ML18101A006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML18101A006 | | number = ML18101A006 | ||
| issue date = 04/11/2018 | | issue date = 04/11/2018 | ||
| title = | | title = Interim Staff Guidance on Financial Assurance | ||
| author name = Duvigneaud | | author name = Duvigneaud D | ||
| author affiliation = NRC/NMSS/DFCSE/PORB | | author affiliation = NRC/NMSS/DFCSE/PORB | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = | | docket = | ||
| license number = | | license number = | ||
| contact person = Duvigneaud | | contact person = Duvigneaud D | ||
| package number = ML18100B106 | | package number = ML18100B106 | ||
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:Interim Staff Guidance Decommissioning Funding Plans Materials Licensees | ||
Interim Staff Guidance Overview | |||
- Decommissioning Funding Plans (DFPs) covering current facility conditions including onsite inventory onsite | |||
- Efficiencies preparing DFPs | |||
- Three items pertaining to Financial Instruments 2 | |||
Interim Staff Guidance DFPs Covering Current Facilities Conditions | |||
- Part 70 licensees covering inventory | |||
- (ML16307A014) NRC response to NEI which outlines a number of acceptable ways to meet the regulation | |||
* Licensee owned - contract in place where another party pays for packing, loading and shipping to an end destination | |||
* Customer owned - customer retains legal title to the material and is contractually responsible for packing, loading and shipping to an end destination | |||
* In-process inventory - justify a brief timeframe to process the material through into finished product, and then it will fall into licensee-owned or customer-owned inventory 3 | |||
Interim Staff Guidance Efficiencies Preparing Decom Funding Plans | |||
- Make sure to include the 8 factors required by 30.35(e)(2), | |||
40.36(d)(2) and CFR 70.25(e)(2): | |||
* Spills of radioactive material producing additional residual radioactivity in onsite subsurface material | |||
* Waste inventory increasing above the amount previously estimated | |||
* Waste disposal costs increasing above the amount previously estimated | |||
* Facility modifications 4 | |||
Interim Staff Guidance Efficiencies Preparing Decom Funding Plans (Continued) | |||
* Changes in authorized possession limits | |||
* Actual remediation costs that exceed the previous cost estimate | |||
* Onsite disposal | |||
* Use of a settling pond Based on these requirement, providing a narrative in the DFP describing these factors will assist to reduce the number of RAIs and in completing the approval process, the Safety Evaluation Report. | |||
5 | |||
Interim Staff Guidance Financial Instruments | |||
- Send original hard copy financial instruments directly to site PM not NRC Document Control as DC does not maintain original hard-copy documents | |||
- For approval, NRC staff needs to review all agreements including any side letters to the financial instruments | |||
- A template sight draft is being provided a sight draft as typically banks require a sight draft to draw on the financial instrument 6 | |||
Interim Staff Guidance Other Areas | |||
* Working to identify other areas in guidance which may need updating to include in the ISG 7 | |||
Interim Staff Guidance Schedule | |||
* Draft ISG is scheduled to be completed end of June 2018 | |||
* 45-day public comment on draft ISG | |||
* Final ISG is scheduled to be completed end of October 2018 8}} |
Latest revision as of 15:49, 30 November 2019
ML18101A006 | |
Person / Time | |
---|---|
Issue date: | 04/11/2018 |
From: | Dylanne Duvigneaud Programmatic Oversight and Regional Support Branch |
To: | |
Duvigneaud D | |
Shared Package | |
ML18100B106 | List: |
References | |
Download: ML18101A006 (8) | |
Text
Interim Staff Guidance Decommissioning Funding Plans Materials Licensees
Interim Staff Guidance Overview
- Decommissioning Funding Plans (DFPs) covering current facility conditions including onsite inventory onsite
- Efficiencies preparing DFPs
- Three items pertaining to Financial Instruments 2
Interim Staff Guidance DFPs Covering Current Facilities Conditions
- Part 70 licensees covering inventory
- (ML16307A014) NRC response to NEI which outlines a number of acceptable ways to meet the regulation
- Licensee owned - contract in place where another party pays for packing, loading and shipping to an end destination
- Customer owned - customer retains legal title to the material and is contractually responsible for packing, loading and shipping to an end destination
- In-process inventory - justify a brief timeframe to process the material through into finished product, and then it will fall into licensee-owned or customer-owned inventory 3
Interim Staff Guidance Efficiencies Preparing Decom Funding Plans
- Make sure to include the 8 factors required by 30.35(e)(2),
40.36(d)(2) and CFR 70.25(e)(2):
- Spills of radioactive material producing additional residual radioactivity in onsite subsurface material
- Waste inventory increasing above the amount previously estimated
- Waste disposal costs increasing above the amount previously estimated
- Facility modifications 4
Interim Staff Guidance Efficiencies Preparing Decom Funding Plans (Continued)
- Changes in authorized possession limits
- Actual remediation costs that exceed the previous cost estimate
- Onsite disposal
- Use of a settling pond Based on these requirement, providing a narrative in the DFP describing these factors will assist to reduce the number of RAIs and in completing the approval process, the Safety Evaluation Report.
5
Interim Staff Guidance Financial Instruments
- Send original hard copy financial instruments directly to site PM not NRC Document Control as DC does not maintain original hard-copy documents
- For approval, NRC staff needs to review all agreements including any side letters to the financial instruments
- A template sight draft is being provided a sight draft as typically banks require a sight draft to draw on the financial instrument 6
Interim Staff Guidance Other Areas
- Working to identify other areas in guidance which may need updating to include in the ISG 7
Interim Staff Guidance Schedule
- Draft ISG is scheduled to be completed end of June 2018
- 45-day public comment on draft ISG
- Final ISG is scheduled to be completed end of October 2018 8