| * Innsbrook Technical Center 5000 Dominion B011le1*ard Glen Allen. \'irp,inia 230(,0 June 14, 1994 Mr. John Daley U. S. Environmental Protection Agency | | * Innsbrook Technical Center 5000 Dominion B011le1*ard Glen Allen. \'irp,inia 230(,0 June 14, 1994 Mr. John Daley U. S. Environmental Protection Agency VIRGINIA POWER Region III (3 AT 33) 841 Chestnut Street Philadelphia, Pennsylvania 19107 |
| * VIRGINIA POWER Region III (3 AT 33) 841 Chestnut Street Philadelphia, Pennsylvania 19107
| |
|
| |
|
| ==Dear.Mr. Daley:== | | ==Dear.Mr. Daley:== |
Line 28: |
Line 27: |
| : 2. If the signed waste shipment record (WSR) is not returned to the station by the waste disposal site operator within 35 days, the station will determine the status of the shipment and notify Virginia Power's Air Quality Department (AQD). If the WSR is not received 45 days after shipment, the station will contact the AQD and written notification will be made to the Environmental Protection Agency (EPA). | | : 2. If the signed waste shipment record (WSR) is not returned to the station by the waste disposal site operator within 35 days, the station will determine the status of the shipment and notify Virginia Power's Air Quality Department (AQD). If the WSR is not received 45 days after shipment, the station will contact the AQD and written notification will be made to the Environmental Protection Agency (EPA). |
| : 3. If the shipment is sent to an interim processor for *volume reduction, and, following processing, the RCAW is to be transported to the ultimate disposal site in partial shipments, the interim processor will make a sufficient number of copies of the original WSR to accompany each partial shipment of RCAW to the ultimate disposal site. Each WSR copy will be given an appropriate identification number (e.g., WSR Nos. lA, lB_, lC, etc.) and must include information describing the portion that this partial shipment represents of the original shipment. If the volume of the waste has been altered, this information must be described in the copy sent with the partial shipment. If the original shipment of RCAW is combined with other shipments, the original -WSR will accompany the entire consolidated shipment. | | : 3. If the shipment is sent to an interim processor for *volume reduction, and, following processing, the RCAW is to be transported to the ultimate disposal site in partial shipments, the interim processor will make a sufficient number of copies of the original WSR to accompany each partial shipment of RCAW to the ultimate disposal site. Each WSR copy will be given an appropriate identification number (e.g., WSR Nos. lA, lB_, lC, etc.) and must include information describing the portion that this partial shipment represents of the original shipment. If the volume of the waste has been altered, this information must be described in the copy sent with the partial shipment. If the original shipment of RCAW is combined with other shipments, the original -WSR will accompany the entire consolidated shipment. |
| - ------ --"
| |
| 9406200257 940614 PDR p | | 9406200257 940614 PDR p |
| ADDCK 05000280 PDR (yo( | | ADDCK 05000280 PDR (yo( |
Line 34: |
Line 32: |
|
| |
|
| ,*/ | | ,*/ |
| .,.:...*
| |
| 1 Mr. John Daley Page No. 2 June _14, 1994 | | 1 Mr. John Daley Page No. 2 June _14, 1994 |
| '4. | | '4. |
| *
| | The original WSR will be sent with the final shipment of the processed RCAW. The WSR will indicate that the shipment is closed and also indicate the identification numbers and amounts of the partial shipments sent earlier. The disposal site operator will forward the WSR copies and signed original to the station. The station then must notify the AQD so that the EPA can be notified that the outstanding WSR has been received . . The station will retain the WSRs for at least two years. |
| * The original WSR will be sent with the final shipment of the processed RCAW. The WSR will indicate that the shipment is closed and also indicate the identification numbers and amounts of the partial shipments sent earlier. The disposal site operator will forward the WSR copies and signed original to the station. The station then must notify the AQD so that the EPA can be notified that the outstanding WSR has been received . . The station will retain the WSRs for at least two years.
| |
| : 5. Copies of the above written notifications will be sent to the Nuclear Regulatory Commission concurrent with transmission of the original notifications to the EPA. | | : 5. Copies of the above written notifications will be sent to the Nuclear Regulatory Commission concurrent with transmission of the original notifications to the EPA. |
| After the complete . explanation and discussion of the proposed | | After the complete . explanation and discussion of the proposed |
Line 48: |
Line 44: |
| * Washington, D. C. 20555 Re: North Anna Power Station Units 1 and 2 Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 Surry Power Station Units 1 and 2 Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 | | * Washington, D. C. 20555 Re: North Anna Power Station Units 1 and 2 Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 Surry Power Station Units 1 and 2 Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 |
| * Verification of .curacy 1. | | * Verification of .curacy 1. |
| * Regulatory requirements set forth in 40 CFR Part 61, (National Emission Standards for Hazardous Air Pollutants (NESHAP) Subpart M-National Emission Standard for Asbestos.
| | Regulatory requirements set forth in 40 CFR Part 61, (National Emission Standards for Hazardous Air Pollutants (NESHAP) Subpart M-National Emission Standard for Asbestos. |
| : 2. October 14, 1993 Memorandum from T. J. Szymanski to W. A. | | : 2. October 14, 1993 Memorandum from T. J. Szymanski to W. A. |
| Thornton concerning Shipping Asbestos: Update. | | Thornton concerning Shipping Asbestos: Update. |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML20206M7921999-05-0707 May 1999 Advises That Vepc Is Proposing to Use Three Chemicals in Bearing Cooling Tower at Naps,That Were Not Addressed in Licensee Last Application for Reissuance of Vpdes Permit ML18152B5991999-01-0808 January 1999 Confirms That Util Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste (Rcaw),Acceptable for Maintaining Compliance with Natl Emissions Stds for Hazardous Air Pollutants (Neshap) Regulations ML20196H6431998-12-0303 December 1998 Informs That Util Is Seeking Approval to Discharge Chlorinated Blowdown from Bearing Cooling Tower for More than 2 H Per Unit as Specified in Special Condition 10 of Vpdes Permit.Meeting During Wk of 981214,requested ML20153G0131998-09-22022 September 1998 Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 VAC25-91-130,Pollution Prevention Requirements) for North Anna Nuclear Power Station ML18153A2671998-09-22022 September 1998 Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 Vac 25-91-130,Pollution Prevention Requirements) for Surry Nuclear Power Station ML18152B8171998-05-18018 May 1998 Discusses Results of Data Contained in Discharge Monitoring rept-QA (Dmr/Qa) Dtd 980114 ML20217Q7691998-05-0404 May 1998 Forwards Revised Application for Exclusionary General Permit for NAPS as Requested by D Vaughan in ML18153A2161998-01-23023 January 1998 Notifies That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 35 Days Since Waste Was Shipped off- Site & Will Not Receive in 45 Days ML20198P8791998-01-12012 January 1998 Submits Application for Exclusionary General Permit for Plant ML20203H6111997-12-15015 December 1997 Forwards Application for General Storm Water Permit for Construction Activity at Naps.Local Government Ordinance Form,Pink Copy of Permit Application Fee Form & Copy of Check for Application,Encl ML20198P2871997-10-29029 October 1997 Requests That Vpdes Permit Be Amended to Reflect That Three Small Package Sewage Treatment Plants Were Permanently Removed from Svc ML20210G9721997-07-22022 July 1997 Submits Proposal to Pressure Test Piping within 10 Days Prior to Normal Fuel Oil Unloading Into Ast,Beginning No Later than 980101 ML20138B3381997-04-23023 April 1997 Provides Info to Support Proposal to Perform Annual Pressure Testing as Method of Leak Detection for Underground Line That Runs from Loading Area 5,000 Barrel Aboveground Storage Tank ML18153A1171997-03-19019 March 1997 Discusses Discharge Monitoring report-quality Assurance (DMR-QA) Results for VA Power Facilities ML18153A1111997-02-14014 February 1997 Confirms 970214 Telcon Re Location of Radiologically Contaminated Asbestos Waste Shipment S-96-1005 ML20149M8131996-12-0505 December 1996 Submits Conditions Which Are Part of 961202 Approval of Temporary Conditional Use Permit Which Allows Construction of Temporary ISFSI or Dry Cask Storage as Listed ML20101R2521996-04-10010 April 1996 Responds to Unacceptable Results Noted in Discharge Monitoring rept-QA Rept for North Anna Power Station (Permit VA0052451) & Yorktown Power Station (Permit VA0004103) ML20101J0511996-03-21021 March 1996 Provides Notice of Intent to Increase Amount of Reverse Osmosis Reject Water Discharged at Outfall 020 ML18151A1871996-03-20020 March 1996 Forwards Application for Reissuance of Vpdes Permit VA0004090 for Plant.W/One Oversize Map ML18153A5301996-03-18018 March 1996 Confirms That Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste Acceptable for Maintaining Compliance W/Natl Emissions Stds for Hazardous Air Pollutants Regulations ML20100B9061996-01-24024 January 1996 Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp by Ferc,Per 18CFR12.44(b)(2).Main Dam'S Five Spillway Gates Satisfactorily Tested as Specified on Attached Form ML18153A5561995-12-11011 December 1995 Requests Approval for Proposed Minor Change in Nature of Internal Discharge at Plant ML18153A6821995-11-29029 November 1995 Responds to 951114 Lab & Technical Insps at Plant on 950928. Submits Actions Taken to Address Items Noted During Insp & Reflected in Lab Rept ML18153A6721995-11-22022 November 1995 Requests That Vmrc Permit 92-1347 Be Extended to Allow Continued Maint Dredging Activity in Future ML18153A7801995-10-10010 October 1995 Responds to Concerns Re Leak Detection Sys in Facilities in Jurisdiction ML18153A7461995-08-30030 August 1995 Notifies of Minor Change in Discharge or Mgt of Pollutants at Surry Power Station ML20087L3411995-08-21021 August 1995 Notifies of Minor Change in Discharge or Mgt of Pollutants at Plant ML18153A7311995-08-0909 August 1995 Forwards Mixing & Dilution of Surry Nuclear Power Plant Cooling Water Discharge Into James River. ML18152A4011995-05-11011 May 1995 Responds to Telcons W/Eh Greene of VA Power'S Air Quality E Dept Re Use of Methylene Chloride in Paint Shop of Surry Power Station.Requests Confirmation That Painting Operation Exempt from Toxics Regulations ML20083K7181995-05-0404 May 1995 Forwards Application for Reissuance of Vpdes Permit for North Anna Power Station W/Addl Data Requested by ML18153A8081995-04-28028 April 1995 Provides Comments on EPA Pr Re Criteria for Certification & Determination of Waste Isolation Pilot Plant Compliance W/ Environ Standards for Mgt & Disposal of SF,high-level & Transuranic Radwastes.Guidance Re Categorization Needed ML18153A7921995-04-12012 April 1995 Submits Comments Re Proposed Revs to Guidance Provided to Federal Agencies on Radiation Protection ML20080J9181995-02-22022 February 1995 Submits Annual Statement Verifying That Each Spillway Gate Has Been Operated at Least Once During Twelve Months Preceeding Annual Insp by FERC Regional Engineer ML20080K8561995-02-22022 February 1995 Submits Notification for Spillway EDG Corrective Maint & Start Failure for Plant Hydroelectric Project ML18153B2351995-02-17017 February 1995 Informs of Receipt of NOV in Ref to Dec 1994 Excursion of Total Suspended Solids Limitations of Vpdes Permit for Plant ML20078M1481995-02-0808 February 1995 Discusses Series of Problems at Sewage Treatment Plant Re Exceedance in Bod ML18153B2161995-02-0101 February 1995 Advises That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 45 Days Since Waste Shipped off-site ML20078H0711995-01-30030 January 1995 Discusses Conditions Affecting Safety of Project That Documents Problem Encounter W/Spillway EDG at Plant Main Dam & Informs on 950103 Spillway EDG Failed to auto-start During Performance of Monthly Periodic Test ML20078E1251995-01-25025 January 1995 Submits Notification Re Stationary Source Permit to Construct & Operate an EDG ML18153B2181995-01-23023 January 1995 Informs That Scientific Ecology Group,Inc Received Shipment S-94-14 Which Consists of 3 B-25 Boxes of Asbestos ML18153B2021995-01-0303 January 1995 Submits Follow Up to Telephone Notification Re Excursion of Total Suspended Solids Limitations at Plant Outfall 181 ML20080C1381994-11-30030 November 1994 Responds to Issues Identified in Repts for Technical & Lab Insps on 941018 & 20.Corrective Actions:Corrected DMR Forms Completed & Submitted to Dept of Environ Quality & TSS Worksheet Form Revised ML20077C2481994-11-22022 November 1994 Discusses Licensee Request for Relief from Ph Limitations in Plant Current Vpdes Permit at Outfalls 003 & 004 ML20078G8421994-11-0909 November 1994 Submits Response to Violations Noted in Insp Repts 50-338/94-10 & 50-339/94-10.Corrective Actions:Upset Conditions Corrected & Facility Performance Inproved ML18153B0611994-08-30030 August 1994 Requests 60-day Extension for Submittal of Initial Abatement Rept & SCR ML20071L6281994-07-28028 July 1994 Ack Receipt of Detailed Response to NPDES Insp Rept 1999-08-17
[Table view] |
Text
--- ------
Dear.Mr. Daley:
This letter is being submitted in order to confirm the agreements reached during your April 19, 1994 telephone conversation with Mr.
Robert B. Asplund, Mr. Earnest H. Greene, Mr. F. Lee Thomasson, Jr.
and Mr. Thomas J. Szymanski of Virginia Power. During that conversation, Mr. Asplund explained Virginia Power's proposed procedure for tracking low-level radiologically contaminated asbestos waste (RCAW) once it is shipped to an interim processor for volume reduction, prior to being transported to the ultimate disposal site. The proposed tracking procedure was explained as follows:
- 1. The Radiological Material Control Departments at the Surry and North Anna Power Stations will begin tracking the RCAW when it leaves the station.
- 2. If the signed waste shipment record (WSR) is not returned to the station by the waste disposal site operator within 35 days, the station will determine the status of the shipment and notify Virginia Power's Air Quality Department (AQD). If the WSR is not received 45 days after shipment, the station will contact the AQD and written notification will be made to the Environmental Protection Agency (EPA).
- 3. If the shipment is sent to an interim processor for *volume reduction, and, following processing, the RCAW is to be transported to the ultimate disposal site in partial shipments, the interim processor will make a sufficient number of copies of the original WSR to accompany each partial shipment of RCAW to the ultimate disposal site. Each WSR copy will be given an appropriate identification number (e.g., WSR Nos. lA, lB_, lC, etc.) and must include information describing the portion that this partial shipment represents of the original shipment. If the volume of the waste has been altered, this information must be described in the copy sent with the partial shipment. If the original shipment of RCAW is combined with other shipments, the original -WSR will accompany the entire consolidated shipment.
9406200257 940614 PDR p
ADDCK 05000280 PDR (yo(
I( \
,*/
1 Mr. John Daley Page No. 2 June _14, 1994
'4.
The original WSR will be sent with the final shipment of the processed RCAW. The WSR will indicate that the shipment is closed and also indicate the identification numbers and amounts of the partial shipments sent earlier. The disposal site operator will forward the WSR copies and signed original to the station. The station then must notify the AQD so that the EPA can be notified that the outstanding WSR has been received . . The station will retain the WSRs for at least two years.
- 5. Copies of the above written notifications will be sent to the Nuclear Regulatory Commission concurrent with transmission of the original notifications to the EPA.
After the complete . explanation and discussion of the proposed
. ti-acking p2-ocedure, y-ou granted 'lirginia ;>cv,er ,rerbal apprc"tral to begin utilizing the new procedure.
- Also during this conversation Mr. Asplund discussed the possibility that Virginia Power may not receive all of the waste shipment records within 45 days, due to the unique processing procedure.
Mr. Asplund explained the steps that would be taken to correct such a situation. The steps include written notification to the EPA to explain the. reason for the delay. It is our understanding that if the WSR is not returned within 45 days*, EPA will not initiate any enforcement action provided Virginia Power notifies the agency as soon as possible thereafter.
If the information stated in this letter agrees with the procedure we discussed during the April 19, 1994 telephone conversation, please confirm your approval in writing. If you have any further questions .or concerns regarding this procedure please do . not hesitate to contict me.
- Very truly yours, A. W. Hadder Manager Air Quality cc: u. S. Nuclear Regulatory Commission Attn: Document Control-Desk
- Washington, D. C. 20555 Re: North Anna Power Station Units 1 and 2 Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 Surry Power Station Units 1 and 2 Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37
- Verification of .curacy 1.
Regulatory requirements set forth in 40 CFR Part 61, (National Emission Standards for Hazardous Air Pollutants (NESHAP) Subpart M-National Emission Standard for Asbestos.
- 2. October 14, 1993 Memorandum from T. J. Szymanski to W. A.
Thornton concerning Shipping Asbestos: Update.
- 3. January 5, 1994 Memorandum from W. A. Thornton, to A. W.
Hadder requesting assistance in resolving the issue of shipping radiologically contaminated asbestos.
- 4. January 26, 1994 Memorandum from R. B. Asplund, to W. A.
Thornton, explaining discussions with the Utility Air Regulatory Group and also with the Region III Office of EPA, regarding tracking waste shipment records for radiologically contaminated asbestos waste.
- 5. March 17, 1994 Memorandum from R. B. Asplund to W. A. Thornton explaining an agreed upon procedure for tracking asbestos waste shipment records.
- 6. April 19, 1994 conference call involving R. B. Asplund, E. H.
Greene, F. L. Thomasson and T. J. Szymanski to Mr. John Daley of the EPA to discuss Virginia Power's proposed procedure for tracking radiologically contaminated asbestos waste.
- 7. Health Physics Procedure HP-1070.040, "Radioactive Waste Disposal Using the Barnwell Disposal Facility", North Anna and Surry Power Stations.
- 8. Health Physics Procedure HP-1072.050, "Radioactive Waste Transfer to Licensed Waste Processors", North Anna and Surry Power Stations.
Commitments/Action Plan
- 1. The AQD will issue a written notification to EPA, with a copy to the NRC, informing them that the WSR has not been received and why.
- 2. The AQD must notify EPA, with a copy to the NRC, that the outstanding WSR has been recei~ed by the station.
Changes to the UFSAR or QA Topical Report None