ML11318A191: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML11318A191 | | number = ML11318A191 | ||
| issue date = 11/01/2011 | | issue date = 11/01/2011 | ||
| title = | | title = OL - NRC PM Open Items List 11-02-11.docx | ||
| author name = | | author name = | ||
| author affiliation = - No Known Affiliation | | author affiliation = - No Known Affiliation | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov] | ||
Sent: Tuesday, November 01, 2011 9:29 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, | Sent: Tuesday, November 01, 2011 9:29 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D | ||
==Subject:== | ==Subject:== | ||
NRC PM Open Items List 11-02-11.docx Attachments: | NRC PM Open Items List 11-02-11.docx Attachments: NRC PM Open Items List 11-02-11.docx For next phone call. | ||
NRC PM Open Items List 11-02-11.docx For next phone call. | Thank You, | ||
~*~*~*~*~*~*~*~*~*~*~*~ | |||
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1 | |||
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 575 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF24C68FA1) | |||
==Subject:== | ==Subject:== | ||
NRC PM Open Items List 11-02-11.docx | NRC PM Open Items List 11-02-11.docx Sent Date: 11/1/2011 9:28:42 AM Received Date: 11/1/2011 9:28:45 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients: | ||
Tracking Status: None | "Arent, Gordon" <garent@tva.gov> | ||
Tracking Status: None | Tracking Status: None "Smith, James D" <jdsmith@tva.gov> | ||
Tracking Status: None | Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> | ||
Tracking Status: None | Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> | ||
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov> | |||
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> | |||
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> | |||
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> | |||
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> | |||
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> | |||
Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 234 11/1/2011 9:28:45 AM NRC PM Open Items List 11-02-11.docx 33871 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received: | |||
Page 1 of 4 NRC PM Open Items List 11/2/11 (423) 751-7777 ID 4233658764# | |||
No. Description Status Additional Comments Resp Org/Person | |||
: 1. Cyber Security Plan/Controls and NRC Table NRC Inspection in 2011 Heinrich/Snyder Implementation Top/Pilot (Bryan) | |||
Jan. 2012 Inspection 4th Qtr 2012 | |||
Page 2 of 4 No. Description Status Additional Comments Resp Org/Person | |||
: 2. Instrumentation RAI List (Knuettel) 1. 9/29/11A 1. Draft response received and comments sent to GA. Eng/Hilmes | |||
: 1. GA/ESI is preparing a report to 2. Various - 2. 04038903-1SP: 10/11/11 A (Smith) document the conformance of their see status 04038903-2SP: 11/14/11 CGD program to NRC requirements 3. 9/26/11A 04038903-4SP: 11/14/11 based on NRC telecom on 8/30/11. 4. 10/4/11 04038903-QSR: 09/30/11 A Draft scheduled for 9/9 is now TBD. 5. 11/18/11 Non-props and affidavits due 11/18/11 | |||
: 2. Updates based on schedule received 6. Various - 3. OP-7.3-240: Complete from GA on 09/07/11 following see status 4. Create new bridge document 04038800-1SP: | |||
conference call on document 7. 10/24/11A 10/11/11A schedule. 8. 10/27/11 5. Provide NRC non-prop and affidavit for all | |||
: 3. Revise GA-ESI procedure for CGI 9. 10/27/11A remaining documents dedication to address NRC 10. 11/14/11 6. WEC to provide the following documents: | |||
comments. WCAP for 0000-ICE-30156 11/9/11 | |||
: 4. Draft received for review 9/20/11. CN-EQT-10-44: 11/9/11 | |||
: 5. Non-props & affidavits DAR-ME-09-10: 10/11/11 A | |||
: 6. WEC to provide demarcated EQ-EV-62-WBT: 11/16/11 proprietary, non-proprietary and EQLR-171: 11/16/11 affidavits for withholding for each EQ-QR-33-WBT: 11/9/11 item. EQ-QR-64-GEN: 11/16/11 | |||
: 7. WEC to revise figure to remove WNA-SD-00250-WBT: 11/2/11 connection from OM to printer to WNA-SD-00248-WBT: 11/2/11 complete commitment. WNA-TP-02988-WBT: 10/26/11 | |||
: 8. WEC to agreed to produce a test WNA-VR-00279-WBT: Complete report for the incore IITA. WNA-PT-00138-WBT: Complete | |||
: 9. WEC has the necessary 7. WNA-AR-00189-WBT:10/24/11A documentation. WEC to produce a 8. IITA In-core EQ report non-proprietary summary report and 9. MI cable 600V test report Produce non-prop place the test reports in the WEC summary document A Rockville office for NRC audit. 10. Next I&C submittal update | |||
: 10. Submit I&C update letter | |||
: 3. Exemption to 10CFR50.49 for some 11/14/11 Determine if exemption required. NRC may need Hilmes Category II cables? to establish a license condition. (Stockton) | |||
Inspection | Page 3 of 4 No. Description Status Additional Comments Resp Org/Person | ||
: 4. Complete Implementation (Hemmer) Pump Substantial building to complete and equipment in Hemmer Relocation May. (Smith) 5/30/12 Provide document of mitigating equipment and location for unit 2. | |||
Bldg Plan 10/31/11 Inspection - | |||
June 2012 Table update - | |||
TBD | |||
: 5. Fire Protection Report Questions 1. 10/25-27/11 1. Audit ENG/Hilmes regarding OMA 2.9/30/11A 2. Group 7 RAI response (Arent) 3.9/30/11A 3. Receive Group 8 RAIs - if needed | |||
: 4. 10/31/11A 4. Response to Group 8 plus 2Qs on 9/30/11 letter | |||
: 5. 11/30/11 5. Submit As-designed U1/U2 FPR | |||
: 6. 9/30/11A 6. Fire Protection Program Audit Frequency - add to | |||
: 7. TBD group 7 response | |||
: 7. Follow-up meeting | |||
: 6. Tech Spec Revisions from latest T/S 1. 11/18/11 1. CSST A & B - discretionary Licensing/Elton markup and NRC Review comments 2. 11/18/11 2. I-131 DEI (Bryan) | |||
: 3. 11/18/11 3. Diesel Generator Frequency 5. Shea | |||
: 4. 11/18/11 4. Unit 1 AST FHA | |||
: 5. 10/31/11A 5. List of Unit 1 Changes | |||
: 7. ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Arent/Bryan Attachment HH? | |||
: 8. SSER 22/23/24 Open Items Response As needed The expanded HH list and status is covered Licensing periodically. | |||
: 9. Transient Analysis issues 10/31/11 Question on RG revision and modes 3, 4, & 5. TVA to ENG/Koontz provide write-up explaining NRC acceptance (CLB) of WEC/Morgan Boron dilution RAI response unit 1 for modes 3, 4, & 5. See SSER OI 132. | |||
: 10. FSAR A107 11/18/11 Current target date for A107 is 11/18/11. Lic/Stockton | |||
4 | Page 4 of 4 No. Description Status Additional Comments Resp Org/Person | ||
: 11. Develop list of planned License 1. 11/18/11 1. Review Unit 1 SER for exemptions. Sand NRR/TVA Conditions, Exemptions and Relief 2. TBD baskets, cyber security, physical security, PAD 4.0 (Bryan) | |||
: | Requests (Arent) 3. TBD 2. NRR to review current exemptions | ||
: 3. Verify required notifications made | |||
: 12. Verify Tech Spec Setpoints match calcs 1. TBD 1. SSDs are complete. Six changes to the TSs will be Eng/Hilmes submitted to NRC (Bryan) | |||
TS certification 2. Feb 2012 2. TS certification | |||
: 13. Issue two Unit Offsite Dose Calculation 3/1/12 Determine actual need date Chemistry/ | |||
Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan) | |||
: 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing | |||
: 15. Submit final as-constructed FSAR 7/1/12 Licensing/ | |||
figures Stockton | |||
: 16. TMI action items 7/1/12 TVA to provide letter when TMI actions are field Licensing complete. (Gordon) | |||
: 17. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR | |||
: 18. ASME Section III N-3 report 8/1/12 | |||
: 0. Discretionary Actions | |||
: 1. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Arent) | |||
: 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing | |||
: 3. Status of GSI 199 Eastern Seismicity Fall 2011 No action pending upcoming Generic Letter TVA/NRR (Arent) | |||
: 4. Letter to notify NRC when Vital Area Jan. 2012 Security Plan Update - Boundary to be restored. Lic/Arent Boundary returned to original location | |||
: 5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Corp SG/ | |||
Waiting for NRC concurrence. When will the WEC Webber analysis be submitted? NRC willing to review as a ISI/Tinley contingency.}} | |||
Woods (Bryan) 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 | |||
: 1. Letter to terminate Part 30/40 License after receipt of Part 50 License | |||
Latest revision as of 00:32, 6 December 2019
ML11318A191 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 11/01/2011 |
From: | - No Known Affiliation |
To: | Division of Operating Reactor Licensing |
References | |
Download: ML11318A191 (6) | |
Text
WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
Sent: Tuesday, November 01, 2011 9:29 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Subject:
NRC PM Open Items List 11-02-11.docx Attachments: NRC PM Open Items List 11-02-11.docx For next phone call.
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 575 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF24C68FA1)
Subject:
NRC PM Open Items List 11-02-11.docx Sent Date: 11/1/2011 9:28:42 AM Received Date: 11/1/2011 9:28:45 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 234 11/1/2011 9:28:45 AM NRC PM Open Items List 11-02-11.docx 33871 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Page 1 of 4 NRC PM Open Items List 11/2/11 (423) 751-7777 ID 4233658764#
No. Description Status Additional Comments Resp Org/Person
- 1. Cyber Security Plan/Controls and NRC Table NRC Inspection in 2011 Heinrich/Snyder Implementation Top/Pilot (Bryan)
Jan. 2012 Inspection 4th Qtr 2012
Page 2 of 4 No. Description Status Additional Comments Resp Org/Person
- 2. Instrumentation RAI List (Knuettel) 1. 9/29/11A 1. Draft response received and comments sent to GA. Eng/Hilmes
- 1. GA/ESI is preparing a report to 2. Various - 2. 04038903-1SP: 10/11/11 A (Smith) document the conformance of their see status 04038903-2SP: 11/14/11 CGD program to NRC requirements 3. 9/26/11A 04038903-4SP: 11/14/11 based on NRC telecom on 8/30/11. 4. 10/4/11 04038903-QSR: 09/30/11 A Draft scheduled for 9/9 is now TBD. 5. 11/18/11 Non-props and affidavits due 11/18/11
- 2. Updates based on schedule received 6. Various - 3. OP-7.3-240: Complete from GA on 09/07/11 following see status 4. Create new bridge document 04038800-1SP:
conference call on document 7. 10/24/11A 10/11/11A schedule. 8. 10/27/11 5. Provide NRC non-prop and affidavit for all
- 3. Revise GA-ESI procedure for CGI 9. 10/27/11A remaining documents dedication to address NRC 10. 11/14/11 6. WEC to provide the following documents:
comments. WCAP for 0000-ICE-30156 11/9/11
- 4. Draft received for review 9/20/11. CN-EQT-10-44: 11/9/11
- 5. Non-props & affidavits DAR-ME-09-10: 10/11/11 A
- 6. WEC to provide demarcated EQ-EV-62-WBT: 11/16/11 proprietary, non-proprietary and EQLR-171: 11/16/11 affidavits for withholding for each EQ-QR-33-WBT: 11/9/11 item. EQ-QR-64-GEN: 11/16/11
- 7. WEC to revise figure to remove WNA-SD-00250-WBT: 11/2/11 connection from OM to printer to WNA-SD-00248-WBT: 11/2/11 complete commitment. WNA-TP-02988-WBT: 10/26/11
- 8. WEC to agreed to produce a test WNA-VR-00279-WBT: Complete report for the incore IITA. WNA-PT-00138-WBT: Complete
- 9. WEC has the necessary 7. WNA-AR-00189-WBT:10/24/11A documentation. WEC to produce a 8. IITA In-core EQ report non-proprietary summary report and 9. MI cable 600V test report Produce non-prop place the test reports in the WEC summary document A Rockville office for NRC audit. 10. Next I&C submittal update
- 10. Submit I&C update letter
- 3. Exemption to 10CFR50.49 for some 11/14/11 Determine if exemption required. NRC may need Hilmes Category II cables? to establish a license condition. (Stockton)
Page 3 of 4 No. Description Status Additional Comments Resp Org/Person
- 4. Complete Implementation (Hemmer) Pump Substantial building to complete and equipment in Hemmer Relocation May. (Smith) 5/30/12 Provide document of mitigating equipment and location for unit 2.
Bldg Plan 10/31/11 Inspection -
June 2012 Table update -
- 5. Fire Protection Report Questions 1. 10/25-27/11 1. Audit ENG/Hilmes regarding OMA 2.9/30/11A 2. Group 7 RAI response (Arent) 3.9/30/11A 3. Receive Group 8 RAIs - if needed
- 4. 10/31/11A 4. Response to Group 8 plus 2Qs on 9/30/11 letter
- 5. 11/30/11 5. Submit As-designed U1/U2 FPR
- 6. 9/30/11A 6. Fire Protection Program Audit Frequency - add to
- 7. TBD group 7 response
- 7. Follow-up meeting
- 6. Tech Spec Revisions from latest T/S 1. 11/18/11 1. CSST A & B - discretionary Licensing/Elton markup and NRC Review comments 2. 11/18/11 2. I-131 DEI (Bryan)
- 3. 11/18/11 3. Diesel Generator Frequency 5. Shea
- 5. 10/31/11A 5. List of Unit 1 Changes
- 7. ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Arent/Bryan Attachment HH?
- 8. SSER 22/23/24 Open Items Response As needed The expanded HH list and status is covered Licensing periodically.
- 9. Transient Analysis issues 10/31/11 Question on RG revision and modes 3, 4, & 5. TVA to ENG/Koontz provide write-up explaining NRC acceptance (CLB) of WEC/Morgan Boron dilution RAI response unit 1 for modes 3, 4, & 5. See SSER OI 132.
- 10. FSAR A107 11/18/11 Current target date for A107 is 11/18/11. Lic/Stockton
Page 4 of 4 No. Description Status Additional Comments Resp Org/Person
- 11. Develop list of planned License 1. 11/18/11 1. Review Unit 1 SER for exemptions. Sand NRR/TVA Conditions, Exemptions and Relief 2. TBD baskets, cyber security, physical security, PAD 4.0 (Bryan)
Requests (Arent) 3. TBD 2. NRR to review current exemptions
- 3. Verify required notifications made
- 12. Verify Tech Spec Setpoints match calcs 1. TBD 1. SSDs are complete. Six changes to the TSs will be Eng/Hilmes submitted to NRC (Bryan)
TS certification 2. Feb 2012 2. TS certification
- 13. Issue two Unit Offsite Dose Calculation 3/1/12 Determine actual need date Chemistry/
Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan)
- 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing
- 15. Submit final as-constructed FSAR 7/1/12 Licensing/
figures Stockton
- 16. TMI action items 7/1/12 TVA to provide letter when TMI actions are field Licensing complete. (Gordon)
- 17. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR
- 18. ASME Section III N-3 report 8/1/12
- 0. Discretionary Actions
- 1. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Arent)
- 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
- 3. Status of GSI 199 Eastern Seismicity Fall 2011 No action pending upcoming Generic Letter TVA/NRR (Arent)
- 4. Letter to notify NRC when Vital Area Jan. 2012 Security Plan Update - Boundary to be restored. Lic/Arent Boundary returned to original location
Waiting for NRC concurrence. When will the WEC Webber analysis be submitted? NRC willing to review as a ISI/Tinley contingency.