ML19350C772: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 25: Line 25:
letter of February 23, 1981, concerning future surveillance of fuel assembly holddown springs.                                                                      ;
letter of February 23, 1981, concerning future surveillance of fuel assembly holddown springs.                                                                      ;
During the next Crystal River Unit 3 refueling outage (currently sched-uled to begin September 19, 1981), a visual examination will be per-fonned .for all fuel assemblies which have completed a full cycle of in-reacto r service and have not been inspected for potential spring fa il ures. This examination will be perfonned using remote video equipm-ent. Control components will be removed from fuel assemblies prior to examination to avoid obstructing the vicu. Any spring failures found at that time will be reported to flRC.
During the next Crystal River Unit 3 refueling outage (currently sched-uled to begin September 19, 1981), a visual examination will be per-fonned .for all fuel assemblies which have completed a full cycle of in-reacto r service and have not been inspected for potential spring fa il ures. This examination will be perfonned using remote video equipm-ent. Control components will be removed from fuel assemblies prior to examination to avoid obstructing the vicu. Any spring failures found at that time will be reported to flRC.
Si ncerely, FLORIDA POWER CORPORATION
Si ncerely, FLORIDA POWER CORPORATION xx Pat y Y. Baynard                                                          "
* xx Pat y Y. Baynard                                                          "
e Manager                                                                . /f            .
e Manager                                                                . /f            .
Nuclear Support' Services L    AP
Nuclear Support' Services L    AP
                                                                                               /p        [
                                                                                               /p        [
6%
6%
                                                                              -
Rg Bi gg/ L',
Rg Bi gg/ L',
                                                                                         .              u.
                                                                                         .              u.
O'Shea(F-01)D-3                                                                          l WQ&
O'Shea(F-01)D-3                                                                          l WQ&
L f          General Office 320i Tn.rty-fourm street soum. P O Box 14042, St Petersburg, Fkot a 11731 8 n 866 5151 0,3 0'6 CfTO}}
L f          General Office 320i Tn.rty-fourm street soum. P O Box 14042, St Petersburg, Fkot a 11731 8 n 866 5151 0,3 0'6 CfTO}}

Latest revision as of 23:49, 30 January 2020

Provides Response to 810223 Ltr Re Future Surveillance of Fuel Assembly Holddown Springs.Visual Exam Will Be Performed for All Assemblies During Next Refueling Outage
ML19350C772
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/30/1981
From: Baynard P
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
3-031-27, 3-31-27, TAC-42266, TAC-46962, NUDOCS 8104060680
Download: ML19350C772 (1)


Text

Florida  !

Power C Q R PO R 41 sO 's March 30, 1981

  1. 3-031-27 File: 3.0.3.a.3 Mr. John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing U.S. fluclear Regulatory Commission Washington, D.C. 20555 Subj ect: Crystal River Unit 3 f Docket No. 50-302 Operating License No. OPR-72 Fuel Assembly Holddown Springs i

Dear Mr. Stolz:

Florida Power Corporation hereby provides the following response to your ,

letter of February 23, 1981, concerning future surveillance of fuel assembly holddown springs.  ;

During the next Crystal River Unit 3 refueling outage (currently sched-uled to begin September 19, 1981), a visual examination will be per-fonned .for all fuel assemblies which have completed a full cycle of in-reacto r service and have not been inspected for potential spring fa il ures. This examination will be perfonned using remote video equipm-ent. Control components will be removed from fuel assemblies prior to examination to avoid obstructing the vicu. Any spring failures found at that time will be reported to flRC.

Si ncerely, FLORIDA POWER CORPORATION xx Pat y Y. Baynard "

e Manager . /f .

Nuclear Support' Services L AP

/p [

6%

Rg Bi gg/ L',

. u.

O'Shea(F-01)D-3 l WQ&

L f General Office 320i Tn.rty-fourm street soum. P O Box 14042, St Petersburg, Fkot a 11731 8 n 866 5151 0,3 0'6 CfTO