ML17213A558: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 10/08/1982 | | issue date = 10/08/1982 | ||
| title = Forwards Weekly Status Summary of Joint Ebasco & C-E Verification Program for 821004-08 | | title = Forwards Weekly Status Summary of Joint Ebasco & C-E Verification Program for 821004-08 | ||
| author name = | | author name = Blodgett T | ||
| author affiliation = EBASCO SERVICES, INC. | | author affiliation = EBASCO SERVICES, INC. | ||
| addressee name = | | addressee name = Eisenhut D | ||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| docket = 05000389 | | docket = 05000389 | ||
Line 14: | Line 14: | ||
| page count = 9 | | page count = 9 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:REGULATOR NFORMATION DISTRIB UT ION EM (R IDS) | |||
'AGCY''<SION NBR: 8210150431 DOC, DATE; 82/10/08 NOTARIZED: NO DOCKET FACIL:50-389 St, Lucia P lant'niit 2, Florida Power L Light Co ~ 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGETT~T.HE Ebasco Services< Inc. of Enserch Corp,) | |||
~ NAME RECIPIENT 'AFFILIATION (sub'HCIP EISENHUT~D,G ~ Division of Licensing | |||
==SUBJECT:== | |||
For wards weekly status summary of Jo int Ebasco L C E engineering verification program for 8?.1004"08 ~ | |||
DISTRIBUTION CODE: B001S COPIES RECEI>ED;LTR TITLE: Licensing Submittal: PSAR/FSAR Amdts 8 | |||
/ ENCL JSIZE: | |||
Rel*ated Correspondence NOTES: | |||
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR P3 'BC 0 LIC BR 03 LA 1, 0 NERSESrV ~ 01 1 1 INTERKAL: ELD/HDS2 1 0 IE FILE 1' | |||
,IE/DEP EPDS 35 IE/DEP/EPLB 36 | |||
'8 1 1 ,3 3 NRR/DE/AEAB 0 NRR/DF/CEB 11 1 1 NRR/DE/EQB NRR/DE/GB 2 ' | |||
13 3 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB NRR/DHFS/HFEB40 24 2 | |||
1 1 | |||
1 2 | |||
1 1 | |||
1 NRR/DE/MEB NRR/DE/QAB NRR/DE/SES NRR/DHFS/LQB 32 | |||
'5 18 21 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DS I/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CP8 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DS I/ETSB 12 1 NRR/DS I/ICSB 16 1 1 NRR/DS I/PSB 19 1 1 NRR/DS I/RAB 22 1 1 23 1 1 NRR/DST/LGB 33 1 1 G 04 1 1 RGN2 2 ? | |||
RM/DDAMI/MIB 1 0 EXTERNAL; ACRS 41 6 6 BNL(AMDTS DMB/DSS (AMDTS) DIV 39 ONLY)'EMA<<REP 1 1 1 LPDR 05 1 1 NRC PDR 02 1 NSIC 05 1 1 NTIS 1. | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 ENCL 49 | |||
>>E I Itth $ | |||
f hll <<h'w << ffh I | |||
'h h y h Iti hc) tip 1EI4IH )II ll ti f 'fh f | |||
I hl tt IC t! | |||
f CI h | |||
E Nt, p | |||
<<<<I I',' l h C, E | |||
<<II r I<< | |||
'E J '> <<Itt <<,J, | |||
Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N. Y. 10048 October 8,1982 Ltr No. EVP-119/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555 | |||
==Dear Mr Eisenhut:== | |||
Re: ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS | |||
==SUMMARY== | |||
FOR PERIOD OCTOBER 4- OCTOBER 8 1982 Attached for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period October 4 through October 8,1982. | |||
Very truly yours, Mi'8 T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 821008 8210150431 0500038'P PDR ADOCK PDR | |||
s ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS SKlMARY FOR PERIOD OCTOBER 4-OCTOBER 8,1982 | |||
: l. Independent design packages for the following items were completed during the period: | |||
: a. HEPA Filter .for the ECCS Area Ventilation System (Verification Item 8) | |||
: b. Area Radiation Monitor GM-26-22 (Verification Item 5) | |||
: c. Tornado Missile Shield Door RA-109 (Verification Item 6) | |||
Copies were transmitted/distributed to members of the Review Committee for review of packages for completeness, Items 8 and 5 via Federal Express on October 4, and Item 6 by hand on October 6. | |||
Committee approval to release these existing designs for ETF comparison is anticipated by October 13. | |||
: 2. A request for additional existing design documents for the Hydrogen Recombiner (Item 4) was made on October 4. A portion has been transmitted from the Project Team to the ETF and the balance is being assembled for transmittal. | |||
existing designs continued for the K | |||
: 3. Comparison of the independent and Hydrogen Recombiner. | |||
-4. . Comparison of independent and existing designs for the Control Room Emergency Cleanup System Valve (Item 3) commenced following receipt of the first existing design documents from the Project Team. Receipt of the balance is expected early next period, including one additionally requested drawing. | |||
: 5. A response was received re two requested, design input items per ETF letter EVP-306/SL-2 of September 2. This is related to preparation of the. independent design package for Verification Item 7,'ain Steam-Isolation Valve. The completed design package is now scheduled for transmittal to Review Committee members on October'l. for package completeness review. | |||
: 6. A meeting of the FPL,C-E and Ebasco EVP Task Force Managers. was held October 6 in Juno Beach, Florida to review program progress.'. | |||
~ On October 7, the Task Force Managers were at the,S't. Lucie jobsite t'o continu planning for the field installation verification phase of t: he program. | |||
1 | |||
ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS | |||
==SUMMARY== | |||
OCTOBER 4-OCTOBER 8,1982 | |||
: 1. Portions of the existing design package for the Safety Injection Tank Isolation Valve (C-E Verification Item 2) have been received from the C-E Project Team. | |||
Comparison of the independent and existing designs has begun using a standard comparison form. Design comparison, planned for October 18 completion, is dependent on receipt of the balance of existing design information from the Ebasco Project Team by October 14. | |||
~ | |||
: 2. The independent design package for the High Pressure Safety Injection Pump (C-E Verification Item 1) was completed and transmitted to Review Committee members on October 5. Release of the existing design package for is expected by October 11. 'omparison | |||
: 3. , On-site verification arrangements were discussed during an October 7 meeting of the Task Force Managers at the St. Lucie 2 construction site. | |||
TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM -. SL2 | |||
~~ OF 10-4-82. | |||
DATE OF PARTICIPATING 'GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD October 4 C-E/FPL Existing design info C-E EVP task | |||
/ Program planning Force Mgr October 4 Ebasco/C-E Transmittal via Fed. Exp. Ebasco EVP Task of Ind. Design Pkgs. Force Mgr to Review Committee; | |||
'Preparation for EVP Task Force Mgrs mtg. | |||
October 4 FPL/Ebasco Response to September 2 Ebasco EVP .Task request for MSIV design Force Mgr input}} |
Latest revision as of 14:27, 4 February 2020
ML17213A558 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 10/08/1982 |
From: | Blodgett T EBASCO SERVICES, INC. |
To: | Eisenhut D Office of Nuclear Reactor Regulation |
References | |
EVP-119-SL-2, NUDOCS 8210150431 | |
Download: ML17213A558 (9) | |
Text
REGULATOR NFORMATION DISTRIB UT ION EM (R IDS)
'AGCY<SION NBR: 8210150431 DOC, DATE; 82/10/08 NOTARIZED: NO DOCKET FACIL:50-389 St, Lucia P lant'niit 2, Florida Power L Light Co ~ 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGETT~T.HE Ebasco Services< Inc. of Enserch Corp,)
~ NAME RECIPIENT 'AFFILIATION (sub'HCIP EISENHUT~D,G ~ Division of Licensing
SUBJECT:
For wards weekly status summary of Jo int Ebasco L C E engineering verification program for 8?.1004"08 ~
DISTRIBUTION CODE: B001S COPIES RECEI>ED;LTR TITLE: Licensing Submittal: PSAR/FSAR Amdts 8
/ ENCL JSIZE:
Rel*ated Correspondence NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR P3 'BC 0 LIC BR 03 LA 1, 0 NERSESrV ~ 01 1 1 INTERKAL: ELD/HDS2 1 0 IE FILE 1'
,IE/DEP EPDS 35 IE/DEP/EPLB 36
'8 1 1 ,3 3 NRR/DE/AEAB 0 NRR/DF/CEB 11 1 1 NRR/DE/EQB NRR/DE/GB 2 '
13 3 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB NRR/DHFS/HFEB40 24 2
1 1
1 2
1 1
1 NRR/DE/MEB NRR/DE/QAB NRR/DE/SES NRR/DHFS/LQB 32
'5 18 21 1
1 1
1 1
1 1
1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DS I/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CP8 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DS I/ETSB 12 1 NRR/DS I/ICSB 16 1 1 NRR/DS I/PSB 19 1 1 NRR/DS I/RAB 22 1 1 23 1 1 NRR/DST/LGB 33 1 1 G 04 1 1 RGN2 2 ?
RM/DDAMI/MIB 1 0 EXTERNAL; ACRS 41 6 6 BNL(AMDTS DMB/DSS (AMDTS) DIV 39 ONLY)'EMA<<REP 1 1 1 LPDR 05 1 1 NRC PDR 02 1 NSIC 05 1 1 NTIS 1.
TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 ENCL 49
>>E I Itth $
f hll <<h'w << ffh I
'h h y h Iti hc) tip 1EI4IH )II ll ti f 'fh f
I hl tt IC t!
f CI h
E Nt, p
<<<<I I',' l h C, E
<<II r I<<
'E J '> <<Itt <<,J,
Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N. Y. 10048 October 8,1982 Ltr No. EVP-119/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr Eisenhut:
Re: ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS
SUMMARY
FOR PERIOD OCTOBER 4- OCTOBER 8 1982 Attached for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period October 4 through October 8,1982.
Very truly yours, Mi'8 T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 821008 8210150431 0500038'P PDR ADOCK PDR
s ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS SKlMARY FOR PERIOD OCTOBER 4-OCTOBER 8,1982
- l. Independent design packages for the following items were completed during the period:
- b. Area Radiation Monitor GM-26-22 (Verification Item 5)
- c. Tornado Missile Shield Door RA-109 (Verification Item 6)
Copies were transmitted/distributed to members of the Review Committee for review of packages for completeness, Items 8 and 5 via Federal Express on October 4, and Item 6 by hand on October 6.
Committee approval to release these existing designs for ETF comparison is anticipated by October 13.
- 2. A request for additional existing design documents for the Hydrogen Recombiner (Item 4) was made on October 4. A portion has been transmitted from the Project Team to the ETF and the balance is being assembled for transmittal.
existing designs continued for the K
- 3. Comparison of the independent and Hydrogen Recombiner.
-4. . Comparison of independent and existing designs for the Control Room Emergency Cleanup System Valve (Item 3) commenced following receipt of the first existing design documents from the Project Team. Receipt of the balance is expected early next period, including one additionally requested drawing.
- 5. A response was received re two requested, design input items per ETF letter EVP-306/SL-2 of September 2. This is related to preparation of the. independent design package for Verification Item 7,'ain Steam-Isolation Valve. The completed design package is now scheduled for transmittal to Review Committee members on October'l. for package completeness review.
- 6. A meeting of the FPL,C-E and Ebasco EVP Task Force Managers. was held October 6 in Juno Beach, Florida to review program progress.'.
~ On October 7, the Task Force Managers were at the,S't. Lucie jobsite t'o continu planning for the field installation verification phase of t: he program.
1
ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS
SUMMARY
OCTOBER 4-OCTOBER 8,1982
- 1. Portions of the existing design package for the Safety Injection Tank Isolation Valve (C-E Verification Item 2) have been received from the C-E Project Team.
Comparison of the independent and existing designs has begun using a standard comparison form. Design comparison, planned for October 18 completion, is dependent on receipt of the balance of existing design information from the Ebasco Project Team by October 14.
~
- 2. The independent design package for the High Pressure Safety Injection Pump (C-E Verification Item 1) was completed and transmitted to Review Committee members on October 5. Release of the existing design package for is expected by October 11. 'omparison
- 3. , On-site verification arrangements were discussed during an October 7 meeting of the Task Force Managers at the St. Lucie 2 construction site.
TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM -. SL2
~~ OF 10-4-82.
DATE OF PARTICIPATING 'GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD October 4 C-E/FPL Existing design info C-E EVP task
/ Program planning Force Mgr October 4 Ebasco/C-E Transmittal via Fed. Exp. Ebasco EVP Task of Ind. Design Pkgs. Force Mgr to Review Committee;
'Preparation for EVP Task Force Mgrs mtg.
October 4 FPL/Ebasco Response to September 2 Ebasco EVP .Task request for MSIV design Force Mgr input