ML19210C396: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ENVIROTECH BUELL Emission Control Division 200 North Seventh Street
{{#Wiki_filter:ENVIROTECH       BUELL Emission Control Division 200 North Seventh Street
,/Lebanon. Pennsylvania 17o42 E , Teleonone 717/272-2001 g g Telex 842 332
/                           Lebanon. Pennsylvania 17o42 g            E Teleonone 717/272-2001 g
*S0-417 to 44 9>I I B q N g 10 q October 12, 1979
Telex 842 332 S0-417 44to          9 B I       I qq N     g       10 October 12, 1979
*fj A>\Secretary of the Comission United States Nuclear Regulatory Comission Washington, DC 20555 Attn: Docketing and Service Section Gentlemen:
* fj A>
/Re: Docket No. 50-289 In the Matter of Metr.opolitan Edison Company Three Mile Island Nuclear Station, Unit #1 As a citi:en of tne area served by Metropolitan Edison Company and one who resides within 20 miles of the Three Mile Island Nuclear Station, I would like to go on record concerning the reopening-and operation of Unit il of the Three Mile Island Nuclear Station (TMI-1).
                                                                                      \
Frcm all the data available to me, it would appear to be unwarranted to continue the order to Metropolitan Edison Company to maintain TMI-1 in a cold shutdown condition.
Secretary of the Comission United States Nuclear Regulatory Comission Washington, DC     20555 Attn:   Docketing and Service Section Gentlemen:
It does not appear to represent a hazard to the public to initiate operation of TMI-1.
                      /
It further there,is economic advantage to the area and to the citize\ appears that ns of the area to have TMI-1 in full operation.
Re:   Docket No. 50-289 In the Matter of Metr.opolitan Edison Company Three Mile Island Nuclear Station, Unit #1 As a citi:en of tne area served by Metropolitan Edison Company and one who resides within 20 miles of the Three Mile Island Nuclear Station, I would like to go on record concerning the reopening-and operation of Unit il of the Three Mile Island Nuclear Station (TMI-1).
Any cost / benefit analysis would have
Frcm all the data available to me, it would appear to be unwarranted to continue the order to Metropolitan Edison Company to maintain TMI-1 in a cold shutdown condition. It does not appear to represent a hazard to the public to initiate operation of TMI-1.             It further there,is economic advantage to the area and to the citize\ ns        appears of the that area to have TMI-1 in full operation.           Any cost / benefit analysis would have
:o conclude tnat the best interests of the residents of the area are served by imediately placing TMI-1 into operation.
:o conclude tnat the best interests of the residents of the area are served by imediately placing TMI-1 into operation.
: would urge the Ccmission to rescind their order and allow TMI-1 to start up and reach full power operation.
: would urge the Ccmission to rescind their order and allow TMI-1 to start up and reach full power operation.
Sincerely, EUELL EMISSION CCNTROL DIVISION ENVIR0 TECH CORPOPATION
Sincerely, EUELL EMISSION CCNTROL DIVISION ENVIR0 TECH CORPOPATION
'NhQ Aivakd e by e-e, M3 i William S. Henderson President shb l lb4'7911140}}
        'NhQ                                         Aivakd ie by e-e, M3 William S. Henderson President shb lb4 l
7911140}}

Latest revision as of 04:34, 2 February 2020

Submits Written Limited Appearance Statement of Environtech Corp in Support of Reopening of Facility.Resumption of Operation Will Be Economically Advantageous for Residents of Area
ML19210C396
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 10/12/1979
From: Henderson W
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML19210C381 List:
References
NUDOCS 7911140174
Download: ML19210C396 (1)


Text

ENVIROTECH BUELL Emission Control Division 200 North Seventh Street

/ Lebanon. Pennsylvania 17o42 g E Teleonone 717/272-2001 g

Telex 842 332 S0-417 44to 9 B I I qq N g 10 October 12, 1979

  • fj A>

\

Secretary of the Comission United States Nuclear Regulatory Comission Washington, DC 20555 Attn: Docketing and Service Section Gentlemen:

/

Re: Docket No. 50-289 In the Matter of Metr.opolitan Edison Company Three Mile Island Nuclear Station, Unit #1 As a citi:en of tne area served by Metropolitan Edison Company and one who resides within 20 miles of the Three Mile Island Nuclear Station, I would like to go on record concerning the reopening-and operation of Unit il of the Three Mile Island Nuclear Station (TMI-1).

Frcm all the data available to me, it would appear to be unwarranted to continue the order to Metropolitan Edison Company to maintain TMI-1 in a cold shutdown condition. It does not appear to represent a hazard to the public to initiate operation of TMI-1. It further there,is economic advantage to the area and to the citize\ ns appears of the that area to have TMI-1 in full operation. Any cost / benefit analysis would have

o conclude tnat the best interests of the residents of the area are served by imediately placing TMI-1 into operation.
would urge the Ccmission to rescind their order and allow TMI-1 to start up and reach full power operation.

Sincerely, EUELL EMISSION CCNTROL DIVISION ENVIR0 TECH CORPOPATION

'NhQ Aivakd ie by e-e, M3 William S. Henderson President shb lb4 l

7911140