ML17355A447: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Distribution Sheet y j~tu Distri-5.txt 99lo/'1 Ol W~Priority: Normal From: Stefanie Fountain Action Recipients:
{{#Wiki_filter:yj~tu Distri-5.txt     99lo/'1 Ol W~
K Jabbour Copies: 1, Paper Copy Internal Recipients:
Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients:              Copies:
Rids Rgn2MailCenter RidsResDraaOerab RidsOcfoDpbaPab Rids Manager RidsAcrsAcnwMailCenter RGN2.RES/DRAA/OERAB OCFO/DPBA.iLE CEHTTER 0 ACR External Recipients:
K Jabbour                       1,       Paper Copy Internal Recipients:
NOAC Internet: dsq@ornl.gov INEEL Marshall 0 0 0 0 OK OK OK OK 0 OK Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy~r v.Paper Copy Total Copies: Item: ADAMS Document Library: ML ADAMS" HQNTAD01 ID'03691931:1
Rids Rgn2MailCenter                 0        OK RidsResDraaOerab                     0      OK RidsOcfoDpbaPab                     0      OK Rids Manager                     0        OK RidsAcrsAcnwMailCenter                 0        OK RGN2.                                 Paper Copy RES/DRAA/OERAB                                 Paper Copy OCFO/DPBA                                 Paper Copy
.iLE CEHTTER 0                             Paper Copy ACR                                   Paper Copy External Recipients:
NOAC Internet: dsq@ornl.gov INEEL Marshall
                                            ~r Paper Copy Paper Copy v.
Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID'03691931:1


==Subject:==
==Subject:==
February, 2000, Operating Data Report and Summary of Operating Experience for Turke y Point Units 3 and 4.Body: ADAMS DISTRIBUTION NOTIFICATION.
Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS.The Document may also be viewed by searching for Accession Number ML003691931
~Page 1
'a if 1 kl r E I Distri-5.txt IE24-Monthiy Operating Report (per Tech Specs)Docket: 05000250 Docket: 05000251 Page 2


R 07,moo L-2000-062 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-Februa 2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company oo@LoQAB i Wr AVERAGE DAILY UNIT PO%'ER LEVEL DOCKET NO.UNIT: DATE: 50-250 6 March 2 2000 COMPLETED BY: O.I.Hanek TEE HONE.H0066-660 ltE OliT MON H 00 DAY 2/1/2000 2/2/2000 2/3/2000 2/4/2000 2/5/2000 2/6/2000 2/7/2000 2/8/2000 2/9/2000 2/1 0/2000 2/1 1/2000 2/1 2/2000 2/1 3/2000 2/1 4/2000 2/1 5/2000 2/1 6/2000 2/17/2000 2/18/2000 2/19/2000 2/20/2000 2/21/2000 2/22/2000 2/23/2000 2/24/2000 2/25/2000 2/26/2000 2/27/2000 2/28/2000 2/29/2000 AVERAGE DAILY POWER LEVEL (MWe-Net)717 717 719 719 723 730 726 724 728 729 727 721 715 712 709 708 711 711 709 706 706 718 723 723 715 314 281 0 0 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 March 2 2000 0.I.Hanek 305 246-6607 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line MONTH 648.3 648.3 1392.3 168794.4-YTD-CUMULATIVE 1392.3 171009.7 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)0.0 444470 0.0 981826 121.8 108915034
February, 2000, Operating Data Report and Summary of Operating Experience for Turke y Point Units 3 and 4.
Body:
ADAMS DISTRIBUTION NOTIFICATION.
Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003691931      ~
Page  1


UNIT SHUTDOWNS DOCKET NO.50-250 ONIP NAME: I I M DATE: March 2 2000 COMPLETED BY: O.I.Hanek PHLEPHOMI:
  'a if 1
~6-000 RHPORP MONER I'000 No.Date Duration{Hours)Reason Method of Shutting Down Reactor'ause
kl r
&Corrective Action Cocntents 2000005 2/28/2000 41.7 Shut down for refueling.
E I
F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method l-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain)  
 
Distri-5.txt IE24 - Monthiy Operating Report (per Tech Specs)
Docket: 05000250 Docket: 05000251 Page 2
 
R  07,moo L-2000-062 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:      Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort - Februa      2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company oo@LoQAB i
 
W r
 
AVERAGE DAILYUNIT PO%'ER LEVEL DOCKET NO.        50-250 UNIT:                        6 DATE:            March 2 2000 COMPLETED BY:    O.I. Hanek TEE  HONE.      H0066-660 ltE OliT MON H            00 DAY              AVERAGE DAILYPOWER LEVEL (MWe-Net) 2/1/2000                      717 2/2/2000                      717 2/3/2000                      719 2/4/2000                      719 2/5/2000                      723 2/6/2000                      730 2/7/2000                      726 2/8/2000                      724 2/9/2000                      728 2/1 0/2000                    729 2/1 1/2000                    727 2/1 2/2000                    721 2/1 3/2000                    715 2/1 4/2000                    712 2/1 5/2000                    709 2/1 6/2000                    708 2/17/2000                      711 2/18/2000                      711 2/19/2000                      709 2/20/2000                      706 2/21/2000                      706 2/22/2000                      718 2/23/2000                      723 2/24/2000                      723 2/25/2000                      715 2/26/2000                      314 2/27/2000                      281 2/28/2000                        0 2/29/2000                        0
 
OPERATING DATA REPORT DOCKET NO.                      50-250 UNIT NAME                      TURKEY POINT UNIT 3 DATE                            March 2 2000 COMPLETED BY                    0. I. Hanek TELEPHONE                        305 246-6607 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)            720
: 2. Maximum Dependable Capacity (MWe-Net)          693 MONTH    -YTD-    CUMULATIVE
: 3. Number of Hours Reactor Was Critical                  648.3    1392.3    171009.7
: 4. Number of Hours Generator Was On Line                648.3    1392.3    168794.4
: 5. Unit Reserve Shutdown Hours                            0.0      0.0        121.8
: 6. Net Electrical Energy (MWH)                        444470    981826    108915034
 
UNIT SHUTDOWNS DOCKET NO.               50-250 ONIP NAME:                   I     I M DATE:                   March 2 2000 COMPLETED BY:           O. I. Hanek PHLEPHOMI:               ~6-000 RHPORP MONER I'                   000 No.             Date         Duration   Reason     Method of                             Corrective Action Reactor'ause
{Hours)                Shutting                              Cocntents Down 2000005         2/28/2000         41.7                                 Shut down for refueling.
F - Forced           Reason                                    Method S - Scheduled       A - Equipment Failure
                            - Maintenance or Test l - Manual 2 - Manual Scram B
C - Refueling                             3 - Automatic Scram D - Regulatory restriction               4  Continuation E - Operator Training &                   5 - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF>>OPERATING EXPERIENCE DOCKET NO.50-250 UNIT:~&#xb9;DATE: March 2 2000 COMPLETED BY: O.I.Hanek TELE<<ONE.'~6-660 EEPOET MONTE~b2000 Unit 3 operated essentially at 100%reactor power until February 25, 2000.Then reactor power was lowered in preparation for a refueling outage which started on February 28, 2000.The unit remained shutdown for refueling for the remainder of the month, and is expected to restart on or about March 26, 2000.
OF>> OPERATING EXPERIENCE DOCKET NO.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 UNIT'.~kP I PP DATE: March 2 2000 COMPLETED BY: O.I.Hanek E E<<ONE:~6-<<TEPEE MONTE I DAY 2/1/2000 2/2/2000 2/3/2000 2/4/2000 2/5/2000 2/6/2000 2/7/2000 2/8/2000 2/9/2000 2/1 0/2000 2/11/2000 2/12/2000 2/13/2000 2/14/2000 2/15/2000 2/1 6/2000 2/17/2000 2/18/2000 2/19/2000 2/20/2000 2/21/2000 2/22/2000 2/23/2000 2/24/2000 2/25/2000 2/26/2000 2/27/2000 2/28/2000 2/29/2000 Y POWER e-Net)AVERAGE DAIL LEVEL (MW 719 719 720 721 725 731 728 726 729 731 730 724 719 717 714 710 712 714 712 713 713 722 728 729 726 724 724 722 717 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 March 2 2000 0.I.Hanek 305 246-6607 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 696 696 0.0 0.0 577.2-YTD-CUMULATIVE 1387.6 167661.8 1369.3 163291.6 6.Net Electrical Energy (MWH)502055 980345 10638871 5 UNIT SHUTDOWNS DOCKET NO.50-251 DNIINBMB:~k*I 66 DATE: March 2 2000 COMPLETED BY: O.I.Hanek TBLBPHDNB:
UNIT:
MPPP-66 RBPDRTMDNTH
DATE:
~bOOO No.Duration (Hours)Reason*Method of Shutting Down Reactor'ause
COMPLETED BY:
&Corrective Action Cosrents N/A N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D Regulatory restriction E-Operator Training a License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain)  
TELE <<ONE.     '~6-660
                                                                          ~&#xb9; 50-250 March 2 2000 O. I. Hanek EEPOET MONTE     ~b2000 Unit 3 operated essentially at 100% reactor power until February 25, 2000. Then reactor power was lowered in preparation for a refueling outage which started on February 28, 2000. The unit remained shutdown for refueling for the remainder of the month, and is expected to restart on or about March 26, 2000.
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.         50-251 UNIT'.             ~kP       I PP DATE:             March 2 2000 COMPLETED BY:
E E <<ONE:         ~6-<<
O. I. Hanek TEPEE MONTE   I DAY           AVERAGE DAILY POWER LEVEL (MWe-Net) 2/1/2000                 719 2/2/2000                 719 2/3/2000                 720 2/4/2000                 721 2/5/2000                 725 2/6/2000                 731 2/7/2000                 728 2/8/2000                 726 2/9/2000                 729 2/1 0/2000               731 2/11/2000                 730 2/12/2000                 724 2/13/2000                 719 2/14/2000                 717 2/15/2000                 714 2/1 6/2000               710 2/17/2000                 712 2/18/2000                 714 2/19/2000                 712 2/20/2000                 713 2/21/2000                 713 2/22/2000                 722 2/23/2000                 728 2/24/2000                 729 2/25/2000                 726 2/26/2000                 724 2/27/2000                 724 2/28/2000                 722 2/29/2000                 717
 
OPERATING DATA REPORT DOCKET NO.                     50-251 UNIT NAME                      TURKEY POINT UNIT 4 DATE                            March 2 2000 COMPLETED BY                    0. I. Hanek TELEPHONE                        305 246-6607 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)         693 MONTH    -YTD-    CUMULATIVE
: 3. Number of Hours Reactor Was Critical                   696    1387.6    167661.8
: 4. Number of Hours Generator Was On Line                 696    1369.3    163291.6
: 5. Unit Reserve Shutdown Hours                             0.0       0.0       577.2
: 6. Net Electrical Energy (MWH)                         502055   980345   10638871 5
 
UNIT SHUTDOWNS DOCKET NO.     50-251 DNIINBMB:       ~k*         I   66 DATE:           March 2 2000 COMPLETED BY:   O. I. Hanek TBLBPHDNB:     MPPP-66 RBPDRTMDNTH     ~bOOO No.                           Duration       Reason* Method of                     & Corrective Action (Hours)
Reactor'ause Shutting Down Cosrents N/A           N/A N/A       N/A               N/A     N/A           N/A F - Forced           Reason                              Method S - Scheduled       A - Equipment   Failure             1 - Manual B - Maintenance or Test           2 - Manual Scram C - Refueling                     3 - Automatic Scram D   Regulatory restriction         4 - Continued E - Operator Training a           5 - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.             50-251 UNIT:                  Turke Point &#xb9;4 DATE:                  March 2 2000 COMPLETE BY:          O. I. Hanek TELEPHONE:              305 246-6607 REPORTMQNTH~00 Unit 4 operated at essentially 100% reactor power for the month of February, 2000.
50-251 Turke Point&#xb9;4 March 2 2000 O.I.Hanek 305 246-6607 REPORTMQNTH~00 Unit 4 operated at essentially 100%reactor power for the month of February, 2000.
 
t t v Distribution Sheet Distri25.txt Priority: Normal From: Stefanie Fountain Action Recipients:
t t v
K Jabbour Copies: 1 Not Found Internal Recipients:
 
Rids Res DraaOerab RGN 2.RES/DRAA/OERAB OCFO/DPBA==
Distri25.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients:              Copies:
--6 FILE-CENTER 01 ACRS External Recipients:
K Jabbour                     1         Not Found Internal Recipients:
NOAC INEEL Marshall OK Not Found Not Found Not Found Not Found Not Found Not Found Not Found Total Copies: Item: ADAMS Document Library: ML ADAMS" HQNTAD01 ID: 003683954  
Rids Res DraaOerab                           OK RGN   2.                             Not Found RES/DRAA/OERAB                                 Not Found OCFO/DPBA==                             Not Found 6 FILE-CENTER 01                             Not Found ACRS                                 Not Found External Recipients:
NOAC                                 Not Found INEEL Marshall                           Not Found Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003683954


==Subject:==
==Subject:==
Turkey Point 3 and 4 Monthly Operation Report-January, 2000.With February 9, 2000 I etter.Body: Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1 f
 
PEB P9 2000 L-2000-034 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-Janua 2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company f30 Q (Qg~a]'
Turkey Point 3 and 4 Monthly Operation Report- January, 2000. With February 9, 2000 I etter.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: 50-250 Februa 4 2000 COMPLETED BY: O.I.Hanek TELEPHONE:
Body:
LOD6-66 ll&#xb9;PDET MDNTH~000 DAY.1/1/2000 1/2/2000 1/3/2000 1/4/2000 1/5/2000 1/6/2000 1/7/2000 1/8/2000 1/9/2000 1/1 0/2000 1/1 1/2000 1/12/2000 1/1 3/2000 1/14/2000 1/1 5/2000 1/16/2000 1/1 7/2000 1/1 8/2000 1/1 9/2000 1/20/2000 1/21/2000 1/22/2000 1/23/2000 1/24/2000 1/25/2000 1/26/2000 1/27/2000 1/28/2000 1/29/2000 1/30/2000 1/31/2000 AVERAGE DAILY POWER LEVEL (MWe-Net)720 717'17 716 710 715 717 716 714 714 713 711 711 716 730 735 730 729 726 726 728 730 726 720 728 733 736 735 729 725 719 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 Februa 4 2000 0.I.Hanek 305 246-6607 (Month/Year) 1.Design Electricai Rating (MWe-Net)720 2.Maximum Dependable Capacity(MWe-Net) 693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 744 744 0.0 744 0.0 168146.1 121.8-YTD-CUMULATIVE 744 170361.4 6.Net Electrical Energy (MWH)537356 537356 108470564 UNIT SHUTDOWNS DOCKET NO.50-250 ENII NAME: I I M APE: I I 4 EM COMPLETED BY: O.I.Hanek PELHPHHNH:
Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page   1
~66-660 REPQRPMDNI'H I~000 No.Date Type'uration (Hours)Reason'ethod of Shutting Down Reactor'ause a Corrective Action Cocaents N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test.C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain)  
 
f PEB   P9   2000 L-2000-034 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort- Janua       2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region   II, USNRC Senior Resident Inspector, USNRC,   Turkey Point Plant an FPL Group company f30 Q               (Qg                                 ~a]
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.       50-250 UNIT:
DATE:           Februa 4 2000 COMPLETED BY:   O.I. Hanek TELEPHONE:       LOD6-66 ll&#xb9;PDET MDNTH ~000 DAY.           AVERAGE DAILYPOWER LEVEL (MWe-Net) 1/1/2000                     720 1/2/2000                     717'17 1/3/2000 1/4/2000                     716 1/5/2000                     710 1/6/2000                     715 1/7/2000                     717 1/8/2000                     716 1/9/2000                     714 1/1 0/2000                   714 1/1 1/2000                   713 1/12/2000                     711 1/1 3/2000                   711 1/14/2000                     716 1/1 5/2000                   730 1/16/2000                     735 1/1 7/2000                   730 1/1 8/2000                   729 1/1 9/2000                   726 1/20/2000                     726 1/21/2000                     728 1/22/2000                     730 1/23/2000                     726 1/24/2000                     720 1/25/2000                     728 1/26/2000                     733 1/27/2000                     736 1/28/2000                     735 1/29/2000                     729 1/30/2000                     725 1/31/2000                     719
 
OPERATING DATAREPORT DOCKET NO.                     50-250 UNIT NAME                      TURKEY POINT UNIT 3 DATE                            Februa 4 2000 COMPLETED BY                    0. I. Hanek TELEPHONE                        305 246-6607 (Month/Year)
: 1. Design Electricai Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity(MWe-Net)           693 MONTH    -YTD-    CUMULATIVE
: 3. Number of Hours Reactor Was Critical                   744      744      170361.4
: 4. Number of Hours Generator Was On Line                 744      744      168146.1
: 5. Unit Reserve Shutdown Hours                             0.0       0.0       121.8
: 6. Net Electrical Energy (MWH)                         537356   537356   108470564
 
UNIT SHUTDOWNS DOCKET NO.             50-250 ENII NAME:                 I     I M APE:                 I I     4   EM COMPLETED BY:         O. I. Hanek PELHPHHNH:             ~66-660 REPQRPMDNI'H         I~000 No.           Date Type'uration         Reason'ethod       of                       a Corrective Action (Hours)
Reactor'ause Shutting Down Cocaents N/A             N/A F - Forced           Reason                                    Method S - Scheduled       A - Equipment Failure                     1 - Manual B - Maintenance or Test.                 2 - Manual Scram C - Refueling                             3 - Automatic Scram D - Regulatory restriction               4 - Continuation E - Operator Training &                   5 - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPKRATING KXPKRIKNCK DOCKET NO.50-250 UNIT:~kN DATE: M COMPLETED BY: O.I.Hanek HIHPHONH:~6M HH OHT MONTH~0 Unit 3 operated essentially at 100%for the month of January, 2000.
OF OPKRATING KXPKRIKNCK DOCKET NO.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 UNIT:~k&#xb9;DATE: bbb 000 COMPLETED BY: O.I.Hanek TEL<<ONE:~0-<<OETMOIITN DAY 1/1/2000 1/2/2000 1/3/2000 1/4/2000 1/5/2000 1/6/2000 1/7/2000 1/8/2000 1/9/2000 1/10/2000 1/11/2000 1/1/2000 1/13/2000 1/14/2000 1/1 5/2000 1/1 6/2000 1/1 7/2000 1/1 8/2000 1/1 9/2000 1/20/2000 1/21/2000 1/22/2000 1/23/2000 1/24/2000 1/25/2000 1/26/2000 1/27/2000 1/28/2000 1/29/2000 1/30/2000 1/31/2000 POWER e-Net)AVERAGE DAILY LEVEL (MW 723 721 720 716 716 718 718 717 716 715 714 712 714 718 730 734 729 730 726 726 728 730 726 337 0 0 142 720 725 727 723 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 Februa 4 2000 O.I.Hanek 305 246-6607 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)691.6 673.3 0.0 478290 691.6 673.3 0.0 478290 166965.8 162595.6 577.2 105886660 UNIT SHUTDOWNS DOCKET NO.50-251 UNIT NAME: 0 I~DATE: 0~000 COMPLETED BY: O.I.Hanek TEAEPHDNH:
UNIT:
H006-660 EEPUET MUNTH~00 Ho.Date Duration (Hours)Reason Method of Shutting Down Reactor Cause&Corrective Action Comments 20000001 1/24/2000 10.'7 The cause of the feedwater control valve failure, that required a manual reactor trip, was a failure in the valve internals.
DATE:
Disassembly of the valve confirmed that the valve cage had disengaged from the valve body web.Corrective actions included repair of the valve and Post Maintenance Testing.A Licensee Event Report (No.2000-001-00) is being prepared for submittal to the NRC.F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Exa~ination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain)
                                                                    ~kN 50-250 M
~'
COMPLETED BY:
~~~'UMMARY OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:
HIHPHONH:      ~6M O. I. Hanek HH OHT MONTH       ~0 Unit 3 operated essentially at 100% for the month of January, 2000.
50-251 Turke Point P4 000 00 O.I.Hanek 305 246-6607 RRPOR MONTH 00 Unit 4 operated at essentially 100%for the month of January, 2000, except between January 24-27, 2000.The reactor was manually tripped on January 24, 2000, aAer experiencing problems with the feedwater control valve to the 4A steam generator.
 
Unit 4 returned to 100%power on January 27, 2000.A Licensee Event Report (No.2000-001-00) is being prepared for submittal to the NRC.  
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
'SAN 0 6 2000 L-2000-004 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-December 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant OIH Attachments f cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant pQp~~a C)g~~~+~3<griggg an FPL Group company
UNIT:
DATE:
                                      ~k&#xb9; 50-251 bbb       000 COMPLETED BY:
TEL <<ONE:         ~0-<<
O. I. Hanek OETMOIITN DAY             AVERAGE DAILYPOWER LEVEL (MWe-Net) 1/1/2000                   723 1/2/2000                   721 1/3/2000                   720 1/4/2000                   716 1/5/2000                   716 1/6/2000                   718 1/7/2000                   718 1/8/2000                   717 1/9/2000                   716 1/10/2000                   715 1/11/2000                   714 1/1/2000                   712 1/13/2000                   714 1/14/2000                   718 1/1 5/2000                 730 1/1 6/2000                 734 1/1 7/2000                 729 1/1 8/2000                 730 1/1 9/2000                 726 1/20/2000                   726 1/21/2000                   728 1/22/2000                   730 1/23/2000                   726 1/24/2000                   337 1/25/2000                     0 1/26/2000                     0 1/27/2000                   142 1/28/2000                   720 1/29/2000                   725 1/30/2000                   727 1/31/2000                   723
 
OPERATING DATA REPORT DOCKET NO.                     50-251 UNIT NAME                      TURKEY POINT UNIT 4 DATE                            Februa 4 2000 COMPLETED BY                    O.I. Hanek TELEPHONE                        305 246-6607 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)         693 MONTH   -YTD-     CUMULATIVE
: 3. Number of Hours Reactor Was Critical                 691.6    691.6    166965.8
: 4. Number of Hours Generator Was On Line                 673.3    673.3    162595.6
: 5. Unit Reserve Shutdown Hours                             0.0      0.0        577.2
: 6. Net Electrical Energy (MWH)                         478290   478290   105886660
 
UNIT SHUTDOWNS DOCKET NO.               50-251 UNIT NAME:                   0       I   ~
DATE:                   0~000 COMPLETED BY:           O. I. Hanek TEAEPHDNH:             H006-660 EEPUET MUNTH   ~00 Ho.             Date           Duration       Reason Method of                       Cause & Corrective Action (Hours)              Shutting                                Comments Down Reactor 20000001       1/24/2000         10.'7                                   The cause of the feedwater control valve failure, that required a manual reactor trip, was a failure in the valve internals. Disassembly of the valve confirmed that the valve cage had disengaged from the valve body web.
Corrective actions included repair of the valve and Post Maintenance Testing.
A Licensee Event Report (No. 2000-001-00) is being prepared for submittal to the NRC.
F - Forced             Reason                            Method S - Scheduled         A - Equipment Failure             1 - Manual B - Maintenance or Test           2 - Manual Scram C - Refueling                     3 - Automatic Scram D - Regulatory restriction         4 - Continued E - Operator Training &           5 - Other (Explain)
License Exa~ination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
 
~
 
~
  ~
    'UMMARY
    ~                                      OF OPERATING EXPERIENCE DOCKET NO.             50-251 UNIT:                  Turke Point P4 DATE:                    000         00 COMPLETE BY:          O. I. Hanek TELEPHONE:              305 246-6607 RRPOR     MONTH               00 Unit 4 operated at essentially 100% for the month of January, 2000, except between January 24-27, 2000. The reactor was manually tripped on January 24, 2000, aAer experiencing problems with the feedwater control valve to the 4A steam generator. Unit 4 returned to 100% power on January 27, 2000. A Licensee Event Report (No. 2000-001-00) is being prepared for submittal to the NRC.
 
SAN 0 6 2000 L-2000-004 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-December 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments f
cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant pQp     ~~a C)g~~~
an FPL Group company                              +   ~3<griggg
 
)
)
Distri61.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients:
Distri61.txt Distribution   Sheet Priority:   Normal From: Esperanza   Lomosbog Action Recipients:                        Copies:
K Jabbour Copies: 1 Not Found Internal Recipients:
K Jabbour                                   1             Not Found Internal Recipients:
RGN 2 RES/DRAA/OERAB OCFO J32BA L CENTER eRS=-~Not Found Not Found Not Found Not Found Not Found External Recipients:
RGN 2                                                       Not  Found RES/DRAA/OERAB                                             Not  Found L
NOAC INEEL Marshall Not Found Not Found Total Copies: Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003674568  
eRS =~
OCFO J32BA CENTER Not Not Not Found Found Found External Recipients:
NOAC                                                       Not Found INEEL Marshall                                             Not Found Total Copies:
Item: ADAMS Document Library:   ML ADAMS"HQNTAD01 ID: 003674568


==Subject:==
==Subject:==
Monthly operating reports for December 1999 for Turkey Point, Units 3 and 4.With 000106 letter.Body: PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-250 UNI:>>I&#xb9;DATE: I COMPLETED BY: O.I.Hanek I&#xb9;I<<ONE:~6 REPORT MONTH December 1999 DAY 12/1/99 12/2/99 12/3/99 12/4/99 12/5/99 12/6/99 12/7/99 12/8/99 12/9/99 12/10/99 12/11/99 12/12/99 12/13/99 12/14/99 12/1 5/99 12/16/99 12/17/99 12/18/99 12/19/99 12/20/99 12/21/99 12/22/99 12/23/99 12/24/99 12/25/99 12/26/99 12/27/99 12/28/99 12/29/99 12/30/99 12/31/99 AVERAGE DAILY POWER LEVEL (MWe-Net)730 733 732 731 728 724 720 708 719 721 720 718 719 718 713 715 720 716 714 711 712 714 710 713 726 733 732 730 730 728 725 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 Janua 3 2000 O.I.Hanek 305 246-6607 REPORTING PERIOD December 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)744 8684.5 167402.1 0.0 0.0 121.8 536729 6112349 107933208 MONTH-YTD-CUMULATIVE 744 870?.4 169617.4 UNIT SHUTDOWNS DOCKET NO.50-250 UNIT NANH: T~HP I 66 DATE: I>>66 COMPLETED BY: O.I.Hanek TH HPHUNN:~06-66 REPORT MONTH December 1999 No.Date Duration (Hours)Reason*Method of Shutting Down Reactor*Cause 4 Corrective Action Comments N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain)  
 
Monthly operating reports   for December 1999   for Turkey Point, Units 3 and 4. With 000106 letter.
Body:
PDR ADOCK   05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.       50-250 UNI:                 >>     I &#xb9; I
DATE:
COMPLETED BY:
I&#xb9;I <<ONE:
REPORT MONTH December 1999
                                  ~6 O.I. Hanek DAY           AVERAGE DAILYPOWER LEVEL (MWe-Net) 12/1/99                   730 12/2/99                   733 12/3/99                   732 12/4/99                   731 12/5/99                   728 12/6/99                   724 12/7/99                   720 12/8/99                   708 12/9/99                   719 12/10/99                   721 12/11/99                   720 12/12/99                   718 12/13/99                   719 12/14/99                   718 12/1 5/99                 713 12/16/99                   715 12/17/99                   720 12/18/99                   716 12/19/99                   714 12/20/99                   711 12/21/99                   712 12/22/99                   714 12/23/99                   710 12/24/99                   713 12/25/99                   726 12/26/99                   733 12/27/99                   732 12/28/99                   730 12/29/99                   730 12/30/99                   728 12/31/99                   725
 
OPERATING DATAREPORT DOCKET NO.                     50-250 UNIT NAME                      TURKEY POINT UNIT 3 DATE                            Janua   3 2000 COMPLETED BY                    O. I. Hanek TELEPHONE                        305 246-6607 REPORTING PERIOD December 1999 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)         693 MONTH    -YTD-    CUMULATIVE
: 3. Number of Hours Reactor Was Critical                   744    870?.4    169617.4
: 4. Number of Hours Generator Was On Line                 744     8684.5     167402.1
: 5. Unit Reserve Shutdown Hours                            0.0       0.0       121.8
: 6. Net Electrical Energy (MWH)                        536729   6112349   107933208
 
UNIT SHUTDOWNS DOCKET NO.               50-250 UNIT NANH:               T~HP     I 66 DATE:                     I       >>66 COMPLETED BY:           O. I. Hanek TH HPHUNN:               ~06-66 REPORT MONTH December 1999 No.           Date       Duration   Reason*     Method of                     Cause 4 Corrective Action (Hours)                Shutting                              Comments Down Reactor*
N/A           N/A F - Forced       Reason                                    Method S - Scheduled   A - Equipment Failure                     1 - Manual B - Maintenance or Test                   2 - Manual Scram C - Refueling                             3 - Automatic Scram D - Regulatory restriction               4 - Continuation E - Operator Training &                   5 - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250&#xb9;&#xb9;&#xb9;&#xb9;.: "" i~DATE: J>>&#xb9;COMPLETED BY: O.I.Hanek&#xb9;&#xb9;&#xb9;&#xb9;&#xb9;ON&#xb9;:~&#xb9;&#xb9;-66 REPORT MONTH December 1999 Unit 3 operated essentially at 100%for the month of December, 1999.
OF OPERATING EXPERIENCE DOCKET NO.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 IINI DATE:~I""'OMPLETED BY: O.I.Hanek PPLPPNONN~06-66 REPORT MONTH December 1999 DAY 12/1/99 12/2/99 12/3/99 12/4/99 12/5/99 12/6/99 12/7/99 12/8/99 12/9/99 12/10/99 12/11/99 12/12/99 12/1 3/99 12/14/99 12/15/99 12/16/99 12/17/99 12/18/99 12/19/99 12/20/99 12/21/99 12/22/99 12/23/99 12/24/99 12/25/99 12/26/99 12/27/99 12/28/99 12/29/99 12/30/99 12/31/99 POWER e-Net)AVERAGE DAILY LEVEL (MW 730 733 733 732 730 726 718 718 719 721 720 719 719 718 714 715 721 718 716 715 715 717 711 714 727 734 734 732 730 729 727 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 Janua 3 2000 O.I.Hanek 305 246-6607 REPORTING PERIOD December 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 744 744 0.0 8206.7 8185.8 166274.2 161922.3 0.0 577.2-YTD-CUMULATIVE 6.Net Electrical Energy (MWH)537706 5735272 105408370 UNIT SHUTDOWNS DOCKET NO.50-251 HNN NAME: 6 6 6 DATE: COMPLETED BY: O.I.Hanek PE EPHHNE'666 6-666 REPORT MONTH December 1999 No.Date Type'uration (Hours)Reason Method of Shutting Down Reactor'ause
                                                  &#xb9;&#xb9;&#xb9;&#xb9;.:
&Corrective Action Comments N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training a License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain)  
DATE:
COMPLETED BY:
                                                  &#xb9;&#xb9;&#xb9;&#xb9;   &#xb9;ON&#xb9;:
J>>
50-250
                                                                        " "  i O. I. Hanek
                                                                    ~&#xb9;&#xb9;-66
                                                                                ~
                                                                                &#xb9; REPORT MONTH December 1999 Unit 3 operated essentially at 100% for the month of December, 1999.
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.           50-251 IINI DATE:
BY:     O. I. Hanek
                                      ~I""'OMPLETED PPLPPNONN         ~06-66 REPORT MONTH December 1999 DAY             AVERAGE DAILYPOWER LEVEL (MWe-Net) 12/1/99                   730 12/2/99                   733 12/3/99                   733 12/4/99                   732 12/5/99                   730 12/6/99                   726 12/7/99                   718 12/8/99                   718 12/9/99                   719 12/10/99                   721 12/11/99                   720 12/12/99                   719 12/1 3/99                 719 12/14/99                   718 12/15/99                   714 12/16/99                   715 12/17/99                   721 12/18/99                   718 12/19/99                   716 12/20/99                   715 12/21/99                   715 12/22/99                   717 12/23/99                   711 12/24/99                   714 12/25/99                   727 12/26/99                   734 12/27/99                   734 12/28/99                   732 12/29/99                   730 12/30/99                   729 12/31/99                   727
 
OPERATING DATA REPORT DOCKET NO.                       50-251 UNIT NAME                        TURKEY POINT UNIT 4 DATE                            Janua   3 2000 COMPLETED BY                    O. I. Hanek TELEPHONE                        305 246-6607 REPORTING PERIOD December 1999 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)           693 MONTH    -YTD-    CUMULATIVE
: 3. Number of Hours Reactor Was Critical           744    8206.7    166274.2
: 4. Number of Hours Generator Was On Line           744    8185.8    161922.3
: 5. Unit Reserve Shutdown Hours                     0.0       0.0       577.2
: 6. Net Electrical Energy (MWH)                 537706   5735272   105408370
 
UNIT SHUTDOWNS DOCKET NO.     50-251 HNN NAME:           6       6 6 DATE:
COMPLETED BY:   O. I. Hanek PE   EPHHNE'666           6-666 REPORT MONTH December 1999 No.           Date Type'uration               Reason Method of                    & Corrective Action (Hours)
Reactor'ause Shutting Down Comments N/A           N/A F - Forced           Reason                              Method S - Scheduled       A - Equipment   Failure             1 - Manual
                      -               or Test           2 - Manual Scram B
C - Maintenance Refueling                     3 - Automatic Scram D - Regulatory restriction         4 - Continued E - Operator Training a             5 - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.       50-251 UNIT:            Turke Point 84 DATE:            Janua   3 2000 COMPLETE BY:      O. I. Hanek TELEPHONE:        ~6-66 REPORT MONTH December 1999 Unit 4 operated at essentially 100% for the month of December, 1999.
50-251 Turke Point 84 Janua 3 2000 O.I.Hanek~6-66 REPORT MONTH December 1999 Unit 4 operated at essentially 100%for the month of December, 1999.  
 
)AN>~Kg P S V~
P  S
tI=PIL.999 L-99-267 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-November 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company f t$f N i v J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:
)AN >~ Kg V   ~
50-250 Turke Point&#xb9;3 December 3 1999 O.I.Hanek~5-MO REPORT MONTH November 1999 DAY 11/1/99 11/2/99 11/3/99 11/4/99 11/5/99 11/6/99 11/7/99 11/8/99 11/9/99 11/1 0/99 11/11/99 11/12/99 11/1 3/99 11/14/99 11/1 5/99 11/1 6/99 11/17/99 11/18/99 11/19/99 11/20/99 11/21/99 11/22/99 11/23/99 11/24/99 11/25/99 11/26/99 11/27/99 11/28/99 11/29/99 11/30/99 AVERAGE DAILY POWER LEVEL (MWe-Net)710 709 716 724 726 724 718 722 722 722 720 720 721 720 692 317 0 348 720 723 722 720 717 717 716 714 716 722 725 726 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 December 3 1999 O.I.Hanek 305 246-6607 REPORTING PERIOD November 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)693.8 677.2 0.0 481025 7963.4 7940.5 0.0 5575620 168873.4 166658.1 121.8 107396479 UNIT SHUTDOWNS DOCKET NO.50-250 LPNNN&#xb9;NE: 3 3&#xb9;3 DATE: December 3 1999 COMPLETED BY: O.I.Hanek PELEPNDNE:
 
333 6-666 REPORT MONTH November 1999 No.Date Type'uration (Hours)Reason'ethod of Shutting Down Reactor'ause
999 tI=PIL.                                                                                   L-99-267 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-November 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.
&Corrective Action Cosments 19900032 11/16/99 42.8 Turbine control valve inoperable, testing and repairs F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation S-Other (Explain)  
Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region   II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company
 
f     t
$ Nf i
v J
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.       50-250 UNIT:            Turke Point &#xb9;3 DATE:            December 3 1999 COMPLETED BY:    O.I. Hanek TELEPHONE:      ~5-MO REPORT MONTH November 1999 DAY           AVERAGE DAILYPOWER LEVEL (MWe-Net) 11/1/99                   710 11/2/99                   709 11/3/99                   716 11/4/99                   724 11/5/99                   726 11/6/99                   724 11/7/99                   718 11/8/99                   722 11/9/99                   722 11/1 0/99                 722 11/11/99                   720 11/12/99                   720 11/1 3/99                 721 11/14/99                   720 11/1 5/99                 692 11/1 6/99                 317 11/17/99                     0 11/18/99                   348 11/19/99                   720 11/20/99                   723 11/21/99                   722 11/22/99                   720 11/23/99                   717 11/24/99                   717 11/25/99                   716 11/26/99                   714 11/27/99                   716 11/28/99                   722 11/29/99                   725 11/30/99                   726
 
OPERATING DATAREPORT DOCKET NO.                     50-250 UNIT NAME                      TURKEY POINT UNIT 3 DATE                            December 3 1999 COMPLETED BY                    O. I. Hanek TELEPHONE                        305 246-6607 REPORTING PERIOD November 1999 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)         693 MONTH   -YTD-     CUMULATIVE
: 3. Number of Hours Reactor Was Critical                 693.8    7963.4    168873.4
: 4. Number of Hours Generator Was On Line                 677.2    7940.5    166658.1
: 5. Unit Reserve Shutdown Hours                             0.0      0.0        121.8
: 6. Net Electrical Energy (MWH)                         481025   5575620   107396479
 
UNIT SHUTDOWNS DOCKET NO.               50-250 LPNNN&#xb9;NE:                   3     3 &#xb9;3 DATE:                   December 3 1999 COMPLETED BY:           O. I. Hanek PELEPNDNE:               333 6-666 REPORT MONTH November 1999 No.           Date   Type'uration         Reason'ethod       of                             Corrective Action Reactor'ause (Hours)                  Shutting                              Cosments Down 19900032       11/16/99           42.8                                   Turbine control valve inoperable, testing and repairs F - Forced           Reason                                    Method S - Scheduled         A - Equipment Failure                     1  Manual B - Maintenance or Test                   2 - Manual Scram C - Refueling                             3 - Automatic  Scram D - Regulatory restriction               4 - Continuation E - Operator Training &                   S  Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250 UNIT:~k&#xb9;3 DATE: December 3 1999 COMPLETED BY: O.I.Hanek TELE&#xb9;NUNE.
OF OPERATING EXPERIENCE DOCKET NO.
~6-66 REPORTMONTH November 1999 Unit 3 operated essentially at 100%in the beginning of the month of November, 1999.On November 15, 1999, power reduction was commenced to test the No.2 turbine control valve.On November 16, 1999, the unit was taken offline to repair the No.2 turbine control valve.On November 18, 1999, Unit 3 resumed 100%power operation and remained at that power level for the rest of the month.
UNIT:
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 UNIT.~ki&#xb9;DATE: December 3 1999 COMPLETED BY: O.I.Hanek TELEPHONE.
DATE:
'666 6-66 REPORT MONTH November 1999 DAY 11/1/99 11/2/99 11/3/99 11/4/99 11/5/99 11/6/99 11/7/99 11/8/99 11/9/99 11/1 0/99 11/11/99 11/12/99 11/1 3/99 11/14/99 11/1 5/99 11/1 6/99 11/1 7/99 11/1 8/99 11/1 9/99 11/20/99 11/21/99 11/22/99 11/23/99 11/24/99 11/25/99 11/26/99 11/27/99 11/28/99 11/29/99 11/30/99 POWER e-Net)AVERAGE DAILY LEVEL (MW 710 710 717 725 727 726 723 687 290 516 715 720 724 723 722 714 724 728 726 725 722 719 718 719 716 714 716 722 725 725
                                                                          ~k&#xb9;3 50-250 December 3 1999 COMPLETED BY:         O. I. Hanek TELE&#xb9;NUNE.             ~6-66 REPORTMONTH November 1999 Unit 3 operated essentially at 100% in the beginning of the month of November, 1999. On November 15, 1999, power reduction was commenced to test the No. 2 turbine control valve. On November 16, 1999, the unit was taken offline to repair the No. 2 turbine control valve. On November 18, 1999, Unit 3 resumed 100% power operation and remained at that power level for the rest of the month.
 
l AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
UNIT.
DATE:
                                      ~ki &#xb9; 50-251 December 3 1999 COMPLETED BY:
TELEPHONE.  '666  O. I. Hanek 6-66 REPORT MONTH November 1999 DAY           AVERAGE DAILYPOWER LEVEL (MWe-Net) 11/1/99                   710 11/2/99                   710 11/3/99                   717 11/4/99                   725 11/5/99                   727 11/6/99                   726 11/7/99                   723 11/8/99                   687 11/9/99                 290 11/1 0/99                 516 11/11/99                   715 11/12/99                   720 11/1 3/99                 724 11/14/99                   723 11/1 5/99                 722 11/1 6/99                 714 11/1 7/99                 724 11/1 8/99                 728 11/1 9/99                 726 11/20/99                 725 11/21/99                 722 11/22/99                 719 11/23/99                 718 11/24/99                 719 11/25/99                 716 11/26/99                 714 11/27/99                 716 11/28/99                   722 11/29/99                   725 11/30/99                   725
 
OPERATING DATAREPORT DOCKET NO.                      50-251 UNIT NAME                        TURKEY POINT UNIT 4 DATE                            December 3 1999 COMPLETED BY                    0. I. Hanek TELEPHONE                        305 246-6607 REPORTING PERIOD November 1999 (MonthNear)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)          693 MONTH    -YTD-    CUMULATIVE
: 3. Number of Hours Reactor Was Critical            720    7462.7    165530.2
: 4. Number of Hours Generator Was On Line          720     7441.8    161178.3
: 5. Unit Reserve Shutdown Hours                      0.0      0.0        577.2
: 6. Net Electrical Energy (MWH)                  502823  5197566    104870664


OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 December 3 1999 0.I.Hanek 305 246-6607 REPORTING PERIOD November 1999 (MonthNear) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 720 720 0.0 7441.8 161178.3 0.0 577.2-YTD-CUMULATIVE 7462.7 165530.2 6.Net Electrical Energy (MWH)502823 5197566 104870664 UNIT SHUTDOWNS DOCKET NO.50-251 HNIINENI!.
UNIT SHUTDOWNS DOCKET NO.     50-251 HNIINENI!.
*I 66 DATE: December 3 1999 COMPLETED BY: O.I.Hanek TELEPHONE:
* I   66 DATE:           December 3 1999 COMPLETED BY:   O. I. Hanek TELEPHONE:     H666-66 REPORT MONTH November 1999 No.           Date         Duration       Reason* Method of                       Corrective Action Reactor'ause 6
H666-66 REPORT MONTH November 1999 No.Date Duration (Hours)Reason*Method of Shutting Down Reactor'ause 6 Corrective Action Comments N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)" Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain)
(Hours)              Shutting                        Comments Down N/A           N/A F Forced         Reason                            Method
  - Scheduled     A - Equipment Failure             1 - Manual S
B - Maintenance or Test           2 - Manual Scram C - Refueling                     3 - Automatic Scram D - Regulatory restriction         4 - Continued E - Operator Training &           5 - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain) "


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.           50-251 UNIT:
50-251 December 3 1999 O.I.Hanek~6-66 REPORT MONTH November 1999 Unit 4 operated at essentially 100%until November 8, 1999, when reactor power was reduced to approximately 40%for turbine valve testing.The unit returned to 100%power on November 10, 1999, and operated at that power level for the rest of the month of November, 1999.
DATE:                 December 3 1999 COMPLETE BY:         O. I. Hanek TELEPHONE:            ~6-66 REPORT MONTH November 1999 Unit 4 operated at essentially 100% until November 8, 1999, when reactor power was reduced to approximately 40% for turbine valve testing. The unit returned to 100% power on November 10, 1999, and operated at that power level for the rest of the month of November, 1999.
fp]8 girg 0'~P II  
 
.Distri50.txt Distribution Sheet Priority: Normal From: Linda Eusebio Action Recipients:
fp ] 8 girg 0 '
K Jabbour Copies: 1 Not Found Internal Recipients:
P
RGN 2 RES/DRAA/OERAB OC g PEN ER 01 ACRS Not Found Not Found Not Found Not Found Not Found External Recipients:
                  ~
NRC PDR NOAC INEEL Marshall 1 1 1 Not Found Not Found Not Found Total Copies: Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993480234  
II
 
                              . Distri50.txt Distribution   Sheet Priority:   Normal From: Linda Eusebio Action Recipients:                        Copies:
K Jabbour                                   1             Not Found Internal Recipients:
RGN 2                                                       Not  Found RES/DRAA/OERAB                                             Not  Found OC                                                         Not  Found g PEN ER   01                                           Not Found ACRS                                                        Not Found External Recipients:
NRC PDR                                       1             Not Found NOAC                                          1            Not Found INEEL  Marshall                              1            Not Found Total Copies:
Item: ADAMS Document Library:   ML ADAMS"HQNTAD01 ID: 993480234


==Subject:==
==Subject:==
Monthly operating reports for November 1999 for Turkey Point, Units 3 and 4.With 991208 letter.Body: PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1  
 
~~~g Distribution Sheet Priority: Normal From: Stefanie Fountain Distri13.txt
Monthly operating reports   for November 1999   for Turkey Point, Units 3 and 4.With 991208 letter.
~i/e)(<Action Recipients:
Body:
KJabbour Copies: 1 Not Found Internal Recipients:
PDR ADOCK   05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1
RGN 2.RES/DRAA/OERAB OC/DBA/PAD F C TEB ACRS Not Found Not Found 1 Not Found 1 Not Found Not Found External Recipients:
 
NRC PDR NOAC INEEL Marshall Not Found Not Found Not Found Total Copies: Item: ADAMS Document Library: ML ADAMS" HQNTAD01 ID: 993220052  
    ~ ~
~ g
 
Distri13.txt Distribution Sheet Priority: Normal
                                          ~i/e)(<
From: Stefanie Fountain Action Recipients:              Copies:
KJabbour                       1         Not Found Internal Recipients:
RGN   2.                             Not Found RES/DRAA/OERAB                                 Not Found OC/DBA/PAD                       1        Not Found F     C   TEB                     1       Not Found ACRS                                  Not Found External Recipients:
NRC PDR                                 Not Found NOAC                                  Not Found INEEL Marshall                            Not Found Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993220052


==Subject:==
==Subject:==
Monthly Operating Reports for October 1999 for Turkey Point, Units 3 and 4, With Nove mber 8, 1999 Letter.Body: PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1


NOV 08'f999 L-99-242 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-October 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.r Very truly yours, R.J.Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: COMPLETED BY TELEPHONE:
Monthly Operating Reports for October 1999 for Turkey Point, Units 3 and 4, With Nove mber 8, 1999 Letter.
50-250 I6 November 2 1999 D.R.Lafleur 305 246-7150 REPORT MONTH October 1999 DAY 10/1/99 10/2/99 10/3/99 10/4/99 10/5/99 10/6/99 10/7/99 10/8/99 10/9/99 10/10/99 10/11/99 10/12/99 10/13/99 10/14/99 10/1 5/99 10/16/99 10/17/99 10/1 8/99 10/1 9/99 10/20/99 10/21/99 10/22/99 10/23/99 10/24/99 10/25/99 10/26/99 10/27/99 10/28/99 10/29/99 10/30/99 10/31/99 AVERAGE DAILY POWER LEVEL (MWe-Net)698 703 707 708 706 702 703 706 707 709 707 698 691 710 717 716 711 708 700 703 702 706 713 719 723 723 723 723 721 719 715 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 November 2 1999 D.R.Lafleur 305 246-7150 REPORTING PERIOD October 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)MONTH-YTD-CUMULATIVE 745.0 7269.6 168179.6 745.0 7263.3 165980.9 0.0 0.0 121.8 528619 5094595 106915454  
Body:
PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page  1
 
NOV 08 'f999 L-99-242 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-October 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.                       r Very truly yours, R. J. Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.       50-250 UNIT:                           I6 DATE:             November 2 1999 COMPLETED BY      D. R. Lafleur TELEPHONE:        305 246-7150 REPORT MONTH October 1999 DAY           AVERAGE DAILYPOWER LEVEL (MWe-Net) 10/1/99                     698 10/2/99                     703 10/3/99                     707 10/4/99                     708 10/5/99                     706 10/6/99                     702 10/7/99                     703 10/8/99                     706 10/9/99                     707 10/10/99                     709 10/11/99                     707 10/12/99                     698 10/13/99                     691 10/14/99                     710 10/1 5/99                   717 10/16/99                     716 10/17/99                     711 10/1 8/99                   708 10/1 9/99                   700 10/20/99                     703 10/21/99                     702 10/22/99                     706 10/23/99                     713 10/24/99                     719 10/25/99                     723 10/26/99                     723 10/27/99                     723 10/28/99                     723 10/29/99                     721 10/30/99                     719 10/31/99                     715
 
OPERATING DATAREPORT DOCKET NO.                     50-250 UNIT NAME                      TURKEY POINT UNIT 3 DATE                            November 2 1999 COMPLETED BY                    D. R. Lafleur TELEPHONE                        305 246-7150 REPORTING PERIOD October 1999 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)         693 MONTH    -YTD-    CUMULATIVE
: 3. Number of Hours Reactor Was Critical                 745.0    7269.6    168179.6
: 4. Number of Hours Generator Was On Line                 745.0   7263.3     165980.9
: 5. Unit Reserve Shutdown Hours                            0.0       0.0       121.8
: 6. Net Electrical Energy (MWH)                        528619   5094595   106915454


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.           50-250 UNIT:                             N DATE:                 November 2 1999 COMPLETED BY          D.R. Lafleur TELEPHONE:            305 246-7150 REPORT MONTH October 1999 Unit 3 operated essentially at 100% in the beginning of the month of October, 1999. On October 12, 1999, power was reduced to 90% for repair of the Heater Drain Tank Level Control Valve, CV-3-1510A. Unit 3 resumed 100% power on October 13, and stayed essentially at 100% power for the rest of the month of October, 1999.
50-250 N November 2 1999 D.R.Lafleur 305 246-7150 REPORT MONTH October 1999 Unit 3 operated essentially at 100%in the beginning of the month of October, 1999.On October 12, 1999, power was reduced to 90%for repair of the Heater Drain Tank Level Control Valve, CV-3-1510A.
 
Unit 3 resumed 100%power on October 13, and stayed essentially at 100%power for the rest of the month of October, 1999.
UNIT SHUTDOWNS DOCKET NO.
UNIT SHUTDOWNS DOCKET NO.50-250 NNHHNANH:~i03 DATE: November 2 1999 COMPLETED BY: D.R.Lafleur HHLHHHDNH:
NNHHNANH:
43303 240-0 REPORT MONTH October 1999 No.Date Duration (Hours)Reason Method of Shutting Down Reactor'ause
DATE:
&Corrective Action Ccecnents N/A N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:
                                                                                                        ~i03 50-250 November 2 1999 COMPLETED BY: D. R. Lafleur HHLHHHDNH:           43303 240- 0 REPORT MONTH October 1999 Duration                Method  of                        Corrective Action No.         Date (Hours)
50-251 November 2 1999 D.R.Lafleur 305 246-7150 REPORT MONTH October 1999 DAY 10/1/99 10/2/99 10/3/99 10/4/99 10/5/99 10/6/99 10/7/99 10/8/99 10/9/99 10/10/99 10/11/99 10/12/99 10/13/99 10/14/99 10/1 5/99 10/16/99 10/1 7/99 10/18/99 10/19/99 10/20/99 10/21/99 10/22/99 10/23/99 10/24/99 10/25/99 10/26/99 10/27/99 10/28/99 10/29/99 10/30/99 10/31/99 AVERAGE DAILY POWER LEVEL (MWe-Net)698 701 706 708 705 703 707 706 708 710 709 706 708 711 715 718 716 711 705 702 696 698 712 719 721 722 724 723 720 719 716 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 November 2 1999 D.R.Lafleur 305 246-7150 REPORTING PERIOD October 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)745.0 745.0 0.0 6742.7 6721.8 0.0 529238 4694743 164810.2 160458.3 577.2 104367841
Reason Reactor'ause Shutting Down Ccecnents N/A         N/A   N/A     N/A         N/A       N/A         N/A F - Forced         Reason                                Method S - Scheduled       A - Equipment Failure                 1 - Manual B - Maintenance or Test               2 - Manual Scram C - Refueling                         3 - Automatic Scram D - Regulatory restriction             4  Continuation E - Operator Training &               5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.         50-251 UNIT:
DATE:             November 2 1999 COMPLETED BY:     D. R. Lafleur TELEPHONE:          305 246-7150 REPORT MONTH October 1999 DAY             AVERAGE DAILYPOWER LEVEL (MWe-Net) 10/1/99                   698 10/2/99                   701 10/3/99                   706 10/4/99                   708 10/5/99                   705 10/6/99                   703 10/7/99                   707 10/8/99                   706 10/9/99                   708 10/10/99                   710 10/11/99                   709 10/12/99                   706 10/13/99                   708 10/14/99                   711 10/1 5/99                   715 10/16/99                   718 10/1 7/99                   716 10/18/99                   711 10/19/99                   705 10/20/99                   702 10/21/99                   696 10/22/99                   698 10/23/99                   712 10/24/99                   719 10/25/99                   721 10/26/99                   722 10/27/99                   724 10/28/99                   723 10/29/99                   720 10/30/99                   719 10/31/99                   716
 
OPERATING DATAREPORT DOCKET NO.                       50-251 UNIT NAME                        TURKEY POINT UNIT 4 DATE                            November 2 1999 COMPLETED BY                    D. R. Lafleur TELEPHONE                        305 246-7150 REPORTING PERIOD October 1999 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)           693 MONTH   -YTD-     CUMULATIVE
: 3. Number of Hours Reactor Was Critical           745.0    6742.7    164810.2
: 4. Number of Hours Generator Was On Line         745.0    6721.8    160458.3
: 5. Unit Reserve Shutdown Hours                     0.0      0.0        577.2
: 6. Net Electrical Energy (MWH)                 529238  4694743    104367841
 
UNIT SHUTDOWNS DOCKET NO.       50-251 0 0 TNT NAME:
DATE:
2~TEE November 2 i
4  4044 1999 COMPLETED BY:    D. R. Lafleur TELEPHONE:        42200  240->>    0 REPORT MONTH October 1999 No.           Date            Duration      Reason'ethod      of                          Corrective Action Reactor'ause (Hours)                Shutting                            Corments Down N/A            N/A    N/A      N/A            N/A        N/A            H/A F - Forced              Reason                                Method S - Scheduled          A -  Equipment Failure
                            - Maintenance or Test l  Manual 2 - Manual Scram B
C - Refueling                          3 - Automatic Scram D - Regulatory restriction            4  - Continued E - Operator Training a                5  - Other (Explain)
License Examination "
F - Mministrative G - Operational Error (Explain)
H - Other (Explain)


UNIT SHUTDOWNS DOCKET NO.50-251 0 0 TNT NAME: 2~TEE 4 i 4044 DATE: November 2 1999 COMPLETED BY: D.R.Lafleur TELEPHONE:
h
42200 240->>0 REPORT MONTH October 1999 No.Date Duration (Hours)Reason'ethod of Shutting Down Reactor'ause
  ~
&Corrective Action Corments N/A N/A N/A N/A N/A N/A H/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training a License Examination
~
" F-Mministrative G-Operational Error (Explain)H-Other (Explain)Method l-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain) h~~


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.             50-251 UNIT:
50-251 November 2 1999 D.R.Lafieur~06-7 5 REPORT MONTH October 1999 Unit 4 operated at essentially 100%for the entire month of October, 1999.  
DATE:                 November 2 1999 COMPLETE BY:           D. R. Lafieur TELEPHONE:            ~06-7       5 REPORT MONTH October 1999 Unit 4 operated at essentially 100% for the entire month of October, 1999.
.~~~Itl>res~r' CATZaOaz 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9910190173 DOC.DATE: 99/09/30 NOTARXZED:
 
NO DOCKET&#xb9;FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-253, Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION LAFLEUR,D.R.
            .~ ~ ~
Florida Power&Light Co.HOVEY,R.J.
Itl res
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION
        ~ r'
 
CATZaOaz 1 REGULAT   Y INFORMATION DISTRIBUTIO         SYSTEM (RIDS)
ACCESSION NBR:9910190173           DOC.DATE: 99/09/30 NOTARXZED: NO                     DOCKET   &#xb9; FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                     C   05000250 50-253, Turkey Point Plant, Unit 4, Florida Power and Light                 C   05000251 AUTH. NAME             AUTHOR AFFILIATION LAFLEUR,D.R.           Florida   Power & Light Co.
HOVEY,R.J.             Florida Power & Light Co.
RECIP.NAME             RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Sept 1999 for Turkey Point, Units 3&4.With 991008 ltr.DISTRIBUTION CODE: IE24D COPIES RECEXVED:LTR ENCL SXZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E COPIES LTTR ENCL 1 1 EXTERNAL: LMXTCO MARSHALL NRC PDR'1 1 1 RECIPIENT XD CODE/NAME JABBOUR,.K INTERNAL: FILE CENTER 01 1 RES/DRAA/OERAB 1 RECIPIENT ID CODE/NAME OC/DBA/PAD RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 0 D i.>su>tjfJ<Jil''~4 N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts       for Sept 1999   for Turkey Point, Units 3 & 4.With 991008 ltr.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF.COPIES REQUIRED: LTTR 8 ENCL 8 OCTO8 1999 L-99-221 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-Se tember 1999 t k 1k In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.l'ery truly yours, R.J.Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant'I 99iQi90i73 990930 I l PDR'ADOCK 05000250, I R PDR an FPL Group company II if AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-250 UM.~ki N DATE: October 5 1999 COMPLETED BY: D.R.Lafleur TELWHDMI:~56-REPORT MONTH Se tember 1999 DAY 9/1/99 9/2/99 9/3/99 9/4/99 9/5/99 9/6/99 9/7/99 9/8/99 9/9/99 9/1 0/99 9/11/99 9/12/99 9/1 3/99 9/14/99 9/1 5/99 9/1 6/99 9/17/99 9/18/99 9/19/99 9/20/99 9/21/99 9/22/99 9/23/99 9/24/99 9/25/99 9/26/99 9/27/99 9/28/99 9/29/99 9/30/99 AVERAGE DAILY POWER LEVEL (MWe-Net)687 686 687 686 687 686 689 694 697 666 230 458 698 707 711 708 701 701 705 707 710 714 709 709 712 712 708 700 703 703  
DISTRIBUTION CODE: IE24D         COPIES RECEXVED:LTR           ENCL       SXZE:
~s~OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 October 5 1999 D.R.Lafleur 305 246-7150 REPORTING PERIOD Se tember 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 720.0 720.0 0.0 6524.6 6518.3 0.0 167434.6 165235.9 121.8 6.Net Electrical Energy (MWH)486444 4565976 106386835  
TITLE: Monthly Operating Report (per Tech Specs)
E NOTES:
RECIPIENT            COPIES              RECIPIENT            COPIES XD CODE/NAME          LTTR ENCL         ID CODE/NAME         LTTR ENCL                0 JABBOUR,.K               1      1 RES/DRAA/OERAB INTERNAL: FILE CENTER 01              1             OC/DBA/PAD               1    1 1              RGN2                     1     1 EXTERNAL: LMXTCO MARSHALL                    1       NOAC                      1     1 NRC PDR'                  1      1 D
N i.>su>tjfJ<Jil''~4 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER     OF. COPIES REQUIRED: LTTR         8   ENCL     8
 
OCTO8 1999 L-99-221 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4                                                                   t Docket Nos. 50-250 and 50-251                                                             k Monthl 0 eratin Re ort-Se tember 1999                                                     1k In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.
l'ery truly yours, R. J. Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region   II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant
                                                      'I 99iQi90i73 990930             l PDR'ADOCK 05000250, I I R                     PDR an FPL Group company
 
II if
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
UM DATE:
                      .           ~ki 50-250 October 5 1999 N
COMPLETED BY:     D. R. Lafleur TELWHDMI:         ~56-REPORT MONTH Se tember 1999 DAY           AVERAGE DAILYPOWER LEVEL (MWe-Net) 9/1/99                     687 9/2/99                     686 9/3/99                     687 9/4/99                     686 9/5/99                     687 9/6/99                     686 9/7/99                     689 9/8/99                     694 9/9/99                     697 9/1 0/99                     666 9/11/99                     230 9/12/99                     458 9/1 3/99                     698 9/14/99                     707 9/1 5/99                     711 9/1 6/99                     708 9/17/99                     701 9/18/99                     701 9/19/99                     705 9/20/99                     707 9/21/99                     710 9/22/99                     714 9/23/99                     709 9/24/99                     709 9/25/99                     712 9/26/99                     712 9/27/99                     708 9/28/99                     700 9/29/99                     703 9/30/99                     703
 
~ s ~
OPERATING DATAREPORT DOCKET NO.                     50-250 UNIT NAME                      TURKEY POINT UNIT 3 DATE                            October 5 1999 COMPLETED BY                    D. R. Lafleur TELEPHONE                        305 246-7150 REPORTING PERIOD Se tember 1999 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)         693 MONTH   -YTD-     CUMULATIVE
: 3. Number of Hours Reactor Was Critical                 720.0    6524.6    167434.6
: 4. Number of Hours Generator Was On Line                 720.0    6518.3    165235.9
: 5. Unit Reserve Shutdown Hours                             0.0       0.0       121.8
: 6. Net Electrical Energy (MWH)                         486444   4565976   106386835


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250 UNI1'.: i N DATE: October 5 1999 COMPLETED BY: D.R.Lafleur TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.             50-250 UNI1'.:                         i N DATE:                 October 5 1999 COMPLETED BY:         D.R. Lafleur TELEPHONE:             ~36->>       0 REPORT MONTH Se tember 1999 Unit 3 operated essentially at 100% in the beginning of the month of September, 1999. On September 10, 1999, power was reduced to 35% for Turbine Plant Cooling Water Heat Exchanger cleaning, turbine valve testing, and waterbox cleaning. Unit 3 resumed 100% power on September 12, 1999 and stayed essentially at 100% power for the rest of the month of September, 1999.
~36->>0 REPORT MONTH Se tember 1999 Unit 3 operated essentially at 100%in the beginning of the month of September, 1999.On September 10, 1999, power was reduced to 35%for Turbine Plant Cooling Water Heat Exchanger cleaning, turbine valve testing, and waterbox cleaning.Unit 3 resumed 100%power on September 12, 1999 and stayed essentially at 100%power for the rest of the month of September, 1999.
 
UNIT SHUTDOWNS DOCKET NO.50-250 ONIIN&#xb9;MH:~k'DATE: October 5 1999.COMPLETED BY: D.R.Lafleur THLHPHONH:
UNIT SHUTDOWNS DOCKET NO.
999 9->>9 HH OHT'ONTH~Sb 999 No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'ause a Corrective Action Coements N/A N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:
ONIIN&#xb9;MH:
50-251 N October 5 1999 D.R.Lafleur 6->>REPORTMONTH Se tember 1999 DAY 9/1/99 9/2/99 9/3/99 9/4/99 9/5/99 9/6/99 9/7/99 9/8/99 9/9/99 9/10/99 9/11/99 9/12/99 9/13/99 9/14/99 9/1 5/99 9/1 6/99 9/1 7/99 9/1 8/99 9/19/99 9/20/99 9/21/99 9/22/99 9/23/99 9/24/99 9/25/99 9/26/99 9/27/99 9/28/99 9/29/99 9/30/99 POWER e-Net)AVERAGE DAILY LEVEL (MW 693 693 695 693 693 694 697 702 705 705 705 699 700 706 708 706 699 700 703 705 709 711 707 708 712 711 706 704 705 702 e~~OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 October 5 1999 D.R.Lafleur REPORTING PERIOD Se tember 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 720.0 720.0 0.0 5997.7 5976.8 0.0 164065.2 159713.3 577.2 6.Net Electrical Energy (MWH)505807 4165505 103838603  
DATE:
                                                                                                          ~k' 50-250 October 5 1999 .
COMPLETED BY:         D. R. Lafleur THLHPHONH:           999     9->>   9 HH   OHT'ONTH     ~Sb           999 Date          Duration    Reason'ethod      of                        Corrective Action No.               Type (Hours)
Reactor'ause Shutting Down a
Coements N/A         N/A   N/A     N/A         N/A       N/A         N/A F - Forced           Reason                                Method S - Scheduled       A - Equipment Failure                 1 - Manual B - Maintenance or Test               2 - Manual Scram C - Refueling                         3 - Automatic Scram D - Regulatory restriction             4 - Continuation E - Operator Training &               5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.         50-251 UNIT:                           N DATE:             October 5 1999 COMPLETED BY:     D. R. Lafleur TELEPHONE:                6->>
REPORTMONTH Se tember 1999 DAY           AVERAGE DAILYPOWER LEVEL (MWe-Net) 9/1/99                   693 9/2/99                   693 9/3/99                   695 9/4/99                   693 9/5/99                   693 9/6/99                   694 9/7/99                   697 9/8/99                   702 9/9/99                   705 9/10/99                   705 9/11/99                   705 9/12/99                   699 9/13/99                   700 9/14/99                   706 9/1 5/99                 708 9/1 6/99                 706 9/1 7/99                 699 9/1 8/99                 700 9/19/99                   703 9/20/99                   705 9/21/99                   709 9/22/99                   711 9/23/99                   707 9/24/99                   708 9/25/99                   712 9/26/99                   711 9/27/99                   706 9/28/99                   704 9/29/99                   705 9/30/99                   702
 
e ~ ~
OPERATING DATAREPORT DOCKET NO.                       50-251 UNIT NAME                        TURKEY POINT UNIT 4 DATE                            October 5 1999 COMPLETED BY                    D. R. Lafleur TELEPHONE REPORTING PERIOD Se tember 1999 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)           693 MONTH   -YTD-     CUMULATIVE
: 3. Number of Hours Reactor Was Critical           720.0    5997.7    164065.2
: 4. Number of Hours Generator Was On Line         720.0    5976.8    159713.3
: 5. Unit Reserve Shutdown Hours                     0.0       0.0       577.2
: 6. Net Electrical Energy (MWH)                 505807   4165505   103838603


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.           50-251 UNIT:                Turke Point P4 DATE:                October 5 1999 COMPLETE BY:          D. R. Lafleur TELEPHONE:            ~06->>
50-251 Turke Point P4 October 5 1999 D.R.Lafleur~06->>REPDHTMONTHS b 999 Unit 4 operated at essentially 100%for the entire month of September, 1999.
REPDHTMONTHS               b     999 Unit 4 operated at essentially 100% for the entire month of September, 1999.
UNIT SHUTDOWNS DOCKET NO.50-251 D Ill N EM!:~9k**I M'ATE: October 5 1999 COMPLETED BY: D.R.Lafleur PELEPHDMI:
 
tktl I->>I REPDRP MDNtH 9*I 999 No.Date TFpe'uration (Hours)Reason'ethod of Shutting Down Reactor'ause
UNIT SHUTDOWNS EM!:
&Corrective Action Coaments N/A N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain) l/h}}
DOCKET NO.       50-251 D Ill N         ~9k**           I October 5 1999  M'ATE:
COMPLETED BY:   D. R. Lafleur PELEPHDMI:       tktl     I->> I REPDRP     MDNtH 9*           I       999 No.           Date TFpe'uration             Reason'ethod     of                         Corrective Action Reactor'ause (Hours)                  Shutting                          Coaments Down N/A             N/A   N/A       N/A           N/A       N/A             N/A F - Forced             Reason                                Method S - Scheduled           A - Equipment Failure                 1 - Manual B - Maintenance or Test               2 - Manual Scram C - Refueling                         3  Automatic Scram D - Regulatory restriction             4  - Continued E - Operator Training &               5  Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
 
l
    /
h}}

Latest revision as of 22:04, 3 February 2020

Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr
ML17355A447
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1999
From: Hovey R, Lafleur D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-221, NUDOCS 9910190173
Download: ML17355A447 (80)


Text

yj~tu Distri-5.txt 99lo/'1 Ol W~

Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients: Copies:

K Jabbour 1, Paper Copy Internal Recipients:

Rids Rgn2MailCenter 0 OK RidsResDraaOerab 0 OK RidsOcfoDpbaPab 0 OK Rids Manager 0 OK RidsAcrsAcnwMailCenter 0 OK RGN2. Paper Copy RES/DRAA/OERAB Paper Copy OCFO/DPBA Paper Copy

.iLE CEHTTER 0 Paper Copy ACR Paper Copy External Recipients:

NOAC Internet: dsq@ornl.gov INEEL Marshall

~r Paper Copy Paper Copy v.

Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID'03691931:1

Subject:

February, 2000, Operating Data Report and Summary of Operating Experience for Turke y Point Units 3 and 4.

Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003691931 ~

Page 1

'a if 1

kl r

E I

Distri-5.txt IE24 - Monthiy Operating Report (per Tech Specs)

Docket: 05000250 Docket: 05000251 Page 2

R 07,moo L-2000-062 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort - Februa 2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company oo@LoQAB i

W r

AVERAGE DAILYUNIT PO%'ER LEVEL DOCKET NO. 50-250 UNIT: 6 DATE: March 2 2000 COMPLETED BY: O.I. Hanek TEE HONE. H0066-660 ltE OliT MON H 00 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 2/1/2000 717 2/2/2000 717 2/3/2000 719 2/4/2000 719 2/5/2000 723 2/6/2000 730 2/7/2000 726 2/8/2000 724 2/9/2000 728 2/1 0/2000 729 2/1 1/2000 727 2/1 2/2000 721 2/1 3/2000 715 2/1 4/2000 712 2/1 5/2000 709 2/1 6/2000 708 2/17/2000 711 2/18/2000 711 2/19/2000 709 2/20/2000 706 2/21/2000 706 2/22/2000 718 2/23/2000 723 2/24/2000 723 2/25/2000 715 2/26/2000 314 2/27/2000 281 2/28/2000 0 2/29/2000 0

OPERATING DATA REPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE March 2 2000 COMPLETED BY 0. I. Hanek TELEPHONE 305 246-6607 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 648.3 1392.3 171009.7
4. Number of Hours Generator Was On Line 648.3 1392.3 168794.4
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 444470 981826 108915034

UNIT SHUTDOWNS DOCKET NO. 50-250 ONIP NAME: I I M DATE: March 2 2000 COMPLETED BY: O. I. Hanek PHLEPHOMI: ~6-000 RHPORP MONER I' 000 No. Date Duration Reason Method of Corrective Action Reactor'ause

{Hours) Shutting Cocntents Down 2000005 2/28/2000 41.7 Shut down for refueling.

F - Forced Reason Method S - Scheduled A - Equipment Failure

- Maintenance or Test l - Manual 2 - Manual Scram B

C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 Continuation E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF>> OPERATING EXPERIENCE DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELE <<ONE. '~6-660

~¹ 50-250 March 2 2000 O. I. Hanek EEPOET MONTE ~b2000 Unit 3 operated essentially at 100% reactor power until February 25, 2000. Then reactor power was lowered in preparation for a refueling outage which started on February 28, 2000. The unit remained shutdown for refueling for the remainder of the month, and is expected to restart on or about March 26, 2000.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT'. ~kP I PP DATE: March 2 2000 COMPLETED BY:

E E <<ONE: ~6-<<

O. I. Hanek TEPEE MONTE I DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2/1/2000 719 2/2/2000 719 2/3/2000 720 2/4/2000 721 2/5/2000 725 2/6/2000 731 2/7/2000 728 2/8/2000 726 2/9/2000 729 2/1 0/2000 731 2/11/2000 730 2/12/2000 724 2/13/2000 719 2/14/2000 717 2/15/2000 714 2/1 6/2000 710 2/17/2000 712 2/18/2000 714 2/19/2000 712 2/20/2000 713 2/21/2000 713 2/22/2000 722 2/23/2000 728 2/24/2000 729 2/25/2000 726 2/26/2000 724 2/27/2000 724 2/28/2000 722 2/29/2000 717

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE March 2 2000 COMPLETED BY 0. I. Hanek TELEPHONE 305 246-6607 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 696 1387.6 167661.8
4. Number of Hours Generator Was On Line 696 1369.3 163291.6
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 502055 980345 10638871 5

UNIT SHUTDOWNS DOCKET NO. 50-251 DNIINBMB: ~k* I 66 DATE: March 2 2000 COMPLETED BY: O. I. Hanek TBLBPHDNB: MPPP-66 RBPDRTMDNTH ~bOOO No. Duration Reason* Method of & Corrective Action (Hours)

Reactor'ause Shutting Down Cosrents N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D Regulatory restriction 4 - Continued E - Operator Training a 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point ¹4 DATE: March 2 2000 COMPLETE BY: O. I. Hanek TELEPHONE: 305 246-6607 REPORTMQNTH~00 Unit 4 operated at essentially 100% reactor power for the month of February, 2000.

t t v

Distri25.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients: Copies:

K Jabbour 1 Not Found Internal Recipients:

Rids Res DraaOerab OK RGN 2. Not Found RES/DRAA/OERAB Not Found OCFO/DPBA== Not Found 6 FILE-CENTER 01 Not Found ACRS Not Found External Recipients:

NOAC Not Found INEEL Marshall Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003683954

Subject:

Turkey Point 3 and 4 Monthly Operation Report- January, 2000. With February 9, 2000 I etter.

Body:

Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

f PEB P9 2000 L-2000-034 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort- Janua 2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company f30 Q (Qg ~a]

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT:

DATE: Februa 4 2000 COMPLETED BY: O.I. Hanek TELEPHONE: LOD6-66 ll¹PDET MDNTH ~000 DAY. AVERAGE DAILYPOWER LEVEL (MWe-Net) 1/1/2000 720 1/2/2000 717'17 1/3/2000 1/4/2000 716 1/5/2000 710 1/6/2000 715 1/7/2000 717 1/8/2000 716 1/9/2000 714 1/1 0/2000 714 1/1 1/2000 713 1/12/2000 711 1/1 3/2000 711 1/14/2000 716 1/1 5/2000 730 1/16/2000 735 1/1 7/2000 730 1/1 8/2000 729 1/1 9/2000 726 1/20/2000 726 1/21/2000 728 1/22/2000 730 1/23/2000 726 1/24/2000 720 1/25/2000 728 1/26/2000 733 1/27/2000 736 1/28/2000 735 1/29/2000 729 1/30/2000 725 1/31/2000 719

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Februa 4 2000 COMPLETED BY 0. I. Hanek TELEPHONE 305 246-6607 (Month/Year)

1. Design Electricai Rating (MWe-Net) 720
2. Maximum Dependable Capacity(MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744 744 170361.4
4. Number of Hours Generator Was On Line 744 744 168146.1
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 537356 537356 108470564

UNIT SHUTDOWNS DOCKET NO. 50-250 ENII NAME: I I M APE: I I 4 EM COMPLETED BY: O. I. Hanek PELHPHHNH: ~66-660 REPQRPMDNI'H I~000 No. Date Type'uration Reason'ethod of a Corrective Action (Hours)

Reactor'ause Shutting Down Cocaents N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test. 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPKRATING KXPKRIKNCK DOCKET NO.

UNIT:

DATE:

~kN 50-250 M

COMPLETED BY:

HIHPHONH: ~6M O. I. Hanek HH OHT MONTH ~0 Unit 3 operated essentially at 100% for the month of January, 2000.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT:

DATE:

~k¹ 50-251 bbb 000 COMPLETED BY:

TEL <<ONE: ~0-<<

O. I. Hanek OETMOIITN DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 1/1/2000 723 1/2/2000 721 1/3/2000 720 1/4/2000 716 1/5/2000 716 1/6/2000 718 1/7/2000 718 1/8/2000 717 1/9/2000 716 1/10/2000 715 1/11/2000 714 1/1/2000 712 1/13/2000 714 1/14/2000 718 1/1 5/2000 730 1/1 6/2000 734 1/1 7/2000 729 1/1 8/2000 730 1/1 9/2000 726 1/20/2000 726 1/21/2000 728 1/22/2000 730 1/23/2000 726 1/24/2000 337 1/25/2000 0 1/26/2000 0 1/27/2000 142 1/28/2000 720 1/29/2000 725 1/30/2000 727 1/31/2000 723

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE Februa 4 2000 COMPLETED BY O.I. Hanek TELEPHONE 305 246-6607 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 691.6 691.6 166965.8
4. Number of Hours Generator Was On Line 673.3 673.3 162595.6
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 478290 478290 105886660

UNIT SHUTDOWNS DOCKET NO. 50-251 UNIT NAME: 0 I ~

DATE: 0~000 COMPLETED BY: O. I. Hanek TEAEPHDNH: H006-660 EEPUET MUNTH ~00 Ho. Date Duration Reason Method of Cause & Corrective Action (Hours) Shutting Comments Down Reactor 20000001 1/24/2000 10.'7 The cause of the feedwater control valve failure, that required a manual reactor trip, was a failure in the valve internals. Disassembly of the valve confirmed that the valve cage had disengaged from the valve body web.

Corrective actions included repair of the valve and Post Maintenance Testing.

A Licensee Event Report (No. 2000-001-00) is being prepared for submittal to the NRC.

F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 - Other (Explain)

License Exa~ination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~

~

~

'UMMARY

~ OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point P4 DATE: 000 00 COMPLETE BY: O. I. Hanek TELEPHONE: 305 246-6607 RRPOR MONTH 00 Unit 4 operated at essentially 100% for the month of January, 2000, except between January 24-27, 2000. The reactor was manually tripped on January 24, 2000, aAer experiencing problems with the feedwater control valve to the 4A steam generator. Unit 4 returned to 100% power on January 27, 2000. A Licensee Event Report (No. 2000-001-00) is being prepared for submittal to the NRC.

SAN 0 6 2000 L-2000-004 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-December 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments f

cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant pQp ~~a C)g~~~

an FPL Group company + ~3<griggg

)

Distri61.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients: Copies:

K Jabbour 1 Not Found Internal Recipients:

RGN 2 Not Found RES/DRAA/OERAB Not Found L

eRS =~

OCFO J32BA CENTER Not Not Not Found Found Found External Recipients:

NOAC Not Found INEEL Marshall Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003674568

Subject:

Monthly operating reports for December 1999 for Turkey Point, Units 3 and 4. With 000106 letter.

Body:

PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNI: >> I ¹ I

DATE:

COMPLETED BY:

I¹I <<ONE:

REPORT MONTH December 1999

~6 O.I. Hanek DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 12/1/99 730 12/2/99 733 12/3/99 732 12/4/99 731 12/5/99 728 12/6/99 724 12/7/99 720 12/8/99 708 12/9/99 719 12/10/99 721 12/11/99 720 12/12/99 718 12/13/99 719 12/14/99 718 12/1 5/99 713 12/16/99 715 12/17/99 720 12/18/99 716 12/19/99 714 12/20/99 711 12/21/99 712 12/22/99 714 12/23/99 710 12/24/99 713 12/25/99 726 12/26/99 733 12/27/99 732 12/28/99 730 12/29/99 730 12/30/99 728 12/31/99 725

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Janua 3 2000 COMPLETED BY O. I. Hanek TELEPHONE 305 246-6607 REPORTING PERIOD December 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744 870?.4 169617.4
4. Number of Hours Generator Was On Line 744 8684.5 167402.1
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 536729 6112349 107933208

UNIT SHUTDOWNS DOCKET NO. 50-250 UNIT NANH: T~HP I 66 DATE: I >>66 COMPLETED BY: O. I. Hanek TH HPHUNN: ~06-66 REPORT MONTH December 1999 No. Date Duration Reason* Method of Cause 4 Corrective Action (Hours) Shutting Comments Down Reactor*

N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

¹¹¹¹.:

DATE:

COMPLETED BY:

¹¹¹¹ ¹ON¹:

J>>

50-250

" " i O. I. Hanek

~¹¹-66

~

¹ REPORT MONTH December 1999 Unit 3 operated essentially at 100% for the month of December, 1999.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 IINI DATE:

BY: O. I. Hanek

~I""'OMPLETED PPLPPNONN ~06-66 REPORT MONTH December 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 12/1/99 730 12/2/99 733 12/3/99 733 12/4/99 732 12/5/99 730 12/6/99 726 12/7/99 718 12/8/99 718 12/9/99 719 12/10/99 721 12/11/99 720 12/12/99 719 12/1 3/99 719 12/14/99 718 12/15/99 714 12/16/99 715 12/17/99 721 12/18/99 718 12/19/99 716 12/20/99 715 12/21/99 715 12/22/99 717 12/23/99 711 12/24/99 714 12/25/99 727 12/26/99 734 12/27/99 734 12/28/99 732 12/29/99 730 12/30/99 729 12/31/99 727

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE Janua 3 2000 COMPLETED BY O. I. Hanek TELEPHONE 305 246-6607 REPORTING PERIOD December 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744 8206.7 166274.2
4. Number of Hours Generator Was On Line 744 8185.8 161922.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 537706 5735272 105408370

UNIT SHUTDOWNS DOCKET NO. 50-251 HNN NAME: 6 6 6 DATE:

COMPLETED BY: O. I. Hanek PE EPHHNE'666 6-666 REPORT MONTH December 1999 No. Date Type'uration Reason Method of & Corrective Action (Hours)

Reactor'ause Shutting Down Comments N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual

- or Test 2 - Manual Scram B

C - Maintenance Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training a 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: Janua 3 2000 COMPLETE BY: O. I. Hanek TELEPHONE: ~6-66 REPORT MONTH December 1999 Unit 4 operated at essentially 100% for the month of December, 1999.

P S

)AN >~ Kg V ~

999 tI=PIL. L-99-267 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-November 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company

f t

$ Nf i

v J

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT: Turke Point ¹3 DATE: December 3 1999 COMPLETED BY: O.I. Hanek TELEPHONE: ~5-MO REPORT MONTH November 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 11/1/99 710 11/2/99 709 11/3/99 716 11/4/99 724 11/5/99 726 11/6/99 724 11/7/99 718 11/8/99 722 11/9/99 722 11/1 0/99 722 11/11/99 720 11/12/99 720 11/1 3/99 721 11/14/99 720 11/1 5/99 692 11/1 6/99 317 11/17/99 0 11/18/99 348 11/19/99 720 11/20/99 723 11/21/99 722 11/22/99 720 11/23/99 717 11/24/99 717 11/25/99 716 11/26/99 714 11/27/99 716 11/28/99 722 11/29/99 725 11/30/99 726

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE December 3 1999 COMPLETED BY O. I. Hanek TELEPHONE 305 246-6607 REPORTING PERIOD November 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 693.8 7963.4 168873.4
4. Number of Hours Generator Was On Line 677.2 7940.5 166658.1
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 481025 5575620 107396479

UNIT SHUTDOWNS DOCKET NO. 50-250 LPNNN¹NE: 3 3 ¹3 DATE: December 3 1999 COMPLETED BY: O. I. Hanek PELEPNDNE: 333 6-666 REPORT MONTH November 1999 No. Date Type'uration Reason'ethod of Corrective Action Reactor'ause (Hours) Shutting Cosments Down 19900032 11/16/99 42.8 Turbine control valve inoperable, testing and repairs F - Forced Reason Method S - Scheduled A - Equipment Failure 1 Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & S Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT:

DATE:

~k¹3 50-250 December 3 1999 COMPLETED BY: O. I. Hanek TELE¹NUNE. ~6-66 REPORTMONTH November 1999 Unit 3 operated essentially at 100% in the beginning of the month of November, 1999. On November 15, 1999, power reduction was commenced to test the No. 2 turbine control valve. On November 16, 1999, the unit was taken offline to repair the No. 2 turbine control valve. On November 18, 1999, Unit 3 resumed 100% power operation and remained at that power level for the rest of the month.

l AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT.

DATE:

~ki ¹ 50-251 December 3 1999 COMPLETED BY:

TELEPHONE. '666 O. I. Hanek 6-66 REPORT MONTH November 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 11/1/99 710 11/2/99 710 11/3/99 717 11/4/99 725 11/5/99 727 11/6/99 726 11/7/99 723 11/8/99 687 11/9/99 290 11/1 0/99 516 11/11/99 715 11/12/99 720 11/1 3/99 724 11/14/99 723 11/1 5/99 722 11/1 6/99 714 11/1 7/99 724 11/1 8/99 728 11/1 9/99 726 11/20/99 725 11/21/99 722 11/22/99 719 11/23/99 718 11/24/99 719 11/25/99 716 11/26/99 714 11/27/99 716 11/28/99 722 11/29/99 725 11/30/99 725

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE December 3 1999 COMPLETED BY 0. I. Hanek TELEPHONE 305 246-6607 REPORTING PERIOD November 1999 (MonthNear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720 7462.7 165530.2
4. Number of Hours Generator Was On Line 720 7441.8 161178.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 502823 5197566 104870664

UNIT SHUTDOWNS DOCKET NO. 50-251 HNIINENI!.

  • I 66 DATE: December 3 1999 COMPLETED BY: O. I. Hanek TELEPHONE: H666-66 REPORT MONTH November 1999 No. Date Duration Reason* Method of Corrective Action Reactor'ause 6

(Hours) Shutting Comments Down N/A N/A F Forced Reason Method

- Scheduled A - Equipment Failure 1 - Manual S

B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) "

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT:

DATE: December 3 1999 COMPLETE BY: O. I. Hanek TELEPHONE: ~6-66 REPORT MONTH November 1999 Unit 4 operated at essentially 100% until November 8, 1999, when reactor power was reduced to approximately 40% for turbine valve testing. The unit returned to 100% power on November 10, 1999, and operated at that power level for the rest of the month of November, 1999.

fp ] 8 girg 0 '

P

~

II

. Distri50.txt Distribution Sheet Priority: Normal From: Linda Eusebio Action Recipients: Copies:

K Jabbour 1 Not Found Internal Recipients:

RGN 2 Not Found RES/DRAA/OERAB Not Found OC Not Found g PEN ER 01 Not Found ACRS Not Found External Recipients:

NRC PDR 1 Not Found NOAC 1 Not Found INEEL Marshall 1 Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993480234

Subject:

Monthly operating reports for November 1999 for Turkey Point, Units 3 and 4.With 991208 letter.

Body:

PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

~ ~

~ g

Distri13.txt Distribution Sheet Priority: Normal

~i/e)(<

From: Stefanie Fountain Action Recipients: Copies:

KJabbour 1 Not Found Internal Recipients:

RGN 2. Not Found RES/DRAA/OERAB Not Found OC/DBA/PAD 1 Not Found F C TEB 1 Not Found ACRS Not Found External Recipients:

NRC PDR Not Found NOAC Not Found INEEL Marshall Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993220052

Subject:

Monthly Operating Reports for October 1999 for Turkey Point, Units 3 and 4, With Nove mber 8, 1999 Letter.

Body:

PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

NOV 08 'f999 L-99-242 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-October 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4. r Very truly yours, R. J. Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT: I6 DATE: November 2 1999 COMPLETED BY D. R. Lafleur TELEPHONE: 305 246-7150 REPORT MONTH October 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 10/1/99 698 10/2/99 703 10/3/99 707 10/4/99 708 10/5/99 706 10/6/99 702 10/7/99 703 10/8/99 706 10/9/99 707 10/10/99 709 10/11/99 707 10/12/99 698 10/13/99 691 10/14/99 710 10/1 5/99 717 10/16/99 716 10/17/99 711 10/1 8/99 708 10/1 9/99 700 10/20/99 703 10/21/99 702 10/22/99 706 10/23/99 713 10/24/99 719 10/25/99 723 10/26/99 723 10/27/99 723 10/28/99 723 10/29/99 721 10/30/99 719 10/31/99 715

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE November 2 1999 COMPLETED BY D. R. Lafleur TELEPHONE 305 246-7150 REPORTING PERIOD October 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 745.0 7269.6 168179.6
4. Number of Hours Generator Was On Line 745.0 7263.3 165980.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 528619 5094595 106915454

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: N DATE: November 2 1999 COMPLETED BY D.R. Lafleur TELEPHONE: 305 246-7150 REPORT MONTH October 1999 Unit 3 operated essentially at 100% in the beginning of the month of October, 1999. On October 12, 1999, power was reduced to 90% for repair of the Heater Drain Tank Level Control Valve, CV-3-1510A. Unit 3 resumed 100% power on October 13, and stayed essentially at 100% power for the rest of the month of October, 1999.

UNIT SHUTDOWNS DOCKET NO.

NNHHNANH:

DATE:

~i03 50-250 November 2 1999 COMPLETED BY: D. R. Lafleur HHLHHHDNH: 43303 240- 0 REPORT MONTH October 1999 Duration Method of Corrective Action No. Date (Hours)

Reason Reactor'ause Shutting Down Ccecnents N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 Continuation E - Operator Training & 5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT:

DATE: November 2 1999 COMPLETED BY: D. R. Lafleur TELEPHONE: 305 246-7150 REPORT MONTH October 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 10/1/99 698 10/2/99 701 10/3/99 706 10/4/99 708 10/5/99 705 10/6/99 703 10/7/99 707 10/8/99 706 10/9/99 708 10/10/99 710 10/11/99 709 10/12/99 706 10/13/99 708 10/14/99 711 10/1 5/99 715 10/16/99 718 10/1 7/99 716 10/18/99 711 10/19/99 705 10/20/99 702 10/21/99 696 10/22/99 698 10/23/99 712 10/24/99 719 10/25/99 721 10/26/99 722 10/27/99 724 10/28/99 723 10/29/99 720 10/30/99 719 10/31/99 716

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE November 2 1999 COMPLETED BY D. R. Lafleur TELEPHONE 305 246-7150 REPORTING PERIOD October 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 745.0 6742.7 164810.2
4. Number of Hours Generator Was On Line 745.0 6721.8 160458.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 529238 4694743 104367841

UNIT SHUTDOWNS DOCKET NO. 50-251 0 0 TNT NAME:

DATE:

2~TEE November 2 i

4 4044 1999 COMPLETED BY: D. R. Lafleur TELEPHONE: 42200 240->> 0 REPORT MONTH October 1999 No. Date Duration Reason'ethod of Corrective Action Reactor'ause (Hours) Shutting Corments Down N/A N/A N/A N/A N/A N/A H/A F - Forced Reason Method S - Scheduled A - Equipment Failure

- Maintenance or Test l Manual 2 - Manual Scram B

C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training a 5 - Other (Explain)

License Examination "

F - Mministrative G - Operational Error (Explain)

H - Other (Explain)

h

~

~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT:

DATE: November 2 1999 COMPLETE BY: D. R. Lafieur TELEPHONE: ~06-7 5 REPORT MONTH October 1999 Unit 4 operated at essentially 100% for the entire month of October, 1999.

.~ ~ ~

Itl res

~ r'

CATZaOaz 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9910190173 DOC.DATE: 99/09/30 NOTARXZED: NO DOCKET ¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-253, Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION LAFLEUR,D.R. Florida Power & Light Co.

HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1999 for Turkey Point, Units 3 & 4.With 991008 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEXVED:LTR ENCL SXZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 JABBOUR,.K 1 1 RES/DRAA/OERAB INTERNAL: FILE CENTER 01 1 OC/DBA/PAD 1 1 1 RGN2 1 1 EXTERNAL: LMXTCO MARSHALL 1 NOAC 1 1 NRC PDR' 1 1 D

N i.>su>tjfJ<Jil~4 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 8 ENCL 8

OCTO8 1999 L-99-221 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 t Docket Nos. 50-250 and 50-251 k Monthl 0 eratin Re ort-Se tember 1999 1k In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

l'ery truly yours, R. J. Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

'I 99iQi90i73 990930 l PDR'ADOCK 05000250, I I R PDR an FPL Group company

II if

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UM DATE:

. ~ki 50-250 October 5 1999 N

COMPLETED BY: D. R. Lafleur TELWHDMI: ~56-REPORT MONTH Se tember 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 9/1/99 687 9/2/99 686 9/3/99 687 9/4/99 686 9/5/99 687 9/6/99 686 9/7/99 689 9/8/99 694 9/9/99 697 9/1 0/99 666 9/11/99 230 9/12/99 458 9/1 3/99 698 9/14/99 707 9/1 5/99 711 9/1 6/99 708 9/17/99 701 9/18/99 701 9/19/99 705 9/20/99 707 9/21/99 710 9/22/99 714 9/23/99 709 9/24/99 709 9/25/99 712 9/26/99 712 9/27/99 708 9/28/99 700 9/29/99 703 9/30/99 703

~ s ~

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE October 5 1999 COMPLETED BY D. R. Lafleur TELEPHONE 305 246-7150 REPORTING PERIOD Se tember 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 6524.6 167434.6
4. Number of Hours Generator Was On Line 720.0 6518.3 165235.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 486444 4565976 106386835

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNI1'.: i N DATE: October 5 1999 COMPLETED BY: D.R. Lafleur TELEPHONE: ~36->> 0 REPORT MONTH Se tember 1999 Unit 3 operated essentially at 100% in the beginning of the month of September, 1999. On September 10, 1999, power was reduced to 35% for Turbine Plant Cooling Water Heat Exchanger cleaning, turbine valve testing, and waterbox cleaning. Unit 3 resumed 100% power on September 12, 1999 and stayed essentially at 100% power for the rest of the month of September, 1999.

UNIT SHUTDOWNS DOCKET NO.

ONIIN¹MH:

DATE:

~k' 50-250 October 5 1999 .

COMPLETED BY: D. R. Lafleur THLHPHONH: 999 9->> 9 HH OHT'ONTH ~Sb 999 Date Duration Reason'ethod of Corrective Action No. Type (Hours)

Reactor'ause Shutting Down a

Coements N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & 5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT: N DATE: October 5 1999 COMPLETED BY: D. R. Lafleur TELEPHONE: 6->>

REPORTMONTH Se tember 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 9/1/99 693 9/2/99 693 9/3/99 695 9/4/99 693 9/5/99 693 9/6/99 694 9/7/99 697 9/8/99 702 9/9/99 705 9/10/99 705 9/11/99 705 9/12/99 699 9/13/99 700 9/14/99 706 9/1 5/99 708 9/1 6/99 706 9/1 7/99 699 9/1 8/99 700 9/19/99 703 9/20/99 705 9/21/99 709 9/22/99 711 9/23/99 707 9/24/99 708 9/25/99 712 9/26/99 711 9/27/99 706 9/28/99 704 9/29/99 705 9/30/99 702

e ~ ~

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE October 5 1999 COMPLETED BY D. R. Lafleur TELEPHONE REPORTING PERIOD Se tember 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 5997.7 164065.2
4. Number of Hours Generator Was On Line 720.0 5976.8 159713.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 505807 4165505 103838603

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point P4 DATE: October 5 1999 COMPLETE BY: D. R. Lafleur TELEPHONE: ~06->>

REPDHTMONTHS b 999 Unit 4 operated at essentially 100% for the entire month of September, 1999.

UNIT SHUTDOWNS EM!:

DOCKET NO. 50-251 D Ill N ~9k** I October 5 1999 M'ATE:

COMPLETED BY: D. R. Lafleur PELEPHDMI: tktl I->> I REPDRP MDNtH 9* I 999 No. Date TFpe'uration Reason'ethod of Corrective Action Reactor'ause (Hours) Shutting Coaments Down N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & 5 Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

l

/

h