NRC Generic Letter 1980-96: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
{{#Wiki_filter:~. '67 -'-.-Z~.St 66 o fi1 J j It ILE OP REGULAYPElu  
{{#Wiki_filter:~.   '67   -     '
5"3L% N COP Docket No. 50-336.. F9.--~4.I..(- 20 0 NOV 14 1m90 Mr. W. G.Nuclear Northeast P. 0. Box Hartford, Counsil, Vice President Engineering  
            .     -   Z~.                                                                                         66 St             o fi1 ILE
& Operations Nuclear Energy Company 270 Connecticut  
        -
06101 Dear Mr. Counsil: As you know, a proposed Section 50.48 and Appendix R to 10 CFR 50 has been pending since May 1980. The Commission has recently approved a revised final version of that proposed Section 50.48 and Appendix R to 10 CFR 50 which will be published in the Federal Re ister shortly and will become effective  
                                                      REGULAYPElu 5"3L%     J Itj N COP         OP
90 days after publ1ca-tf-.  
Docket No. 50-336                                                                                             ..         F9
This revised 10 CFR 50.48 will contain schedules for completion of all fire protection modifications.
                                                                                                            .
                                                                                                                    -   -   ~4.I..
                                                                                                                                                0
                                                                                                              (-           20
                                                                                  NOV 14 1m90
            Mr. W. G.             Counsil, Vice President Nuclear      Engineering & Operations Northeast            Nuclear Energy Company P. 0. Box            270
              Hartford,            Connecticut 06101 Dear Mr. Counsil:
                                                                                                    10 CFR 50 has been As you know, a proposed Section 50.48 and Appendix R to                                         a revised pending since May 1980. The Commission has recently                             approved R  to      10 CFR 50
              final version of that proposed Section 50.48 and Appendixand will become which will be published in the Federal Re ister shortly                                 50.48 will effective 90 days after publ1ca-tf-. This revised 10 CFRmodifications.


One set of schedules will be applicable to features covered by Appendix R.A similar set of schedules will be applicable to all other fire protection modifications that have been approved by the NRC staff in a staff safety evaluation report. This latter set of schedules will require completion of modifications not covered by Appendix R by schedules specified in the revised rule or by the dates noa specified as license conditions, whichever is sooner, unless an extension or exemption is approved by NRC.Some of the completion dates discussed in the SER for your facility may be associated with modifications for which the NRC staff required additional information, such as design details or test results, to be subsequently reviewed and approved by the NRC staff prior to implementation.
contain schedules for completion of all fire protection                                     by Appendix R.


To the extent that there are fire protection modifications such as this for your facility and the required additional information has not yet been approved by the staff as evidenced in a staff safety evaluation report, there is no present implementation requirement;
One set of schedules will be applicable to features covered fire protection A similar set of schedules will be applicable to                          all  other in a staff safety modifications that have been approved by the NRC staff                                         completion evaluation report. This latter set of schedules will require                          specified          in of modifications not covered by Appendix R by schedules                                 conditions, the revised rule or by the dates noa specified as license approved by NRC.
consequently, completion of such items will be governed by the schedules in the revised rule.In the interim, pending the effective date of the revised rule, the Commission has approved a new Section 50.48 of 10 CFR 50 suspending completion dates for fire protection modifications previously approved by the NRC staff.This new section became effective upon publication in the Federal Re ister on October 29, 1980 (45 FR 71569). A copy of the new rule is enclosed for your information.


This rule will be superseded by the revised rule when it becomes effective.
whichever is sooner, unless an extension or exemption is facility may Some of the completion dates discussed in the SER for yourrequired additional be associated with modifications for which the NRC staff be subsequently information, such as design details or test results, to                                                To the reviewed and approved by the NRC staff prior to implementation.                        as  this      for your extent that there are fire protection modifications such                              yet    been      approved facility and the required additional information has notreport, there is no by the staff as evidenced in a staff safety evaluation                                        of such items present implementation requirement; consequently, completion will be governed by the schedules in the revised rule.


Al is PI M(It Ct 01 21 IoOI -pg0_ .r OFFICE SURNAMEO DATEO p....................................
rule, the Commission In the interim, pending the effective date of the revised completion dates has approved a new Section 50.48 of 10 CFR 50 suspending the NRC staff.
....................................
....................................
.................
...................................
1.................
.................
...................
I.tJ~, .fD Af.i1NC l4 ..GVRMN RNIGOFC:17.8-6 fiCfto rF'D O41R 10.7AI1 Pjr^M n24n*U.S. GOVERNMENT
PRINTING OFFICE: 1979-289-369
--o-2-In the near future, we plan to contact you to Identify specifically which fire protection features associated with your facility are covered by Appendix R and would thus be subject to one set of schedules, and which are previously approved itetms which are covered by a different set of schedules.


Sincerely, Original signed by Darrell G. Lisenhut Darrell G. Elsenhut, Director Division of Licensing Enclosuro:
for fire protection modifications previously approved by Federal Re ister This new section became effective upon publication in the is enclosed on October 29, 1980 (45 FR 71569). A copy of the new rule                        the revised rule when for your information. This rule will be superseded by it becomes effective.                                                                                                 Al is  PI
As stated cc w/enclosure:
                                                                                                                                        M(It  Ct
See next page DISTRIBUTION:
01 21IoOI                      -
Docket File NRC PDR L PDR TERA NSIC ORB#3 Rdg NRR Rdg EGCase DEisenhut RPurple TNovak RTedesco GLainas JRoe VBenaroya OELD OI&E (3)RAClark Project Manager -O i a"'PMKreutzerti)
      _.
ACRS (16)RFerguson
 
(5)JHeltemes Gray File -ORB#3 D OR3 DL ORB#3:DL l AD:OR:DL D: SURNAME ,f zer/i .L.. ....................  
pg0                                r p.................................... ................. ...................................
..... RA.t WAE.. /!#80 11J2801/10
      OFFICE
i4j80.DATE l ... I ..........  
  SURNAMEO ....................................
.1- 1 .. .. .. .i / 0 ...- ! ... 1... ...80 ..................
                                                                                                        I.                                  1
I*U.S. GOVERNMENT
                                                                                  ................. ................. ...................
PRINTING OFFICE: 1979-289-369
          DATEO ....................................
..- -I--A MOcrA flAn Docke'IO UNITED STATES b { aNUCLEAR REGULATORY
                              l4                          .. GVRMN
COMMISSION
                                                                .fD        RNIGOFC:17.8-6 tJ~, Af.i1NC
g WASHINGTON, D.C. 20555 t aNovember
    O41R 10.7AI1 Pjr^M      n24n                      *U.S. GOVERNMENT PRINTING OFFICE: 1979-289-369
14, 1980.t No. 50-336 Mr. W. G. Counsil, Vice President Nuclear Engineering
& Operations Northeast Nuclear Energy Company P. 0. Box 270 Hartford, Connecticut
06101 Dear Mr. Counsil: As you know, a proposed Section 50.48 and Appendix R to 10 CFR 50 has been pending since May 1980. The Cnmmission has recently approved a revised final version of that proposed Section 50.48 and Appendix R to 10 CFR 50 which will be published in the Federal Register shortly and will become effective
90 days after publication.WThis revised 10 CFR 50.48 will contain schedules for completion of all fire protection modifications.


One set of schedules will be applicable to features covered by Appendix R.A similar set of schedules will be applicable to all other fire protection modifications that have been approved by the NRC staff in a staff safety evaluation report. This latter set of schedules will require completion of modifications not covered by Appendix R by schedules specified in the revised rule or by the dates now specified as license conditions, whichever is sooner, unless an extension or exemption is approved by NRC.Some of the completion dates discussed in the SER for your facility may be associated with modifications for which the NRC staff required additional information, such as design details or test results, to be subsequently reviewed and approved by the NRC staff prior to implementation.
-
                    o
              -
                                                              -2- In the near future, we plan to contact you to Identify                        specifically are covered which fire protection features associated with your facility                                  and by Appendix R and would thus be subject to one set of schedules,           by a different which are previously approved itetms which are covered set of schedules.


To the extent that there are fire protection modifications such as this for your facility and the required additional information has not yet been approved by the staff as evidenced in a staff safety evaluation report, there is no present implementation requirement;
Sincerely, Original signed by Darrell G. Lisenhut Darrell G. Elsenhut, Director Division of Licensing Enclosuro:
consequently, completion of such items will be governed by the schedules in the revised rule.In the interim, pending the effective date of the revised rule, the Commission has approved a new Section 50.48 of 10 CFR 50 suspending completion dates for fire protection modifications previously approved by the NRC staff.This new section became effective upon publication in the Federal Register on October 29, 1980 (45 FR 71569). A copy of the new rule is enclsd for your information.
      As stated cc w/enclosure:
      See next page DISTRIBUTION:
          Docket File NRC PDR
          L PDR
          TERA
          NSIC
          ORB#3 Rdg NRR Rdg EGCase DEisenhut RPurple TNovak RTedesco GLainas JRoe VBenaroya OELD
          OI&E (3)
          RAClark Project Manager -O i a"'
          PMKreutzerti)
          ACRS (16)
          RFerguson (5)
          JHeltemes Gray File -ORB#3 ORB#3:DL    l  AD:OR:DL          D:
                                          OR3D DL
                                                    .L......................            ..... RA.t SURNAME                ,f  zer/i
    .      DATEl ...  I /!#80
                          WAE..        .
                                .......... 11-  ..  .... .i    ...-
                                                                    / 0      i4j80
                                                                                ! .      ..   11J2801/10
                                                                                              1...  ...80 ..................
                I
  -  I--A     MOcrA  flAn                          GOVERNMENT PRINTING OFFICE: 1979-289-369


This rule will be superseded by the revised rule when it becomes effective.
'IO
                                      UNITED STATES
                      aNUCLEAR      REGULATORY      COMMISSION
                b {
                                    WASHINGTON, D.C. 20555 g
              t  aNovember                  14, 1980
Docke .t No. 50-336 Mr. W. G. Counsil, Vice President Nuclear Engineering & Operations Northeast Nuclear Energy Company P. 0. Box 270
      Hartford, Connecticut 06101 Dear Mr. Counsil:
                                                                  R to 10 CFR 50 has been As you know, a proposed Section 50.48 andhasAppendix          approved a revised pending since May 1980. The Cnmmission 50.48 recently and Appendix R to 10 CFR 50
        final version of that proposed Section Register        shortly and will become which will be published in the Federal          revised 10 CFR 50.48 will effective 90 days after publication.WThis          protection modifications.


I
contain schedules for completion of all fireto features covered by Appendix R.
'-I-2-In the near future, we plan to contact you to identify specifically which fire protection features associated with your facility are covered by Appendix R and would thus be subject to one set of schedules, and which are previously approved items which are covered by a different set of schedules.


ncerely,& .w rctor Division of Licensing Enclosure:
One set of schedules will be applicable              to all other fire protection A similar set of schedules will be applicablethe  NRC  staff in a staff safety modifications that have been approved by              will    require completion evaluation report. This latter set of schedules R  by  schedules    specified in of modifications not covered by Appendix            as license conditions, the revised rule or by the dates now specified or  exemption    is approved by NRC.
As stated cc w/enclosure:
See next page Northeast Nuclear Energy Company% 401, cc: William H. Cuddy, Esquire Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut
06103 Anthony Z. Roisman Katural Resources 917 15th Street, Washington, D.C.Defense Council NOW.20005 Mr. Lawrence Bettencourt.


First Selectman.Town of Waterford Hall of Records -200 Boston Post Road Waterford, Connecticut
whichever is sooner, unless an extension SER for your facility may Some of the completion dates discussed in the  the NRC staff required additional be associated with modifications fororwhich test results, to be subsequently information, such as design details                    implementation. To the reviewed and approved by the NRC staff prior to modifications such as this for your extent that there are fire protection information        has not yet been approved facility and the required additional safety evaluation report, there is no by the staff as evidenced in a staff                      completion of such items present implementation requirement; consequently,       rule.
06385 Northeast Nuclear Energy Company ATTN: Superintendent Millstone Plant Post Office Box 128 Waterford, Connecticut
06385 n r Technical Assessment Mr. John Shedlosky Resident Inspector/Millstone c/o U.S. NRC P. 0. Drawer KK Niantic, CT 06357 Mr. Charles B. Brin'cman Manager -Washington Nuclear Operations C-E Power Systems Combustion Engineering, Inc.4853 Cordell Ave., Suite A-1.Bethesda, Maryland 20014 Connecticut Energy Agency*ATTN: Assistant Director, Research and Policy Development Department of Planning and Energy Policy 20 Grand Street Hartford, Connecticut
06106 Division Office of Radiation Programs (AW-459)U. S. Environmental Protect1 Crystal Mall #2 Arlington, Virginia 20460 on Agency U. S. Environmental Protection Agency Region I Office ATTN: EIS COORDINATOR
John F. Kennedy Federal Building Boston, Massachusetts
02203 Waterford Public tibrary Rope Ferry Road, Route 156 Waterford, Connecticut
06385 Northeast Utilities Service Company ATTN: Mr. James R. Himnelwright Nuclear Engineering and Operations P. 0. Box 270 Hartford, Connecticut
06101.


-a I --. -I'Feieral Register / Vol. 4S. No. 211 t Wednesday.
will be governed by the schedules in the revised In the interim, pending the effective10date    of the revised rule, the Commission has approved a new Section 50.48 of      CFR  50 suspending completion dates for fire protection modifications previously      approved by the NRC staff.


October 29. 198D I Riugs anJ Regulatins
publication      in the Federal Register This new section became effective upon          of  the  new  rule is enclsd on October 29, 1980 (45 FR 71569). A copy be  superseded    by  the revised rule when for your information. This rule will it becomes effective.
7156 published on October a.1980 45 FR 64949. Te corrected I O9 is published below.EFFECrrVE
DAT: April I& ISM FOR FURTHER INFORMAflON
CONTAC11 Robert P. De Young. Private Radio Bureau. (202) 632-7175.ADORESS Federal Communications Commission.


Washington, D.C. 2055 SUPPEMENTARY
I
INFORMATIONC
In the Matter of amendment of Part 0 to transfer authority for common carrier matters involving public coast stations to the Private Radio Bureau.udeased: August 25.290 1 In the Order in the above-captioned matter. FCC 80-179 released April 7.-980 Section 0.91 of the rules was amended to reflect a transfer of function fro! the Common Carrier Bureau to the Private Radio Bureau (45 FR 25399. AprlJ 15.1950).2.Section
0M of the rules was also-amended by Order. FCC 79-8 released March 7.1980. to reflect the reorganization of the Common Carrier --Bureau. Through inadvertence.


oar Order of April 7. amended the language of the rule prior to Its having been amnded by our Order of March 7.1980 (45 FR45619. March 13. 198).1.To correct this situation.
'-I
                                    -2- In the near future, we plan to contact you to identify specifically are covered which fire protection features associated with your facility    and by Appendix R and would thus be subject to one set of schedules, a different which are previously approved items which are covered by set of schedules.


Section OM is amended as set forth in the attached appendix.
ncerely,
                                          &    .     w      rctor Division of Licensing Enclosure:
As stated cc w/enclosure:
See next page


to amend the cL-rently effective language of the rule.Federal Conmunications Commission.
Northeast Nuclear Energy Company
% 401, Mr. John Shedlosky cc:                                            Resident Inspector/Millstone William H. Cuddy, Esquire                      c/o U.S. NRC
        Day, Berry & Howard                            P. 0. Drawer KK
          Counselors at Law                              Niantic, CT 06357 One Constitution Plaza Hartford, Connecticut 06103 Mr. Charles B. Brin'cman Anthony Z. Roisman                            Manager - Washington Nuclear Katural Resources    Defense  Council            Operations
          917 15th Street,    NOW.                      C-E Power Systems Washington, D.C.     20005                      Combustion  Engineering, Inc.


lSecs:4. 3M. 48 StaL. as amended. I2O 10H1 47, US.C. 154.3033* .Ticaxic,-Se~rraI-
4853 Cordell Ave., Suite A-1.
--*Part 0 of Chapter I of Title 47 of the Code of Federal Regulations is amendec as follows: In I 0.91 the introductory text is revised to read as follows: 50J1 Funetions the Buea Tbe Common Carrier Bureau develops, recommends and administers policies and programs for the regulation of services, facilities, rates and practice of entitiesiexcluding public coast stations in the maritime mobile service)which furnish interstate or foreign communications service for hire-whether by wire, radio. cable or satellit facilities and of ancillary operations related to the ;=visions or use of such services.


The Bureau also regulates the atest, terms.,and conditions for cable Ielevision and pole attachments, where-s ltgachme~
Maryland 20014 Mr. Lawrence Bettencourt. First Selectman Bethesda,
are not regulated by a state and not provided by railroads or rovernmentally-or cooperatively owned utilities.
        .Town of Waterford Hall of Records - 200 Boston Post Road Waterford, Connecticut 06385 Northeast Nuclear Energy Company ATTN: Superintendent                          Connecticut Energy Agency Millstone Plant                    *ATTN: Assistant Director, Research Post Office Box 128                                    and Policy Development Waterford, Connecticut 06385                  Department of Planning and Energy Policy n    r Technical Assessment
                                                        20 Grand Street Division                                  Hartford, Connecticut    06106 Office of Radiation Programs (AW-459)                        Agency U. S. Environmental Protect1 on Crystal Mall #2 Arlington, Virginia      20460
            U. S. Environmental Protection Agency Region I Office ATTN: EIS COORDINATOR
            John F. Kennedy Federal Building Boston, Massachusetts 02203 Waterford Public tibrary Rope Ferry Road, Route 156 Waterford, Connecticut 06385 Northeast Utilities Service Company ATTN: Mr. James R. Himnelwright Nuclear Engineering and Operations P. 0. Box 270
              Hartford, Connecticut 06101
      .


The Bureau also performs the following specfic functions:
-a -. I -          -I
* * * * -pCLEAP REGULATORY
            'Feieral    Register / Vol. 4S. No. 211 t Wednesday. October 29. 198D I Riugs anJ Regulatins                              7156 published on October a.1980 45 FR              performs the following specfic                   earlier anticipated has been reqgred to
OMMtSSION
64949. Te corrected I O9 is published          functions:                                                     pm on rispotei
-0CFR Par 50 ._re Protection Schedules for Operating Nuclear Power Plants AOENc: U.S. Nuclear Regulatory Commission.
                                                              *     *   -
below.                                          *     *
EFFECrrVE DAT:         April I& ISM                                                              completion. and wil ho.'porete.


AI ow Final Ile.- -summARr. The Nuclear Regulatory Commission (N'RC) is amending its regulations to temporarily suspend.-completion schedules for certain fire protection features ir. operating nuclear plants pending completion of its ongoing comprehensive fire protection rulemaking.
implementation schedule difern irm FOR FURTHER INFORMAflON CONTAC11                                                                  that in the proposedmrule.ttlaszrt yet Robert P. De Young. Private Radio                                                                .been published and i any een:d Bureau. (202) 632-7175.                                                                          not be effective until 90 days pCLEAP REGULATORY                            publication. -
ADORESS Federal Communications                    OMMtSSION -                                       Certain NRC licensees.hownm ane Commission. Washington, D.C. 2055 SUPPEMENTARY INFORMATIONC                          0CFR Par 50        ._                        at present operating under licen In the Matter of amendment of Part 0                                                          conditions or technical spedicatbw re Protection Schedules for                  thereto which Include the N;veoxr1I
to transfer authority for common carrier                                                        deadline or other dates wbic wl matters involving public coast stations        Operating Nuclear Power Plants to the Private Radio Bureau.                                                                    precede the effective date of te Eia AOENc: U.S. Nuclear Regulatory                   rule. To the extent that-these Ecensees udeased: August 25.290                    Commission.                                      have been unable to complete aD &fte
    1 In the Order in the above-captioned      AI ow Final Ile.-             -                  fire protection measures tawhich these matter. FCC 80-179 released April 7.                                                            deadlines apply. continued opeaion summARr. The Nuclear Regulatory                  would violate the license conditios.


This suspension is necessary because some NRC licensees are unable to meet fire protection implementation deadlines contained in licensed conditions.
-980 Section 0.91 of the rules was              Commission (N'RC) is amending its                The violation would extend cnly =3 amended to reflect a transfer of function      regulations to temporarily suspend.-
fro! the Common Carrier Bureau to the                                                            the final rule becomes effctair, s!sce Private Radio Bureau (45 FR 25399. AprlJ        completion schedules for certain fire            the implementaton schedule ccn,.I d protection features ir. operating nuclear        In the final rule will supersede
15.1950).                                      plants pending completion of its ongoing Inconsistent license conditio=s
    2.Section 0M of the rules was also          comprehensive fire protection
-amended by Order. FCC 79-8                                                                          The Commission has determian rulemaking. This suspension is                 -. based upon a review of the ctm e:rd released March 7.1980. to reflect the          necessary because some NRC licensees reorganization of the Common Carrier -                                                            in this rulemakz. that relief rom thes&e~s^
                                                are unable to meet fire protection               license conditions is appropriale - :
-Bureau. Through inadvertence. oar              implementation deadlines contained in Order of April 7. amended the language                                                            pending promulgation of the fnah iale on licensed conditions. The Commission              fire protection applicable to aIL NC
of the rule prior to Its having been            has found that fire protection measures - licensees Extensive fire protectio:
  amnded by our Order of March 7.1980            already implemented give reasonable
  (45 FR45619. March 13. 198).                                                                    measures have already been assurance of safety. and that no health          implemented at all operating plau~s The
    1.To correct this situation. Section        aud safety interest would be served by OM is amended as set forth in the                                                                implementation schedule of the final forcing certain licensees to shut down            rule will be uniform and compreh:sive.


The Commission has found that fire protection measures -already implemented give reasonable assurance of safety. and that no health aud safety interest would be served by forcing certain licensees to shut down during the brief period between the license condition deadlines and the effectiveness of the final fire protection rule.EFCTiVE DATE: October 29, 29BO.FOR FURTHER INFORMATION  
attached appendix. to amend the                during the brief period between the               and will apply to all operating placis cL-rently effective language of the rule.      license condition deadlines and the               including those with diffrent schedules Federal Conmunications Commission.            effectiveness of the final fire protection       contained in license conditios. N:
  lSecs:4. 3M. 48 StaL. as amended.I2O 10H1      rule.                                             public health and safety Interest wonu
  47, US.C. 154.3033                            EFCTiVE DATE: October 29, 29BO.                   be served by forcing only those
      *      .Ticaxic,                          FOR FURTHER INFORMATION  


==CONTACT==
==CONTACT==
.W11lliam Shields. Office of Executive Legal Director.
.                 licensees unable to meet'dead2ines
 
        -Se~rraI-
U.S. Nuclear Regulatory Commission.
                -                    -*          W11lliam Shields. Office of Executive           preceding the effectiveness of tie !nal Part 0 of Chapter I of Title 47 of the      Legal Director. U.S. Nuclear Regulatory           rule to shut down for the brief btnim..
 
  Code of Federal Regulations is amendec          Commission. Washington. D.C. 20555,             To the contrary. the fire prsteczon as follows:                                    phone 301-492-69                                 measures already implemented Sh>v In I 0.91 the introductory text is          SUPPLEUCNTARY INFORMATION: On May               reasonable assurance that all ope.atmig revised to read as follows:                    29,1980 the Commission published in             nuclear plants may continue to operate the Federal Register (45 FR 36402) a           -safely even though the final rule w1
Washington.
  50J1      Funetions    the Buea                Notice of Proposed Rulernaking entitled         require additional fire-protecticn Tbe Common Carrier Bureau                  .re Protection Program for Nuclear               measures at many plants.
 
D.C. 20555, phone 301-492-69 SUPPLEUCNTARY  
INFORMATION:  
On May 29,1980 the Commission published in the Federal Register (45 FR 36402) a Notice of Proposed Rulernaking entitled.re Protection Program for Nuclear Plants Operating Prior to January 1, 1n7.- The proposed rule provided that s all tire protection modifications except alternate or dedicated shutdown capability would be required to be Implemented by November 1,1980, unless the Commission approve an e extension for good cause, This deadline was also stated in the Commission's May.2 1980 Mernorandum and Order On the Union of Concerned Scientists Petition for Emergency and Remedial Action. 21 NRC 707.n9. ---k Many of the commenters on the proposed rule contended that the November 1 deadline was unachievable.
 
Moreover, much more time than was earlier anticipated has been reqgred to pm on ris potei completion.
 
and wil ho.'porete.


implementation schedule difern irm that in the proposedmrule.ttlaszrt yet.been published and i any een:d not be effective until 90 days publication.
develops, recommends and administers            Plants Operating Prior to January 1,                The Administrative Proc'ure Act policies and programs for the regulation        1n7.- The proposed rule provided that            provides that a rule may be effectire of services, facilities, rates and practice s  all tire protection modifications except        upon-publication when that rule -Vaws of entitiesiexcluding public coast            alternate or dedicated shutdown                  or recognizes an exception cr rtieews a stations in the maritime mobile service)      capability would be required to be              restriction." 5 U.S.C. 553 [d)(). This ruL
  which furnish interstate or foreign            Implemented by November 1,1980,                  relieves certain NRC licensees 'ro- communications service for hire-              unless the Commission approve an                license conditions or technical whether by wire, radio. cable or satellit e    extension for good cause, This deadline          specifications thereto in regard to fie facilities and of ancillary operations        was also stated in the Commission's              protection Implementation deadlines.


-Certain NRC licensees.hownm ane at present operating under licen conditions or technical spedicatbw thereto which Include the N;veoxr1 I deadline or other dates wbic wl precede the effective date of te Eia rule. To the extent that-these Ecensees have been unable to complete aD &fte fire protection measures t awhich these deadlines apply. continued opeaion would violate the license conditios.
related to the ;=visions or use of such        May.21980 Mernorandum and Order                  and will therefore be effective rp= the services. The Bureau also regulates the       On the Union of Concerned Scientists          .--date of publication in the Fedml atest,terms.,and conditions for cable        Petition for Emergency and Remedial              Refister.'Furthernore, as noted ab-re.


The violation would extend cnly =3 the final rule becomes effctair, s!sce the implementaton schedule ccn,.I d In the final rule will supersede Inconsistent license conditio=s The Commission has determian-.based upon a review of the ctm e:rd in this rulemakz.
Ielevision and pole attachments, where        Action. 21 NRC 707.n9.                    - -- the proposed rule stated that extensions
  -s     ltgachme~are not regulated by ak          Many of the commenters on the                from the November 1. deadline woed be state and not provided by railroads or        proposed rule contended that the                 considered for good causc. Extsive rovernmentally-or cooperatively                November 1 deadline was unachievable. public comment was received to th owned utilities. The Bureau also              Moreover, much more time than was                effect that the deadline was eurealntic


that relief rom thes&e~s^license conditions is appropriale
r      4.  N              .O -9
-: pending promulgation of the fnah iale on fire protection applicable to aIL NC licensees Extensive fire protectio:
7i-i-                              7e1a ettr/VL4.N.=          1Wdeda.Otbr2.9    ue n euaim and should be revised. Under these cicumstances the Commission believes that there is good cause for an extension of the license condition schedules pending ellectiveness of the final rule on fire protection Tae rule provides that all compliance dates contained in license conditions or technical specifications for required fire protection measures are suspended pending fu-ther action by the Commission. As Is clear from the above discussion, that further action will be promulgation of the final rule on fire protection. The Commission intends that licessees arected by this rule should                                          2=
measures have already been implemented at all operating plau~s The implementation schedule of the final rule will be uniform and compreh:sive.
use best efforts to complete all required measures as soon as possible despite the suspension of the deadlines for this bi.f period.


and will apply to all operating placis including those with diffrent schedules contained in license conditios.
Pursuant to the Atomic Energy Act of
  1954. as amended. the Energy Reorganization Act of 1974. as amended.


N: public health and safety Interest wonu be served by forcing only those licensees unable to meet'dead2ines preceding the effectiveness of tie !nal rule to shut down for the brief btnim..To the contrary.
and Sections 552 and 553 of Title 5 of the United States Code, notice is hereby given that the following amendment to Title 10. Chapter L Code of Federal Regulations. Part 50. is published as a document subject to codification.


the fire prsteczon measures already implemented Sh>v reasonable assurance that all ope.atmig nuclear plants may continue to operate-safely even though the final rule w1 require additional fire-protecticn measures at many plants.The Administrative Proc'ure Act provides that a rule may be effectire upon-publication when that rule -Vaws or recognizes an exception cr rtieews a restriction." 5 U.S.C. 553 [d)(). This ruL relieves certain NRC licensees
PART 5S-DOMESTIC LICENSING OF
'ro-license conditions or technical specifications thereto in regard to fie protection Implementation deadlines.
  PRODUCTION AND UTILIZATION
  FACILITIES
      1. A new Section 58U is added to read as follows
  150.4 Fere protectIon schedu&e.


and will therefore be effective rp= the.--date of publication in the Fedml Refister.'Furthernore, as noted ab-re.the proposed rule stated that extensions from the November 1. deadline woed be considered for good causc. Extsive public comment was received to th effect that the deadline was eurealntic r 4. N .O -9 7i-i- 7e1a ettr/VL4.N.=
To the extent that any facility's license conditions or technical specifications incorporate compliance dates for modifications neceussary to proVide fire protection features proposed by a licensee and accepted by the NRC staff as satisfying the proisions of Appendix A to Branch Tech=ical Position BTP/APCSB 9.5-1 and reflected in NRC staff Fire Protection Safety Evaluation Reports Issued prior to the effective date of this rule. those dates are hereby suspended ptndmn further action by the Commission.
1Wdeda.Otbr2.9 ue n euaim and should be revised. Under these cicumstances the Commission believes that there is good cause for an extension of the license condition schedules pending ellectiveness of the final rule on fire protection Tae rule provides that all compliance dates contained in license conditions or technical specifications for required fire protection measures are suspended pending fu-ther action by the Commission.


As Is clear from the above discussion, that further action will be promulgation of the final rule on fire protection.
(Semimb. Pub. Law u3- e6a Stat. 94& Sec.


The Commission intends that licessees arected by this rule should use best efforts to complete all required measures as soon as possible despite the suspension of the deadlines for this bi.f period.Pursuant to the Atomic Energy Act of 1954. as amended. the Energy Reorganization Act of 1974. as amended.and Sections 552 and 553 of Title 5 of the United States Code, notice is hereby given that the following amendment to Title 10. Chapter L Code of Federal Regulations.
20t Prb. Law 33-43L 8 Stat 242 (42 US.C.


Part 50. is published as a document subject to codification.
Zzwi(b). 581u]
      Dated at Washingtorn D.C this 27th day of Ocober 198 Fo: eeNuclear Regulatory Commission.


PART 5S-DOMESTIC
S=uel C Chil.
LICENSING
OF PRODUCTION
AND UTILIZATION
FACILITIES
1. A new Section 58U is added to read as follows 1 50.4 Fere protectIon schedu&e.To the extent that any facility's license conditions or technical specifications incorporate compliance dates for modifications neceussary to proVide fire protection features proposed by a licensee and accepted by the NRC staff as satisfying the proisions of Appendix A to Branch Tech=ical Position BTP/APCSB
9.5-1 and reflected in NRC staff Fire Protection Safety Evaluation Reports Issued prior to the effective date of this rule. those dates are hereby suspended ptndmn further action by the Commission.(Semimb. Pub. Law u3- e6a Stat. 94& Sec.20t Prb. Law 33-43L 8 Stat 242 (42 US.C.Zzwi(b). 581u]Dated at Washingtorn D.C this 27th day of Ocober 198 Fo: e eNuclear Regulatory Commission.


S=uel C Chil.Secrexry of c Commission.
Secrexry of c Commission.


jfl DMc 6..a3' Saad U4.U-M Mt4 aaj SnMuwo c0oE 75904$-U 2=}}
jfl DMc 6..a3' Saad U4.U-M Mt4 aaj SnMuwo c0oE 75904$-U}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 01:51, 24 November 2019

NRC Generic Letter 1980-096: Transmittal of Revised Rule 10 CFR 50, Section 50.48 Suspending Completion Dates for Fire Protection Modifications Previously Approved by NRC Staff
ML031350464
Person / Time
Issue date: 11/14/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-80-096, NUDOCS 8012110012
Download: ML031350464 (7)


~. '67 - '

. - Z~. 66 St o fi1 ILE

-

REGULAYPElu 5"3L% J Itj N COP OP

Docket No. 50-336 .. F9

.

- - ~4.I..

0

(- 20

NOV 14 1m90

Mr. W. G. Counsil, Vice President Nuclear Engineering & Operations Northeast Nuclear Energy Company P. 0. Box 270

Hartford, Connecticut 06101 Dear Mr. Counsil:

10 CFR 50 has been As you know, a proposed Section 50.48 and Appendix R to a revised pending since May 1980. The Commission has recently approved R to 10 CFR 50

final version of that proposed Section 50.48 and Appendixand will become which will be published in the Federal Re ister shortly 50.48 will effective 90 days after publ1ca-tf-. This revised 10 CFRmodifications.

contain schedules for completion of all fire protection by Appendix R.

One set of schedules will be applicable to features covered fire protection A similar set of schedules will be applicable to all other in a staff safety modifications that have been approved by the NRC staff completion evaluation report. This latter set of schedules will require specified in of modifications not covered by Appendix R by schedules conditions, the revised rule or by the dates noa specified as license approved by NRC.

whichever is sooner, unless an extension or exemption is facility may Some of the completion dates discussed in the SER for yourrequired additional be associated with modifications for which the NRC staff be subsequently information, such as design details or test results, to To the reviewed and approved by the NRC staff prior to implementation. as this for your extent that there are fire protection modifications such yet been approved facility and the required additional information has notreport, there is no by the staff as evidenced in a staff safety evaluation of such items present implementation requirement; consequently, completion will be governed by the schedules in the revised rule.

rule, the Commission In the interim, pending the effective date of the revised completion dates has approved a new Section 50.48 of 10 CFR 50 suspending the NRC staff.

for fire protection modifications previously approved by Federal Re ister This new section became effective upon publication in the is enclosed on October 29, 1980 (45 FR 71569). A copy of the new rule the revised rule when for your information. This rule will be superseded by it becomes effective. Al is PI

M(It Ct

01 21IoOI -

_.

pg0 r p.................................... ................. ...................................

OFFICE

SURNAMEO ....................................

I. 1

................. ................. ...................

DATEO ....................................

l4 .. GVRMN

.fD RNIGOFC:17.8-6 tJ~, Af.i1NC

O41R 10.7AI1 Pjr^M n24n *U.S. GOVERNMENT PRINTING OFFICE: 1979-289-369

-

o

-

-2- In the near future, we plan to contact you to Identify specifically are covered which fire protection features associated with your facility and by Appendix R and would thus be subject to one set of schedules, by a different which are previously approved itetms which are covered set of schedules.

Sincerely, Original signed by Darrell G. Lisenhut Darrell G. Elsenhut, Director Division of Licensing Enclosuro:

As stated cc w/enclosure:

See next page DISTRIBUTION:

Docket File NRC PDR

L PDR

TERA

NSIC

ORB#3 Rdg NRR Rdg EGCase DEisenhut RPurple TNovak RTedesco GLainas JRoe VBenaroya OELD

OI&E (3)

RAClark Project Manager -O i a"'

PMKreutzerti)

ACRS (16)

RFerguson (5)

JHeltemes Gray File -ORB#3 ORB#3:DL l AD:OR:DL D:

OR3D DL

.L...................... ..... RA.t SURNAME ,f zer/i

. DATEl ... I /!#80

WAE.. .

.......... 11- .. .... .i ...-

/ 0 i4j80

! . .. 11J2801/10

1... ...80 ..................

I

- I--A MOcrA flAn GOVERNMENT PRINTING OFFICE: 1979-289-369

'IO

UNITED STATES

aNUCLEAR REGULATORY COMMISSION

b {

WASHINGTON, D.C. 20555 g

t aNovember 14, 1980

Docke .t No. 50-336 Mr. W. G. Counsil, Vice President Nuclear Engineering & Operations Northeast Nuclear Energy Company P. 0. Box 270

Hartford, Connecticut 06101 Dear Mr. Counsil:

R to 10 CFR 50 has been As you know, a proposed Section 50.48 andhasAppendix approved a revised pending since May 1980. The Cnmmission 50.48 recently and Appendix R to 10 CFR 50

final version of that proposed Section Register shortly and will become which will be published in the Federal revised 10 CFR 50.48 will effective 90 days after publication.WThis protection modifications.

contain schedules for completion of all fireto features covered by Appendix R.

One set of schedules will be applicable to all other fire protection A similar set of schedules will be applicablethe NRC staff in a staff safety modifications that have been approved by will require completion evaluation report. This latter set of schedules R by schedules specified in of modifications not covered by Appendix as license conditions, the revised rule or by the dates now specified or exemption is approved by NRC.

whichever is sooner, unless an extension SER for your facility may Some of the completion dates discussed in the the NRC staff required additional be associated with modifications fororwhich test results, to be subsequently information, such as design details implementation. To the reviewed and approved by the NRC staff prior to modifications such as this for your extent that there are fire protection information has not yet been approved facility and the required additional safety evaluation report, there is no by the staff as evidenced in a staff completion of such items present implementation requirement; consequently, rule.

will be governed by the schedules in the revised In the interim, pending the effective10date of the revised rule, the Commission has approved a new Section 50.48 of CFR 50 suspending completion dates for fire protection modifications previously approved by the NRC staff.

publication in the Federal Register This new section became effective upon of the new rule is enclsd on October 29, 1980 (45 FR 71569). A copy be superseded by the revised rule when for your information. This rule will it becomes effective.

I

'-I

-2- In the near future, we plan to contact you to identify specifically are covered which fire protection features associated with your facility and by Appendix R and would thus be subject to one set of schedules, a different which are previously approved items which are covered by set of schedules.

ncerely,

& . w rctor Division of Licensing Enclosure:

As stated cc w/enclosure:

See next page

Northeast Nuclear Energy Company

% 401, Mr. John Shedlosky cc: Resident Inspector/Millstone William H. Cuddy, Esquire c/o U.S. NRC

Day, Berry & Howard P. 0. Drawer KK

Counselors at Law Niantic, CT 06357 One Constitution Plaza Hartford, Connecticut 06103 Mr. Charles B. Brin'cman Anthony Z. Roisman Manager - Washington Nuclear Katural Resources Defense Council Operations

917 15th Street, NOW. C-E Power Systems Washington, D.C. 20005 Combustion Engineering, Inc.

4853 Cordell Ave., Suite A-1.

Maryland 20014 Mr. Lawrence Bettencourt. First Selectman Bethesda,

.Town of Waterford Hall of Records - 200 Boston Post Road Waterford, Connecticut 06385 Northeast Nuclear Energy Company ATTN: Superintendent Connecticut Energy Agency Millstone Plant *ATTN: Assistant Director, Research Post Office Box 128 and Policy Development Waterford, Connecticut 06385 Department of Planning and Energy Policy n r Technical Assessment

20 Grand Street Division Hartford, Connecticut 06106 Office of Radiation Programs (AW-459) Agency U. S. Environmental Protect1 on Crystal Mall #2 Arlington, Virginia 20460

U. S. Environmental Protection Agency Region I Office ATTN: EIS COORDINATOR

John F. Kennedy Federal Building Boston, Massachusetts 02203 Waterford Public tibrary Rope Ferry Road, Route 156 Waterford, Connecticut 06385 Northeast Utilities Service Company ATTN: Mr. James R. Himnelwright Nuclear Engineering and Operations P. 0. Box 270

Hartford, Connecticut 06101

.

-a -. I - -I

'Feieral Register / Vol. 4S. No. 211 t Wednesday. October 29. 198D I Riugs anJ Regulatins 7156 published on October a.1980 45 FR performs the following specfic earlier anticipated has been reqgred to

64949. Te corrected I O9 is published functions: pm on rispotei

  • * -

below. * *

EFFECrrVE DAT: April I& ISM completion. and wil ho.'porete.

implementation schedule difern irm FOR FURTHER INFORMAflON CONTAC11 that in the proposedmrule.ttlaszrt yet Robert P. De Young. Private Radio .been published and i any een:d Bureau. (202) 632-7175. not be effective until 90 days pCLEAP REGULATORY publication. -

ADORESS Federal Communications OMMtSSION - Certain NRC licensees.hownm ane Commission. Washington, D.C. 2055 SUPPEMENTARY INFORMATIONC 0CFR Par 50 ._ at present operating under licen In the Matter of amendment of Part 0 conditions or technical spedicatbw re Protection Schedules for thereto which Include the N;veoxr1I

to transfer authority for common carrier deadline or other dates wbic wl matters involving public coast stations Operating Nuclear Power Plants to the Private Radio Bureau. precede the effective date of te Eia AOENc: U.S. Nuclear Regulatory rule. To the extent that-these Ecensees udeased: August 25.290 Commission. have been unable to complete aD &fte

1 In the Order in the above-captioned AI ow Final Ile.- - fire protection measures tawhich these matter. FCC 80-179 released April 7. deadlines apply. continued opeaion summARr. The Nuclear Regulatory would violate the license conditios.

-980 Section 0.91 of the rules was Commission (N'RC) is amending its The violation would extend cnly =3 amended to reflect a transfer of function regulations to temporarily suspend.-

fro! the Common Carrier Bureau to the the final rule becomes effctair, s!sce Private Radio Bureau (45 FR 25399. AprlJ completion schedules for certain fire the implementaton schedule ccn,.I d protection features ir. operating nuclear In the final rule will supersede

15.1950). plants pending completion of its ongoing Inconsistent license conditio=s

2.Section 0M of the rules was also comprehensive fire protection

-amended by Order. FCC 79-8 The Commission has determian rulemaking. This suspension is -. based upon a review of the ctm e:rd released March 7.1980. to reflect the necessary because some NRC licensees reorganization of the Common Carrier - in this rulemakz. that relief rom thes&e~s^

are unable to meet fire protection license conditions is appropriale - :

-Bureau. Through inadvertence. oar implementation deadlines contained in Order of April 7. amended the language pending promulgation of the fnah iale on licensed conditions. The Commission fire protection applicable to aIL NC

of the rule prior to Its having been has found that fire protection measures - licensees Extensive fire protectio:

amnded by our Order of March 7.1980 already implemented give reasonable

(45 FR45619. March 13. 198). measures have already been assurance of safety. and that no health implemented at all operating plau~s The

1.To correct this situation. Section aud safety interest would be served by OM is amended as set forth in the implementation schedule of the final forcing certain licensees to shut down rule will be uniform and compreh:sive.

attached appendix. to amend the during the brief period between the and will apply to all operating placis cL-rently effective language of the rule. license condition deadlines and the including those with diffrent schedules Federal Conmunications Commission. effectiveness of the final fire protection contained in license conditios. N:

lSecs:4. 3M. 48 StaL. as amended.I2O 10H1 rule. public health and safety Interest wonu

47, US.C. 154.3033 EFCTiVE DATE: October 29, 29BO. be served by forcing only those

  • .Ticaxic, FOR FURTHER INFORMATION

CONTACT

. licensees unable to meet'dead2ines

-Se~rraI-

- -* W11lliam Shields. Office of Executive preceding the effectiveness of tie !nal Part 0 of Chapter I of Title 47 of the Legal Director. U.S. Nuclear Regulatory rule to shut down for the brief btnim..

Code of Federal Regulations is amendec Commission. Washington. D.C. 20555, To the contrary. the fire prsteczon as follows: phone 301-492-69 measures already implemented Sh>v In I 0.91 the introductory text is SUPPLEUCNTARY INFORMATION: On May reasonable assurance that all ope.atmig revised to read as follows: 29,1980 the Commission published in nuclear plants may continue to operate the Federal Register (45 FR 36402) a -safely even though the final rule w1

50J1 Funetions the Buea Notice of Proposed Rulernaking entitled require additional fire-protecticn Tbe Common Carrier Bureau .re Protection Program for Nuclear measures at many plants.

develops, recommends and administers Plants Operating Prior to January 1, The Administrative Proc'ure Act policies and programs for the regulation 1n7.- The proposed rule provided that provides that a rule may be effectire of services, facilities, rates and practice s all tire protection modifications except upon-publication when that rule -Vaws of entitiesiexcluding public coast alternate or dedicated shutdown or recognizes an exception cr rtieews a stations in the maritime mobile service) capability would be required to be restriction." 5 U.S.C. 553 [d)(). This ruL

which furnish interstate or foreign Implemented by November 1,1980, relieves certain NRC licensees 'ro- communications service for hire- unless the Commission approve an license conditions or technical whether by wire, radio. cable or satellit e extension for good cause, This deadline specifications thereto in regard to fie facilities and of ancillary operations was also stated in the Commission's protection Implementation deadlines.

related to the ;=visions or use of such May.21980 Mernorandum and Order and will therefore be effective rp= the services. The Bureau also regulates the On the Union of Concerned Scientists .--date of publication in the Fedml atest,terms.,and conditions for cable Petition for Emergency and Remedial Refister.'Furthernore, as noted ab-re.

Ielevision and pole attachments, where Action. 21 NRC 707.n9. - -- the proposed rule stated that extensions

-s ltgachme~are not regulated by ak Many of the commenters on the from the November 1. deadline woed be state and not provided by railroads or proposed rule contended that the considered for good causc. Extsive rovernmentally-or cooperatively November 1 deadline was unachievable. public comment was received to th owned utilities. The Bureau also Moreover, much more time than was effect that the deadline was eurealntic

r 4. N .O -9

7i-i- 7e1a ettr/VL4.N.= 1Wdeda.Otbr2.9 ue n euaim and should be revised. Under these cicumstances the Commission believes that there is good cause for an extension of the license condition schedules pending ellectiveness of the final rule on fire protection Tae rule provides that all compliance dates contained in license conditions or technical specifications for required fire protection measures are suspended pending fu-ther action by the Commission. As Is clear from the above discussion, that further action will be promulgation of the final rule on fire protection. The Commission intends that licessees arected by this rule should 2=

use best efforts to complete all required measures as soon as possible despite the suspension of the deadlines for this bi.f period.

Pursuant to the Atomic Energy Act of

1954. as amended. the Energy Reorganization Act of 1974. as amended.

and Sections 552 and 553 of Title 5 of the United States Code, notice is hereby given that the following amendment to Title 10. Chapter L Code of Federal Regulations. Part 50. is published as a document subject to codification.

PART 5S-DOMESTIC LICENSING OF

PRODUCTION AND UTILIZATION

FACILITIES

1. A new Section 58U is added to read as follows

150.4 Fere protectIon schedu&e.

To the extent that any facility's license conditions or technical specifications incorporate compliance dates for modifications neceussary to proVide fire protection features proposed by a licensee and accepted by the NRC staff as satisfying the proisions of Appendix A to Branch Tech=ical Position BTP/APCSB 9.5-1 and reflected in NRC staff Fire Protection Safety Evaluation Reports Issued prior to the effective date of this rule. those dates are hereby suspended ptndmn further action by the Commission.

(Semimb. Pub. Law u3- e6a Stat. 94& Sec.

20t Prb. Law 33-43L 8 Stat 242 (42 US.C.

Zzwi(b). 581u]

Dated at Washingtorn D.C this 27th day of Ocober 198 Fo: eeNuclear Regulatory Commission.

S=uel C Chil.

Secrexry of c Commission.

jfl DMc 6..a3' Saad U4.U-M Mt4 aaj SnMuwo c0oE 75904$-U

Template:GL-Nav