ML12053A296: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/26/2012
| issue date = 03/26/2012
| title = December 21, 2011 - Summary of Public Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 9.5.1 Fire Protection
| title = December 21, 2011 - Summary of Public Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 9.5.1 Fire Protection
| author name = Poole J C
| author name = Poole J
| author affiliation = NRC/NRR/DORL/LPWB
| author affiliation = NRC/NRR/DORL/LPWB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000391
| docket = 05000391
| license number =  
| license number =  
| contact person = Poole J C
| contact person = Poole J
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 3
| page count = 3
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:REGCJ<.., UNITED STATES ! << Iii )'01> 0 1 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 '</. lI/-***i' March 26, 2012 LICENSEE:
{{#Wiki_filter:,-~,.,,, REGCJ<..,                                 UNITED STATES
Tennessee Valley Authority FACILITY:
    ~~v                    )'01>             NUCLEAR REGULATORY COMMISSION
Watts Bar Nuclear Power Plant, Unit 2  
!                              ~                      WASHINGTON, D.C. 20555-0001
<<                                0 Iii
~
1
                                ~
    '</.                     ~
      ~                ~o                                  March 26, 2012 lI/-***i' LICENSEE:         Tennessee Valley Authority FACILITY:         Watts Bar Nuclear Power Plant, Unit 2


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF DECEMBER 21,2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT RELATED TO SECTION 9.5.1 FIRE PROTECTION On December 21,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF DECEMBER 21,2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT RELATED TO SECTION 9.5.1 FIRE PROTECTION On December 21,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the NRC staff's questions and comments on the Watts Bar Nuclear Plant Unit 2 Final Safety AnalYSis Report, Section 9.5.1, Fire Protection Report (FPR), in support of TVA's application for an operating license. A list of participants is enclosed.
The purpose of the meeting was to discuss the NRC staff's questions and comments on the Watts Bar Nuclear Plant Unit 2 Final Safety AnalYSis Report, Section 9.5.1, Fire Protection Report (FPR), in support of TVA's application for an operating license. A list of participants is enclosed.
The meeting consisted of the NRC staff and TVA staff discussing new material that was added to the November 30, 2011, version of the FPR, as well as the information quality and consistency issues that the staff identified. TVA agreed that the new material was not of sufficient quality and was not properly integrated into the rest of the FPR TVA indicated that they would re-work this material and resubmit it to the staff. TVA also stated that the FPR would be re-reviewed once the revisions were completed to resolve the continued quality assurance issues.
The meeting consisted of the NRC staff and TVA staff discussing new material that was added to the November 30, 2011, version of the FPR, as well as the information quality and consistency issues that the staff identified.
Members of the public did not participate in the meeting.
TVA agreed that the new material was not of sufficient quality and was not properly integrated into the rest of the FPR TVA indicated that they would re-work this material and resubmit it to the staff. TVA also stated that the FPR would be re-reviewed once the revisions were completed to resolve the continued quality assurance issues. Members of the public did not participate in the meeting. Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391  
Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391


==Enclosure:==
==Enclosure:==


List of Participants cc w/encl: Distribution via Listserv LIST OF DECEMBER 21, 2011, PUBLIC MEETING TENNESSEE VALLEY AUTHORITY  
List of Participants cc w/encl: Distribution via Listserv
-FINAL SAFETY ANALYSIS REPORT SECTION 9.5.1 FIRE WATTS BAR NUCLEAR PLANT, UNIT Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Participants:
 
PositionlTitle Organization Steve Campbell Branch Chief Watts Bar Special Projects Branch (LPWB) Division of Operating Reactor Licensing (DORL) Patrick Milano Sr. Project Manager LPWB\DORL Justin Poole Sr. Project Manager LPWB\DORL Alex Klein Branch Chief Fire Protection Branch (AFPB) Division of Risk Assessment (DRA) Daniel Frumkin Team Leader AFPB/DRA Charles Moulton Fire Protection Engineer AFPB/DRA Gary Cooper Fire Protection Engineer AFPB/DRA Tennessee Valley Authority (TVA) Participants:
LIST OF PARTICIPANTS DECEMBER 21, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY - FINAL SAFETY ANALYSIS REPORT REVIEW SECTION 9.5.1 FIRE PROTECTION WATTS BAR NUCLEAR PLANT, UNIT 2 Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation
Gordon Arent Licensing Manager TVA Watts Bar Unit 2 William Crouch Engineering TVA Watts Bar Unit 2 Steve Hilmes Electrical and I&C TVA Watts Bar Unit 2 Manager Charles Brush Electrical Engineer EPM Enclosure March 26,2012 Tennessee Valley Authority Watts Bar Nuclear Power Plant, Unit 2  
 
==Participants:==
PositionlTitle             Organization Steve Campbell       Branch Chief             Watts Bar Special Projects Branch (LPWB)
Division of Operating Reactor Licensing (DORL)
Patrick Milano       Sr. Project Manager       LPWB\DORL Justin Poole       Sr. Project Manager       LPWB\DORL Alex Klein           Branch Chief             Fire Protection Branch (AFPB)
Division of Risk Assessment (DRA)
Daniel Frumkin     Team Leader               AFPB/DRA Charles Moulton     Fire Protection Engineer AFPB/DRA Gary Cooper         Fire Protection Engineer AFPB/DRA Tennessee Valley Authority (TVA)
 
==Participants:==
Gordon Arent         Licensing Manager         TVA Watts Bar Unit 2 William Crouch     Engineering               TVA Watts Bar Unit 2 Steve Hilmes         Electrical and I&C       TVA Watts Bar Unit 2 Manager Charles Brush       Electrical Engineer       EPM Enclosure
 
March 26,2012 LICENSEE:        Tennessee Valley Authority FACILITY:        Watts Bar Nuclear Power Plant, Unit 2
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF DECEMBER 21, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT RELATED TO SECTION 9.5.1 FIRE PROTECTION On December 21, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF DECEMBER 21, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT RELATED TO SECTION 9.5.1 FIRE PROTECTION On December 21, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the NRC staff's questions and comments on the Watts Bar Nuclear Plant Unit 2 Final Safety Analysis Report, Section 9.5.1, Fire Protection Report (FPR), in support of TVA's application for an operating license. A list of participants is enclosed.
The purpose of the meeting was to discuss the NRC staff's questions and comments on the Watts Bar Nuclear Plant Unit 2 Final Safety Analysis Report, Section 9.5.1, Fire Protection Report (FPR), in support of TVA's application for an operating license. A list of participants is enclosed.
The meeting consisted of the NRC staff and TVA staff discussing new material that was added to the November 30, 2011, version of the FPR, as well as the information quality and conSistency issues that the staff identified. TVA agreed that the new material was not of sufficient quality and was not properly integrated into the rest of the FPR. TVA indicated that they would re-work this material and resubmit it to the staff. TVA also stated that the FPR would be re-reviewed once the revisions were completed to resolve the continued quality assurance issues.
The meeting consisted of the NRC staff and TVA staff discussing new material that was added to the November 30, 2011, version of the FPR, as well as the information quality and conSistency issues that the staff identified.
Members of the public did not participate in the meeting.
TVA agreed that the new material was not of sufficient quality and was not properly integrated into the rest of the FPR. TVA indicated that they would re-work this material and resubmit it to the staff. TVA also stated that the FPR would be re-reviewed once the revisions were completed to resolve the continued quality assurance issues. Members of the public did not participate in the meeting. Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov. IRA! Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391  
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
IRA!
Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391


==Enclosure:==
==Enclosure:==


List of Participants cc w/encl: Distribution via Listserv DISTRIBUTION:
List of Participants cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsRgn2MailCenter Resource LPWB R/F PMNS Resources RidsNrrlLABCJayton (Hard copy) RidsOpaMaiJ Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MaiJCTR Resource MKotzala, EDO RidsNrrDorlLp_WB Resource RidsOgcMailCenter Resource RidsNrrOd Resource RidsNrrDorl Resource CMoulton, NRR AKlein, NRR JLedford, RII DFrumkin, NRR JPoole, NRR PMilano, NRR CSteger, NRR RHanna, RII ADAMS Accession No' MI 12053A296.. -OFFICE LPWB\PM LPWB\LA LPWB\BC ii NAME DATE JPoole 3/23/12 BClayton 3/27112 SCampbell 3/26/12 II II OFFICIAL RECORD}}
PUBLIC                                 RidsRgn2MailCenter Resource         LPWB R/F PMNS Resources                         RidsNrrlLABCJayton (Hard copy)       RidsOpaMaiJ Resource RidsNrrPMWattsBar2 Resource             RidsAcrsAcnw_MaiJCTR Resource       MKotzala, EDO RidsNrrDorlLp_WB Resource               RidsOgcMailCenter Resource           RidsNrrOd Resource RidsNrrDorl Resource                   CMoulton, NRR                       AKlein, NRR JLedford, RII                           DFrumkin, NRR                       JPoole, NRR PMilano, NRR                           CSteger, NRR                         RHanna, RII ADAMS Accession   No'.. MI-12053A296 OFFICE         LPWB\PM           LPWB\LA           LPWB\BC           i NAME           JPoole            BClayton          SCampbell        I DATE           3/23/12           3/27112           3/26/12           II OFFICIAL RECORD COPY}}

Latest revision as of 23:40, 5 December 2019

December 21, 2011 - Summary of Public Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 9.5.1 Fire Protection
ML12053A296
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/26/2012
From: Justin Poole
Watts Bar Special Projects Branch
To:
Poole J
References
Download: ML12053A296 (3)


Text

,-~,.,,, REGCJ<.., UNITED STATES

~~v )'01> NUCLEAR REGULATORY COMMISSION

! ~ WASHINGTON, D.C. 20555-0001

<< 0 Iii

~

1

~

'</. ~

~ ~o March 26, 2012 lI/-***i' LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF DECEMBER 21,2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT RELATED TO SECTION 9.5.1 FIRE PROTECTION On December 21,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the NRC staff's questions and comments on the Watts Bar Nuclear Plant Unit 2 Final Safety AnalYSis Report, Section 9.5.1, Fire Protection Report (FPR), in support of TVA's application for an operating license. A list of participants is enclosed.

The meeting consisted of the NRC staff and TVA staff discussing new material that was added to the November 30, 2011, version of the FPR, as well as the information quality and consistency issues that the staff identified. TVA agreed that the new material was not of sufficient quality and was not properly integrated into the rest of the FPR TVA indicated that they would re-work this material and resubmit it to the staff. TVA also stated that the FPR would be re-reviewed once the revisions were completed to resolve the continued quality assurance issues.

Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Participants cc w/encl: Distribution via Listserv

LIST OF PARTICIPANTS DECEMBER 21, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY - FINAL SAFETY ANALYSIS REPORT REVIEW SECTION 9.5.1 FIRE PROTECTION WATTS BAR NUCLEAR PLANT, UNIT 2 Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation

Participants:

PositionlTitle Organization Steve Campbell Branch Chief Watts Bar Special Projects Branch (LPWB)

Division of Operating Reactor Licensing (DORL)

Patrick Milano Sr. Project Manager LPWB\DORL Justin Poole Sr. Project Manager LPWB\DORL Alex Klein Branch Chief Fire Protection Branch (AFPB)

Division of Risk Assessment (DRA)

Daniel Frumkin Team Leader AFPB/DRA Charles Moulton Fire Protection Engineer AFPB/DRA Gary Cooper Fire Protection Engineer AFPB/DRA Tennessee Valley Authority (TVA)

Participants:

Gordon Arent Licensing Manager TVA Watts Bar Unit 2 William Crouch Engineering TVA Watts Bar Unit 2 Steve Hilmes Electrical and I&C TVA Watts Bar Unit 2 Manager Charles Brush Electrical Engineer EPM Enclosure

March 26,2012 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF DECEMBER 21, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT RELATED TO SECTION 9.5.1 FIRE PROTECTION On December 21, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the NRC staff's questions and comments on the Watts Bar Nuclear Plant Unit 2 Final Safety Analysis Report, Section 9.5.1, Fire Protection Report (FPR), in support of TVA's application for an operating license. A list of participants is enclosed.

The meeting consisted of the NRC staff and TVA staff discussing new material that was added to the November 30, 2011, version of the FPR, as well as the information quality and conSistency issues that the staff identified. TVA agreed that the new material was not of sufficient quality and was not properly integrated into the rest of the FPR. TVA indicated that they would re-work this material and resubmit it to the staff. TVA also stated that the FPR would be re-reviewed once the revisions were completed to resolve the continued quality assurance issues.

Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

IRA!

Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Participants cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn2MailCenter Resource LPWB R/F PMNS Resources RidsNrrlLABCJayton (Hard copy) RidsOpaMaiJ Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MaiJCTR Resource MKotzala, EDO RidsNrrDorlLp_WB Resource RidsOgcMailCenter Resource RidsNrrOd Resource RidsNrrDorl Resource CMoulton, NRR AKlein, NRR JLedford, RII DFrumkin, NRR JPoole, NRR PMilano, NRR CSteger, NRR RHanna, RII ADAMS Accession No'.. MI-12053A296 OFFICE LPWB\PM LPWB\LA LPWB\BC i NAME JPoole BClayton SCampbell I DATE 3/23/12 3/27112 3/26/12 II OFFICIAL RECORD COPY