ML18045A291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/01/1980
| issue date = 07/01/1980
| title = Forwards Rept on Endurance Testing of Auxiliary Feedwater Pumps.
| title = Forwards Rept on Endurance Testing of Auxiliary Feedwater Pumps.
| author name = HOFFMAN D P
| author name = Hoffman D
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name = CRUTCHFIELD D
| addressee name = Crutchfield D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000255
| docket = 05000255
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:General O.fflces:
{{#Wiki_filter:General O.fflces: 212 West Mlchiga.n Avenue, Jackson, Michigan 49201 * (517) 788-0550
212 West Mlchiga.n Avenue, Jackson, Michigan 49201 * (517) 788-0550 .July 1, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief
    .July 1, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief
* Operating Reactors Branch No 5. US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -AUXILIARY FEEDWATER PUMPS ENDURANCE TEST RESULTS ConSU-"llers Po.wer Company committed by letter dated* December 11, 1979 to perform an endurance test on the auxiliary feedwater pumps at the Palisades Plant. This test was performed in accordance with NRC recommendations received by copy en January 25, 1980.. The results .of the tests state that the auxiliary feedwater pumps performed as designed without exceeding any operating limits. A detailed report on the endurance testing of the auxiliary feedwater pumps is attached to this letter. David P Hoffman Nuclear Licensing Administrator CC . JGKeppler, USNRC. NRC Inspector-Palisades  
* Operating Reactors Branch No 5.
.. 80070SOl50}}
US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR     PALISADES PLANT - AUXILIARY FEEDWATER PUMPS ENDURANCE TEST RESULTS ConSU-"llers Po.wer Company committed by letter dated* December 11, 1979 to perform an endurance test on the auxiliary feedwater pumps at the Palisades Plant.
This test was performed in accordance with NRC recommendations received by tele-copy en January 25, 1980.. The results .of the tests state that the auxiliary feedwater pumps performed as designed without exceeding any operating limits.
A detailed report on the endurance testing of the auxiliary feedwater pumps is attached to this letter.
David P Hoffman Nuclear Licensing Administrator CC . JGKeppler, USNRC.
NRC R~si~ent Inspector-Palisades 80070SOl50                   ~}}

Latest revision as of 13:27, 3 February 2020

Forwards Rept on Endurance Testing of Auxiliary Feedwater Pumps.
ML18045A291
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/01/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML18045A292 List:
References
TASK-10, TASK-RR NUDOCS 8007030250
Download: ML18045A291 (1)


Text

General O.fflces: 212 West Mlchiga.n Avenue, Jackson, Michigan 49201 * (517) 788-0550

.July 1, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief

  • Operating Reactors Branch No 5.

US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - AUXILIARY FEEDWATER PUMPS ENDURANCE TEST RESULTS ConSU-"llers Po.wer Company committed by letter dated* December 11, 1979 to perform an endurance test on the auxiliary feedwater pumps at the Palisades Plant.

This test was performed in accordance with NRC recommendations received by tele-copy en January 25, 1980.. The results .of the tests state that the auxiliary feedwater pumps performed as designed without exceeding any operating limits.

A detailed report on the endurance testing of the auxiliary feedwater pumps is attached to this letter.

David P Hoffman Nuclear Licensing Administrator CC . JGKeppler, USNRC.

NRC R~si~ent Inspector-Palisades 80070SOl50 ~