ML19317E453: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
{{#Wiki_filter:-
{{#Wiki_filter:-
N
N
                        *
                                                                               -UNI'A Oconso Unit 3 DATE 9/9/76 50-287 Q                                                                DOCKET NO.
      **
  -
                                                                               -UNI'A Oconso Unit 3
    .
* DATE 9/9/76 50-287 Q                                                                DOCKET NO.
PREPARED BY      L. J. Bare OPERATING STATUS                                                                                        ,
PREPARED BY      L. J. Bare OPERATING STATUS                                                                                        ,
: 1. REPORTING PERIOD:      August 1            THROUGH        August 31, 1976 GROSS HOURS IN REPORTING PERIOD:                744.00
: 1. REPORTING PERIOD:      August 1            THROUGH        August 31, 1976 GROSS HOURS IN REPORTING PERIOD:                744.00
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (HWe-Net):              871
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (HWe-Net):              871
                                                                                        -
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
: 4. REASONS FOR RESTRICTION (IF ANY)
: 4. REASONS FOR RESTRICTION (IF ANY)
This Month        Year to Date        Cumulative        f
This Month        Year to Date        Cumulative        f
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                      744.0            4559.7              11704.0
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                      744.0            4559.7              11704.0 6.
                                                                                -                  -
6.
                                                              -
REACTOR RESERVE SHUTDOWN HOURS
REACTOR RESERVE SHUTDOWN HOURS
: 7. HOURS GENERATOR ON-LINE                      744.0            4503.3              11452.0
: 7. HOURS GENERATOR ON-LINE                      744.0            4503.3              11452.0
: 8.                                                                -
: 8.                                                                -
                                                            -                                      -
UNIT RESERVE SHUTDOWN HOURS
UNIT RESERVE SHUTDOWN HOURS
: 9. GROSS THERMAL ENERGY GENERATED (MWH) 1860376                    10849608            26767658
: 9. GROSS THERMAL ENERGY GENERATED (MWH) 1860376                    10849608            26767658
Line 60: Line 50:
!                                                        PERIOD UNIT FORCD OUTACE RATE - FORCED OUTAGE HOURS
!                                                        PERIOD UNIT FORCD OUTACE RATE - FORCED OUTAGE HOURS
                                                                                               }$Q X 100 HOLHS GENERATOR ON !.INE + FORCED CUTAGE HOURS
                                                                                               }$Q X 100 HOLHS GENERATOR ON !.INE + FORCED CUTAGE HOURS
                ,-


                                                                                                                        . - -
                -    -
                                                                                        .
                              -
            .
    ..    .
              *          *
      ..
DOCKET NO. 50-287 UNIT Oc nee Unit _3 DATE 9/9/76        _
DOCKET NO. 50-287 UNIT Oc nee Unit _3 DATE 9/9/76        _
AVERAGE DAILY UNIT POWER LEVEL MONTH      August, 1976 AVERAGE DAILY POWER LEVEL                          AVERAGE DAILY POWER LEVEL DAY                  (MWe-net)                    DAY                  (MWe-net)          .
AVERAGE DAILY UNIT POWER LEVEL MONTH      August, 1976 AVERAGE DAILY POWER LEVEL                          AVERAGE DAILY POWER LEVEL DAY                  (MWe-net)                    DAY                  (MWe-net)          .
Line 85: Line 66:


f                                                                                                                                                  .
f                                                                                                                                                  .
                                                                                                                                                                      .
                                                                                                                                                                      -
                                                                                                                                                                        .,
50-287                .
50-287                .
D CKET NO.
D CKET NO.
UNIT SHUTDOWNS                                  UNIT N AMti Oconee Unit 3          -
UNIT SHUTDOWNS                                  UNIT N AMti Oconee Unit 3          -
DATli  9/9/76 REPORT MONTil        August, 1976
DATli  9/9/76 REPORT MONTil        August, 1976 4
                                                                                                                                                                            <
TYPE                                  fAETHOD OF F FORCED  DURATION                    SHUTTING DOWN NO. DATE  S SCHEDULED (HOURS)  . REASON (1)      THE REACTOR (2)            CORRECTIVE ACTIONS / COMMENTS
4 TYPE                                  fAETHOD OF F FORCED  DURATION                    SHUTTING DOWN NO. DATE  S SCHEDULED (HOURS)  . REASON (1)      THE REACTOR (2)            CORRECTIVE ACTIONS / COMMENTS
                                                                                                                                                                               }
                                                                                                                                                                               }
(1) REASON                          (2) METilOD A -EQUIPMENT F AILURE (EXPLAIN)      1-MANUAL B - MAINT. OR TEST.                2-MANUAL C- RLI'ULLING                          SCR AM D-REGULATORY RFSTRICTION            3- AUTOM ATIC E-OPERATOR TRAINING AND                SCRAM              i LICENSE EXAMINATION F- ADMINIST R AllVE G-OPLRAllON AL ERROR ILXPLAIN) 11 - OlllL R (E hPLAIN)
(1) REASON                          (2) METilOD A -EQUIPMENT F AILURE (EXPLAIN)      1-MANUAL B - MAINT. OR TEST.                2-MANUAL C- RLI'ULLING                          SCR AM D-REGULATORY RFSTRICTION            3- AUTOM ATIC E-OPERATOR TRAINING AND                SCRAM              i LICENSE EXAMINATION F- ADMINIST R AllVE G-OPLRAllON AL ERROR ILXPLAIN) 11 - OlllL R (E hPLAIN)
                                                                                                                                .
SL MMARY:
SL MMARY:
No outages this month.
No outages this month.
                                                                                                                                                    .
__.__ ______.___________ _ _____ __ _}}
__.__ ______.___________ _ _____ __ _}}

Latest revision as of 07:16, 1 February 2020

Monthly Operating Rept for Aug 1976
ML19317E453
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/09/1976
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E449 List:
References
NUDOCS 7912180708
Download: ML19317E453 (3)


Text

-

N

-UNI'A Oconso Unit 3 DATE 9/9/76 50-287 Q DOCKET NO.

PREPARED BY L. J. Bare OPERATING STATUS ,

1. REPORTING PERIOD: August 1 THROUGH August 31, 1976 GROSS HOURS IN REPORTING PERIOD: 744.00
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (HWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative f

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 4559.7 11704.0 6.

REACTOR RESERVE SHUTDOWN HOURS

7. HOURS GENERATOR ON-LINE 744.0 4503.3 11452.0
8. -

UNIT RESERVE SHUTDOWN HOURS

9. GROSS THERMAL ENERGY GENERATED (MWH) 1860376 10849608 26767658
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 638280 3738430 9183344
11. NET ELECTRICAL ENERGY GENERATED (MWH) 610094 3566632 8745066
12. REACTOR SERVICE FACTOR 100.0 77.9 78.0
13. REACTOR AVAILABILITY FACTOR 100.0 77.1 79.6
14. UNIT SERVICE FACTOR 100.0 76.9 76.4
15. UNIT AVAILABILITY FACTOR 100.0 76.9 76.4
16. UNIT CAPACITY FACTOR (Using Net 94.2 69.9 66.9 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 92.5 68.7 65.7*
18. UNIT FORCED OUTAGE RATE O 20.6 15.2
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

September 18 - Refueling - 46 days

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100

!!OURS IN REPORTING PERIOD REACTOR AVAIL \BILIW FACTOR = HOIIPS REACTOR k'AS AVAIL \Gl.E TO OPERATE X 100 110URS IN REl'ORTING PERIOD UNIT SERVICE TACTOR = hcl *PS CD;ERATOR ON I.T NE X 00 HOURS IN REPORTING PERIOD UNIT AVAIL \BILITY FACTOR = 1100RS tfNIT WAS AVAT1 ALLE TO CENERATE X 100 HOURS IN REPORTING t'ER10D

! UNIT CAPACITY FACTCR = NET ELECTRICAL PCbER CT.NT.RATFD _y S 15 FPt hnL.

(N.it C.ipatrility or Desig gt - c t ).1 X 1B

! PERIOD UNIT FORCD OUTACE RATE - FORCED OUTAGE HOURS

}$Q X 100 HOLHS GENERATOR ON !.INE + FORCED CUTAGE HOURS

DOCKET NO. 50-287 UNIT Oc nee Unit _3 DATE 9/9/76 _

AVERAGE DAILY UNIT POWER LEVEL MONTH August, 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

632 726 1

17 748 18 547 2

837 19 773 3

840 20 840 4

849 5 851 21 22 853 6 857 857 23 853 7

853 8 746 24 852 9 857 25

'857 26 852 10 853 27 851 11 850 28 849 12 848 29 843 13 844 30 851 14 849 31 854 15 16 847 DAILY UNrr POWER LEVEL FORM INSTRUCrlONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be .>ceasions when the daily average power level exceeds the 1007o line (or the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

l I

[i .

f .

50-287 .

D CKET NO.

UNIT SHUTDOWNS UNIT N AMti Oconee Unit 3 -

DATli 9/9/76 REPORT MONTil August, 1976 4

TYPE fAETHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) . REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS

}

(1) REASON (2) METilOD A -EQUIPMENT F AILURE (EXPLAIN) 1-MANUAL B - MAINT. OR TEST. 2-MANUAL C- RLI'ULLING SCR AM D-REGULATORY RFSTRICTION 3- AUTOM ATIC E-OPERATOR TRAINING AND SCRAM i LICENSE EXAMINATION F- ADMINIST R AllVE G-OPLRAllON AL ERROR ILXPLAIN) 11 - OlllL R (E hPLAIN)

SL MMARY:

No outages this month.

__.__ ______.___________ _ _____ __ _