ML14211A053: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 07/29/2014 | | issue date = 07/29/2014 | ||
| title = Assessment Follow-Up Letter for Arkansas Nuclear One, Units 1 and 2 | | title = Assessment Follow-Up Letter for Arkansas Nuclear One, Units 1 and 2 | ||
| author name = Dapas M | | author name = Dapas M | ||
| author affiliation = NRC/RGN-IV/ORA | | author affiliation = NRC/RGN-IV/ORA | ||
| addressee name = Browning J | | addressee name = Browning J | ||
Line 9: | Line 9: | ||
| docket = 05000313, 05000368 | | docket = 05000313, 05000368 | ||
| license number = DPR-051, NPF-006 | | license number = DPR-051, NPF-006 | ||
| contact person = Werner G | | contact person = Werner G | ||
| document type = Letter | | document type = Letter | ||
| page count = 4 | | page count = 4 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:July 29, 2014 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 July 29, 2014 Jeremy Browning, Site Vice President Arkansas Nuclear One Entergy Operations, Inc. | ||
1448 SR 333 | 1448 SR 333 Russellville, AR 72802-0967 | ||
==SUBJECT:== | ==SUBJECT:== | ||
ASSESSMENT FOLLOW-UP LETTER FOR ARKANSAS NUCLEAR ONE, | ASSESSMENT FOLLOW-UP LETTER FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 | ||
==Dear Mr. Browning:== | ==Dear Mr. Browning:== | ||
As a result of our continuous review of plant performance, the U. S. Nuclear Regulatory Commission (NRC) updated its assessment of Arkansas Nuclear One, Units 1 and 2. The | As a result of our continuous review of plant performance, the U. S. Nuclear Regulatory Commission (NRC) updated its assessment of Arkansas Nuclear One, Units 1 and 2. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and plans for future inspections at your facility. This letter supplements, but does not supersede, the annual assessment letter issued on March 4, 2014. | ||
In a letter to you dated June 23, 2014, the NRC informed you of its final risk significance determination associated with inspection findings in the Initiating Events Cornerstone for Unit 1 and Unit 2. Those findings, which we concluded were of substantial safety significance (Yellow), involved your | In a letter to you dated June 23, 2014, the NRC informed you of its final risk significance determination associated with inspection findings in the Initiating Events Cornerstone for Unit 1 and Unit 2. Those findings, which we concluded were of substantial safety significance (Yellow), | ||
involved your staffs failure to provide adequate oversight for the planned movement of the Unit 1 turbine stator in March 2013 using a temporary hoisting assembly. More specifically, your staff failed to identify deficiencies in a vendor calculation and an incorrectly sized component in the north tower structure of the temporary hoisting assembly. In addition, the temporary hoisting assembly was not designed for at least 125 percent of the projected hook load, and a load test was not performed in all configurations for which the temporary hoisting assembly would be used. | |||
Given the significance of the findings referenced above, the NRC determined the performance at Arkansas Nuclear One, Unit 1 and Unit 2, to be in the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix beginning the first quarter of 2014. The NRC plans to conduct a supplemental inspection to review the actions taken to address the performance issues associated with the Yellow findings in accordance with Inspection Procedure 95002, | Also, on June 18, 2014, the NRC informed you of our final significance determination with respect to a Greater-than-Green inspection finding in the Security Cornerstone. | ||
Given the significance of the findings referenced above, the NRC determined the performance at Arkansas Nuclear One, Unit 1 and Unit 2, to be in the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix beginning the first quarter of 2014. The NRC plans to conduct a supplemental inspection to review the actions taken to address the performance issues associated with the Yellow findings in accordance with Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area. The NRC will plan this inspection activity when you provide written notification of your readiness for the inspection. | |||
J. Browning This supplemental inspection will provide assurance that the root and contributing causes of risk-significant performance issues are understood, that the extent of condition and the extent of cause of risk-significant performance issues are identified, and that corrective actions for risk-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence. This inspection will also determine if safety culture components caused or significantly contributed to the risk-significant performance issues. | |||
The NRC also plans to conduct a supplemental inspection to review the actions taken to address the performance issues associated with the finding in the Security Cornerstone. The NRC will plan this inspection activity when you provide written notification of your readiness for the inspection. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Please contact Mr. Gregory Werner at (817) 200-1574 with any questions you have regarding this letter. | Please contact Mr. Gregory Werner at (817) 200-1574 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Marc L. Dapas Regional Administrator Docket Nos.: 50-313, 50-368 License Nos: DPR-51; NPF-6 | |||
Marc L. Dapas Regional Administrator | |||
ML14211A053 | ML14211A053 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: | ||
By: GEW Yes No Non-Publicly Available Sensitive RGN-002 OFFICE C:DRP/E C:DRS/PSB1 D:DRS AD:DRP DRA RA NAME GWerner:PBH MHaire AVegel TPruett KKennedy MDapas SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ | |||
DATE 06/23/14 06/25/14 06/25/14 07/21/14 07/25/14 07/29/14 Letter to Jeremy Browning from Marc L. Dapas dated July 29, 2014 | |||
==SUBJECT:== | ==SUBJECT:== | ||
ASSESSMENT FOLLOW-UP LETTER FOR ARKANSAS NUCLEAR ONE, | ASSESSMENT FOLLOW-UP LETTER FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 Electronic Distribution via RIV: | ||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | Acting DRP Director (Troy.Pruett@nrc.gov) | ||
Acting DRP Deputy Director (Michael.Hay@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | DRS Deputy Director (Jeff.Clark@nrc.gov) | ||
Senior Resident Inspector (Brian.Tindell@nrc.gov) | Senior Resident Inspector (Brian.Tindell@nrc.gov) | ||
Resident Inspector (Abin.Fairbanks@nrc.gov) Resident Inspector (Matt.Young@nrc.gov) Administrative Assistant (Gloria.Hatfield@nrc.gov) | Resident Inspector (Abin.Fairbanks@nrc.gov) | ||
Resident Inspector (Matt.Young@nrc.gov) | |||
Administrative Assistant (Gloria.Hatfield@nrc.gov) | |||
Branch Chief (Greg.Werner@nrc.gov) | Branch Chief (Greg.Werner@nrc.gov) | ||
Senior Project Engineer (Cale.Young@nrc.gov) | Senior Project Engineer (Cale.Young@nrc.gov) | ||
Project Engineer (Jim.Melfi@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) | Project Engineer (Jim.Melfi@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
RIV State Liaison Officer (Bill.Maier@nrc.gov) | RIV State Liaison Officer (Bill.Maier@nrc.gov) | ||
Project Manager (Peter.Bamford@nrc.gov) | Project Manager (Peter.Bamford@nrc.gov) | ||
Line 57: | Line 64: | ||
Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov) | Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov) | ||
Director, DORL, NRR (Michele.Evans@nrc.gov) | Director, DORL, NRR (Michele.Evans@nrc.gov) | ||
Deputy Director, DORL, NRR (Louise.Lund@nrc.gov) Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) | Deputy Director, DORL, NRR (Louise.Lund@nrc.gov) | ||
Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
Technical Support Assistant (Loretta.Williams@nrc.gov) | Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov R4TSB-AA@nrc.gov}} | RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) | ||
ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov R4TSB-AA@nrc.gov}} |
Latest revision as of 18:47, 5 February 2020
ML14211A053 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 07/29/2014 |
From: | Dapas M Region 4 Administrator |
To: | Jeremy G. Browning Entergy Operations |
Werner G | |
References | |
Download: ML14211A053 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 July 29, 2014 Jeremy Browning, Site Vice President Arkansas Nuclear One Entergy Operations, Inc.
1448 SR 333 Russellville, AR 72802-0967
SUBJECT:
ASSESSMENT FOLLOW-UP LETTER FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2
Dear Mr. Browning:
As a result of our continuous review of plant performance, the U. S. Nuclear Regulatory Commission (NRC) updated its assessment of Arkansas Nuclear One, Units 1 and 2. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and plans for future inspections at your facility. This letter supplements, but does not supersede, the annual assessment letter issued on March 4, 2014.
In a letter to you dated June 23, 2014, the NRC informed you of its final risk significance determination associated with inspection findings in the Initiating Events Cornerstone for Unit 1 and Unit 2. Those findings, which we concluded were of substantial safety significance (Yellow),
involved your staffs failure to provide adequate oversight for the planned movement of the Unit 1 turbine stator in March 2013 using a temporary hoisting assembly. More specifically, your staff failed to identify deficiencies in a vendor calculation and an incorrectly sized component in the north tower structure of the temporary hoisting assembly. In addition, the temporary hoisting assembly was not designed for at least 125 percent of the projected hook load, and a load test was not performed in all configurations for which the temporary hoisting assembly would be used.
Also, on June 18, 2014, the NRC informed you of our final significance determination with respect to a Greater-than-Green inspection finding in the Security Cornerstone.
Given the significance of the findings referenced above, the NRC determined the performance at Arkansas Nuclear One, Unit 1 and Unit 2, to be in the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix beginning the first quarter of 2014. The NRC plans to conduct a supplemental inspection to review the actions taken to address the performance issues associated with the Yellow findings in accordance with Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area. The NRC will plan this inspection activity when you provide written notification of your readiness for the inspection.
J. Browning This supplemental inspection will provide assurance that the root and contributing causes of risk-significant performance issues are understood, that the extent of condition and the extent of cause of risk-significant performance issues are identified, and that corrective actions for risk-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence. This inspection will also determine if safety culture components caused or significantly contributed to the risk-significant performance issues.
The NRC also plans to conduct a supplemental inspection to review the actions taken to address the performance issues associated with the finding in the Security Cornerstone. The NRC will plan this inspection activity when you provide written notification of your readiness for the inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Gregory Werner at (817) 200-1574 with any questions you have regarding this letter.
Sincerely,
/RA/
Marc L. Dapas Regional Administrator Docket Nos.: 50-313, 50-368 License Nos: DPR-51; NPF-6
ML14211A053 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: GEW Yes No Non-Publicly Available Sensitive RGN-002 OFFICE C:DRP/E C:DRS/PSB1 D:DRS AD:DRP DRA RA NAME GWerner:PBH MHaire AVegel TPruett KKennedy MDapas SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/
DATE 06/23/14 06/25/14 06/25/14 07/21/14 07/25/14 07/29/14 Letter to Jeremy Browning from Marc L. Dapas dated July 29, 2014
SUBJECT:
ASSESSMENT FOLLOW-UP LETTER FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 Electronic Distribution via RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
Administrative Assistant (Gloria.Hatfield@nrc.gov)
Branch Chief (Greg.Werner@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Jim.Melfi@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
RIV State Liaison Officer (Bill.Maier@nrc.gov)
Project Manager (Peter.Bamford@nrc.gov)
Branch Chief, TSB (Geoffrey.Miller@nrc.gov)
R4DRPBC@nrc.gov R4DRSBC@nrc.gov Director, DIRS, NRR (Scott.Morris@nrc.gov)
Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)
Director, DORL, NRR (Michele.Evans@nrc.gov)
Deputy Director, DORL, NRR (Louise.Lund@nrc.gov)
Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov R4TSB-AA@nrc.gov