ML18058B258: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:'i consumers Power | {{#Wiki_filter:'i consumers Power POWERiNii MICHlliAN§S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 December 4, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of November, 1992. | ||
If you have any questions or concerns, please feel free to contact*me at (616) 764-8913; extension 0113. | |||
Sincerely, PJ Kl uskowski Reactor Engineer CC: DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Palisades Resident.Inspector, Palisades DRHahn~ Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades SMMcintyre, Pl3-121 Administrator, USNRC Document Control, 950*22*35*10/L SMH92*30 | |||
( 9212110135.-921130-~ | |||
PDR ADOCK | PDR ADOCK | ||
* 05000255 . ' * | * 05000255 . ' * | ||
* R . " . ... PDR * ! A CMS' ENERGY COMPANY 1.J | * R . " . ... PDR *! A CMS' ENERGY COMPANY j9qll 1.J | ||
: 2. REPORTING PERIOD: 921101-921130 | OPERATING DATA REPORT DOCKET NO 50-255 DATE 11-30-92 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 OPERATING STATUS: | ||
: 3. LICENSED THERMAL POWER (MWt) 2530.0 4. NAMEPLATE RATING (GROSS MWe) 811.7 5. DESIGN ELECTRICAL RATING (NET MWe) 805.0 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770 7 .. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): 10. REASONS FOR RESTRICTIONS, IF ANY: 11. HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR WAS CRITICAL 13. REACTOR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR ON-LINE 15. UNIT RESERVE SHUTDOWN HOURS 16. GROSS THERMAL ENERGY GENERATED (MWH) 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 18. NET ELECTRICAL ENERGY GENERATED (MWH) | NOTES: | ||
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | : 1. UNIT NAME Palisades | ||
** Based on condenser backpressure | : 2. REPORTING PERIOD: 921101-921130 | ||
* Weighted Average (635 MWe used as MDC Net prior to October 1985) | : 3. LICENSED THERMAL POWER (MWt) 2530.0 | ||
/-=9=2 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1. 0 17. 791 2. 0 18. 793 3. 0 19. 792 4. 0 20. 788 5. 0 21. 788 6. 0 22. 792 7. 0 23. 792 8. 0 24. 793 9. 637 25. 791 10. 784 26. 791 11. 788 27. 794 12. 786 28. 793 13. 793 29. 792 -14. 791 30. 793 15. 792 16. 792 INSTRUCTIONS: | : 4. NAMEPLATE RATING (GROSS MWe) 811.7 | ||
: 5. DESIGN ELECTRICAL RATING (NET MWe) 805.0 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770 7.. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730 | |||
: 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
*This Month Yr-to-Date Cumulative | |||
: 11. HOURS IN REPORTING PERIOD 720.0 8040.0 183663.0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 544.7 5942.0 102988.6 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS | |||
: 14. HOURS GENERATOR ON-LINE 532.0 5551.1 98462.6 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1326168.0 13760863.0 210415476.0 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 435610.0 4492728.0 66271453 .0 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 413860.0 4275796.0 62447804.0 | |||
: 19. UNIT SERVICE FACTOR 73.9% 69.0% 53.6% | |||
: 20. UNIT AVAILABILITY FACTOR 73.9% 69.0% 53.6% | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 78.7% 72.9% 50.9%* | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 71.4% 66.1% 42.2% | |||
: 23. UNIT FORCED OUTAGE RATE 26 .1% 12.3% 30.5% | |||
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | |||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | |||
** Based on condenser backpressure | |||
* Weighted Average (635 MWe used as MDC Net prior to October 1985) | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO -----"-'50'---=25"-=5 UNIT Palisades DATE _ _, ._,2:s..l...:.0~4 l /-=9=2 COMPLETED BY SMHandlovits MONTH NOVEMBER 1992 TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) | |||
: 1. 0 17. 791 | |||
: 2. 0 18. 793 | |||
: 3. 0 19. 792 | |||
: 4. 0 20. 788 | |||
: 5. 0 21. 788 | |||
: 6. 0 22. 792 | |||
: 7. 0 23. 792 | |||
: 8. 0 24. 793 | |||
: 9. 637 25. 791 | |||
: 10. 784 26. 791 | |||
: 11. 788 27. 794 | |||
: 12. 786 28. 793 | |||
: 13. 793 29. 792 | |||
- 14. 791 30. 793 | |||
: 15. 792 | |||
: 16. 792 INSTRUCTIONS: | |||
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | ||
REPORT MONTH NOVEMBER 1992 No. Date Type 1 06 921030 F l. 2. F: Forced S: Scheduled | |||
B-Maintenance or Test C-Refue ling 0-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | DOCKET NO so-2ss UNIT Palisades DATE 12/04/92 COMPLETED BY SMHandlovits ' | ||
REPORT MONTH NOVEMBER 1992 TELEPHONE (616 )764-8913 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause &Corrective 4 6 (Hours) Shutting Event Code Code Action to 3 | |||
Down Reactor Report # Prevent Recurrence 06 921030 F 188.0 A 3 LER 92039 Failure of uninterruptible power supply in DEH system | |||
: l. 2. 3. 4. 5. | |||
F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refue ling 3-Automatic Scram Event Report (LER) File 0-Regulatory Restriction 4-0ther (Explain) (NUREG-0161) | |||
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) | H-Other (Explain) | ||
~ . , .. | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR NOVEMBER 1992 The unit began the month shutdown, but went critical November 8 at 0719 hours and was on-line at 2002 hours. Full power was reached by 0000 hours November 10, and the plant operated at 100% power for the remainder of the month.}} | OF OPERATING EXPERIENCE FOR NOVEMBER 1992 The unit began the month shutdown, but went critical November 8 at 0719 hours and was on-line at 2002 hours. Full power was reached by 0000 hours November 10, and the plant operated at 100% power for the remainder of the month.}} |
Latest revision as of 11:10, 3 February 2020
ML18058B258 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 11/30/1992 |
From: | Handlovits S, Kluskowski P CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9212110135 | |
Download: ML18058B258 (5) | |
Text
'i consumers Power POWERiNii MICHlliAN§S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 December 4, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of November, 1992.
If you have any questions or concerns, please feel free to contact*me at (616) 764-8913; extension 0113.
Sincerely, PJ Kl uskowski Reactor Engineer CC: DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Palisades Resident.Inspector, Palisades DRHahn~ Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades SMMcintyre, Pl3-121 Administrator, USNRC Document Control, 950*22*35*10/L SMH92*30
( 9212110135.-921130-~
PDR ADOCK
- 05000255 . ' *
OPERATING DATA REPORT DOCKET NO 50-255 DATE 11-30-92 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 OPERATING STATUS:
NOTES:
- 1. UNIT NAME Palisades
- 2. REPORTING PERIOD: 921101-921130
- 3. LICENSED THERMAL POWER (MWt) 2530.0
- 4. NAMEPLATE RATING (GROSS MWe) 811.7
- 5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770 7.. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
- 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- This Month Yr-to-Date Cumulative
- 11. HOURS IN REPORTING PERIOD 720.0 8040.0 183663.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 544.7 5942.0 102988.6
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE 532.0 5551.1 98462.6
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1326168.0 13760863.0 210415476.0
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 435610.0 4492728.0 66271453 .0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 413860.0 4275796.0 62447804.0
- 19. UNIT SERVICE FACTOR 73.9% 69.0% 53.6%
- 20. UNIT AVAILABILITY FACTOR 73.9% 69.0% 53.6%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 78.7% 72.9% 50.9%*
- 22. UNIT CAPACITY FACTOR (USING DER NET) 71.4% 66.1% 42.2%
- 23. UNIT FORCED OUTAGE RATE 26 .1% 12.3% 30.5%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO -----"-'50'---=25"-=5 UNIT Palisades DATE _ _, ._,2:s..l...:.0~4 l /-=9=2 COMPLETED BY SMHandlovits MONTH NOVEMBER 1992 TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)
- 1. 0 17. 791
- 2. 0 18. 793
- 3. 0 19. 792
- 4. 0 20. 788
- 5. 0 21. 788
- 6. 0 22. 792
- 7. 0 23. 792
- 8. 0 24. 793
- 9. 637 25. 791
- 10. 784 26. 791
- 11. 788 27. 794
- 12. 786 28. 793
- 13. 793 29. 792
- 14. 791 30. 793
- 15. 792
- 16. 792 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.
DOCKET NO so-2ss UNIT Palisades DATE 12/04/92 COMPLETED BY SMHandlovits '
REPORT MONTH NOVEMBER 1992 TELEPHONE (616 )764-8913 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause &Corrective 4 6 (Hours) Shutting Event Code Code Action to 3
Down Reactor Report # Prevent Recurrence 06 921030 F 188.0 A 3 LER 92039 Failure of uninterruptible power supply in DEH system
- l. 2. 3. 4. 5.
F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refue ling 3-Automatic Scram Event Report (LER) File 0-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
~ . , ..
SUMMARY
OF OPERATING EXPERIENCE FOR NOVEMBER 1992 The unit began the month shutdown, but went critical November 8 at 0719 hours0.00832 days <br />0.2 hours <br />0.00119 weeks <br />2.735795e-4 months <br /> and was on-line at 2002 hours0.0232 days <br />0.556 hours <br />0.00331 weeks <br />7.61761e-4 months <br />. Full power was reached by 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> November 10, and the plant operated at 100% power for the remainder of the month.