ML18139C161: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/18/1982
| issue date = 11/18/1982
| title = Public Version of Revision 1 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure.
| title = Public Version of Revision 1 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure.
| author name = COX F M, SAUNDERS R T
| author name = Cox F, Saunders R
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.....~
    ..~ -
            ;* * *:: : .*'t e                                e SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES EPIP-1. 01 Enclosed are recently revised pages to the Surry Power Station Emergency Plan Implementing Procedures. Please take the following actions in order to keep your manual updated with the most recent revisions.
EPIP-1.01      Emergency Manager Controlling Procedure Remove and Destroy          Enter Page 1 of 8 and              Page 1 of 8 page 5 of 8 dated            and page 5 of 07-29-82                    8 dated 11-18-82 1  -8212170044 821210--~---*-
PDR ADOCK 05000280 F                          PDR
 
                                                . *,. :...*_ . ---~. . .
                                                                                                      .*.***      *  * ***** *.! *    ,, .. *. . ~ ."' ..
' ND. 9711117231 e  * . VIRGINIA' ELECTRIC AND POWER*COMPAN'.'f e
SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER                                  PROCEDURE TITLE                                                      REVISION 01 EPIP-1.01                EMERGENCY MANAGER CONTROLLING PROCEDURE                                                  PAGE (With 1 Attachment)                                            1 of 8 PURPOSE To initially assess a potential emergency condition and initiate corrective actions.
USER Shift Supervisor or Station Emergency Manager ENTRY CONDITIONS Any~ of the following:
: 1. Another station procedure directs initiation of this procedure OR
: 2. A potential        emergency                    condition        is      reported      to  the          Shift Supervisor.
REVISION RECORD REV, 00  PAGE(S): ENTIRE PROCEDURE                                                                DATE :JUH 2 9 1982 REV. 01  PAGE(S): 1 of 8 and 5 of 8                                                                DATE :NOY 1 8 13S2 REV,      PAGE(S):                                                                                  DATE:
REV,      PAGE(S)":                                                                                  DATE:.
REV.      PAGE(S):                                                                                  DATE:
REV,      PAGE(S):                                                                                  DATE:
REV.      PAGE(S):                                                                                  DATE:
APPROVAL RECOMMENDED
                                                          -*e,d~  CHAIRMAN STA noN NUCLEAR SAFETY DATE AND OPERATING COMMITTEE NOY  t      8 1982
 
No. 97867211 NUMBER
                          -                PROCEDURE TITLE e
REVISION
() l EPIP-1. 01              EMERGENCY l-lANAGER CONTROLLING PROCEDURE                          PAGE 5 of 8 STEP  1-----1      ACTION/EXPECTED RESPONSE                      RESPONSE /VDT OBTAINED 4*        (CONTINUED)
: 2) SRO-On-Call R. Johnson          /              ~t~em~! contact via beeper
                                                                          -~\
OR J. Peterson                          Attempt contact via beeper
                                        /                  *---  - -      - ~ '  /
c)  Verify classification
              ; d). IF required by Alert, Site Emergency or General Emergency, request initiation of Standing Order 21 NOTE:  Return to Step 2 of this instruction as necessary during the course of the situation for additional events and reclassification.
: 5.        VERIFY EALS EXCEEDED:
a)  Assure EALs - EXCEEDED                  a)  IF EALs NOT exceeded, DO NOT declare an emergency classification.
: 1) Continue appropriate corrective action IAW procedures.
: 2) GO TO Step 7 of this procedure.}}

Latest revision as of 23:54, 2 February 2020

Public Version of Revision 1 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure.
ML18139C161
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/18/1982
From: Cox F, Saunders R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139C159 List:
References
EPIP-1.01-01, EPIP-1.01-1, NUDOCS 8212170044
Download: ML18139C161 (3)


Text

.....~

..~ -

* *
  • : : .*'t e e SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES EPIP-1. 01 Enclosed are recently revised pages to the Surry Power Station Emergency Plan Implementing Procedures. Please take the following actions in order to keep your manual updated with the most recent revisions.

EPIP-1.01 Emergency Manager Controlling Procedure Remove and Destroy Enter Page 1 of 8 and Page 1 of 8 page 5 of 8 dated and page 5 of 07-29-82 8 dated 11-18-82 1 -8212170044 821210--~---*-

PDR ADOCK 05000280 F PDR

. *,. :...*_ . ---~. . .

.*.*** * * ***** *.! * ,, .. *. . ~ ."' ..

' ND. 9711117231 e * . VIRGINIA' ELECTRIC AND POWER*COMPAN'.'f e

SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION 01 EPIP-1.01 EMERGENCY MANAGER CONTROLLING PROCEDURE PAGE (With 1 Attachment) 1 of 8 PURPOSE To initially assess a potential emergency condition and initiate corrective actions.

USER Shift Supervisor or Station Emergency Manager ENTRY CONDITIONS Any~ of the following:

1. Another station procedure directs initiation of this procedure OR
2. A potential emergency condition is reported to the Shift Supervisor.

REVISION RECORD REV, 00 PAGE(S): ENTIRE PROCEDURE DATE :JUH 2 9 1982 REV. 01 PAGE(S): 1 of 8 and 5 of 8 DATE :NOY 1 8 13S2 REV, PAGE(S): DATE:

REV, PAGE(S)": DATE:.

REV. PAGE(S): DATE:

REV, PAGE(S): DATE:

REV. PAGE(S): DATE:

APPROVAL RECOMMENDED

-*e,d~ CHAIRMAN STA noN NUCLEAR SAFETY DATE AND OPERATING COMMITTEE NOY t 8 1982

No. 97867211 NUMBER

- PROCEDURE TITLE e

REVISION

() l EPIP-1. 01 EMERGENCY l-lANAGER CONTROLLING PROCEDURE PAGE 5 of 8 STEP 1-----1 ACTION/EXPECTED RESPONSE RESPONSE /VDT OBTAINED 4* (CONTINUED)

2) SRO-On-Call R. Johnson / ~t~em~! contact via beeper

-~\

OR J. Peterson Attempt contact via beeper

/ *--- - - - ~ ' /

c) Verify classification

d). IF required by Alert, Site Emergency or General Emergency, request initiation of Standing Order 21 NOTE
Return to Step 2 of this instruction as necessary during the course of the situation for additional events and reclassification.
5. VERIFY EALS EXCEEDED:

a) Assure EALs - EXCEEDED a) IF EALs NOT exceeded, DO NOT declare an emergency classification.

1) Continue appropriate corrective action IAW procedures.
2) GO TO Step 7 of this procedure.