{{#Wiki_filter:TECHNICAL SPECIFICATION 312 Effective Page Listing Unit 1-3.1/4.1-5 Unit 2-3.1/4 3.1/4 3.1/4 3.1/4 3.1/4.1-4.1-5.1-9~1 1 1.1-16 Unit 3-3.1/4.1-4 9310040387 930930 PDR ADOCK 05000259 P PDR 1><r 1 l Jl 1' PROPOSED TECHNICAL SPECIFICATION CHANGE BROWNS FERRY NUCLEAR PLANT UNIT 1 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
{{#Wiki_filter:TECHNICAL SPECIFICATION 312 Effective Page Listing Unit 1   3.1/4.1-5 Unit 2   3.1/4 .1-4 3.1/4 .1-5 3.1/4 .1-9 3.1/4 1 1 1
NOTES FOR TABLE 1 A There shall be two operable or tripped trip systems for each function.If the minimum number of operable instrument channels per trip system cannot be met for one trip system, trip the inoperable channels or entire trip system within one hour, or, alternatively, take the below listed action for that trip function.If the minimum number of operable instrument channels cannot be met by either trip system, the appropriate action listed below (refer to right-hand column of Table)shall be taken.An inoperable channel need not be placed in the tripped condition where this would cause the trip function to occur.In these cases, the inoperable channel shall be restored to operable status within two hours, or take the action listed below for that trip function.A.Initiate insertion of operable rods and complete insertion of all operable rods within four hours.In refueling mode, suspend all operations involving core alterations and fully insert all operable control rods within one hour.B.Reduce power level to IRM range and place mode switch in the STARTUP/HOT Standby position within 8 hours.C.Reduce turbine load and close main steam line isolation valves within 8 hours.D.Reduce power to less than 30 percent of rated.2.The scram discharge volume high water level bypass may be used in SHUTDOWN or REFUEL to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip.A control rod withdraw block is present when this scram is bypassed.3~Bypassed if reactor pressure is less than 1055 psig and mode switch not in RUN.Bypassed when turbine first stage pressure is less than 154 psig.5.IRMs are bypassed when APRMs are onscale and the reactor mode switch is in the RUN position.6.The design permits closure of any two lines without a scram being initiated.
                ~
7 0 When the reactor is subcritical and the reactor water temperature is less than 212oF, only the following trip functions need to be operable: A.Mode switch in shutdown B.Manual scram C.High flux IRM D.Scram discharge volume high level E.APRM 15 percent scram BFN Unit 1 3.1/4.1-5 PROPOSED TECHNICAL SPECIFICATION CHANGE BROMNS FERRY NUCLEAR PLANT UNIT 2 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
3.1/4 . 1-16 Unit 3   3. 1/4. 1-4 9310040387 930930 PDR   ADOCK 05000259 P                   PDR
TABLE 3.1.A REACTOR PROTECTION SYSTEH (SCRAH)INSTRUHENTATION REQUIREHENTS Hin.No.of Operable Instr.Channels Per Trip Tri Level Settin H de in which Func ion Hu Be~Orabli;Shut-Startup/down~Refuel 7 RoatHtandb Run A~ti n 7 High Water Level in West Scram Discharge Tank (LS-85-45A-D)
High Water Level in East Scram Discharge Tank (LS-85-45E-H)
Hain Steam Line Isolation Valve Closure Turbine Control Valve Fast Closure or Turbine Trip Turbine Stop Valve Closure Turbine First Stage Pressure Permissive (PIS-1-81A&B, PI 5-1-91A&8)
<50 Gallons<50 Gallons<105 Valve Closure>550 psig<lOX Valve Closure not>154 psig X(2)X(2)X(2)X(2)X(18)X(18)1.A X 1.A X(6)1.A or 1.C X(4)1.A or 1.D X(4)1.A or 1.D X(18)1.A or 1.D (19)Hain Steam Line High Radiation (14)3 X Normal Full Power Background (20)X(9)X(9)X(9)1.A or 1.C


There shall be two OPERABLE or tripped trip systems for each function.If the minimum number of OPERABLE instrument channels per trip system cannot be met for one trip system, trip the INOPERABLE channels or entire trip system within one hour, or, alternatively, take the below listed action for that trip function.If the minimum number of OPERABLE instrument channels cannot be met by either trip system, the appropriate action listed below (refer to right-hand column of Table)shall be taken.An INOPERABLE channel need not be placed in the tripped condition where this would cause the trip function to occur.In these cases, the INOPERABLE channel shall be restored to OPERABLE status within two hours, or take the action listed below for that trip function.A.Initiate insertion of OPERABLE rods and complete insertion of all OPERABLE rods within four hours.In refueling mode, suspend all operations involving core alterations and fully insert all OPERABLE control rods within one hour.B.Reduce power level to IRM range and place mode switch in the STARTUP/HOT Standby position within 8 hours.C.Reduce turbine load and close main steam line isolation valves within 8 hours.D.Reduce power to less than 30 percent of rated.2~The scram discharge volume high water level bypass may be used in SHUTDOWN or REFUEL to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip.A control rod withdraw block is present when this scram is bypassed.3~(Deleted)4~Bypassed when turbine first stage pressure is less than 154 psig.5~IRMs are bypassed when APRMs are onscale and the reactor mode switch is in the RUN position.6.The design permits closure of any two lines without a scram being initiated.
1
7~When the reactor is subcritical and the reactor water temperature is less than 212 F, only the following trip functions need to be OPERABLE: A.Mode switch in SHUTDOWN B.Manual scram C.High flux IRM D.Scram discharge volume high level E.APRM 15 percent scram BFN Unit 2 3.1/4.1-5
>< r          1' 1 l Jl


~ru~>2 High Water Level in Scram Discharge Tank Float Switches (LS-85-45C-F)
PROPOSED  TECHNICAL SPECIFICATION CHANGE BROWNS FERRY NUCLEAR PLANT UNIT 1 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
A Electronic Level Switches (LS-85-45A, 8, G, H)Hain Steam Line High Radiation Main Steam Line Isolation Valve Cl osure Turbine Control Valve Fast Closure or turbine trip Turbine First Stage Pressure Permissive (PIS-1-81A and B, PIS-1-91A and 8)Turbine Stop Valve Closure TABLE 4.1.A (Continued)
 
Fun ion 1 T Trip Channel and Alarm Trip Channel and Alarm (7)Trip Channel and Alarm (4)Trip Channel and Alarm Trip Channel and Alarm Trip Channel and Alarm (7)Trip Channel and Alarm Hinim Fr u n Once/Honth Once/Honth Once/3 Honths (8)Once/3 Honths (8)Once/Honth (1)Every three months Once/Month (1)
NOTES FOR TABLE        1 A There    shall  be two operable or tripped trip systems for each function.
TABLE 4.1.8 REACTOR PROTECTION SYSTEM (SCRAM)INSTRUMENT CALIBRATION MINIMUH CALIBRATION FRE()UENCIES FOR REACTOR PROTECTION INSTRUMENT CHANNELS Instrumen Ch nn 1 Grou 1~Calibra i a inim Fr n 2 IRH High Flux Comparison to APRH on Controlled Note (4)Startups (6)APRH High Flux Output Signal Flow Bias Signal LPRH Signal High Reactor Pressure (PIS-3-22 AA, BB, C, 0)High Drywell Pressure (PIS-64-56 A-D)Reactor Low Water Level (LIS-3-203 A-D)High Water Level in Scram Discharge Volume Float Switches (LS-85-45-C-F)
If the    minimum number of operable instrument channels per trip system cannot be met for one trip system, trip the inoperable channels or entire trip system within one hour, or, alternatively, take the below listed action for that trip function.          If the minimum number of operable instrument channels cannot be met by either trip system, the appropriate action listed below (refer to right-hand column of Table) shall be taken. An inoperable channel need not be placed in the tripped condition where this would cause the trip function to occur. In these cases, the inoperable channel shall be restored to operable status within two hours, or take the action listed below for that          trip function.
Electronic Level Switches (LS-85-45 A, 8, G, H)Hain Steam Line Isolation Valve Cl osure Hain Steam Line High Radiation Turbine First Stage Pressure Permissive (PIS-1-81 A&B, PIS-1-91 A&B)Turbine Stop Valve Closure Turbine Control Valve Fast Closure on Turbine Trip Heat Balance Calibrate Flow Bias Signal (7)TIP System Traverse (8)Standard Pressure Source Standard Pressure Source Pressure Standard Calibrated Water Column Calibrated Water Column Note (5)Standard Current Source (3)Standard Pressure Source Note (5)Standard Pressure Source Once/7 Days Once/Operating Cycle Every 1000 Effective Full Power Hours Once/6 Honths (9)Once/18 Honths (9)Once/18 Honths (9)Once/18 Honths Once/18 Months (9)Note (5)Every 3 Honths Once/18 Honths (9)Note (5)Once/Operating Cycle 3.1~BS~S (Cont'd)be accommodated which would result in slow scram times or partial control rod insertion.
A. Initiate insertion of      operable rods and complete insertion of all operable rods within four hours. In refueling mode, suspend all operations involving core alterations and fully insert all operable control rods within one hour.
To preclude this occurrence, level switches have been provided in the instrument volume which alarm and scram the reactor when the volume of water reaches 50 gallons.As indicated above, there is sufficient volume in the piping to accommodate the scram without impairment of the scram times or amount of insertion of the control rods.This function shuts the reactor down while sufficient volume remains to accommodate the discharge water and precludes the situation in which a scram would be required but not be able to perform its function adequately.
B. Reduce power    level to IRM range and place mode switch in the STARTUP/HOT    Standby  position within 8 hours.
A source range monitor (SRM)system is also provided to supply additional neutron level information during startup but has no scram functions.
C. Reduce    turbine load    and close main steam    line isolation valves within 8 hours.
Reference Section 7.5.4 FSAR.Thus, the IRM is required in the REFUEL and STARTUP modes.In the power range the APRM system provides required protection.
D. Reduce power    to less than    30  percent of rated.
Reference Section 7.5.7 FSAR.Thus, the IRM System is not required in the RUN mode.The APRMs and the IRMs provide adequate coverage in the STARTUP and intermediate range.The high reactor pressure, high drywell pressure, reactor low water level, and scram discharge volume high level scrams are required for STARTUP and RUN modes of plant operation.
: 2. The scram discharge volume        high water level bypass may be used in SHUTDOWN    or  REFUEL  to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip.
They are, therefore, required to be operational for these modes of reactor operation.
A control rod withdraw block is present when this scram is bypassed.
The requirement to have the scram functions as indicated in Table 3.1.A OPERABLE in the REFUEL mode is to assure that shifting to the REFUEL mode during reactor power operation does not diminish the need for the reactor protection system.Because of the APRM downscale limit of g 3 percent when in the RUN mode and high level limit of g15 percent when in the STARTUP Mode, the transition between the STARTUP and RUN Modes must be made with the APRM instrumentation indicating between 3 percent and 15 percent of rated power or a control rod scram will occur.In addition, the IRM system must be indicating below the High Flux setting (120/125 of scale)or a scram will occur when in the STARTUP Mode.For normal operating conditions, these limits provide assurance of overlap between the IRM system and APRM system so that there are no"gaps" in the power level indications (i.e., the power level is continuously monitored from beginning of startup to full power and from full power to SHUTDOWN).
3~    Bypassed    if reactor    pressure  is less than  1055  psig and  mode  switch not in RUN.
When power is being reduced, if a transfer to the STARTUP mode is made and the IRMs have not been fully inserted (a maloperational but not impossible condition) a control rod block immediately occurs so that reactivity insertion by control rod withdrawal cannot occur.BFN Unit 2 3.1/4.1-16 PROPOSED TECHNICAL SPECIFICATION CHANGE BROMNS FERRY NUCLEAR PLANT UNIT 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
Bypassed when      turbine  first  stage pressure  is less than  154  psig.
OTES FOR TABL 1 A There shall be two OPERABLE or tripped trip systems for each function.If the minimum number of OPERABLE instrument channels per trip system cannot be met for one trip system, trip the INOPERABLE channels or entire trip system within one hour, or, alternatively, take the below listed action for that trip function.If the minimum number of OPERABLE instrument channels cannot be met by either trip system, the appropriate action listed below (refer to right-hand column of Table)shall be taken.An INOPERABLE channel need not be placed in the tripped condition where this would cause the trip function to occur.In these cases, the INOPERABLE channel shall be restored to OPERABLE status within two hours, or take the action listed below for that trip function.A.Initiate insertion of OPERABLE rods and complete insertion of all OPERABLE rods within four hours.In refueling mode, suspend all operations involving core alterations and fully insert all OPERABLE control rods within one hour.B.Reduce power level to IRM range and place mode switch in the STARTUP/HOT STANDBY position within 8 hours.C.Reduce turbine load and close main steam line isolation valves within 8 hours.D.Reduce power to less than 30 percent of rated.2.The scram discharge volume high water level bypass may be used in SHUTDOWN or REFUEL to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip.A control rod withdraw block is present when this scram is bypassed.3.DELETED 4.Bypassed when turbine first stage pressure is less than 154 psig.5.IRMs are bypassed when APRMs are onscale and the reactor mode switch is in the RUN position.6.The design permits closure of any two lines without a scram being initiated.
: 5. IRMs    are bypassed when    APRMs  are onscale and the reactor mode switch      is in the    RUN  position.
7.When the reactor is subcritical and the reactor water temperature is less than 212oF, only the following trip functions need to be OPERABLE: A.Mode switch in shutdown B.Manual scram C.High flux IRM D.Scram discharge volume high level E.APRM 15 percent scram BFN Unit 3 3.1/4.1-4 ENCLOSURE 2 BROMNS FERRY NUCLEAR PLANT (BFN)UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION REASON FOR THE CHANGE The scram pilot air header pressure trip switches perform the same function as the redundant high water level switches in the scram discharge instrument volume for fast fill events in which the high level instrument response time may have been inadequate.
: 6. The design    permits closure of any two lines without        a scram  being initiated.
TVA's reanalysis of the Control Rod Drive (CRD)system concluded that a successful scram would be achieved with the level instrumentation and without the scram pilot air header pressure trip switches scram function.The overall scram system design still satisfies the criteria contained in the generic Safety Evaluation Report (SER), which was transmitted by NRC letter to All BWR Licensees, dated December 9, 1980, BWR Scram Discharge System'.The potential for a plant transient due to the mal-operation or testing of these switches, the resources required for surveillance and maintenance of the switches, and the costs associated with installing the Class 1E switches in Units 1 and 3 outweigh the safety benefits of this redundant scram feature.Consequently, TVA has decided to request the removal of the scram function of these switches from the BFN Unit 2 Technical Specifications.
70    When    the reactor is subcritical and the reactor water temperature is less than 212oF, only the following trip functions need to be operable:
A. Mode    switch in shutdown B. Manual scram C. High    flux IRM D. Scram discharge volume        high level E. APRM 15    percent scram BFN                                          3.1/4.1-5 Unit 1
 
PROPOSED TECHNICAL SPECIFICATION CHANGE BROMNS FERRY NUCLEAR PLANT UNIT 2 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
 
TABLE 3.1.A REACTOR PROTECTION SYSTEH (SCRAH) INSTRUHENTATION REQUIREHENTS Hin. No. of Operable Instr.                                                H de  in which Func ion Hu Be Channels                                                        ~Orabli; Per Trip                                              Shut-                Startup/
Tri Level Settin    down    ~Refuel 7  RoatHtandb  Run  A~ti n  7 High Water Level in West Scram Discharge Tank (LS-85-45A-D)     < 50 Gallons        X(2)   X(2)                          1.A High Water Level in East Scram Discharge Tank (LS-85-45E-H)     < 50 Gallons        X(2)   X(2)                   X    1.A Hain Steam Line      <105 Valve Closure                                  X(6) 1.A or 1.C Isolation Valve Closure Turbine Control      >550 psig                                            X(4) 1.A or 1.D Valve Fast Closure or Turbine Trip Turbine Stop        <lOX Valve Closure                                  X(4)  1.A or 1.D Valve Closure Turbine First        not >154 psig                X(18)      X(18)        X(18) 1.A or 1.D (19)
Stage Pressure Permissive (PIS-1-81A&B, PI 5-1-91A&8)
Hain Steam Line    3 X Normal  Full              X(9)      X(9)        X(9)  1.A or 1.C High Radiation      Power Background (14)                (20)
 
There    shall  be two OPERABLE    or tripped trip systems for each function.
If  the minimum number of      OPERABLE    instrument channels per trip system cannot be met for one trip system, trip the INOPERABLE channels or entire trip system within one hour, or, alternatively, take the below listed action for that trip function.           If  the minimum number of OPERABLE instrument channels cannot be met by either trip system, the appropriate action listed below (refer to right-hand column of Table) shall be taken. An INOPERABLE channel need not be placed in the tripped condition where this would cause the trip function to occur. In these cases, the INOPERABLE channel shall be restored to OPERABLE status within two hours, or take the action listed below for that trip function.
A. Initiate insertion of      OPERABLE rods and complete insertion of all OPERABLE    rods within four hours. In refueling mode, suspend all operations involving core alterations and fully insert all OPERABLE control rods within one hour.
B. Reduce power    level to IRM range and place mode switch in the STARTUP/HOT    Standby  position within 8 hours.
C. Reduce    turbine load  and  close main steam line isolation valves within 8  hours.
D. Reduce power    to less than  30  percent of rated.
2~  The scram discharge volume        high water level bypass may be used in SHUTDOWN    or  REFUEL  to bypass the scram discharge volume high-high water level    scram  signal  in order to reset the reactor protection system trip.
A  control    rod  withdraw  block is present when this scram is bypassed.
3~  (Deleted) 4 ~  Bypassed when     turbine  first stage    pressure  is less than 154 psig.
5 ~  IRMs    are bypassed when    APRMs  are onscale and the reactor mode switch    is in  the RUN position.
: 6. The design      permits closure of any two lines without      a scram being initiated.
7 ~  When    the reactor  is subcritical    and the  reactor water temperature is less than 212 F, only the following        trip  functions need to be OPERABLE:
A. Mode  switch in   SHUTDOWN B. Manual scram C. High  flux IRM D. Scram discharge volume      high level E. APRM 15    percent scram BFN                                        3.1/4.1-5 Unit 2
 
TABLE 4.1.A (Continued)
                                        ~ru ~>2              Fun  ion 1 T            Hinim  Fr  u n High Water Level  in Scram Discharge Tank Float Switches (LS-85-45C-F)   A            Trip Channel and Alarm    Once/Honth Electronic Level Switches (LS-85-45A, 8, G, H)                            Trip Channel and Alarm (7) Once/Honth Hain Steam Line High Radiation                        Trip Channel and Alarm (4) Once/3 Honths (8)
Main Steam Line  Isolation Valve Cl osure                                            Trip Channel and Alarm    Once/3 Honths (8)
Turbine Control Valve Fast Closure or turbine trip                              Trip Channel and Alarm    Once/Honth (1)
Turbine First Stage Pressure Permissive (PIS-1-81A and B, PIS-1-91A and 8)                                    Trip Channel and Alarm (7) Every three months Turbine Stop Valve Closure                            Trip Channel and Alarm    Once/Month (1)
 
TABLE  4.1.8 REACTOR PROTECTION SYSTEM (SCRAM) INSTRUMENT CALIBRATION MINIMUH CALIBRATION FRE()UENCIES FOR REACTOR PROTECTION INSTRUMENT CHANNELS Instrumen  Ch nn  1                Grou  1                ~Calibra i a                        inim  Fr    n  2 IRH High Flux                                              Comparison to  APRH on  Controlled  Note (4)
Startups (6)
APRH  High Flux Output Signal                                        Heat Balance                        Once/7 Days Flow Bias Signal                                      Calibrate Flow Bias Signal (7)      Once/Operating Cycle LPRH  Signal                                                TIP System Traverse (8)              Every 1000 Effective Full Power Hours High Reactor Pressure                                      Standard Pressure Source            Once/6 Honths (9)
(PIS-3-22 AA, BB, C, 0)
High Drywell Pressure                                      Standard Pressure Source            Once/18 Honths (9)
(PIS-64-56 A-D)
Reactor Low Water Level                                    Pressure Standard                    Once/18 Honths (9)
(LIS-3-203 A-D)
High Water Level in Scram Discharge Volume Float Switches (LS-85-45-C-F)                                        Calibrated Water    Column          Once/18 Honths Electronic Level Switches (LS-85-45 A, 8, G, H)                                Calibrated Water    Column          Once/18 Months (9)
Hain Steam Line  Isolation Valve Cl osure                                                  Note (5)                            Note (5)
Hain Steam Line High Radiation                              Standard Current Source (3)          Every 3 Honths Turbine First Stage Pressure Permissive (PIS-1-81 A&B, PIS-1-91 A&B)                                            Standard Pressure Source            Once/18 Honths (9)
Turbine Stop Valve Closure                                  Note (5)                            Note (5)
Turbine Control Valve Fast Closure on Turbine Trip                                          Standard Pressure Source            Once/Operating Cycle
 
3.1  ~BS~S  (Cont'd) be accommodated  which would result in slow scram times or partial control rod insertion. To preclude this occurrence, level switches have been provided in the instrument volume which alarm and scram the reactor when the volume of water reaches 50 gallons. As indicated above, there is sufficient volume in the piping to accommodate the scram without impairment of the scram times or amount of insertion of the control rods. This function shuts the reactor down while sufficient volume remains to accommodate the discharge water and precludes the situation in which a scram would be required but not be able to perform its function adequately.
A  source range monitor (SRM) system is also provided to supply additional neutron level information during startup but has no scram functions.
Reference Section 7.5.4 FSAR. Thus, the IRM is required in the REFUEL and STARTUP modes. In the power range the APRM system provides required protection. Reference Section 7.5.7 FSAR. Thus, the IRM System is not required in the RUN mode. The APRMs and the IRMs provide adequate coverage in the STARTUP and intermediate range.
The  high reactor pressure, high drywell pressure, reactor low water level,  and scram discharge volume high level scrams are required for STARTUP and RUN modes of plant operation. They are, therefore, required to be operational for these modes of reactor operation.
The requirement  to have the scram functions as indicated in Table 3.1.A OPERABLE  in the REFUEL mode  is to assure that shifting to the REFUEL mode during reactor power operation does not diminish the need for the reactor protection system.
Because of the APRM downscale limit of g 3 percent when in the RUN mode and high level limit of g15 percent when in the STARTUP Mode, the transition between the STARTUP and RUN Modes must be made with the APRM instrumentation indicating between 3 percent and 15 percent of rated power or a control rod scram will occur. In addition, the IRM system must be indicating below the High Flux setting (120/125 of scale) or a scram will occur when in the STARTUP Mode. For normal operating conditions, these limits provide assurance of overlap between the IRM system and  APRM system so that there are no "gaps" in the power level indications (i.e., the power level is continuously monitored from beginning of startup to full power and from full power to SHUTDOWN).
When power is being reduced,    if a transfer to the STARTUP mode is made and the IRMs have not been fully inserted (a maloperational but not impossible condition) a control rod block immediately occurs so that reactivity insertion by control rod withdrawal cannot occur.
BFN                                    3.1/4.1-16 Unit 2
 
PROPOSED TECHNICAL SPECIFICATION CHANGE BROMNS FERRY NUCLEAR PLANT UNIT 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
 
OTES FOR TABL          1 A There    shall  be two OPERABLE or tripped trip systems for each function.
If the    minimum number of OPERABLE instrument channels per trip system cannot be met for one trip system, trip the INOPERABLE channels or entire trip system within one hour, or, alternatively, take the below listed action for that trip function.           If the minimum number of OPERABLE instrument channels cannot be met by either trip system, the appropriate action listed below (refer to right-hand column of Table) shall be taken. An INOPERABLE channel need not be placed in the tripped condition where this would cause the trip function to occur. In these cases, the INOPERABLE channel shall be restored to OPERABLE status within two hours, or take the action listed below for that         trip function.
A. Initiate insertion of       OPERABLE rods and complete insertion of all OPERABLE     rods within four hours. In refueling mode, suspend all operations involving core alterations and fully insert all OPERABLE control rods within one hour.
B. Reduce power     level to IRM range and place mode switch in the STARTUP/HOT STANDBY     position within 8 hours.
C. Reduce   turbine load   and close main steam   line isolation valves within 8 hours.
D. Reduce power     to less than   30 percent of rated.
: 2. The scram discharge volume         high water level bypass may be used in SHUTDOWN     or REFUEL   to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip.
A control rod withdraw block is present when this scram is bypassed.
: 3. DELETED
: 4. Bypassed when       turbine first stage pressure   is less than 154 psig.
: 5. IRMs   are bypassed when     APRMs are onscale and the reactor mode switch is in the     RUN position.
: 6. The design     permits closure of any two lines without     a scram being initiated.
: 7. When   the reactor is subcritical and the reactor water temperature is less than 212oF, only the following trip functions need to be OPERABLE:
A. Mode   switch in shutdown B. Manual scram C. High   flux   IRM D. Scram discharge volume       high level E. APRM 15     percent scram BFN                                           3.1/4.1-4 Unit  3
 
ENCLOSURE 2 BROMNS FERRY NUCLEAR PLANT   (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION REASON FOR THE CHANGE The scram   pilot air header pressure trip switches perform the function as the redundant high water level switches in the same scram discharge instrument volume for fast     fill events in which the high level instrument response time may have been inadequate.
TVA's reanalysis of the Control Rod Drive (CRD) system concluded that a successful scram would be achieved with the level instrumentation and without the scram pilot air header pressure trip switches scram function. The overall scram system design still satisfies the criteria contained in the generic Safety Evaluation Report (SER), which was transmitted by NRC letter to All BWR   Licensees,   dated December 9, 1980, BWR Scram Discharge System'.
The potential for a plant transient due to the mal-operation or testing of these switches, the resources required for surveillance and maintenance of the switches, and the costs associated with installing the Class 1E switches in Units 1 and 3 outweigh the safety benefits of this redundant scram feature.
Consequently, TVA has decided to request the removal of the scram function of these switches from the BFN Unit 2 Technical Specifications.
In addition, the description of the scram discharge volume high water level bypass in the Units 1, 2, and 3 Technical Specifications requires clarification in order to reduce the potential for misinterpretation.
In addition, the description of the scram discharge volume high water level bypass in the Units 1, 2, and 3 Technical Specifications requires clarification in order to reduce the potential for misinterpretation.
DESCRIPTION OF THE PROPOSED CHANGE The following specific changes are required to remove the scram pilot air header pressure trip switches scram function from the Unit 2 Technical Specifications:
DESCRIPTION OF THE PROPOSED CHANGE The following specific changes are required to remove the scram pilot air   header pressure trip switches scram function from the Unit 2 Technical Specifications:
1)The current requirements for Reactor Protection System instrumentation are listed in Table 3.1.A, Reactor Protection System (SCRAM)Instrumentation Requirements.
: 1) The current requirements for Reactor Protection System instrumentation are listed in Table 3.1.A, Reactor Protection System (SCRAM) Instrumentation Requirements. The low scram pilot air header pressure instrumentation will be deleted from this table.
The low scram pilot air header pressure instrumentation will be deleted from this table.
 
ENCLOSURE 2 (CONTINUED)
Page 2 oS 7 ENCLOSURE 2 (CONTINUED)
Page 2 oS 7 BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION 2)The current Note 2 for Table 3.1.A states: "Scram discharge volume high bypass may be used in SHUTDOWN or REFUEL to bypass scram discharge volume scram and scram pilot air header low pressure scram with control rod block for reactor protection system reset." The reference to the bypass of the scram pilot air header low pressure scram will be removed.The revised wording of this note is provided at the end of this section.3)The trip functions currently required to be OPERABLE when the reactor is subcritical and the reactor water temperature is less that 212'F are listed as shown below in Note 7 in the Notes for Table 3.1.A section:>>When the reactor is subcritical and the reactor water temperature is less than 212'F, only the following trip functions need to be OPERABLE: A.Mode switch in SHUTDOWN B.Manual scram C.High flux IRM D.Scram discharge volume high level E.APRM 15 percent scram F.Scram pilot air header low pressure" Note 7F, Scram pilot air header low pressure, will be deleted.4)The current functional tests and the minimum functional test frequencies for safety related Reactor Protection System instrument and control circuits are listed in Table 4.1.A.The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2)will be deleted.
BROWNS FERRY NUCLEAR PLANT       (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
ENCLOSURE 2 (CONTINUED)
REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION
Page 3 oS 7 BROMNS FERRY NUCLEAR PLANT (BFN)UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION 5)The current Reactor Protection System instrument calibration minimum calibration frequencies for reactor protection instrument channels are listed in Table 4.1.B.The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2)will be deleted.6)The current Bases Section 3.1 states: "The high reactor pressure, high drywell pressure, reactor low water level, low scram pilot air header pressure and scram discharge volume high level scrams are required for STARTUP and RUN modes of plant operation." The requirement for the low scram pilot air header pressure scrams for STARTUP and RUN modes of plant operation will be deleted as shown below: The high reactor pressure, high drywell pressure, reactor low water level, and scram discharge volume high level scrams are required for STARTUP and RUN modes of plant operation.
: 2) The   current Note     2 for Table 3.1.A states:
7)The current Bases Section 3.1 states: "The low scram pilot air header pressure trip performs the same function as the high water level in the scram discharge instrument volume for fast fill events in which the high level instrument response time may be inadequate.
          "Scram discharge volume high bypass may be used in SHUTDOWN   or REFUEL to bypass scram discharge volume scram and scram pilot air header low pressure scram with control rod block for reactor protection system reset."
A fast fill event is postulated for certain degraded control air events in which the scram outlet valves unseat enough to allow 5 gpm per drive leakage into the scram discharge volume but not enough to cause control rod insertion." This discussion of the low scram pilot air header pressure trip is being deleted.
The   reference to the bypass of the scram pilot air header low pressure scram will be removed. The revised wording of this note is provided at the end of this section.
ll ENCLOSURE 2 (CONTINUED)
: 3) The   trip functions currently required to be OPERABLE when the reactor is subcritical and the reactor water temperature is less that 212'F are listed as shown below in Note 7 in the Notes for Table 3.1.A section:
Page 4 oS 7 BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)REASO FOR THE CHANGE DESCRIPTION AND JUSTIFICATION The following specific changes are required to clarify the description of the Reactor Protection System scram discharge volume high water level bypass in the Units 1, 2, and 3 Technical Specifications:
          >>When the reactor is subcritical and the reactor water temperature is less than 212'F, only the following trip functions need to be OPERABLE:
The current Note 2 for Table 3.1.A in the Unit 2 Technical Specifications states: "Scram discharge volume high bypass may be used in SHUTDOWN or REFUEL to bypass scram discharge volume scram and scram pilot air header low pressure scram with control rod block for reactor protection system reset.The current Note 2 for Table 3.1.A in the Units 1 and 3 Technical Specifications states: "Scram discharge volume high bypass may be used in shutdown or refuel to bypass scram discharge volume scram with control rod block for reactor protection system reset." The removal of the low scram pilot air header pressure trip for Unit 2 is described above.The description of the scram discharge volume high water level bypass will be clarified and Note 2 for Table 3.1.A for Units 1, 2, and 3 will read as shown below: The scram discharge volume high water level bypass may be used in SHUTDOWN or REFUEL to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip.A control rod withdraw block is present, when this scram is bypassed.
A. Mode switch in SHUTDOWN B. Manual scram C. High   flux   IRM D. Scram   discharge volume high level E. APRM 15   percent scram F. Scram pilot air header low pressure" Note 7F, Scram     pilot air header low pressure, will be deleted.
ENCLOSURE 2 (CONTINUED)
: 4) The current functional tests and the minimum functional test frequencies for safety related Reactor Protection System instrument and control circuits are listed in Table 4.1.A.
Page 5 oS 7.BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION a7USTZFZCATZON FOR THE PROPOSED CHANGE The Unit 2 scram pilot air header pressure trip switches perform the same function as the high water level switches in the scram discharge instrument volume for fast.fill events in which the high level instrument response time may have been inadequate.
The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2) will be deleted.
Section 4.2.4.1 of the generic SER states that the CRD system shall be analyzed based on a plant-specific maximum inleakage to ensure that the system function is not lost prior to initiation of automatic scram.Maximum inleakage is the maximum flow rate, past the seal and through the scram discharge line, without control rod motion, summed over all control rods.The analysis should show no need for vents or drains.The Technical Basis for this section states that a maximum flow rate past the scram outlet valve, without rod motion, is 5 gpm per rod.This value should be used in the analysis to assure system function, or justification should be provided for using a different value.Any value that is used must be verified to be conservative by assured CRD seal maintenance requirements based on stall flow tests.TVA's previous analyses of the scram discharge system were performed assuming the 5 gpm per rod inleakage flow rate.This resulted in approximately 465 gpm inleakage into a scram discharge volume.The fast fill transient reanalysis was based upon unit specific CRD leakage rates and scram discharge instrument volume water level instrumentation characteristics.
 
The intent of the analysis was to show that a successful scram would be achieved using only the water level instrumentation and not the scram pilot air header pressure trip switches.The water level in the scram discharge instrument volume is monitored by redundant and diverse Magnetrol and heated reference resistive temperature devices (RTD)level switches.Since the level switches are redundant, redundancy in the instrumentation that initiates the scram signal is maintained even with the removal of the scram pilot air header pressure trip switches scram function.The RTD switches were confirmed to respond within two seconds and the response time delay associated with the Magnetrol''float switches was included in the analysis.No credit was taken for vents or drains and control rod motion was assumed not to occur until scram initiation.
Page 3 oS 7 ENCLOSURE 2 (CONTINUED)
This reanalysis is consistent with the acceptance criteria of the generic SER (Reference 1).A copy of the supporting calculation for this reanalysis is available for review at TVA s Rockville office.  
BROMNS FERRY NUCLEAR PLANT   (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION
: 5) The current Reactor   Protection System instrument calibration minimum calibration   frequencies for reactor protection instrument channels are listed in Table 4.1.B. The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2) will be deleted.
: 6) The current Bases Section 3.1 states:
        "The high reactor pressure, high drywell pressure, reactor low water level, low scram pilot air header pressure and scram discharge volume high level scrams are required for STARTUP and RUN modes of plant operation."
The requirement for the low scram pilot air header pressure scrams for STARTUP and RUN modes of plant operation will be deleted as shown below:
The high reactor pressure, high drywell pressure, reactor low water level, and scram discharge volume high level scrams are required for STARTUP and RUN modes of plant operation.
: 7) The current Bases Section 3.1 states:
        "The low scram pilot air header pressure trip performs the same function as the high water level in the scram discharge instrument volume for fast   fill events in which the high level instrument response time may be inadequate. A fast fill event is postulated for certain degraded control air events in which the scram outlet valves unseat enough to allow 5 gpm per drive leakage into the scram discharge volume but not enough to cause control rod insertion."
This discussion of the low scram pilot air header pressure trip is being deleted.
 
ll Page 4 oS 7 ENCLOSURE 2 (CONTINUED)
BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
REASO   FOR THE CHANGE DESCRIPTION AND JUSTIFICATION The following specific changes are required to clarify the description of the Reactor Protection System scram discharge volume high water level bypass in the Units 1, 2, and 3 Technical Specifications:
The current Note 2 for Table 3.1.A in the Unit 2 Technical Specifications states:
          "Scram discharge volume high bypass may be used in SHUTDOWN or REFUEL to bypass scram discharge volume scram and scram pilot air header low pressure scram with control rod block for reactor protection system reset.
The current Note 2 for Table 3.1.A in the Units 1 and 3 Technical Specifications states:
          "Scram discharge volume high bypass may be used in shutdown or refuel to bypass scram discharge volume scram with control rod block for reactor protection system   reset."
The removal   of the low scram pilot air header pressure trip for Unit   2 is described above. The description of the scram discharge volume high water level bypass will be clarified and Note 2 for Table 3.1.A for Units 1, 2, and 3 will read as shown below:
The scram discharge volume high water level bypass may be used in SHUTDOWN or REFUEL to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip. A control rod withdraw block is present, when this scram is bypassed.
 
Page 5 oS 7 ENCLOSURE 2   (CONTINUED)
        .BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION a7USTZFZCATZON FOR THE PROPOSED   CHANGE The Unit 2 scram pilot air header pressure trip switches perform the same function as the high water level switches in the scram discharge instrument volume for fast. fill events in which the high level instrument response time may have been inadequate.
Section 4.2.4.1 of the generic SER states that the CRD system shall be analyzed based on a plant-specific maximum inleakage to ensure that the system function is not lost prior to initiation of automatic scram. Maximum inleakage is the maximum flow rate, past the seal and through the scram discharge line, without control rod motion, summed over all control rods. The analysis should show no need for vents or drains. The Technical Basis for this section states that a maximum flow rate past the scram outlet valve, without rod motion, is 5 gpm per rod. This value should be used in the analysis to assure system function, or justification should be provided for using a different value.
Any value that is used must be verified to be conservative by assured CRD seal maintenance requirements based on stall flow tests.
TVA's previous analyses   of the scram discharge system were performed assuming the   5 gpm per rod inleakage flow rate. This resulted in approximately 465 gpm inleakage into a scram discharge volume. The fast     fill transient reanalysis was based upon unit specific CRD leakage rates and scram discharge instrument volume water level instrumentation characteristics.
The intent of the analysis was to show that a successful scram would be achieved using only the water level instrumentation and not the scram pilot air header pressure trip switches.
The water level in the scram discharge instrument volume is monitored by redundant and diverse Magnetrol and heated reference resistive temperature devices (RTD) level switches. Since the level switches are redundant, redundancy in the instrumentation that initiates the scram signal is maintained even with the removal of the scram pilot air header pressure trip switches scram function. The RTD switches were confirmed to respond within two seconds and the response time delay associated with the Magnetrol''float switches was included in the analysis. No credit was taken for vents or drains and control rod motion was assumed not to occur until scram initiation. This reanalysis is consistent with the acceptance criteria of the generic SER (Reference 1). A copy of the supporting calculation for this reanalysis is available for review at TVA s Rockville office.
 
Page 6 oS 7 ENCLOSURE 2  (CONTINUED)
BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION The  reanalysis concluded that a successful Unit 2 scram would be achieved, with the level instrumentation and without the scram pilot air header pressure trip switches scram function, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region shown below:
      . 60 I
CO                      152.5 50 O                                        vIIIACQEPTQBLE E
    ~ 40 I Unit 2
                  'Cycle tI                    I 30 O
f30          I eau.r    mrna I
I      I I
I                        I I
a 20                    I I
I AQCEPViABLP 17 0
10 I      I 0
4.8    1.9        2      2.1  2.2    2.3    2.4  2.5    2.6    2.7 Average Withdrawal Stall Flow Rate, GPM Definitions:
The Magnetrol Versus RTD Response          Time Delay    is the maximum allowable time delay between the RTD and Magnetrol level switches as measured following a reactor scram.      The maximum allowable response time delay for either the East or West scram discharge instrument volume is defined as the maximum delay between any RTD level switch and any Magnetrol level switch for that scram discharge instrument volume.
 
s ~, 4 1*I
 
Page 7 oS 7 ENCLOSURE 2 (CONTINUED)
BROMNS FERRY NUCLEAR PLANT  (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)
REASO  FOR THE CHANGE DESCRIPTION AND JUSTIFICATION The Average Withdrawal  Stall Flow Rate  is the  CRD stall flow rate averaged over  all fully withdrawn rods.
As shown on  the above figure, during Unit. 2 Cycle 6, the average stall flow leakage    was 1.9 to 2.1 gpm per CRD. The maximum response time delay between the RTD and Magnetrol level switches for either scram discharge instrument volume was less than 28 seconds. This combination of stall flow rate and instrument delay is well within the acceptable region.
TVA's current Unit 2 procedures require measurements of CRD stall flow rates during reactor power operation for the fully withdrawn CRDs. In addition, as part of the implementation of this proposed Technical Specification, TVA intends to revise its procedures to monitor and take appropriate actions to ensure CRD and scram discharge system performance within the acceptable response time delays and stall flow rates. These systems can degrade over time due to long term mechanisms such as crud buildup and corrosion. However, these mechanisms are relatively slow. Therefore, TVA considers an acceptable frequency of confirmation of the response time delay and stall flow rate to be once per operating cycle or at the next scram occurred during that cycle.
if a scram has not In addition, the description of the scram discharge volume high water level bypass in the Units 1, 2, and 3 Technical Specifications requires clarification in order to reduce the potential for misinterpretation.
 
ENCLOSURE 3 BROWNS FERRY NUCLEAR PLANT  (BFN)
PROPOSED  NO SIGNIFICANT,HAZARDS CONSIDERATIONS DETERMINATION DESCRZPTZON OF THE PROPOSED TECHNICAL SPECIFICATION CHANGE The  following specific changes are required to remove the scram pilot air  header pressure trip switches scram function from the Unit 2 Technical Specifications:
: 1) The current requirements for Reactor Protection System instrumentation are listed in Table 3.1.A, Reactor Protection System (SCRAM) Instrumentation Requirements. The low scram pilot air header pressure instrumentation will be deleted from this table.
: 2) The reference to the bypass of the scram pilot air header low pressure scram  will be  removed from Note 2 for Table 3.1.A.
: 3) The  trip functions currently required to be OPERABLE when the reactor is subcritical and the reactor water temperature is less that 212'F are listed in Note 7 in the Notes for Table 3.1.A section. Note 7F, Scram pilot air header low pressure, will be deleted.
: 4) The current functional tests and the minimum functional test frequencies for safety related Reactor Protection System instrument and control circuits are listed in Table 4.1.A.
The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2) will be deleted.
: 5) The current Reactor Protection System instrument calibration minimum calibration frequencies for reactor protection instrument channels are listed in Table 4.1.B. The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2) will be deleted.
: 6) The current Bases Section 3.1 will be revised to reflect the deletion of the low scram pilot air header pressure switches scram  function.
Also, the description of the Reactor Protection System scram discharge volume high water level bypass in Note 2 for Table 3.1.A of the Units 1, 2, and 3 Technical Specifications will be clarified.
 
Page 2 oS 5 ENCLOSURE 3  (CONTINUED)
BROWNS FERRY NUCLEAR PLANT (BFN)
PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION BASES FOR PROPOSED NO SIGNIFICANT HAZARDS CONSZDERATZON DETERMINATION NRC  has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c). A proposed amendment to, an operating license involves no significant hazards considerations    if operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from an accident previously evaluated, or (3) involve a significant reduction in a margin of safety. The proposed TS change is judged to involve no significant hazards considerations based on the following:
: 1. The proposed amendment does not involve a significant increase in the probability or consequences of any accident previously evaluated.
The Unit 2 scram pilot air header pressure trip switches perform the same function as the high water level switches in the scram discharge instrument volume. They automatically initiate control rod insertion (scram) in the event that degraded air conditions are detected in the BWR control air supply system. Since the scram pilot air header pressure trip function is to ensure that the Control Rod Drive (CRD)
System is available to mitigate the consequence of an accident or transient, and the removal of the scram pilot air header pressure trip switches scram function does not effect the precursors for any accident or transient analyzed in Chapter 14 of the BFN Final Safety Analysis Report (FSAR),
there is no increase in the probability of any accident previously evaluated.
The scram system has been analyzed, based on a plant-specific maximum  inleakage, and the removal of the scram pilot air header pressure  trip switches scram function would  still result in a successful scram, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region.
Administrative controls  and  periodic measurements of the CRD and scram discharge system performance ensure acceptable response time delays and stall flow rates. Since the scram function would be successfully performed, the removal of the scram pilot air header pressure trip switches scram function does not involve a significant increase in the consequences of any accident previously evaluated.
 
    ~ I ~    F N
          'h Wl>>
 
Page 3 oS 5 ENCLOSURE 3  (CONTINUED)
BROMNS FERRY NUCLEAR PLANT (BFN)
PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION The  clarification of the description of the  scram discharge volume high water level  bypass  in the Reactor Protection System does not reflect  a modification to plant equipment, maintenance activities,  or operating instructions. The revised description does  not effect the precursors for any accident or transient analyzed in Chapter 14 of the BFN FSAR or equipment used in the mitigation of these accidents or transients. Therefore, there is no increase in the probability of any accident previously evaluated nor an increase in the consequences of any accident previously evaluated.
: 2. The proposed amendment does, not create the possibility of a new or different kind of accident from any accident previously evaluated.
The design  criteria for the scram system is contained in the generic Safety Evaluation Report (SER), which was transmitted by NRC letter to All BWR Licensees, dated December 9, 1980, BWR Scram Discharge System. Section 4.2.4.1 of the generic SER states that the CRD system shall be analyzed based on a plant-specific maximum inleakage to ensure that the system function is not lost prior to initiation of automatic scram.
This analysis has been performed and    it was concluded that the removal of the scram pilot air header pressure trip switches scram function would still allow a successful scram, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region. Administrative controls and periodic measurements of the CRD and scram discharge system performance ensure acceptable response time delays and stall flow rates.
The overall scram system design is in conformance with the generic SER. No new system failure modes are created as a result of removing the scram pilot air header pressure trip switches scram function since, assuming the maximum CRD inleakage due to a degraded air supply system, redundant and diverse level switches will initiate a successful scram prior to this function becoming disabled. The removal of the scram pilot air header pressure trip switches scram function does not create the possibility of a new or different kind of accident from any accident previously evaluated.
 
4
~ W ~


ENCLOSURE 2 (CONTINUED)
Page 6 oS 7 BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION The reanalysis concluded that a successful Unit 2 scram would be achieved, with the level instrumentation and without the scram pilot air header pressure trip switches scram function, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region shown below:.60 CO 50 O E~40 O f30 a 20 I 152.5 I Unit 2'Cycle tI I eau.r mrna I I I I I I AQCEPViABLP vIIIACQEPTQBLE I 30 I I I I 17 0 10 0 I I 4.8 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Average Withdrawal Stall Flow Rate, GPM Definitions:
The Magnetrol Versus RTD Response Time Delay is the maximum allowable time delay between the RTD and Magnetrol level switches as measured following a reactor scram.The maximum allowable response time delay for either the East or West scram discharge instrument volume is defined as the maximum delay between any RTD level switch and any Magnetrol level switch for that scram discharge instrument volume.
s~, 4$1*I ENCLOSURE 2 (CONTINUED)
Page 7 oS 7 BROMNS FERRY NUCLEAR PLANT (BFN)UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)REASO FOR THE CHANGE DESCRIPTION AND JUSTIFICATION The Average Withdrawal Stall Flow Rate is the CRD stall flow rate averaged over all fully withdrawn rods.As shown on the above figure, during Unit.2 Cycle 6, the average stall flow leakage was 1.9 to 2.1 gpm per CRD.The maximum response time delay between the RTD and Magnetrol level switches for either scram discharge instrument volume was less than 28 seconds.This combination of stall flow rate and instrument delay is well within the acceptable region.TVA's current Unit 2 procedures require measurements of CRD stall flow rates during reactor power operation for the fully withdrawn CRDs.In addition, as part of the implementation of this proposed Technical Specification, TVA intends to revise its procedures to monitor and take appropriate actions to ensure CRD and scram discharge system performance within the acceptable response time delays and stall flow rates.These systems can degrade over time due to long term mechanisms such as crud buildup and corrosion.
However, these mechanisms are relatively slow.Therefore, TVA considers an acceptable frequency of confirmation of the response time delay and stall flow rate to be once per operating cycle or at the next scram if a scram has not occurred during that cycle.In addition, the description of the scram discharge volume high water level bypass in the Units 1, 2, and 3 Technical Specifications requires clarification in order to reduce the potential for misinterpretation.
ENCLOSURE 3 BROWNS FERRY NUCLEAR PLANT (BFN)PROPOSED NO SIGNIFICANT, HAZARDS CONSIDERATIONS DETERMINATION DESCRZPTZON OF THE PROPOSED TECHNICAL SPECIFICATION CHANGE The following specific changes are required to remove the scram pilot air header pressure trip switches scram function from the Unit 2 Technical Specifications:
1)The current requirements for Reactor Protection System instrumentation are listed in Table 3.1.A, Reactor Protection System (SCRAM)Instrumentation Requirements.
The low scram pilot air header pressure instrumentation will be deleted from this table.2)The reference to the bypass of the scram pilot air header low pressure scram will be removed from Note 2 for Table 3.1.A.3)The trip functions currently required to be OPERABLE when the reactor is subcritical and the reactor water temperature is less that 212'F are listed in Note 7 in the Notes for Table 3.1.A section.Note 7F, Scram pilot air header low pressure, will be deleted.4)The current functional tests and the minimum functional test frequencies for safety related Reactor Protection System instrument and control circuits are listed in Table 4.1.A.The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2)will be deleted.5)The current Reactor Protection System instrument calibration minimum calibration frequencies for reactor protection instrument channels are listed in Table 4.1.B.The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2)will be deleted.6)The current Bases Section 3.1 will be revised to reflect the deletion of the low scram pilot air header pressure switches scram function.Also, the description of the Reactor Protection System scram discharge volume high water level bypass in Note 2 for Table 3.1.A of the Units 1, 2, and 3 Technical Specifications will be clarified.
Page 2 oS 5 ENCLOSURE 3 (CONTINUED)
BROWNS FERRY NUCLEAR PLANT (BFN)PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION BASES FOR PROPOSED NO SIGNIFICANT HAZARDS CONSZDERATZON DETERMINATION NRC has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c).A proposed amendment to, an operating license involves no significant hazards considerations if operation of the facility in accordance with the proposed amendment would not (1)involve a significant increase in the probability or consequences of an accident previously evaluated, or (2)create the possibility of a new or different kind of accident from an accident previously evaluated, or (3)involve a significant reduction in a margin of safety.The proposed TS change is judged to involve no significant hazards considerations based on the following:
1.The proposed amendment does not involve a significant increase in the probability or consequences of any accident previously evaluated.
The Unit 2 scram pilot air header pressure trip switches perform the same function as the high water level switches in the scram discharge instrument volume.They automatically initiate control rod insertion (scram)in the event that degraded air conditions are detected in the BWR control air supply system.Since the scram pilot air header pressure trip function is to ensure that the Control Rod Drive (CRD)System is available to mitigate the consequence of an accident or transient, and the removal of the scram pilot air header pressure trip switches scram function does not effect the precursors for any accident or transient analyzed in Chapter 14 of the BFN Final Safety Analysis Report (FSAR), there is no increase in the probability of any accident previously evaluated.
The scram system has been analyzed, based on a plant-specific maximum inleakage, and the removal of the scram pilot air header pressure trip switches scram function would still result in a successful scram, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region.Administrative controls and periodic measurements of the CRD and scram discharge system performance ensure acceptable response time delays and stall flow rates.Since the scram function would be successfully performed, the removal of the scram pilot air header pressure trip switches scram function does not involve a significant increase in the consequences of any accident previously evaluated.
~I~F N'h Wl>>
Page 3 oS 5 ENCLOSURE 3 (CONTINUED)
BROMNS FERRY NUCLEAR PLANT (BFN)PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION The clarification of the description of the scram discharge volume high water level bypass in the Reactor Protection System does not reflect a modification to plant equipment, maintenance activities, or operating instructions.
The revised description does not effect the precursors for any accident or transient analyzed in Chapter 14 of the BFN FSAR or equipment used in the mitigation of these accidents or transients.
Therefore, there is no increase in the probability of any accident previously evaluated nor an increase in the consequences of any accident previously evaluated.
2.The proposed amendment does, not create the possibility of a new or different kind of accident from any accident previously evaluated.
The design criteria for the scram system is contained in the generic Safety Evaluation Report (SER), which was transmitted by NRC letter to All BWR Licensees, dated December 9, 1980, BWR Scram Discharge System.Section 4.2.4.1 of the generic SER states that the CRD system shall be analyzed based on a plant-specific maximum inleakage to ensure that the system function is not lost prior to initiation of automatic scram.This analysis has been performed and it was concluded that the removal of the scram pilot air header pressure trip switches scram function would still allow a successful scram, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region.Administrative controls and periodic measurements of the CRD and scram discharge system performance ensure acceptable response time delays and stall flow rates.The overall scram system design is in conformance with the generic SER.No new system failure modes are created as a result of removing the scram pilot air header pressure trip switches scram function since, assuming the maximum CRD inleakage due to a degraded air supply system, redundant and diverse level switches will initiate a successful scram prior to this function becoming disabled.The removal of the scram pilot air header pressure trip switches scram function does not create the possibility of a new or different kind of accident from any accident previously evaluated.
4~W~
Page 4 oS 5 ENCLOSURE 3 (CONTINUED)
Page 4 oS 5 ENCLOSURE 3 (CONTINUED)
BROWNS FERRY NUCLEAR PLANT (BFN)PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION The clarification of the description of the scram discharge volume high water level bypass in the Reactor Protection System does not reflect a modification to plant equipmentg maintenance activities,.or operating instructions.
BROWNS FERRY NUCLEAR PLANT (BFN)
No new external threats, system interactions, release pathways, or equipment failure modes are created.Therefore, the clarification of this description does not create the possibility of a new or different kind of accident from any accident previously evaluated.
PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION The clarification of the description of the scram discharge volume high water level bypass in the Reactor Protection System does not reflect a modification to plant equipmentg maintenance activities,.or operating instructions. No new external threats, system interactions, release pathways, or equipment failure modes are created. Therefore, the clarification of this description does not create the possibility of a new or different kind of accident from any accident previously evaluated.
3.The proposed amendment does not involve a significant reduction in the margin of safety.The water level in the scram discharge instrument volume is monitored by redundant Magnetrol and heated reference resistive temperature devices (RTD)level switches.Since the level switches are redundant and diverse-, redundancy and diversity in the instrumentation that initiates the scram signal is maintained even with the removal of the scram pilot air header pressure trip switches scram function.The scram system has been analyzed, based on a plant-specific maximum inleakage, and the removal of the scram pilot air header pressure trip switches scram function would still result in a successful scram, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region.Since the scram system would successfully operate to mitigate the consequences of accidents and transients previously analyzed, the proposed amendment does not, involve a significant reduction in the margin of safety.The clarification of the description of the scram discharge volume high water level bypass in the Reactor Protection System does not reflect a modification to plant equipment, maintenance activities, or operating instructions.
: 3. The proposed amendment does not involve a significant reduction in the margin of safety.
There is no change to the licensing or design basis of the Reactor Protection System.Therefore, the revised description does not involve a significant reduction in the margin of safety.  
The water level in the scram discharge instrument volume is monitored by redundant Magnetrol and heated reference resistive temperature devices (RTD) level switches. Since the level switches are redundant and diverse-, redundancy and diversity in the instrumentation that initiates the scram signal is maintained even with the removal of the scram pilot air header pressure trip switches scram function.
~'a~A e Page 5 oS 5 ENCLOSURE 3 (CONTINUED)
The scram system has been analyzed,   based on a plant-specific maximum inleakage, and the removal   of the scram pilot air header pressure trip switches scram function would still result in a successful scram, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region.
BROWNS FERRY NUCLEAR PLANT (BFN)PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION CONCLUSXON TVA has evaluated the proposed amendment described above against the criteria given in 10 CFR 50.92(c)in accordance with the requirements of 10 CFR 50.91(a)(1).
Since the scram system would successfully operate to mitigate the consequences of accidents and transients previously analyzed, the proposed amendment does not, involve a significant reduction in the margin of safety.
This evaluation has determined that the proposed amendment will not (1)involve a significant increase in the probability or consequences of an accident previously evaluated, (2)create the possibility for a new or different kind of accident from any accident previously evaluated, or (3)involve a significant reduction in a margin of safety.Thus, TVA has concluded that the proposed amendment does not involve a significant hazards consideration.
The clarification of the description of the scram discharge volume high water level bypass in the Reactor Protection System does not reflect a modification to plant equipment, maintenance activities, or operating instructions. There is no change to the licensing or design basis of the Reactor Protection System. Therefore, the revised description does not involve a significant reduction in the margin of safety.
 
    ~ 'a
~ A e
 
Page 5 oS 5 ENCLOSURE 3 (CONTINUED)
BROWNS FERRY NUCLEAR PLANT (BFN)
PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION CONCLUSXON TVA has evaluated the proposed amendment described above against the criteria given in 10 CFR 50.92(c) in accordance with the requirements of 10 CFR 50.91(a)(1). This evaluation has determined that the proposed amendment will not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility for a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Thus, TVA has concluded that the proposed amendment does not involve a significant hazards consideration.
 
r a}}
r a}}

Latest revision as of 15:21, 3 February 2020

Proposed Tech Specs for Removal of Scram Discharge Vol Air Header Pressure Trip Switches Scram Function on Unit 2 & Clarification of Description of RPS Scram Discharge Vol High Water Level Bypass in Units 1,2 & 3 TS
ML18037A478
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/30/1993
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18037A477 List:
References
NUDOCS 9310040387
Download: ML18037A478 (33)


Text

TECHNICAL SPECIFICATION 312 Effective Page Listing Unit 1 3.1/4.1-5 Unit 2 3.1/4 .1-4 3.1/4 .1-5 3.1/4 .1-9 3.1/4 1 1 1

~

3.1/4 . 1-16 Unit 3 3. 1/4. 1-4 9310040387 930930 PDR ADOCK 05000259 P PDR

1

>< r 1' 1 l Jl

PROPOSED TECHNICAL SPECIFICATION CHANGE BROWNS FERRY NUCLEAR PLANT UNIT 1 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

NOTES FOR TABLE 1 A There shall be two operable or tripped trip systems for each function.

If the minimum number of operable instrument channels per trip system cannot be met for one trip system, trip the inoperable channels or entire trip system within one hour, or, alternatively, take the below listed action for that trip function. If the minimum number of operable instrument channels cannot be met by either trip system, the appropriate action listed below (refer to right-hand column of Table) shall be taken. An inoperable channel need not be placed in the tripped condition where this would cause the trip function to occur. In these cases, the inoperable channel shall be restored to operable status within two hours, or take the action listed below for that trip function.

A. Initiate insertion of operable rods and complete insertion of all operable rods within four hours. In refueling mode, suspend all operations involving core alterations and fully insert all operable control rods within one hour.

B. Reduce power level to IRM range and place mode switch in the STARTUP/HOT Standby position within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

C. Reduce turbine load and close main steam line isolation valves within 8 hours.

D. Reduce power to less than 30 percent of rated.

2. The scram discharge volume high water level bypass may be used in SHUTDOWN or REFUEL to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip.

A control rod withdraw block is present when this scram is bypassed.

3~ Bypassed if reactor pressure is less than 1055 psig and mode switch not in RUN.

Bypassed when turbine first stage pressure is less than 154 psig.

5. IRMs are bypassed when APRMs are onscale and the reactor mode switch is in the RUN position.
6. The design permits closure of any two lines without a scram being initiated.

70 When the reactor is subcritical and the reactor water temperature is less than 212oF, only the following trip functions need to be operable:

A. Mode switch in shutdown B. Manual scram C. High flux IRM D. Scram discharge volume high level E. APRM 15 percent scram BFN 3.1/4.1-5 Unit 1

PROPOSED TECHNICAL SPECIFICATION CHANGE BROMNS FERRY NUCLEAR PLANT UNIT 2 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

TABLE 3.1.A REACTOR PROTECTION SYSTEH (SCRAH) INSTRUHENTATION REQUIREHENTS Hin. No. of Operable Instr. H de in which Func ion Hu Be Channels ~Orabli; Per Trip Shut- Startup/

Tri Level Settin down ~Refuel 7 RoatHtandb Run A~ti n 7 High Water Level in West Scram Discharge Tank (LS-85-45A-D) < 50 Gallons X(2) X(2) 1.A High Water Level in East Scram Discharge Tank (LS-85-45E-H) < 50 Gallons X(2) X(2) X 1.A Hain Steam Line <105 Valve Closure X(6) 1.A or 1.C Isolation Valve Closure Turbine Control >550 psig X(4) 1.A or 1.D Valve Fast Closure or Turbine Trip Turbine Stop <lOX Valve Closure X(4) 1.A or 1.D Valve Closure Turbine First not >154 psig X(18) X(18) X(18) 1.A or 1.D (19)

Stage Pressure Permissive (PIS-1-81A&B, PI 5-1-91A&8)

Hain Steam Line 3 X Normal Full X(9) X(9) X(9) 1.A or 1.C High Radiation Power Background (14) (20)

There shall be two OPERABLE or tripped trip systems for each function.

If the minimum number of OPERABLE instrument channels per trip system cannot be met for one trip system, trip the INOPERABLE channels or entire trip system within one hour, or, alternatively, take the below listed action for that trip function. If the minimum number of OPERABLE instrument channels cannot be met by either trip system, the appropriate action listed below (refer to right-hand column of Table) shall be taken. An INOPERABLE channel need not be placed in the tripped condition where this would cause the trip function to occur. In these cases, the INOPERABLE channel shall be restored to OPERABLE status within two hours, or take the action listed below for that trip function.

A. Initiate insertion of OPERABLE rods and complete insertion of all OPERABLE rods within four hours. In refueling mode, suspend all operations involving core alterations and fully insert all OPERABLE control rods within one hour.

B. Reduce power level to IRM range and place mode switch in the STARTUP/HOT Standby position within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

C. Reduce turbine load and close main steam line isolation valves within 8 hours.

D. Reduce power to less than 30 percent of rated.

2~ The scram discharge volume high water level bypass may be used in SHUTDOWN or REFUEL to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip.

A control rod withdraw block is present when this scram is bypassed.

3~ (Deleted) 4 ~ Bypassed when turbine first stage pressure is less than 154 psig.

5 ~ IRMs are bypassed when APRMs are onscale and the reactor mode switch is in the RUN position.

6. The design permits closure of any two lines without a scram being initiated.

7 ~ When the reactor is subcritical and the reactor water temperature is less than 212 F, only the following trip functions need to be OPERABLE:

A. Mode switch in SHUTDOWN B. Manual scram C. High flux IRM D. Scram discharge volume high level E. APRM 15 percent scram BFN 3.1/4.1-5 Unit 2

TABLE 4.1.A (Continued)

~ru ~>2 Fun ion 1 T Hinim Fr u n High Water Level in Scram Discharge Tank Float Switches (LS-85-45C-F) A Trip Channel and Alarm Once/Honth Electronic Level Switches (LS-85-45A, 8, G, H) Trip Channel and Alarm (7) Once/Honth Hain Steam Line High Radiation Trip Channel and Alarm (4) Once/3 Honths (8)

Main Steam Line Isolation Valve Cl osure Trip Channel and Alarm Once/3 Honths (8)

Turbine Control Valve Fast Closure or turbine trip Trip Channel and Alarm Once/Honth (1)

Turbine First Stage Pressure Permissive (PIS-1-81A and B, PIS-1-91A and 8) Trip Channel and Alarm (7) Every three months Turbine Stop Valve Closure Trip Channel and Alarm Once/Month (1)

TABLE 4.1.8 REACTOR PROTECTION SYSTEM (SCRAM) INSTRUMENT CALIBRATION MINIMUH CALIBRATION FRE()UENCIES FOR REACTOR PROTECTION INSTRUMENT CHANNELS Instrumen Ch nn 1 Grou 1 ~Calibra i a inim Fr n 2 IRH High Flux Comparison to APRH on Controlled Note (4)

Startups (6)

APRH High Flux Output Signal Heat Balance Once/7 Days Flow Bias Signal Calibrate Flow Bias Signal (7) Once/Operating Cycle LPRH Signal TIP System Traverse (8) Every 1000 Effective Full Power Hours High Reactor Pressure Standard Pressure Source Once/6 Honths (9)

(PIS-3-22 AA, BB, C, 0)

High Drywell Pressure Standard Pressure Source Once/18 Honths (9)

(PIS-64-56 A-D)

Reactor Low Water Level Pressure Standard Once/18 Honths (9)

(LIS-3-203 A-D)

High Water Level in Scram Discharge Volume Float Switches (LS-85-45-C-F) Calibrated Water Column Once/18 Honths Electronic Level Switches (LS-85-45 A, 8, G, H) Calibrated Water Column Once/18 Months (9)

Hain Steam Line Isolation Valve Cl osure Note (5) Note (5)

Hain Steam Line High Radiation Standard Current Source (3) Every 3 Honths Turbine First Stage Pressure Permissive (PIS-1-81 A&B, PIS-1-91 A&B) Standard Pressure Source Once/18 Honths (9)

Turbine Stop Valve Closure Note (5) Note (5)

Turbine Control Valve Fast Closure on Turbine Trip Standard Pressure Source Once/Operating Cycle

3.1 ~BS~S (Cont'd) be accommodated which would result in slow scram times or partial control rod insertion. To preclude this occurrence, level switches have been provided in the instrument volume which alarm and scram the reactor when the volume of water reaches 50 gallons. As indicated above, there is sufficient volume in the piping to accommodate the scram without impairment of the scram times or amount of insertion of the control rods. This function shuts the reactor down while sufficient volume remains to accommodate the discharge water and precludes the situation in which a scram would be required but not be able to perform its function adequately.

A source range monitor (SRM) system is also provided to supply additional neutron level information during startup but has no scram functions.

Reference Section 7.5.4 FSAR. Thus, the IRM is required in the REFUEL and STARTUP modes. In the power range the APRM system provides required protection. Reference Section 7.5.7 FSAR. Thus, the IRM System is not required in the RUN mode. The APRMs and the IRMs provide adequate coverage in the STARTUP and intermediate range.

The high reactor pressure, high drywell pressure, reactor low water level, and scram discharge volume high level scrams are required for STARTUP and RUN modes of plant operation. They are, therefore, required to be operational for these modes of reactor operation.

The requirement to have the scram functions as indicated in Table 3.1.A OPERABLE in the REFUEL mode is to assure that shifting to the REFUEL mode during reactor power operation does not diminish the need for the reactor protection system.

Because of the APRM downscale limit of g 3 percent when in the RUN mode and high level limit of g15 percent when in the STARTUP Mode, the transition between the STARTUP and RUN Modes must be made with the APRM instrumentation indicating between 3 percent and 15 percent of rated power or a control rod scram will occur. In addition, the IRM system must be indicating below the High Flux setting (120/125 of scale) or a scram will occur when in the STARTUP Mode. For normal operating conditions, these limits provide assurance of overlap between the IRM system and APRM system so that there are no "gaps" in the power level indications (i.e., the power level is continuously monitored from beginning of startup to full power and from full power to SHUTDOWN).

When power is being reduced, if a transfer to the STARTUP mode is made and the IRMs have not been fully inserted (a maloperational but not impossible condition) a control rod block immediately occurs so that reactivity insertion by control rod withdrawal cannot occur.

BFN 3.1/4.1-16 Unit 2

PROPOSED TECHNICAL SPECIFICATION CHANGE BROMNS FERRY NUCLEAR PLANT UNIT 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

OTES FOR TABL 1 A There shall be two OPERABLE or tripped trip systems for each function.

If the minimum number of OPERABLE instrument channels per trip system cannot be met for one trip system, trip the INOPERABLE channels or entire trip system within one hour, or, alternatively, take the below listed action for that trip function. If the minimum number of OPERABLE instrument channels cannot be met by either trip system, the appropriate action listed below (refer to right-hand column of Table) shall be taken. An INOPERABLE channel need not be placed in the tripped condition where this would cause the trip function to occur. In these cases, the INOPERABLE channel shall be restored to OPERABLE status within two hours, or take the action listed below for that trip function.

A. Initiate insertion of OPERABLE rods and complete insertion of all OPERABLE rods within four hours. In refueling mode, suspend all operations involving core alterations and fully insert all OPERABLE control rods within one hour.

B. Reduce power level to IRM range and place mode switch in the STARTUP/HOT STANDBY position within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

C. Reduce turbine load and close main steam line isolation valves within 8 hours.

D. Reduce power to less than 30 percent of rated.

2. The scram discharge volume high water level bypass may be used in SHUTDOWN or REFUEL to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip.

A control rod withdraw block is present when this scram is bypassed.

3. DELETED
4. Bypassed when turbine first stage pressure is less than 154 psig.
5. IRMs are bypassed when APRMs are onscale and the reactor mode switch is in the RUN position.
6. The design permits closure of any two lines without a scram being initiated.
7. When the reactor is subcritical and the reactor water temperature is less than 212oF, only the following trip functions need to be OPERABLE:

A. Mode switch in shutdown B. Manual scram C. High flux IRM D. Scram discharge volume high level E. APRM 15 percent scram BFN 3.1/4.1-4 Unit 3

ENCLOSURE 2 BROMNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION REASON FOR THE CHANGE The scram pilot air header pressure trip switches perform the function as the redundant high water level switches in the same scram discharge instrument volume for fast fill events in which the high level instrument response time may have been inadequate.

TVA's reanalysis of the Control Rod Drive (CRD) system concluded that a successful scram would be achieved with the level instrumentation and without the scram pilot air header pressure trip switches scram function. The overall scram system design still satisfies the criteria contained in the generic Safety Evaluation Report (SER), which was transmitted by NRC letter to All BWR Licensees, dated December 9, 1980, BWR Scram Discharge System'.

The potential for a plant transient due to the mal-operation or testing of these switches, the resources required for surveillance and maintenance of the switches, and the costs associated with installing the Class 1E switches in Units 1 and 3 outweigh the safety benefits of this redundant scram feature.

Consequently, TVA has decided to request the removal of the scram function of these switches from the BFN Unit 2 Technical Specifications.

In addition, the description of the scram discharge volume high water level bypass in the Units 1, 2, and 3 Technical Specifications requires clarification in order to reduce the potential for misinterpretation.

DESCRIPTION OF THE PROPOSED CHANGE The following specific changes are required to remove the scram pilot air header pressure trip switches scram function from the Unit 2 Technical Specifications:

1) The current requirements for Reactor Protection System instrumentation are listed in Table 3.1.A, Reactor Protection System (SCRAM) Instrumentation Requirements. The low scram pilot air header pressure instrumentation will be deleted from this table.

Page 2 oS 7 ENCLOSURE 2 (CONTINUED)

BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION

2) The current Note 2 for Table 3.1.A states:

"Scram discharge volume high bypass may be used in SHUTDOWN or REFUEL to bypass scram discharge volume scram and scram pilot air header low pressure scram with control rod block for reactor protection system reset."

The reference to the bypass of the scram pilot air header low pressure scram will be removed. The revised wording of this note is provided at the end of this section.

3) The trip functions currently required to be OPERABLE when the reactor is subcritical and the reactor water temperature is less that 212'F are listed as shown below in Note 7 in the Notes for Table 3.1.A section:

>>When the reactor is subcritical and the reactor water temperature is less than 212'F, only the following trip functions need to be OPERABLE:

A. Mode switch in SHUTDOWN B. Manual scram C. High flux IRM D. Scram discharge volume high level E. APRM 15 percent scram F. Scram pilot air header low pressure" Note 7F, Scram pilot air header low pressure, will be deleted.

4) The current functional tests and the minimum functional test frequencies for safety related Reactor Protection System instrument and control circuits are listed in Table 4.1.A.

The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2) will be deleted.

Page 3 oS 7 ENCLOSURE 2 (CONTINUED)

BROMNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION

5) The current Reactor Protection System instrument calibration minimum calibration frequencies for reactor protection instrument channels are listed in Table 4.1.B. The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2) will be deleted.
6) The current Bases Section 3.1 states:

"The high reactor pressure, high drywell pressure, reactor low water level, low scram pilot air header pressure and scram discharge volume high level scrams are required for STARTUP and RUN modes of plant operation."

The requirement for the low scram pilot air header pressure scrams for STARTUP and RUN modes of plant operation will be deleted as shown below:

The high reactor pressure, high drywell pressure, reactor low water level, and scram discharge volume high level scrams are required for STARTUP and RUN modes of plant operation.

7) The current Bases Section 3.1 states:

"The low scram pilot air header pressure trip performs the same function as the high water level in the scram discharge instrument volume for fast fill events in which the high level instrument response time may be inadequate. A fast fill event is postulated for certain degraded control air events in which the scram outlet valves unseat enough to allow 5 gpm per drive leakage into the scram discharge volume but not enough to cause control rod insertion."

This discussion of the low scram pilot air header pressure trip is being deleted.

ll Page 4 oS 7 ENCLOSURE 2 (CONTINUED)

BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

REASO FOR THE CHANGE DESCRIPTION AND JUSTIFICATION The following specific changes are required to clarify the description of the Reactor Protection System scram discharge volume high water level bypass in the Units 1, 2, and 3 Technical Specifications:

The current Note 2 for Table 3.1.A in the Unit 2 Technical Specifications states:

"Scram discharge volume high bypass may be used in SHUTDOWN or REFUEL to bypass scram discharge volume scram and scram pilot air header low pressure scram with control rod block for reactor protection system reset.

The current Note 2 for Table 3.1.A in the Units 1 and 3 Technical Specifications states:

"Scram discharge volume high bypass may be used in shutdown or refuel to bypass scram discharge volume scram with control rod block for reactor protection system reset."

The removal of the low scram pilot air header pressure trip for Unit 2 is described above. The description of the scram discharge volume high water level bypass will be clarified and Note 2 for Table 3.1.A for Units 1, 2, and 3 will read as shown below:

The scram discharge volume high water level bypass may be used in SHUTDOWN or REFUEL to bypass the scram discharge volume high-high water level scram signal in order to reset the reactor protection system trip. A control rod withdraw block is present, when this scram is bypassed.

Page 5 oS 7 ENCLOSURE 2 (CONTINUED)

.BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION a7USTZFZCATZON FOR THE PROPOSED CHANGE The Unit 2 scram pilot air header pressure trip switches perform the same function as the high water level switches in the scram discharge instrument volume for fast. fill events in which the high level instrument response time may have been inadequate.

Section 4.2.4.1 of the generic SER states that the CRD system shall be analyzed based on a plant-specific maximum inleakage to ensure that the system function is not lost prior to initiation of automatic scram. Maximum inleakage is the maximum flow rate, past the seal and through the scram discharge line, without control rod motion, summed over all control rods. The analysis should show no need for vents or drains. The Technical Basis for this section states that a maximum flow rate past the scram outlet valve, without rod motion, is 5 gpm per rod. This value should be used in the analysis to assure system function, or justification should be provided for using a different value.

Any value that is used must be verified to be conservative by assured CRD seal maintenance requirements based on stall flow tests.

TVA's previous analyses of the scram discharge system were performed assuming the 5 gpm per rod inleakage flow rate. This resulted in approximately 465 gpm inleakage into a scram discharge volume. The fast fill transient reanalysis was based upon unit specific CRD leakage rates and scram discharge instrument volume water level instrumentation characteristics.

The intent of the analysis was to show that a successful scram would be achieved using only the water level instrumentation and not the scram pilot air header pressure trip switches.

The water level in the scram discharge instrument volume is monitored by redundant and diverse Magnetrol and heated reference resistive temperature devices (RTD) level switches. Since the level switches are redundant, redundancy in the instrumentation that initiates the scram signal is maintained even with the removal of the scram pilot air header pressure trip switches scram function. The RTD switches were confirmed to respond within two seconds and the response time delay associated with the Magnetrolfloat switches was included in the analysis. No credit was taken for vents or drains and control rod motion was assumed not to occur until scram initiation. This reanalysis is consistent with the acceptance criteria of the generic SER (Reference 1). A copy of the supporting calculation for this reanalysis is available for review at TVA s Rockville office.

Page 6 oS 7 ENCLOSURE 2 (CONTINUED)

BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

REASON FOR THE CHANGE DESCRIPTION AND JUSTIFICATION The reanalysis concluded that a successful Unit 2 scram would be achieved, with the level instrumentation and without the scram pilot air header pressure trip switches scram function, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region shown below:

. 60 I

CO 152.5 50 O vIIIACQEPTQBLE E

~ 40 I Unit 2

'Cycle tI I 30 O

f30 I eau.r mrna I

I I I

I I I

a 20 I I

I AQCEPViABLP 17 0

10 I I 0

4.8 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Average Withdrawal Stall Flow Rate, GPM Definitions:

The Magnetrol Versus RTD Response Time Delay is the maximum allowable time delay between the RTD and Magnetrol level switches as measured following a reactor scram. The maximum allowable response time delay for either the East or West scram discharge instrument volume is defined as the maximum delay between any RTD level switch and any Magnetrol level switch for that scram discharge instrument volume.

s ~, 4 1*I

Page 7 oS 7 ENCLOSURE 2 (CONTINUED)

BROMNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 (TVA BFN TECHNICAL SPECIFICATION AMENDMENT 312)

REASO FOR THE CHANGE DESCRIPTION AND JUSTIFICATION The Average Withdrawal Stall Flow Rate is the CRD stall flow rate averaged over all fully withdrawn rods.

As shown on the above figure, during Unit. 2 Cycle 6, the average stall flow leakage was 1.9 to 2.1 gpm per CRD. The maximum response time delay between the RTD and Magnetrol level switches for either scram discharge instrument volume was less than 28 seconds. This combination of stall flow rate and instrument delay is well within the acceptable region.

TVA's current Unit 2 procedures require measurements of CRD stall flow rates during reactor power operation for the fully withdrawn CRDs. In addition, as part of the implementation of this proposed Technical Specification, TVA intends to revise its procedures to monitor and take appropriate actions to ensure CRD and scram discharge system performance within the acceptable response time delays and stall flow rates. These systems can degrade over time due to long term mechanisms such as crud buildup and corrosion. However, these mechanisms are relatively slow. Therefore, TVA considers an acceptable frequency of confirmation of the response time delay and stall flow rate to be once per operating cycle or at the next scram occurred during that cycle.

if a scram has not In addition, the description of the scram discharge volume high water level bypass in the Units 1, 2, and 3 Technical Specifications requires clarification in order to reduce the potential for misinterpretation.

ENCLOSURE 3 BROWNS FERRY NUCLEAR PLANT (BFN)

PROPOSED NO SIGNIFICANT,HAZARDS CONSIDERATIONS DETERMINATION DESCRZPTZON OF THE PROPOSED TECHNICAL SPECIFICATION CHANGE The following specific changes are required to remove the scram pilot air header pressure trip switches scram function from the Unit 2 Technical Specifications:

1) The current requirements for Reactor Protection System instrumentation are listed in Table 3.1.A, Reactor Protection System (SCRAM) Instrumentation Requirements. The low scram pilot air header pressure instrumentation will be deleted from this table.
2) The reference to the bypass of the scram pilot air header low pressure scram will be removed from Note 2 for Table 3.1.A.
3) The trip functions currently required to be OPERABLE when the reactor is subcritical and the reactor water temperature is less that 212'F are listed in Note 7 in the Notes for Table 3.1.A section. Note 7F, Scram pilot air header low pressure, will be deleted.
4) The current functional tests and the minimum functional test frequencies for safety related Reactor Protection System instrument and control circuits are listed in Table 4.1.A.

The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2) will be deleted.

5) The current Reactor Protection System instrument calibration minimum calibration frequencies for reactor protection instrument channels are listed in Table 4.1.B. The low scram pilot air header pressure switches (PS 85-35 A1, A2, B1, and B2) will be deleted.
6) The current Bases Section 3.1 will be revised to reflect the deletion of the low scram pilot air header pressure switches scram function.

Also, the description of the Reactor Protection System scram discharge volume high water level bypass in Note 2 for Table 3.1.A of the Units 1, 2, and 3 Technical Specifications will be clarified.

Page 2 oS 5 ENCLOSURE 3 (CONTINUED)

BROWNS FERRY NUCLEAR PLANT (BFN)

PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION BASES FOR PROPOSED NO SIGNIFICANT HAZARDS CONSZDERATZON DETERMINATION NRC has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c). A proposed amendment to, an operating license involves no significant hazards considerations if operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from an accident previously evaluated, or (3) involve a significant reduction in a margin of safety. The proposed TS change is judged to involve no significant hazards considerations based on the following:

1. The proposed amendment does not involve a significant increase in the probability or consequences of any accident previously evaluated.

The Unit 2 scram pilot air header pressure trip switches perform the same function as the high water level switches in the scram discharge instrument volume. They automatically initiate control rod insertion (scram) in the event that degraded air conditions are detected in the BWR control air supply system. Since the scram pilot air header pressure trip function is to ensure that the Control Rod Drive (CRD)

System is available to mitigate the consequence of an accident or transient, and the removal of the scram pilot air header pressure trip switches scram function does not effect the precursors for any accident or transient analyzed in Chapter 14 of the BFN Final Safety Analysis Report (FSAR),

there is no increase in the probability of any accident previously evaluated.

The scram system has been analyzed, based on a plant-specific maximum inleakage, and the removal of the scram pilot air header pressure trip switches scram function would still result in a successful scram, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region.

Administrative controls and periodic measurements of the CRD and scram discharge system performance ensure acceptable response time delays and stall flow rates. Since the scram function would be successfully performed, the removal of the scram pilot air header pressure trip switches scram function does not involve a significant increase in the consequences of any accident previously evaluated.

~ I ~ F N

'h Wl>>

Page 3 oS 5 ENCLOSURE 3 (CONTINUED)

BROMNS FERRY NUCLEAR PLANT (BFN)

PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION The clarification of the description of the scram discharge volume high water level bypass in the Reactor Protection System does not reflect a modification to plant equipment, maintenance activities, or operating instructions. The revised description does not effect the precursors for any accident or transient analyzed in Chapter 14 of the BFN FSAR or equipment used in the mitigation of these accidents or transients. Therefore, there is no increase in the probability of any accident previously evaluated nor an increase in the consequences of any accident previously evaluated.

2. The proposed amendment does, not create the possibility of a new or different kind of accident from any accident previously evaluated.

The design criteria for the scram system is contained in the generic Safety Evaluation Report (SER), which was transmitted by NRC letter to All BWR Licensees, dated December 9, 1980, BWR Scram Discharge System. Section 4.2.4.1 of the generic SER states that the CRD system shall be analyzed based on a plant-specific maximum inleakage to ensure that the system function is not lost prior to initiation of automatic scram.

This analysis has been performed and it was concluded that the removal of the scram pilot air header pressure trip switches scram function would still allow a successful scram, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region. Administrative controls and periodic measurements of the CRD and scram discharge system performance ensure acceptable response time delays and stall flow rates.

The overall scram system design is in conformance with the generic SER. No new system failure modes are created as a result of removing the scram pilot air header pressure trip switches scram function since, assuming the maximum CRD inleakage due to a degraded air supply system, redundant and diverse level switches will initiate a successful scram prior to this function becoming disabled. The removal of the scram pilot air header pressure trip switches scram function does not create the possibility of a new or different kind of accident from any accident previously evaluated.

4

~ W ~

Page 4 oS 5 ENCLOSURE 3 (CONTINUED)

BROWNS FERRY NUCLEAR PLANT (BFN)

PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION The clarification of the description of the scram discharge volume high water level bypass in the Reactor Protection System does not reflect a modification to plant equipmentg maintenance activities,.or operating instructions. No new external threats, system interactions, release pathways, or equipment failure modes are created. Therefore, the clarification of this description does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. The proposed amendment does not involve a significant reduction in the margin of safety.

The water level in the scram discharge instrument volume is monitored by redundant Magnetrol and heated reference resistive temperature devices (RTD) level switches. Since the level switches are redundant and diverse-, redundancy and diversity in the instrumentation that initiates the scram signal is maintained even with the removal of the scram pilot air header pressure trip switches scram function.

The scram system has been analyzed, based on a plant-specific maximum inleakage, and the removal of the scram pilot air header pressure trip switches scram function would still result in a successful scram, provided that the CRD leakage rate and the water level instrumentation response characteristics remain within the success criteria region.

Since the scram system would successfully operate to mitigate the consequences of accidents and transients previously analyzed, the proposed amendment does not, involve a significant reduction in the margin of safety.

The clarification of the description of the scram discharge volume high water level bypass in the Reactor Protection System does not reflect a modification to plant equipment, maintenance activities, or operating instructions. There is no change to the licensing or design basis of the Reactor Protection System. Therefore, the revised description does not involve a significant reduction in the margin of safety.

~ 'a

~ A e

Page 5 oS 5 ENCLOSURE 3 (CONTINUED)

BROWNS FERRY NUCLEAR PLANT (BFN)

PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATIONS DETERMINATION CONCLUSXON TVA has evaluated the proposed amendment described above against the criteria given in 10 CFR 50.92(c) in accordance with the requirements of 10 CFR 50.91(a)(1). This evaluation has determined that the proposed amendment will not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility for a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Thus, TVA has concluded that the proposed amendment does not involve a significant hazards consideration.