ML18101A006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18101A006
| number = ML18101A006
| issue date = 04/11/2018
| issue date = 04/11/2018
| title = 04/11/2018 Interim Staff Guidance on Financial Assurance
| title = Interim Staff Guidance on Financial Assurance
| author name = Duvigneaud D D
| author name = Duvigneaud D
| author affiliation = NRC/NMSS/DFCSE/PORB
| author affiliation = NRC/NMSS/DFCSE/PORB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket =  
| docket =  
| license number =  
| license number =  
| contact person = Duvigneaud D D
| contact person = Duvigneaud D
| package number = ML18100B106
| package number = ML18100B106
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Interim Staff Guidance Decommissioning Funding Plans Materials Licensees
 
Interim Staff Guidance Overview
- Decommissioning Funding Plans (DFPs) covering current facility conditions including onsite inventory onsite
- Efficiencies preparing DFPs
- Three items pertaining to Financial Instruments 2
 
Interim Staff Guidance DFPs Covering Current Facilities Conditions
- Part 70 licensees covering inventory
- (ML16307A014) NRC response to NEI which outlines a number of acceptable ways to meet the regulation
* Licensee owned - contract in place where another party pays for packing, loading and shipping to an end destination
* Customer owned - customer retains legal title to the material and is contractually responsible for packing, loading and shipping to an end destination
* In-process inventory - justify a brief timeframe to process the material through into finished product, and then it will fall into licensee-owned or customer-owned inventory 3
 
Interim Staff Guidance Efficiencies Preparing Decom Funding Plans
-  Make sure to include the 8 factors required by 30.35(e)(2),
40.36(d)(2) and CFR 70.25(e)(2):
* Spills of radioactive material producing additional residual radioactivity in onsite subsurface material
* Waste inventory increasing above the amount previously estimated
* Waste disposal costs increasing above the amount previously estimated
* Facility modifications 4
 
Interim Staff Guidance Efficiencies Preparing Decom Funding Plans (Continued)
* Changes in authorized possession limits
* Actual remediation costs that exceed the previous cost estimate
* Onsite disposal
* Use of a settling pond Based on these requirement, providing a narrative in the DFP describing these factors will assist to reduce the number of RAIs and in completing the approval process, the Safety Evaluation Report.
5
 
Interim Staff Guidance Financial Instruments
-  Send original hard copy financial instruments directly to site PM not NRC Document Control as DC does not maintain original hard-copy documents
-  For approval, NRC staff needs to review all agreements including any side letters to the financial instruments
-  A template sight draft is being provided a sight draft as typically banks require a sight draft to draw on the financial instrument 6
 
Interim Staff Guidance Other Areas
* Working to identify other areas in guidance which may need updating to include in the ISG 7
 
Interim Staff Guidance Schedule
* Draft ISG is scheduled to be completed end of June 2018
* 45-day public comment on draft ISG
* Final ISG is scheduled to be completed end of October 2018 8}}

Latest revision as of 15:49, 30 November 2019

Interim Staff Guidance on Financial Assurance
ML18101A006
Person / Time
Issue date: 04/11/2018
From: Dylanne Duvigneaud
Programmatic Oversight and Regional Support Branch
To:
Duvigneaud D
Shared Package
ML18100B106 List:
References
Download: ML18101A006 (8)


Text

Interim Staff Guidance Decommissioning Funding Plans Materials Licensees

Interim Staff Guidance Overview

- Decommissioning Funding Plans (DFPs) covering current facility conditions including onsite inventory onsite

- Efficiencies preparing DFPs

- Three items pertaining to Financial Instruments 2

Interim Staff Guidance DFPs Covering Current Facilities Conditions

- Part 70 licensees covering inventory

- (ML16307A014) NRC response to NEI which outlines a number of acceptable ways to meet the regulation

  • Licensee owned - contract in place where another party pays for packing, loading and shipping to an end destination
  • Customer owned - customer retains legal title to the material and is contractually responsible for packing, loading and shipping to an end destination
  • In-process inventory - justify a brief timeframe to process the material through into finished product, and then it will fall into licensee-owned or customer-owned inventory 3

Interim Staff Guidance Efficiencies Preparing Decom Funding Plans

- Make sure to include the 8 factors required by 30.35(e)(2),

40.36(d)(2) and CFR 70.25(e)(2):

  • Spills of radioactive material producing additional residual radioactivity in onsite subsurface material
  • Waste inventory increasing above the amount previously estimated
  • Waste disposal costs increasing above the amount previously estimated
  • Facility modifications 4

Interim Staff Guidance Efficiencies Preparing Decom Funding Plans (Continued)

  • Actual remediation costs that exceed the previous cost estimate
  • Onsite disposal
  • Use of a settling pond Based on these requirement, providing a narrative in the DFP describing these factors will assist to reduce the number of RAIs and in completing the approval process, the Safety Evaluation Report.

5

Interim Staff Guidance Financial Instruments

- Send original hard copy financial instruments directly to site PM not NRC Document Control as DC does not maintain original hard-copy documents

- For approval, NRC staff needs to review all agreements including any side letters to the financial instruments

- A template sight draft is being provided a sight draft as typically banks require a sight draft to draw on the financial instrument 6

Interim Staff Guidance Other Areas

  • Working to identify other areas in guidance which may need updating to include in the ISG 7

Interim Staff Guidance Schedule

  • Draft ISG is scheduled to be completed end of June 2018
  • 45-day public comment on draft ISG
  • Final ISG is scheduled to be completed end of October 2018 8