record Rated Drive Flow (WDRATED) from the CRSP Unit Status sheet Enters 32.89 Mlbm/hr from the CRSP Unit Status sheet. _____         _____         _____
* 1. IF the process computer is     Determines that A and B NOT available, THEN obtain     recirc pump flows are 16 recirc pump flow for each       Mlbm/hr and calculated loop from 2 A(B) PP FLOW,       total drive flow is 32 FI 2-260-5A(B) AND calculate   Mlbm/hr.
* 3. Calculate Drive Flow (%)
Total Drive Flow                                            _____   _____       _____
Calculates drive flow percentage to be 97.29%
: 2. Record Rated Drive Flow         Enters 32.89 Mlbm/hr from (WD RATED ) from the CRSP       the CRSP Unit Status Unit Status sheet              sheet.                     _____   _____       _____
_____        _____        _____
* 3. Calculate Drive Flow (%)       Calculates drive flow percentage to be 97.29%
: 4. Record the percent FLOW
: 4. Record the percent FLOW        Determines percent FLOW
(%) indicated on RBM CH 7 RPS CH A, at Panel 902(3)
(%) indicated on RBM CH 7      on RBM CH 7 RPS CH A RPS CH A, at Panel 902(3)-     is 97%
-37 Determines percent FLOW on RBM CH 7 RPS CH A is 97%   _____         _____         _____
37                                                          _____   _____       _____
: 5. Record the percent FLOW (%) indicated on RBM CH 8 RPS CH B, at Panel 902(3)
: 5. Record the percent FLOW         Determines percent FLOW
-37 Determines percent FLOW on RBM CH 8 RPS CH B is 97%   _____         _____         _____
(%) indicated on RBM CH 8      on RBM CH 8 RPS CH B RPS CH B, at Panel 902(3)-     is 97%
* 6. Verify the values recorded in Steps 4 AND 5 are LESS THAN OR EQUAL TO the Desired Setting per Operator Aid Unit 2(3) APRM/RBM Flow Converter Setting vs. Total Drive Flow, for WD% value calculated in Step 3 Using Operator aid, Determines values are greater than Desired Settings. Acceptance criteria no t met. _____         _____         _____
37                                                          _____   _____       _____
* 6. Verify the values recorded in   Using Operator aid, Steps 4 AND 5 are LESS         Determines values are THAN OR EQUAL TO the           greater than Desired Desired Setting per Operator   Settings.
Aid Unit 2(3) APRM/RBM Flow Converter Setting vs.     Acceptance criteria not Total Drive Flow, for WD%       met.
value calculated in Step 3                                 _____   _____       _____
A-N-3-R                                                                  Page 5 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  7. Contact the QNE AND IMD to perform DIS 0700
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
-02, APRM/RBM Flow Instrumentation Total Drive Flow Adjustment States that the QNE AND IMD would be contacted to perform APRM/RBM Flow Instrumentation Total Drive Flow Adjustment
: 7. Contact the QNE AND IMD to     States that the QNE AND perform DIS 0700-02,           IMD would be contacted to APRM/RBM Flow                  perform APRM/RBM Flow Instrumentation Total Drive   Instrumentation Total Drive Flow Adjustment                Flow Adjustment
_____        _____        _____
: 8. Informs Unit Supervisor task   Examinee notifies the Unit is complete.                  Supervisor.
: 8. Informs Unit Supervisor task is complete.
CUE:
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
_____        _____        _____
END JPM Stop Time:_________
CUE: Acknowledge report of task completion.
A-N-3-R                                                                    Page 6 of 8
END   JPM Stop Time
 
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:    RO JPM Title: APRM Flow Bias Calibration Check Revision Number: 00
Job


JPM Number:
==Title:==
A-N-3-R Task Number and Title: 215L0007 , Perform Unit 2(3) power range monitoring system surveillance K/A Number and Importance: Generic 2.2.14    3.9 / 4.3
RO JPM


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
APRM Flow Bias Calibration Check Revision Number: 00 JPM Number: A-N-3-R Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Pa th: Yes No   Perform SRO Only: Yes No Time Critical:
==Title:==
Yes No Estimated Time to Complete:
215L0007, Perform Unit 2(3) power range monitoring system surveillance K/A Number and Importance: Generic 2.2.14      3.9 / 4.3 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete:       minutes         Actual Time Used:           minutes
minutes Actual Time Used:
minutes


==References:==
==References:==
DOS 0500-26, rev 00; Operator Aid #74, rev 09 EVALUATION


DOS 0500-26 , rev 00; Operator Aid #74, rev 09 EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-3-R                                                                    Page 7 of 8


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 is at full power.
: 2. Unit 2 is at full power.
: 3. The plant process computer is currently unavailable.
: 3. The plant process computer is currently unavailable.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to perform DOS 0500
: 1. The Unit Supervisor has directed you to perform DOS 0500-26, APRM FLOW BIAS CALIBRATION CHECK.
-26, APRM FLOW BIAS CALIBRATION CHECK.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
A-N-3-R                                                          Page 8 of 8


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW JPM Number: A-N-3-S Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW  JPM Number:
Job Performance Measure (JPM)
A-N-3-S Revision Number: 0 0  Date: 0 8/13  EXAM MATERIAL
Revision Record (Summary)
Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.
A-N-3-S                                                   Page 2 of 8


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-3-S  Page 2 of 8  Revision Record (Summary)
Revision 0 0 Modified JPM for ILT 12
-1 (2013-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 6600-01 Job Performance Measure (JPM)
: 1. Provide a marked up copy of DOS 6600-01 A-N-3-S                                                   Page 3 of 8
A-N-3-S Page 4 of 8 INITIAL CONDITIONS
 
: 1. You are the Unit 3 Unit Supervisor
Job Performance Measure (JPM)
. 2. The Unit 3 EDG was run for a normal even month surveillance.
INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor.
: 2. The Unit 3 EDG was run for a normal even month surveillance.
: 3. No maintenance was performed on the Unit 3 EDG.
: 3. No maintenance was performed on the Unit 3 EDG.
: 4. The Unit 3 NSO has completed DOS 6600
: 4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.
-01, DIESEL GENERATOR SURVEILLANCE TEST S for the Unit 3 EDG
INITIATING CUE
. INITIATING CUE
: 1. Verify the Unit 3 EDG surveillance has been completed correctly.
: 1. Verify the Unit 3 EDG surveillance has been completed correctly.
: 2. Review the surveillance and determine the operability of the Unit 3 EDG.
: 2. Review the surveillance and determine the operability of the Unit 3 EDG.
: 3. Inform the Shift Manager when the task is complete.
: 3. Inform the Shift Manager when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-S                                                                        Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOS 6600-01 NOTE: Other unidentified errors exist. Only items marked as critical are required.
UNSAT    Comment PERFORMANCE CHECKLIST                           STANDARDS                 SAT NOTE:
* 1. Verify D/G has operated for   > 60 minutes with a load of 2340 to 2600 kW Recognizes that the diesel ran for less than 6 0 minutes. Acceptance criteria not met.
Provide the examinee with the supplied copy of DOS 6600-01 NOTE:
_____         _____         _____
Other unidentified errors exist. Only items marked as critical are required.
* 2. Diesel fuel oil day tank level > 29.5 inches (for U2 or U3 EDG) Recognizes that Diesel fuel oil day tank level is less than 29.5 inches Acceptance criteria not met. _____         _____         _____
* 1. Verify D/G has operated for       Recognizes that the diesel
* 3. Verify D/G START AIR A1/A2 RECEIVER TANK pressure in Step 3.a.(16) is greater than D/G START AIR B1/B2 RECEIVER TANK in Step 3.a.(16) Recognizes that A1/A2 RECEIVER TANK pressure is not greater than B1/B2 RECEIVER TANK pressure. Acceptance criteria not met. _____         _____         _____
          > 60 minutes with a load of       ran for less than 60 2340 to 2600 kW                   minutes. Acceptance criteria not met.             _____     _____       _____
: 4. IF air pressure between banks has equalized, THEN initiate an Issue Report to repair check valve.
* 2. Diesel fuel oil day tank level >   Recognizes that Diesel 29.5 inches (for U2 or U3         fuel oil day tank level is EDG)                              less than 29.5 inches Acceptance criteria not       _____     _____       _____
Recognizes that an issue report needs to be generated to repair the check valve.
met.
_____         _____         _____
* 3. Verify D/G START AIR A1/A2        Recognizes that A1/A2 RECEIVER TANK pressure in         RECEIVER TANK Step 3.a.(16) is greater than     pressure is not greater D/G START AIR B1/B2                than B1/B2 RECEIVER RECEIVER TANK in Step             TANK pressure.
: 5. Verify 'A' compressor stops between 245 and 260 psig.
3.a.(16)                           Acceptance criteria not       _____     _____       _____
Recognizes that the 'A' compressor stopped > 260 psig. _____         _____         _____
met.
: 6. IF Compressor "A" OR "B" stop pressures are NOT within expected range (224 t o 260 psig), THEN contact the Plant Engineering System Manager AND initiate an Issue Report.
: 4. IF air pressure between           Recognizes that an issue banks has equalized, THEN         report needs to be initiate an Issue Report to       generated to repair the repair check valve.               check valve.                 _____     _____       _____
Recognizes that compressor 'A' did not stop within the expected range (265 psig), the System Engineer needs to be contacted.
: 5. Verify A compressor stops       Recognizes that the A between 245 and 260 psig.         compressor stopped > 260 psig.                         _____     _____       _____
_____         _____         _____
: 6. IF Compressor A OR "B"           Recognizes that stop pressures are NOT             compressor A did not stop within expected range (224 to      within the expected range 260 psig), THEN contact the       (265 psig), the System Plant Engineering System          Engineer needs to be Manager AND initiate an            contacted.                   _____     _____       _____
Issue Report.
A-N-3-S                                                                        Page 5 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  7. Notify System Engineer that 'A' compressor did not stop at the expected band.
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
Notifies System Engineer that 'A' compressor did not start at the expected band.
: 7. Notify System Engineer that     Notifies System Engineer A compressor did not stop at   that A compressor did not the expected band.              start at the expected band. _____   _____     _____
_____         _____         _____
* 8. Declare D/G Operable             Recognizes that the Acceptance Criteria for the Unit 3 EDG is not met and     _____    _____      _____
* 8. Declare D/G Operable Recognizes that the Acceptance Criteria for the Unit 3 EDG is not met and determines the EDG is inoperable. _____        _____        _____
determines the EDG is inoperable.
: 9. Informs Shift Manager task is complete. Examinee notifies the Shift Manager. _____        _____        _____
: 9. Informs Shift Manager task is   Examinee notifies the Shift complete.                        Manager.
CUE: Acknowledge report of task completion.
CUE:
END   JPM Stop Time
Acknowledge report of task completion.
:_________
END JPM Stop Time:_________
A-N-3-S                                                                    Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:
Job
SRO       JPM Title: DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW Revision Number: 00
 
==Title:==
SRO JPM


JPM Number:
==Title:==
A-N-3-S Task Number and Title: 264L009 , Perform Surveillance Testing K/A Number and Importance: Generic 2.2.12    3.7 / 4.1
DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW Revision Number: 00 JPM Number: A-N-3-S Task Number and


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
264L009, Perform Surveillance Testing K/A Number and Importance: Generic 2.2.12      3.7 / 4.1 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
15 minutes Actual Time Used:
minutes


==References:==
==References:==
DOS 6600-01, rev 123 EVALUATION


DOS 6600-01 , rev 123  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-3-S                                                                    Page 7 of 8


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor. 2. The Unit 3 EDG was run for a normal even month surveillance.
: 1. You are the Unit 3 Unit Supervisor.
: 2. The Unit 3 EDG was run for a normal even month surveillance.
: 3. No maintenance was performed on the Unit 3 EDG.
: 3. No maintenance was performed on the Unit 3 EDG.
: 4. The Unit 3 NSO has completed DOS 6600
: 4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.
-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG
INITIATING CUE
. INITIATING CUE
: 1. Verify the Unit 3 EDG surveillance has been completed correctly.
: 1. Verify the Unit 3 EDG surveillance has been completed correctly.
: 2. Review the surveillance and determine the operability of the Unit 3 EDG.
: 2. Review the surveillance and determine the operability of the Unit 3 EDG.
: 3. Inform the Shift Manager when the task is complete.
: 3. Inform the Shift Manager when the task is complete.
A-N-3-S                                                              Page 8 of 8


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


DETERMINE ACTIONS FOR A FIRE  JPM Number:
Job Performance Measure (JPM)
A-N-4-R Revision Number: 0 0  Date: 0 8/13    EXAM MATERIAL
Revision Record (Summary)
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.
A-N-4-R                                                 Page 2 of 7


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-4-R  Page 2 of 7  Revision Record (Summary)
Revision 0 0 New JPM for ILT 12
-1 (2013-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a copy of DOA 0010-10 and DOA 0010
: 1. Provide a copy of DOA 0010-10 and DOA 0010-S1 A-N-4-R                                                   Page 3 of 7
-S1 Job Performance Measure (JPM)
 
A-N-4-R Page 4 of 7 INITIAL CONDITIONS
Job Performance Measure (JPM)
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 3. Hazmat and rescue response are not required.
: 3. Hazmat and rescue response are not required.
: 4. The Fire brigade has been alerted and is attempting to combat the fir e unsuccessfully.
: 4. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
: 5. A dedicated outside line is not available.
: 5. A dedicated outside line is not available.
INITIATING CUE
INITIATING CUE
: 1. The Unit supervisor has directed you to enter and execute DOA 0010
: 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION.
-10, FIRE-EXPLOSION.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. Information For Evaluator's Use:
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-R                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOA 0010-10. Provide the examinee with the supplied copy of DOA 0010
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                 SAT NOTE:
-S1 when requested.
Provide the examinee with the supplied copy of DOA 0010-10.
* 1. Notify Coal City Fire Protection District. (Refer to DOA 0010-S1, Key Phone Numbers for DOA 0010 Block Procedures.)
Provide the examinee with the supplied copy of DOA 0010-S1 when requested.
From DOA 0010
* 1. Notify Coal City Fire         From DOA 0010-S1 Protection District. (Refer to determines that 815-942-DOA 0010-S1, Key Phone         0336 is the number Numbers for DOA 0010 Block needed to contact the           _____     _____         _____
-S1 determines that 815
Procedures.)                  CCFPD.
-942-0336 is the number needed to contact the CCFPD. _____         _____         _____
* 2. Dial 815-942-0336 and             Dials 815-942-0336 and communicate the details of        communicates the location the fire.                          of the fire.                 _____   _____     _____
* 2. Dial 815-942-0336 and communicate the details of the fire. Dials 815-942-0336 and communicates the location of the fire.
CUE:
_____         _____         _____
If requested by the examinee, the TSO can not contact the Coal City Fire Department because they are currently dealing with grid instabilities.
CUE: If requested by the examinee, the TSO can not contact the Coal City Fire Department because they are currently dealing with grid instabilities.
: 3. Notifies TSO via direct line for   Notifies the TSO from a major fire.                        control room phone using the TSO direct line button and provides call back       _____    _____      _____
: 3. Notifies TSO via direct line for major fire.
phone number.
Notifies the TSO from a control room phone using the TSO direct line button and provides call back phone number.
: 4. Notify Security Shift              Notifies the Security Shift Supervisor that outside fire       Supervisor that the department will be                CCFPD will be responding responding AND request             to the Lift Station.
_____        _____        _____
assistance in providing access to affected area if                                       _____   _____     _____
: 4. Notify Security Shift Supervisor that outside fire department will be responding AND request assistance in providing access to affected area if necessary.
necessary.
Notifies the Security Shift Supervisor that the CCFPD will be responding to the Lift Station.
: 5. Informs Unit Supervisor task       Examinee notifies the Unit is complete.                      Supervisor.
_____         _____         _____
CUE:
: 5. Informs Unit Supervisor task is complete.
Acknowledge report of task completion.
Examinee notifies the Unit Supervisor.
END JPM Stop Time:_________
_____        _____        _____
A-N-4-R                                                                        Page 5 of 7
CUE: Acknowledge report of task completion.
 
END   JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 6 of 7  Operator's Name:
Operators Name:
Job Title:    RO JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 00
Job


JPM Number:
==Title:==
A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic 2.4.27    3.4 / 3.9
RO JPM


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
DETERMINE ACTIONS FOR A FIRE Revision Number: 00 JPM Number: A-N-4-R Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
295L009, Respond to a fire/explosion K/A Number and Importance: Generic 2.4.27      3.4 / 3.9 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete:       minutes         Actual Time Used:           minutes
Yes No Estimated Time to Complete:
minutes Actual Time Used:
minutes


==References:==
==References:==
DOA 0010-10, rev 18; DOA 0010-S1, rev 14 EVALUATION


DOA 0010-10 , rev 18; DOA 0010
==SUMMARY==
-S1, rev 14 EVALUATION
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-4-R                                                                    Page 6 of 7


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 7 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 3. Hazmat and rescue response are not required.
: 3. Hazmat and rescue response are not required.
: 4. The Fire brigade has been alerted and is attempting to combat the fir e unsuccessfully.
: 4. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
: 5. A dedicated outside line is not available.
: 5. A dedicated outside line is not available.
INITIATING CUE
INITIATING CUE
: 1. The Unit supervisor has directed you to enter and execute DOA 0010
: 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION.
-10, FIRE-EXPLOSION.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
A-N-4-R                                                              Page 7 of 7


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure SELECT PERSONNEL FOR RADIATION WORK JPM Number: A-N-4-S Revision Number: 00 Date: 08/13 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


SELECT PERSON NEL FOR RADIATION WOR K  JPM Number:
Job Performance Measure (JPM)
A-N-4-S  Revision Number: 00  Date: 08/13   
Revision Record (Summary)
 
Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.
Developed By:
A-N-4-S                                                    Page 2 of 10
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-4-S  Page 2 of 10  Revision Record (Summary) Revision 0 0    Modified JPM for ILT 12
-1 (2013-301) NRC Exam.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 3 of 10  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room. 2. Markup a survey map for the Unit 3 RWCU Pump Room.
: 1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room.
: 3. Clean copy of RP
: 2. Markup a survey map for the Unit 3 RWCU Pump Room.
-AA-203.
: 3. Clean copy of RP-AA-203.
A-N-4-S                                                    Page 3 of 10
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 4 of 10  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
: 1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
: 2. Five NLOs are available this shift.
: 2. Five NLOs are available this shift.
None of the five have received dose at any location other than Dresden Station.
* None of the five have received dose at any location other than Dresden Station.
None of the five have received dose since midnight on any RWPs other than 10004555. 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:
* None of the five have received dose since midnight on any RWPs other than 10004555.
Name DDE dose received on         RWP 10004555 Today Annual TEDE dose To Date Alex 4 0 mrem 1 550 mrem Dan 5 mrem 1 950 mrem Mike 0 mrem 1 920 mrem Sue 45 mrem 1 8 50 mrem Tom 10 mrem 1 7 50 mrem 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
: 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:
45 minutes total in the area near the following two valves: 3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump) 15 minutes total in the area near the following one valve: 3-1201-128A 'A' RWCU Pump Suction (at 'A' RWCU Pump)
DDE dose received on           Annual TEDE dose Name RWP 10004555 Today                   To Date Alex                   40 mrem                     1550 mrem Dan                     5 mrem                     1950 mrem Mike                     0 mrem                     1920 mrem Sue                     45 mrem                     1850 mrem Tom                     10 mrem                     1750 mrem
 
: 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
* 45 minutes total in the area near the following two valves:
3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)
* 15 minutes total in the area near the following one valve:
3-1201-128A A RWCU Pump Suction (at A RWCU Pump)
INITIATING CUE
INITIATING CUE
: 1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.
: 1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.
A-N-4-S                                                                Page 4 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 5 of 10  Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use: UNSAT requires written comments on respective step.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be  
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-S                                                                      Page 5 of 10


performed. The timeclock starts when the candidate acknowledges the initiating cue.
Job Performance Measure (JPM)
JPM Start Time: _________
UNSAT    Comment PERFORMANCE CHECKLIST                        STANDARDS                  SAT NOTE:
Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and the supplied copy of RP-AA-203.
The following steps may be performed in any order.
: 1. Reviews Survey Maps to          Reviews the survey maps determine area dose rates.      and determines area dose rates to be 50 mr/hr for the first group of 2 valves and    _____    _____      _____
160 mr/hr for the remaining valve.
NOTE:
The following calculations should be made:
2 valve clearance projected dose = 0.75 hr x 40 mr/hr = 30 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 40 mrem + 30 mrem = 65 mrem
* 2. Calculates that the projected    Determines the NLOs will dose that will be received for  receive 30 mrem on the the task is 65 mrem.            first 2 valves and 35 on the next valve.                    _____    _____      _____
CUE:
IF the candidate inquires whether or not any of the NLOs has received permission to exceed any dose limits, respond: None of the Non Licensed Operators have received permission to exceed any limits.
NOTE:
The following steps may be performed in any order.
* 3. Determines that ALEX            Alexs total daily dose on CAN NOT perform the job          RWP 10004555 would be because he would exceed the     105 mrem.
80 mrem dose alarm on RWP                                      _____    _____      _____
10004555.
A-N-4-S                                                                    Page 6 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 6 of 10  JPM Start Time
UNSAT    Comment PERFORMANCE CHECKLIST                     STANDARDS                 SAT
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and the supplied copy of RP
* 4. Determines that Dan          Dans total Annual dose CAN NOT perform the job      would be 2015 mrem.
-AA-203. The following steps may be performed in any order.
because he would exceed the 2000 mrem Exelon Annual                                    _____   _____     _____
: 1. Reviews Survey Maps to determine area dose rates.
limit.
Reviews the survey maps and determines area dose rates to be 50 mr/hr for the first group of 2 valves and 160 mr/hr for the remaining valve. _____         _____         _____
* 5. Determines that Mike CAN      Mikes total RWP daily perform the job because no    dose and Annual dose will limits will be exceeded.     remain below the limits.
NOTE: The following calculations should be made:
* 6. Determines that Sue          Alexs total daily dose on CAN NOT perform the job       RWP 10004555 would be because she would exceed     110 mrem.
2 valve clearance projected dose = 0.
the 80 mrem dose alarm on RWP 10004555.
75 hr x 4 0 mr/hr = 30 mrem 1 valve clearance projected dose = 0.25 hr x 1 40 mr/hr =
* 7. Determines that Tom CAN      Toms total RWP daily perform the job because no    dose and Annual dose will limits will be exceeded.      remain below the limits.
35 mrem Total projected dose for the job  = 40 mrem + 30 mrem =
END JPM Stop Time:_________
65 mrem
A-N-4-S                                                                Page 7 of 10
* 2. Calculates that the projected dose that will be received for the task is 65 mrem. Determines the NLO's will receive 30 mrem on the first 2 valves and 35 on the next valve. _____        _____        _____
 
CUE: IF the candidate inquires whether or not any of the NLOs has received permission to exceed any dose limits, respond: "None of the Non Licensed Operators have received permission to exceed any limits".
NOTE: The following steps may be performed in any order.
* 3. Determines that ALEX            CAN NOT perform the job because he would exceed the 80 mrem dose alarm on RWP 10004555. Alex's total daily dose on RWP 10004555 would be             105 mrem. _____        _____        __
___
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 7 of 10  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
Operators Name:
* 4. Determines that Dan          CAN NOT perform the job because he would exceed the 2000 mrem Exelon Annual limit. Dan's total Annual dose would be 2015 mrem. _____        _____        _____
Job
* 5. Determines that Mike CAN perform the job because no limits will be exceeded.
 
Mike's total RWP daily dose and Annual dose will remain below the limits.
==Title:==
_____        _____        _____
SRO JPM
* 6. Determines that Sue          CAN NOT perform the job because she would exceed the 80 mrem dose alarm on RWP 10004555
. Alex's total daily dose on RWP 10004555 would be            110 mrem. _____        _____        _____
* 7. Determines that Tom CAN perform the job because no limits will be exceeded.
Tom's total RWP daily dose and Annual dose will remain below the limits. _____        _____        _____
END  JPM Stop Time
:_________
Job Performance Measure (JPM)
A-N-4-S  Page 8 of 10  Operator's Name:
Job Title:
SRO       JPM Title: SELECT PERSONEL FOR RADIATION WORK


Revision Number: 0 0
==Title:==
JPM Number: A-N-4-S Task Number and Title:
SELECT PERSONEL FOR RADIATION WORK Revision Number: 00 JPM Number: A-N-4-S Task Number and
29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.4    3.2 / 3.7


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.4      3.2 / 3.7 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 10 minutes           Actual Time Used:           minutes
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
10 minutes Actual Time Used:
minutes


==References:==
==References:==
RP-AA-203, rev 03 EVALUATION


RP-AA-203, rev 03  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-4-S                                                                    Page 8 of 10


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:  Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 9 of 10  KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two NLO s can receive the dose, necessary to compl ete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour total dose on RWP 1000 4555, and total Annual TEDE dose for each Operator. Calculation:
KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two NLOs can receive the dose, necessary to complete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour total dose on RWP 10004555, and total Annual TEDE dose for each Operator.
2 valve s clearance (at RWCU Aux Pump) projected dose = 0.
Calculation:
75 hr x 40 mr/hr =
2 valves clearance (at RWCU Aux Pump) projected dose = 0.75 hr x 40 mr/hr =
30mrem 1 valve clearance (at 'A' RWCU Pump) projected dose = 0.25hr x 1 4 0 mr/hr = 35mrem 30mrem + 35 mrem = 65 mrem projected job dose for clearance order hanging Name DDE dose received on RWP 10004555 today Annual TEDE dose as of Midnight To Date Projected dose on          RWP 10004555                  for the 24 hour period Projected Annual TEDE    (including all dose from              last 24 hours)
30mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25hr x 140 mr/hr =
Alex 40 mrem 1 550 mrem (40 + 65 =)
35mrem 30mrem + 35 mrem = 65 mrem projected job dose for clearance order hanging DDE dose         Annual TEDE      Projected dose on      Projected Annual TEDE Name      received on RWP       dose as of       RWP 10004555          (including all dose from 10004555 today    Midnight To Date for the 24 hour period         last 24 hours)
105 mrem (1 550 + 65 =)
(40 + 65 =)             (1550 + 65 =)
1 615 mrem Dan 5 mrem 1 950 mrem (5 + 65 =)
Alex          40 mrem          1550 mrem 105 mrem                 1615 mrem (5 + 65 =)             (1950 + 65 =)
70 mrem (1 950 + 65 =)
Dan            5 mrem           1950 mrem 70 mrem                 2015 mrem (0 + 65 =)             (1920 + 65 =)
20 15 mrem Mike 0 mrem 1 920 mrem (0 + 65 =)               65 mrem (1 920 + 65 =)
Mike          0 mrem          1920 mrem 65 mrem                 1985 mrem (45 + 65 =)             (1850 + 65 =)
1985 mrem Sue 45 mrem 1 8 50 mrem (45 + 65 =)
Sue          45 mrem          1850 mrem 110 mrem                 1915 mrem (10 + 65 =)             (1750 + 65 =)
1 10 mrem (1 850 + 65 =)
Tom          10 mrem          1750 mrem 75 mrem                1815 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.
1915 mrem Tom 10 mrem 1 7 50 mrem (10 + 65 =)
A-N-4-S                                                                  Page 9 of 10
75 mrem (1 750 + 65 =)
1 8 15 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 10 of 10  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555
: 1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
. 2. Five NLOs are available this shift.
: 2. Five NLOs are available this shift.
None of the five have received dose at any location other than Dresden Station. None of the five have received dose since midnight on any RWPs other than 10004555.
* None of the five have received dose at any location other than Dresden Station.
* None of the five have received dose since midnight on any RWPs other than 10004555.
: 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:
: 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:
Name DDE dose received on         RWP 10004555 Today Annual TEDE dose To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
DDE dose received on           Annual TEDE dose Name RWP 10004555 Today                   To Date Alex                     40 mrem                     1550 mrem Dan                       5 mrem                     1950 mrem Mike                       0 mrem                     1920 mrem Sue                     45 mrem                     1850 mrem Tom                     10 mrem                     1750 mrem
45 minutes total in the area near the following two valves: 3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump) 15 minutes total in the area near the following one valve: 3-1201-128A 'A' RWCU Pump Suction (at 'A' RWCU Pump)
: 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
 
* 45 minutes total in the area near the following two valves:
3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)
* 15 minutes total in the area near the following one valve:
3-1201-128A A RWCU Pump Suction (at A RWCU Pump)
INITIATING CUE
INITIATING CUE
: 1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.
: 1. CALCULATE the expected dose for the work in RWCU Pump Room.
DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.
A-N-4-S                                                              Page 10 of 10


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 02 Date: 08/13 Developed By:
Instructor                Date Approved By:
Facility Representative    Date


AUTHORIZE USE OF KI JPM Number:
Job Performance Measure (JPM)
A-N-5-S Revision Number: 0 2 Date: 0 8/1 3   
Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for ILT 12-1 (2013-301) NRC Exam.
A-N-5-S                                                   Page 2 of 9


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-5-S  Page 2 of 9  Revision Record (Summary)
Revision 0 1 Bank JPM. Revision 0 2 Revised for ILT 12-1 (2013-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 3 of 9  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Two (2) marked up copies of EP
: 1. Two (2) marked up copies of EP-AA-113-F-02.
-AA-113-F-02. 2. Blank copy of EP
: 2. Blank copy of EP-AA-113.
-AA-113. 3. Blank copy of EP
: 3. Blank copy of EP-AA-113-F-03.
-AA-113-F-03.
A-N-5-S                                                    Page 3 of 9
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 4 of 9  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Station Emergency Director.
: 1. You are the Station Emergency Director.
: 2. A General Emergency has been declared.
: 2. A General Emergency has been declared.
Line 865: Line 875:
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
: 9. The operation requires two people to enter the field.
: 9. The operation requires two people to enter the field.
: 10. Clay Morrow , Employee ID
: 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
# 123456 and Jax Teller Employee ID
# 891011 have volunteered.
: 11. Clay and Jax have NEVER received an emergency exposure before.
: 11. Clay and Jax have NEVER received an emergency exposure before.
: 12. Authorization for Emergency Exposure (EP
: 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
-AA-113-F-02 forms) have been filled out for Clay and Jax. INITIATING CUES
INITIATING CUES
: 1. Execute section 4.4 of EP
: 1. Execute section 4.4 of EP-AA-113.
-AA-113.  
 
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
A-N-5-S                                                                Page 4 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 5 of 9  Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-5-S                                                                        Page 5 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 6 of 9  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the Examinee the provided copies of:
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
EP-AA-113-F-02, and EP-AA-113. 1. Applicant determines need for emergency action.
Provide the Examinee the provided copies of:
Emergency action is needed per initiating cue.
EP-AA-113-F-02, and EP-AA-113.
_____        _____        _____
: 1. Applicant determines need for   Emergency action is emergency action.               needed per initiating cue.
CUE: If asked, Clay and Jax do NOT have any adverse reactions to KI.
CUE:
: 2. Applicant recognizes per the initiating cue that authorization to take KI must also be completed prior to the emergency workers entering the space.
If asked, Clay and Jax do NOT have any adverse reactions to KI.
Recognizes that authorization to take KI must also be completed.
: 2. Applicant recognizes per the     Recognizes that initiating cue that             authorization to take KI authorization to take KI must    must also be completed.
_____        _____        _____
also be completed prior to the                               _____        _____      _____
* 3. Determines there is or has been a Loss of Fuel Clad Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.
emergency workers entering the space.
Determines KI must be issued.
* 3. Determines there is or has       Determines KI must be been a Loss of Fuel Clad         issued.
_____        _____        _____
Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected                                 _____        _____      _____
CUE: When applicant determines KI must be issued, provide EP-AA-113-F-03 form and instruct applicant to complete form.
to have a high iodine concentration. Determines KI must be issued.
CUE:
When applicant determines KI must be issued, provide EP-AA-113-F-03 form and instruct applicant to complete form.
A-N-5-S                                                                    Page 6 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 7 of 9  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT    Comment PERFORMANCE CHECKLIST                     STANDARDS                 SAT
* 4. Documents the decision to issue KI using THYROID BLOCKING AGENT AUTHORIZATION Form   (EP-AA-113-F-03). BOTH individuals being authorized for KI and entering the space must be listed with their correct names and employee ID numbers: Clay Morrow 123456 Jax Teller          
* 4. Documents the decision to     BOTH individuals being issue KI using THYROID         authorized for KI and BLOCKING AGENT                 entering the space must be AUTHORIZATION Form             listed with their correct (EP-AA-113-F-03).             names and employee ID numbers:
* Clay Morrow               _____      _____      _____
123456
* Jax Teller 891011 NOTE:
If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.
: 5. Notifies Occupational Health  Examinee states that (Medical) Services            he/she would notify OHS.
Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.
NOTE:
JPM is complete when applicant notifies OHS of KI use.
END JPM Stop Time:_________
A-N-5-S                                                                  Page 7 of 9


891011      _____        _____        _____ NOTE: If asked for Radiation Protection Manager to sign and date EP
-AA-113-F-03,                                  enter name as "TIG TRAGER" and today's date in the appropriate blanks.
: 5. Notifies Occupational Health (Medical) Services Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.
Examinee states that he/she would notify OHS
. _____        _____        _____
NOTE: JPM is complete when applicant notifies OHS of KI use.
END  JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 8 of 9  Operator's Name:
Operators Name:
Job Title:    SRO JPM Title: AUTHORIZE USE OF KI Revision Number: 0 2
Job
JPM Number:  A-N-5-S  Task Number and Title: 29900LK150 , Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.
K/A Number and Importance: Generic.2.4.
4 0    2.7 / 4.5


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
SRO JPM
Simulator Control Room In-Plant Testing Method: Simulate Alternate Path
 
: Yes No   Perform SRO Only: Yes No Time Critical:
==Title:==
Yes No Estimated Time to Complete:
AUTHORIZE USE OF KI Revision Number: 02 JPM Number: A-N-5-S Task Number and
20 minutes Actual Time Used:
 
minutes
==Title:==
29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.
K/A Number and Importance: Generic.2.4.40        2.7 / 4.5 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 20 minutes Actual Time Used:                 minutes


==References:==
==References:==
EP-AA-113-F-02, rev B; EP-AA-113-F-03, rev D; EP-AA-113, rev 11 EVALUATION


EP-AA-1 13-F-02, rev B; EP-AA-113-F-03, rev D; EP-AA-113 , rev 1 1  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-5-S                                                                      Page 8 of 9


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 9 of 9  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Station Emergency Director.
: 1. You are the Station Emergency Director.
: 2. A General Emergency has been declared.
: 2. A General Emergency has been declared.
: 3. There is an offsite release in progress.
: 3. There is an offsite release in progress.
: 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS. 5. Containment is currently being challenged.
: 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
: 6. The TSC has NOT been activated, but the appropriate EAL has been declared. 7. An Emergency life saving operation MUST be performed.
: 5. Containment is currently being challenged.
: 6. The TSC has NOT been activated, but the appropriate EAL has been declared.
: 7. An Emergency life saving operation MUST be performed.
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
: 9. The operation requires two people to enter the field.
: 9. The operation requires two people to enter the field.
: 10. Clay Morrow , Employee ID
: 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
# 123456 and Jax Teller Employee ID
# 891011 have volunteered.
: 11. Clay and Jax have NEVER received an emergency exposure before.
: 11. Clay and Jax have NEVER received an emergency exposure before.
: 12. Authorization for Emergency Exposure (EP
: 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
-AA-113-F-02 forms) have been filled out for Clay and Jax. INITIATING CUES
INITIATING CUES
: 1. Execute section 4.4 of EP
: 1. Execute section 4.4 of EP-AA-113.
-AA-113.}}
A-N-5-S                                                                Page 9 of 9}}

Latest revision as of 23:19, 5 February 2020

2013, Dresden Initial License Exam, as Administered Admin JPMs
ML13354B850
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/02/2013
From: Walton R
Operations Branch III
To:
Walton R
Shared Package
ML11355A018 List:
References
Download: ML13354B850 (74)


Text

Exelon Nuclear Job Performance Measure DETERMINE GENERATOR OPERATING LIMITS JPM Number: A-N-1-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-1-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with Turbine load at 900 MW and Turbine Reactive load at 200 MVAR.

NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

DOCUMENT PREPARATION

1. Provide a clean copy of DOP 6400-08.

A-N-1-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 Generator is operating at 900 MWe and 200MVARs.
3. Unit 2 Generator voltage regulator in service in automatic.
4. Unit 2 Generator H 2 pressure is 59 psig.
5. TSO has requested Unit 2 raise MVARs to 350 MVAR.

INITIATING CUE

1. The Unit supervisor has directed you to raise Unit 2 MVARs to 350 MVAR.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOP 6400-08.

1. Maintain system parameters Verifies TSO request can within stability and operability be performed within limits curves for existing hydrogen of Figure 2 or 4.

pressure. _____ _____ _____

  • 2. Use AUTO VOLTAGE Places the AUTO ADJUST control switch to VOLTAGE ADJUST C/S to control system voltage within RAISE to raise MVAR to _____ _____ _____

the Target Voltage Schedule 350 MVAR.

& Voltage Range OR as directed by TSO.

CUE:

After MVARs adjusted, a local operator on rounds informs the control room that the pressure regulator malfunctioned and H 2 pressure is now 50 PSIG.

  • 3. Ensure loading on Unit 2 is Verifies that current within Figure 2, Dresden Unit conditions are not within 2 Generator Capability the limits of figure 2 or 4 Curves and Under Excitation and recommends lowering Limiter Settings, Regulator In MVARs to < 300 MVAR.

Service, AND/OR Figure 4, Dresden Unit 2 Generator Capability Curves (Expanded _____ _____ _____

View) Regulator In Service.

CUE:

If required, As SRO, ask the examinee where they should leave MVARs, and verify their response is within the capability curve limits (JPM COMPLETE)

4. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

A-N-1-R Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT END JPM Stop Time:_________

A-N-1-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

Determine Generator Operating Limits Revision Number: 00 JPM Number: A-N-1-R Task Number and

Title:

299L029, Conduct Shift Operations K/A Number and Importance: Generic 2.1.25 3.9/ 4.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: minutes Actual Time Used: minutes

References:

DOP 6400-08, rev 30 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-1-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 Generator is operating at 900 MWe and 200MVARs.
3. Unit 2 Generator voltage regulator in service in automatic.
4. Unit 2 Generator H 2 pressure is 59 psig.
5. TSO has requested Unit 2 raise MVARs to 350 MVAR.

INITIATING CUE

1. The Unit supervisor has directed you to raise Unit 2 MVARs to 350 MVAR.
2. Inform the Unit Supervisor when the task is complete.

A-N-1-R Page 8 of 8

Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 01 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM.

Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam.

A-N-1-S Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. None A-N-1-S Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. An event has occurred resulting in the following conditions:
  • Unit 2 is at 95% power.
  • The seven-day Tech Spec time clock is about to expire for the Unit 2 EDG being degraded.
  • Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUE

1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
2. Inform the Shift Manager when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-S Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of

  • 1. Determines the event is Determines the event is reportable per SAF 1.2 reportable per SAF 1.2, Plant Shutdown Required by Technical Specifications _____ _____ _____
  • 2. Determines the time limit to Determines the time limit report via ENS as soon as to report via ENS as practicable, and in all cases soon as practicable, and within four hour of initiating in all cases within four the shutdown that is required hour of initiating the by TS.

shutdown that is required by TS. _____ _____ _____

3. Determines if plant shutdown Determines a LER is is completed, submit a required to the NRC within Licensee Event Report to the 60 days of discovery of the NRC within 60 days of event if plant shutdown is _____ _____ _____

discovery of the event. completed.

4. Informs Shift Manager task is Examinee notifies the Shift complete. Manager.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-1-S Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

Reportability Determination Revision Number: 01 JPM Number: A-N-1-S Task Number and

Title:

299L001, Determine Reportability requirements as outlined in station Reportability manual.

K/A Number and Importance: Generic 2.1.10 2.7 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

Reportability Manual LS-AA-1110, rev 19 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-1-S Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. An event has occurred resulting in the following conditions:
  • Unit 2 is at 95% power.
  • The seven-day Tech Spec time clock is about to expire for the Unit 2 EDG being degraded.
  • Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUE

1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
2. Inform the Shift Manager when the task is complete.

A-N-1-S Page 7 of 7

Exelon Nuclear Job Performance Measure DETERMINE HEAT STRESS ACTIONS JPM Number: A-N-2-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-2-R Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a clean copy of SA-AA-111 A-N-2-R Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The following conditions exist in the Drywell where work is being performed:
  • Dry Bulb Temperature is 110°F
  • Wet Bulb Globe Temperature (WBGT) is 101°F
  • Single PCs and scrubs are required
  • The work involves inspections and moderate climbing
  • The duration of the work will be 10 minutes
3. The WBGT in the area outside the Drywell bullpen is 78°F INITIATING CUE
1. The Unit Supervisor has directed you to complete attachment 4 of SA-AA-111 for the work to be performed in the Drywell.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

A-N-2-R Page 4 of 9

Job Performance Measure (JPM)

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-R Page 5 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of

1. Record the dry bulb From initial conditions, dry temperature bulb temp is 110°F.
2. Record the Wet Bulb Globe From initial conditions, Temperature (WBGT) WBGT temp is 101°F.
  • 3. Classify the work Determines the environment (HT, VHT, EHT) environment is HT based on an action time being calculated. _____ _____ _____
4. Record the metabolic rate Determines the metabolic (Low, Moderate, High) rate is moderate per attachment 2. _____ _____ _____
5. Record the clothing ensemble From initial conditions, Single PCs and scrubs are required. _____ _____ _____
  • 6. Record the Action Time Determines the action time is 20 minutes from per attachment 3. _____ _____ _____
7. Record Check Time Determines the check time Frequency frequency to be 5-10 min.
8. Record the Maximum Determines Maximum Extended Action Time Extended Action Time is 30 min. _____ _____ _____
  • 9. Record the Recovery Time Calculates the Recovery time is 30 min.
10. Record the Cool Area Determines that the area location outside the Drywell Bullpen meets the requirements for _____ _____ _____

a cool area.

A-N-2-R Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

11. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-2-R Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

Determine Heat Stress Actions Revision Number: 00 JPM Number: A-N-2-R Task Number and

Title:

299l029, Conduct Shift Operations.

K/A Number and Importance: Generic.

Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: minutes Actual Time Used: minutes

References:

procedure, rev ##

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-R Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The following conditions exist in the Drywell where work is being performed:
  • Dry Bulb Temperature is 110°F
  • Wet Bulb Globe Temperature (WBGT) is 101°F
  • Single PCs and scrubs are required
  • The work involves inspections and moderate climbing
  • The duration of the work will be 10 minutes
3. The WBGT in the area outside the Drywell bullpen is 78°F INITIATING CUE
1. The Unit Supervisor has directed you to complete attachment 4 of SA-AA-111 for the work to be performed in the Drywell.
2. Inform the Unit Supervisor when the task is complete.

A-N-2-R Page 9 of 9

Exelon Nuclear Job Performance Measure AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number: A-N-2-S Revision Number: 01 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM.

Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam.

A-N-2-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Clean copy of LS-AA-119.

A-N-2-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Shift Manager.
2. Both units are operating at near rated power.
3. It is Monday 10/21/13 @ 0600
4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
5. Another SRO will not be able to come in until 1300.
6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
7. No other Licensed individual is available to fill the Safety Related position.
8. The Unit 2 SRO working shift 1 is Steve Smith.
9. Steve is ready and willing to work the overtime and will work until 1300.
10. Steve is NOT fatigued and IS mentally alert.
11. Steves Employee ID# is: 987654.
12. Safety-related work WILL be performed by Steve during the shift.
13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13.
14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:

Tue Wed Thu Fri Sat Sun Mon Shift 10/15/13 10/16/13 10/17/13 10/18/13 10/19/13 10/20/13 10/21/13 1 (2300-0700) 8 8 8 8 8 8 8 2 (0700-1500) 4 4 4 3 (1500-2300)

INITIATING CUE

1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
2. The Operations Director will complete sections 2 - 4 of LS-AA-119.

A-N-2-S Page 4 of 8

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-S Page 5 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of LS-AA-119.

  • 1. Reviews procedure to Determines that overtime determine what limits will be would exceed:

exceeded.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 days.

  • 2. Properly fills out Attachment Critical areas are:

1, Section 1 - Request portion. Planned Waiver Start:

10/21/13 / 1100 Planned Waiver End:

10/21/13 / 1300 Planned Waiver Duration:

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

> 72 in any 7 days.

checked Submitted by: name, signature, date, and time. _____ _____ _____

3. Forwards paperwork to the Forwards paperwork to the Operations Director. Operations Director or designee. _____ _____ _____

END JPM Stop Time:_________

A-N-2-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS Revision Number: 01 JPM Number: A-N-2-S Task Number and

Title:

299L057, Perform administrative duties to ensure overtime restrictions are not exceeded.

K/A Number and Importance: Generic.1.5 2.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

LS-AA-119, rev 10 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Shift Manager.
2. Both units are operating at near rated power.
3. It is Monday 10/21/13 @ 0600
4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
5. Another SRO will not be able to come in until 1300.
6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
7. No other Licensed individual is available to fill the Safety Related position.
8. The Unit 2 SRO working shift 1 is Steve Smith.
9. Steve is ready and willing to work the overtime and will work until 1300.
10. Steve is NOT fatigued and IS mentally alert.
11. Steves Employee ID# is: 987654.
12. Safety-related work WILL be performed by Steve during the shift.
13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13.
14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:

Tue Wed Thu Fri Sat Sun Mon Shift 10/15/13 10/16/13 10/17/13 10/18/13 10/19/13 10/20/13 10/21/13 1 (2300-0700) 8 8 8 8 8 8 8 2 (0700-1500) 4 4 4 3 (1500-2300)

INITIATING CUE

1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
2. The Operations Director will complete sections 2 - 4 of LS-AA-119.

A-N-2-S Page 8 of 8

Exelon Nuclear Job Performance Measure PERFORM APRM FLOW BIAS CALIBRATION CHECK JPM Number: A-N-3-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-3-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a clean copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74 A-N-3-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 is at full power.
3. The plant process computer is currently unavailable.

INITIATING CUE

1. The Unit Supervisor has directed you to perform DOS 0500-26, APRM FLOW BIAS CALIBRATION CHECK.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74 CUE:

When the examinee states they will check FI 2-260-5A(B) and RBM 7/8 provide them with the appropriate supplied picture.

  • 1. IF the process computer is Determines that A and B NOT available, THEN obtain recirc pump flows are 16 recirc pump flow for each Mlbm/hr and calculated loop from 2 A(B) PP FLOW, total drive flow is 32 FI 2-260-5A(B) AND calculate Mlbm/hr.

Total Drive Flow _____ _____ _____

2. Record Rated Drive Flow Enters 32.89 Mlbm/hr from (WD RATED ) from the CRSP the CRSP Unit Status Unit Status sheet sheet. _____ _____ _____
  • 3. Calculate Drive Flow (%) Calculates drive flow percentage to be 97.29%
4. Record the percent FLOW Determines percent FLOW

(%) indicated on RBM CH 7 on RBM CH 7 RPS CH A RPS CH A, at Panel 902(3)- is 97%

37 _____ _____ _____

5. Record the percent FLOW Determines percent FLOW

(%) indicated on RBM CH 8 on RBM CH 8 RPS CH B RPS CH B, at Panel 902(3)- is 97%

37 _____ _____ _____

  • 6. Verify the values recorded in Using Operator aid, Steps 4 AND 5 are LESS Determines values are THAN OR EQUAL TO the greater than Desired Desired Setting per Operator Settings.

Aid Unit 2(3) APRM/RBM Flow Converter Setting vs. Acceptance criteria not Total Drive Flow, for WD% met.

value calculated in Step 3 _____ _____ _____

A-N-3-R Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

7. Contact the QNE AND IMD to States that the QNE AND perform DIS 0700-02, IMD would be contacted to APRM/RBM Flow perform APRM/RBM Flow Instrumentation Total Drive Instrumentation Total Drive Flow Adjustment Flow Adjustment
8. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

APRM Flow Bias Calibration Check Revision Number: 00 JPM Number: A-N-3-R Task Number and

Title:

215L0007, Perform Unit 2(3) power range monitoring system surveillance K/A Number and Importance: Generic 2.2.14 3.9 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: minutes Actual Time Used: minutes

References:

DOS 0500-26, rev 00; Operator Aid #74, rev 09 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-3-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 is at full power.
3. The plant process computer is currently unavailable.

INITIATING CUE

1. The Unit Supervisor has directed you to perform DOS 0500-26, APRM FLOW BIAS CALIBRATION CHECK.
2. Inform the Unit Supervisor when the task is complete.

A-N-3-R Page 8 of 8

Exelon Nuclear Job Performance Measure DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW JPM Number: A-N-3-S Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-3-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 6600-01 A-N-3-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The Unit 3 EDG was run for a normal even month surveillance.
3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.

INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-S Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOS 6600-01 NOTE:

Other unidentified errors exist. Only items marked as critical are required.

  • 1. Verify D/G has operated for Recognizes that the diesel

> 60 minutes with a load of ran for less than 60 2340 to 2600 kW minutes. Acceptance criteria not met. _____ _____ _____

  • 2. Diesel fuel oil day tank level > Recognizes that Diesel 29.5 inches (for U2 or U3 fuel oil day tank level is EDG) less than 29.5 inches Acceptance criteria not _____ _____ _____

met.

  • 3. Verify D/G START AIR A1/A2 Recognizes that A1/A2 RECEIVER TANK pressure in RECEIVER TANK Step 3.a.(16) is greater than pressure is not greater D/G START AIR B1/B2 than B1/B2 RECEIVER RECEIVER TANK in Step TANK pressure.

3.a.(16) Acceptance criteria not _____ _____ _____

met.

4. IF air pressure between Recognizes that an issue banks has equalized, THEN report needs to be initiate an Issue Report to generated to repair the repair check valve. check valve. _____ _____ _____
5. Verify A compressor stops Recognizes that the A between 245 and 260 psig. compressor stopped > 260 psig. _____ _____ _____
6. IF Compressor A OR "B" Recognizes that stop pressures are NOT compressor A did not stop within expected range (224 to within the expected range 260 psig), THEN contact the (265 psig), the System Plant Engineering System Engineer needs to be Manager AND initiate an contacted. _____ _____ _____

Issue Report.

A-N-3-S Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

7. Notify System Engineer that Notifies System Engineer A compressor did not stop at that A compressor did not the expected band. start at the expected band. _____ _____ _____
  • 8. Declare D/G Operable Recognizes that the Acceptance Criteria for the Unit 3 EDG is not met and _____ _____ _____

determines the EDG is inoperable.

9. Informs Shift Manager task is Examinee notifies the Shift complete. Manager.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW Revision Number: 00 JPM Number: A-N-3-S Task Number and

Title:

264L009, Perform Surveillance Testing K/A Number and Importance: Generic 2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

DOS 6600-01, rev 123 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-3-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The Unit 3 EDG was run for a normal even month surveillance.
3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.

INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

A-N-3-S Page 8 of 8

Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-4-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a copy of DOA 0010-10 and DOA 0010-S1 A-N-4-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. Hazmat and rescue response are not required.
4. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
5. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOA 0010-10.

Provide the examinee with the supplied copy of DOA 0010-S1 when requested.

  • 1. Notify Coal City Fire From DOA 0010-S1 Protection District. (Refer to determines that 815-942-DOA 0010-S1, Key Phone 0336 is the number Numbers for DOA 0010 Block needed to contact the _____ _____ _____

Procedures.) CCFPD.

  • 2. Dial 815-942-0336 and Dials 815-942-0336 and communicate the details of communicates the location the fire. of the fire. _____ _____ _____

CUE:

If requested by the examinee, the TSO can not contact the Coal City Fire Department because they are currently dealing with grid instabilities.

3. Notifies TSO via direct line for Notifies the TSO from a major fire. control room phone using the TSO direct line button and provides call back _____ _____ _____

phone number.

4. Notify Security Shift Notifies the Security Shift Supervisor that outside fire Supervisor that the department will be CCFPD will be responding responding AND request to the Lift Station.

assistance in providing access to affected area if _____ _____ _____

necessary.

5. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-4-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

DETERMINE ACTIONS FOR A FIRE Revision Number: 00 JPM Number: A-N-4-R Task Number and

Title:

295L009, Respond to a fire/explosion K/A Number and Importance: Generic 2.4.27 3.4 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: minutes Actual Time Used: minutes

References:

DOA 0010-10, rev 18; DOA 0010-S1, rev 14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. Hazmat and rescue response are not required.
4. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
5. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION.
2. Inform the Unit Supervisor when the task is complete.

A-N-4-R Page 7 of 7

Exelon Nuclear Job Performance Measure SELECT PERSONNEL FOR RADIATION WORK JPM Number: A-N-4-S Revision Number: 00 Date: 08/13 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-4-S Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room.
2. Markup a survey map for the Unit 3 RWCU Pump Room.
3. Clean copy of RP-AA-203.

A-N-4-S Page 3 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five NLOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem

4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
  • 45 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 4 of 10

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-S Page 5 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and the supplied copy of RP-AA-203.

The following steps may be performed in any order.

1. Reviews Survey Maps to Reviews the survey maps determine area dose rates. and determines area dose rates to be 50 mr/hr for the first group of 2 valves and _____ _____ _____

160 mr/hr for the remaining valve.

NOTE:

The following calculations should be made:

2 valve clearance projected dose = 0.75 hr x 40 mr/hr = 30 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 40 mrem + 30 mrem = 65 mrem

  • 2. Calculates that the projected Determines the NLOs will dose that will be received for receive 30 mrem on the the task is 65 mrem. first 2 valves and 35 on the next valve. _____ _____ _____

CUE:

IF the candidate inquires whether or not any of the NLOs has received permission to exceed any dose limits, respond: None of the Non Licensed Operators have received permission to exceed any limits.

NOTE:

The following steps may be performed in any order.

  • 3. Determines that ALEX Alexs total daily dose on CAN NOT perform the job RWP 10004555 would be because he would exceed the 105 mrem.

80 mrem dose alarm on RWP _____ _____ _____

10004555.

A-N-4-S Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 4. Determines that Dan Dans total Annual dose CAN NOT perform the job would be 2015 mrem.

because he would exceed the 2000 mrem Exelon Annual _____ _____ _____

limit.

  • 5. Determines that Mike CAN Mikes total RWP daily perform the job because no dose and Annual dose will limits will be exceeded. remain below the limits.
  • 6. Determines that Sue Alexs total daily dose on CAN NOT perform the job RWP 10004555 would be because she would exceed 110 mrem.

the 80 mrem dose alarm on RWP 10004555.

  • 7. Determines that Tom CAN Toms total RWP daily perform the job because no dose and Annual dose will limits will be exceeded. remain below the limits.

END JPM Stop Time:_________

A-N-4-S Page 7 of 10

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

SELECT PERSONEL FOR RADIATION WORK Revision Number: 00 JPM Number: A-N-4-S Task Number and

Title:

29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.4 3.2 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

RP-AA-203, rev 03 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-S Page 8 of 10

Job Performance Measure (JPM)

KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two NLOs can receive the dose, necessary to complete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> total dose on RWP 10004555, and total Annual TEDE dose for each Operator.

Calculation:

2 valves clearance (at RWCU Aux Pump) projected dose = 0.75 hr x 40 mr/hr =

30mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25hr x 140 mr/hr =

35mrem 30mrem + 35 mrem = 65 mrem projected job dose for clearance order hanging DDE dose Annual TEDE Projected dose on Projected Annual TEDE Name received on RWP dose as of RWP 10004555 (including all dose from 10004555 today Midnight To Date for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

(40 + 65 =) (1550 + 65 =)

Alex 40 mrem 1550 mrem 105 mrem 1615 mrem (5 + 65 =) (1950 + 65 =)

Dan 5 mrem 1950 mrem 70 mrem 2015 mrem (0 + 65 =) (1920 + 65 =)

Mike 0 mrem 1920 mrem 65 mrem 1985 mrem (45 + 65 =) (1850 + 65 =)

Sue 45 mrem 1850 mrem 110 mrem 1915 mrem (10 + 65 =) (1750 + 65 =)

Tom 10 mrem 1750 mrem 75 mrem 1815 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.

A-N-4-S Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five NLOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem

4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
  • 45 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room.

DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 10 of 10

Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 02 Date: 08/13 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for ILT 12-1 (2013-301) NRC Exam.

A-N-5-S Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Two (2) marked up copies of EP-AA-113-F-02.
2. Blank copy of EP-AA-113.
3. Blank copy of EP-AA-113-F-03.

A-N-5-S Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared.
7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.

INITIATING CUES

1. Execute section 4.4 of EP-AA-113.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

A-N-5-S Page 4 of 9

Job Performance Measure (JPM)

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-5-S Page 5 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee the provided copies of:

EP-AA-113-F-02, and EP-AA-113.

1. Applicant determines need for Emergency action is emergency action. needed per initiating cue.

CUE:

If asked, Clay and Jax do NOT have any adverse reactions to KI.

2. Applicant recognizes per the Recognizes that initiating cue that authorization to take KI authorization to take KI must must also be completed.

also be completed prior to the _____ _____ _____

emergency workers entering the space.

  • 3. Determines there is or has Determines KI must be been a Loss of Fuel Clad issued.

Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected _____ _____ _____

to have a high iodine concentration. Determines KI must be issued.

CUE:

When applicant determines KI must be issued, provide EP-AA-113-F-03 form and instruct applicant to complete form.

A-N-5-S Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 4. Documents the decision to BOTH individuals being issue KI using THYROID authorized for KI and BLOCKING AGENT entering the space must be AUTHORIZATION Form listed with their correct (EP-AA-113-F-03). names and employee ID numbers:
  • Clay Morrow _____ _____ _____

123456

  • Jax Teller 891011 NOTE:

If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.

5. Notifies Occupational Health Examinee states that (Medical) Services he/she would notify OHS.

Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.

NOTE:

JPM is complete when applicant notifies OHS of KI use.

END JPM Stop Time:_________

A-N-5-S Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

AUTHORIZE USE OF KI Revision Number: 02 JPM Number: A-N-5-S Task Number and

Title:

29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.

K/A Number and Importance: Generic.2.4.40 2.7 / 4.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

EP-AA-113-F-02, rev B; EP-AA-113-F-03, rev D; EP-AA-113, rev 11 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-5-S Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared.
7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.

INITIATING CUES

1. Execute section 4.4 of EP-AA-113.

A-N-5-S Page 9 of 9