Line 97: |
Line 97: |
| lEC-02271 This design change eliminated the 91% voltage vital bus transfer scheme between station power transformers and provided (3) 91% undervoltage relays wired to each vital bus providing inputs to its SEC unit for a 2 of 3 logic to the diesel generator. There was no change to any plant process or discharge or to the environmental impact of the plant. No unreviewed safety or environmental questions are involved. | | lEC-02271 This design change eliminated the 91% voltage vital bus transfer scheme between station power transformers and provided (3) 91% undervoltage relays wired to each vital bus providing inputs to its SEC unit for a 2 of 3 logic to the diesel generator. There was no change to any plant process or discharge or to the environmental impact of the plant. No unreviewed safety or environmental questions are involved. |
| * DCR - Design Change Request | | * DCR - Design Change Request |
| * SALEM GENERATING STATION MONTHLY OPERATING
| | |
| | SALEM GENERATING STATION MONTHLY OPERATING |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
Line 109: |
Line 110: |
| Eddy current testing showed thirty two tubes indicating greater than 30% wear and all 362 row one tubes are to be plugged. Additionally, three plugs from previously plugged tubes have been removed for analysis as a follow up to the North Anna tube plug failure. | | Eddy current testing showed thirty two tubes indicating greater than 30% wear and all 362 row one tubes are to be plugged. Additionally, three plugs from previously plugged tubes have been removed for analysis as a follow up to the North Anna tube plug failure. |
|
| |
|
| .*'
| | REFUELING INFORMATION DOCKET NO.: 50-272 COMPLETED BY: P. White UNIT NAME: Salem 1 DATE: May 10, 19 89 TELEPHONE: 609/935-6000 EXTENSION: 4497 Month APRIL 1989 |
| * REFUELING INFORMATION DOCKET NO.: 50-272 COMPLETED BY: P. White UNIT NAME: Salem 1 DATE: May 10, 19 89 TELEPHONE: 609/935-6000 EXTENSION: 4497 Month APRIL 1989
| |
| : 1. Refueling information has changed from last month: | | : 1. Refueling information has changed from last month: |
| YES X NO | | YES X NO |
Similar Documents at Salem |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0261998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 1.With 990115 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr ML18106A9831998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 2.With 981214 Ltr ML18106A9801998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 1.With 981214 Ltr ML18106A9641998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 2. with 981112 Ltr ML18106A9631998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 1. with 981112 Ltr ML18106A9151998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 2.With 981012 Ltr ML18106A9131998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 1.With 981012 Ltr ML18106A8751998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With 980915 Ltr ML18106A8741998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Unit 1.With 980915 Ltr ML18106A8161998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 1. W/980817 Ltr ML18106A8151998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 2. W/980817 Ltr ML18106A7151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 2. W/980715 Ltr ML18106A7141998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 1. W/980715 Ltr ML18106A6541998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 1. W/980615 Ltr ML18106A6531998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 2. W/980615 Ltr ML18106A6121998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1.W/980515 Ltr ML18106A6111998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Unit 2. W/980515 Ltr ML18106A5561998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem,Unit 1. W/980415 Ltr ML18106A4591998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem Unit 2. W/980415 Ltr ML18106A3771998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 1.W/980316 Ltr ML18106A3761998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 2.W/980316 Ltr ML18106A3281998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 2. W/980217 Ltr ML18106A3271998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 1. W/980217 Ltr ML18106A2721997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem,Unit 2. W/980115 Ltr ML18106A2711997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem Generating Station,Unit 1.W/980115 Ltr ML18106A2081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 1. W/971212 Ltr ML18106A2071997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 2. W/971212 Ltr ML18102B6811997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 2.W/ 971117 Ltr ML18102B6801997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 1.W/ 971117 Ltr ML18102B6271997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Salem,Unit 2. W/971015 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML20205P1671999-01-31031 January 1999 a POST-PLUME Phase, Federal Participation Exercise ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr 1999-09-30
[Table view] |
Text
e
.*.-o PS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station flay 11, 1989 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of April 1989 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modification Operating Summary Refueling Information sk~
L. K. Miller General Manager -
Salem Operations RH: sl cc: Mr. William T. Russell Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Enclosures 8-l-7.R4
- :=~*:')(- ):"*1:i::::*:(
- - - ")*-*4(").,:. - ..**, (l~.'JI""
~b~- ~fiocK o5otu272 R PDC The Energy People ff14
'l I 95-2189 (SM) 12-88
.e AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-272 Unit Name Salem # 1 Date 5-09-89 Completed by Art Orticelle Telephone 609-935-6000 Extension 4451 Month APRIL 1989 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 16 0 P. 8.1-7 Rl j,G'*:f
OPERATING DATA REPORT Docket No .50-272 Date: 5~--o-=-=-9--~8~9~--------
Telephone: 935-6000 Completed by Pell White Extension: ~4~4~5~1-------------
Operating Status
- 1. Unit Name Salem No. 1 Notes
- 2. Reporting Period April 1989
- 3. Licensed Thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross MWe) 1170
- 5. Design Electrical Rating (Net MWe) 1115
- 6. Maximum Dependable Capacity(Gross MWe)1149
- 7. Maximum Dependable Capacity (Net MWe) 1106
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
--~---------------~------------------------------------
- 9. Power Level to Which Restricted, if any (Net MWe) N/A
~~~------------
- 10. Reasons for Restrictions, if any N/A
~--------------~-------
This Month Year to Date Cumulative
- 11. Hours in Reporting Period 719 2879 103752
- 12. No. of Hrs. Reactor was Critical 0 1862.33 66 494. 53
- 13. Reactor Reserve Shutdown Hrs. 0 0 0
- 14. Hours Generator On-Line 0 1811.75 64 447. 65
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 6106848 201543640.4
- 17. Gross Elec. Energy Generated (MWH) 0 2039200 66986380
- 18. Net Elec. Energy Generated (MWH) -4020 1945095 63751219
- 19. Unit Service Factor 0 62.9 62.1
- 20. Unit Availability Factor 0 62.9 62.1
- 21. Unit Capacity Factor (using MDC Net) 0 61.1 55.6
- 22. Unit Capacity Factor (using DER Net) 0 60.6 55.1 2 3. Unit Forced Outage Rate 0 12.2 22.1
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
NONE 25*. If shutdown at end of Report Period, Estimated Date of Startup:
Unit currently in 8th refueling outage scheduled start date May 26, 1989.
8-l-7.R2
HNIT SHUTDOWN AND POWER REDUCTIONS Docket No.50-272
~~~~~~~~-
REPORT MONTH APRIL 1989 Unit Name Salem No.I Date 5-09-89 Completed by Art Orticelle Telephone 609-935-6000 Extension 4451 Method of Duration Shutting License Cause and Corrective No. Date Type Hours Reason Down Event System Component Action to 1 2 Reactor Report Code 4 C od*e 5 Prevent Recurrence NUCLEAR REACTOR 0071 4-01-89 s 719 c 4 ------ CA VESSEL OVERHAUL GENERATOR MAJOR 0071 4-01-89 s 719 c 4 ------ HA GENERA OVERHAUL MAJOR TURBINE 007 1 4-01-89 s 719 c 4 ------ HA TURBIN OVERHAUL 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit-F: Forced A-Equipment Failure-explain 1-Man ua 1 Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara- Source C-Refue ling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-0ther (LER) File H-Other-explain (NUREG 0161)
PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 1 WO NO UNIT EQUIPMENT IDENTIFICATION 890125071 1 EMERG. AIR COMPRESSOR FAILURE DESCRIPTION: #1 EMERG. AIR COMPRESSOR OIL LEAK / REPLACE GASKET.
890330094 1 lSAll 8 FAILURE DESCRIPTION: FAILED LEAK RATE TEST/MARK NO. A-157. INSPECT.
890330112 1 lSAll 9 "FAILURE DESCRIPTION: FAILED LEAK RATE TEST / MARK NO. A-165. INSPECT.
890410160 1 1C5Y FAILURE DESCRIPTION: lC VTL INSTR. BUS INVERTER BREAKER/CHANGE OVERLOAD.
890413128 1 RX CAVITY LIGHTING FAILURE DESCRIPTION: RX CAVITY LIGHTING/TROUBLESHOOT.
890425105 1 11SJ188 FAILURE DESCRIPTION: LEAKING THRU/CLEAN OFF BORIC ACID & CAP END OF PIPE.
SALEr1 UNIT 1 890425112 1 11SJ189 FAILURE DESCRIPTION: LEAKING THRU/CLEAN OFF BORIC ACID & CAP END OF PIPE.
890425113 1 12SJ188 FAILURE DESCRIPTION: LEAKING THRU/CLEAN OFF BORIC ACID & CAP END OF PIPE ..
890425119 1 12SJ189 FAILURE DESCRIPTION: LEAKING THRU/CLEAN OFF BORIC ACID & CAP END OF PIPE.
.MAJbR PLANT MODIFICATIONS DOCKET NO.: 50*-272
~EPORT MONTH APRIL 1989 UNIT NAME: Salem 1 DATE: May 10, 19 89 COMPLETED BY: P. White TELEPHONE: 609/339-4455
- DCR NO. PRINCIPAL SYSTEM DESCRIPTION lEC-02065 Charging This design change added a pulsation dampener to the discharge of the positive displacement charging pump.
lEC-02066 Charging This design change added a suction stabilizer to the piping upstream of the #13 positive displacement charging pump.
lEC-02173 Turbine Controls This design change installed AMSAC (ATWS Mitigation System Actuation Circuitry).
lEC-02271 Electrical This design change eliminated the 91% voltage vital bus transfer scheme between station power transformers and provided (3) 91% undervoltage relays wired to each vital bus providing inputs to its SEC unit for a 2 of 3 logic to the diesel generator.
- DCR - Design Change Request
e MAJOR PLANT MODIFICATIONS e
DOCKET NO.: 50-272 REPORT MONTH APRIL 1989 UNIT NAME: Salem 1 DATE: May 10, 19 89 COMPLETED BY: P. White TELEPHONE: 609/339-4455
- DCR SAFETY EVALUATION 10 CFR 50.59 lEC-02065 This design change added a pulsation dampener to the discharge of #13 positive displacement charging pump. The unit selected is _a gas charged bladder design which is currently in use at a number of other nuclear plants. There was no change to any plant process or discharge or to the environmental impact of the plant. "No unreviewed safety or environmental questions are involved.
lEC-02066 This design change added a suction stabilizer to the piping upstream of #13 positive displacement charging pump. The unit selected is a gas charged bladder design which is currently in use at a number of other nuclear plants. There was no change to any plant process or discharge or to the environmental impact of the plant. No unreviewed safety or environmental questions are involved.
lEC-02173 This design change installed AMSAC (ATWS Mitigation Actuation Circuitry). The system provides a diverse means for tripping the main steam turbine and initiating auxiliary feedwater in the event of an anticipated transient without a scram. There was no change to any plant process or discharge or to the environmental impact of the plant. No unreviewed safety or environmental questions are involved.
lEC-02271 This design change eliminated the 91% voltage vital bus transfer scheme between station power transformers and provided (3) 91% undervoltage relays wired to each vital bus providing inputs to its SEC unit for a 2 of 3 logic to the diesel generator. There was no change to any plant process or discharge or to the environmental impact of the plant. No unreviewed safety or environmental questions are involved.
- DCR - Design Change Request
SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
- UNIT NO. 1 APRIL 1989 SALEM UNIT NO. 1 The Unit was shutdown for the entire period for a refueling outage.
Major work accomplished during the period included the following:
- 1. Reassembly of nos. 12 & 14 Reactor Coolant Pump Seals;
- 2. Containment Fan Coil Unit service water piping replacement;
- 3. Eddy current examination of Steam generator tubes, and
- 4. Fuel element ultrasonic testing and full face visual inspection
- 5. Replacement of Vital Instrument Inverter Fuel element visual inspection and ultrasonic testing disclosed a total of eleven (11) assemblies requiring further examination. An evaluation of the affected assemblies cleared six (6) for re-use, five (5) were identified for replacement.
Eddy current testing showed thirty two tubes indicating greater than 30% wear and all 362 row one tubes are to be plugged. Additionally, three plugs from previously plugged tubes have been removed for analysis as a follow up to the North Anna tube plug failure.
REFUELING INFORMATION DOCKET NO.: 50-272 COMPLETED BY: P. White UNIT NAME: Salem 1 DATE: May 10, 19 89 TELEPHONE: 609/935-6000 EXTENSION: 4497 Month APRIL 1989
- 1. Refueling information has changed from last month:
YES X NO
- 2. Scheduled date for next refueling: March 28, 1989
- 3. Scheduled date for restart following refueling: May 24, 1989
- 4. A) Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMINED TO DATE X B) Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO X If no, when is it scheduled? May 1989
- 5. Scheduled date(s) for subm~tting proposed licensing action:
May if required
- 6. Important licensing considerations associated with refueling:
NONE
- 7. Number of Fuel Assemblies:
A) Inc ore 193 B) In Spent Fuel Storage 540
- 8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
- 9. Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity: September 2001 8-1-7.R4