ML18094A545: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
{{#Wiki_filter:-
{{#Wiki_filter:-
CORRECTED  COPY        OPERATING DATA REPORT
CORRECTED  COPY        OPERATING DATA REPORT
          .
           \                                                      Docket No .50-272 Date: 3-10-89 Telephone: 935-6000 Completed by    Pell White                                  Extension: ~4~4~5~1,-....---~-~
           \                                                      Docket No .50-272 Date: 3-10-89 Telephone: 935-6000 Completed by    Pell White                                  Extension: ~4~4~5~1,-....---~-~
Operating Status
Operating Status
Line 70: Line 69:
                                                 ,. , 'I ()-
                                                 ,. , 'I ()-
                                                 . /
                                                 . /
                                                '--'
I I; ,') ') --
* I I; ,') ') --
                                                                           '-/  *~
                                                                           '-/  *~
                                                                                   *: . )
                                                                                   *: . )
                                                                                       ,_          f./9/f)  I/!
                                                                                       ,_          f./9/f)  I/!
( 8907070299 890619          \ I PDR ADOCK 05000272 R                PNU}}
( 8907070299 890619          \ I PDR ADOCK 05000272 R                PNU}}

Latest revision as of 06:18, 3 February 2020

Revised Operating Data Rept to Monthly Operating Rept for Salem Unit 1 for Feb 1989
ML18094A545
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/28/1989
From: White P
Public Service Enterprise Group
To:
Shared Package
ML18094A544 List:
References
NUDOCS 8907070299
Download: ML18094A545 (1)


Text

-

CORRECTED COPY OPERATING DATA REPORT

\ Docket No .50-272 Date: 3-10-89 Telephone: 935-6000 Completed by Pell White Extension: ~4~4~5~1,-....---~-~

Operating Status

1. Unit Name Salem No. 1 Notes
2. Reporting Period February 1989
3. Licensed Thermal Power (MWt) 3411
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity(Gross MWe)1149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason ~~-'-~-~~~-~-~~------~--~-~~-~~~~~

N/A

9. Power Level to Which Restricted, if any (Net MWe) N/A

-~~~~---------------~

10. Reasons for Restrictions, if any N/A

--'-~-------~-~-------------------~~-~

This Month Year to Date Cumulative

11. Hours in Reporting Period 672 1416 102289
12. No. of Hrs. Reactor was Critical
  • 570.6 13 14. 6 65946.8
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator On-Line
  • 520.31

...,_----~-~-

  • 1264.31
  • 63900.2
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated ------

(MWH) 17 4 7 9 7 2 . 8 4251211.2 199688003~6

17. Gross Elec. Energy Generated (MWH) 57 99 20 1420550 66367730
18. Net Elec. Energy Generated (MWH) 551851 1359434 63165549
19. Unit Service Factor
  • 77.4
  • 89. 3
  • 62.5
20. Unit Availability Factor
  • 77.4
  • 89.3
  • 62.5
21. Unit Capacity Factor (using MDC Net) 74.3 86.8 55.8
22. Unit Capacity Factor (using DER Net) 73.7 86.1 55.4
23. Unit Forced Outage Rate
  • 22.5
  • 10.7
  • 22.2
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

Refueling outage scheduled for April 15, 1989 and lasting approximately 55 da s.

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A 8-1-7.R2

,. , 'I ()-

. /

I I; ,') ') --

'-/ *~

  • . )

,_ f./9/f) I/!

( 8907070299 890619 \ I PDR ADOCK 05000272 R PNU