ML060690168: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.: ---, X I so It#o&, '.7 .I**4*, .0'UNITED ITATES NUCLEAR REGULATrORY COMMISSION WASHJNOTONI, D. C. 20551 471Mc~w0'0-cZ FIG 15 84 AO%.* .Docket lHos. STN 50-482 and STH 50-483 MEMORANDUM FOR: H. Denton, tlRR*E. Case, NRR*G. Edison, NRR*D. Elsenhut, DL T. Novak, DL*F. MIlraglia, DL H. Thompson, DHFS W. Johnston L. Rubenstein R. Vollmer, DE D. Muller, DSI (Acting)T. Speis, DST B. Snyder, TMIPO G. Ho ohan, ORAB G. Lainas, DL D. Crutchfitld, DL W. Houston THRU: FROM:
{{#Wiki_filter:.: - - -   , X I   so   It#o&,     '
471Mc~w0'0-cZ
                                                          'UNITED ITATES
                  .7 . I                     NUCLEAR REGULATrORY COMMISSION
                **4*,       .0                         WASHJNOTONI, D. C.20551 FIG 15 84 Docket lHos. STN 50-482                           AO%.* .
and STH 50-483 MEMORANDUM FOR:       H. Denton, tlRR*                     R. Vollmer, DE E. Case, NRR*                       D. Muller, DSI (Acting)
G. Edison, NRR*                     T. Speis, DST D. Elsenhut, DL                     B. Snyder, TMIPO T. Novak, DL*                       G. Ho ohan, ORAB F. MIlraglia, DL                    G. Lainas, DL H. Thompson, DHFS                   D. Crutchfitld, DL W. Johnston                         W. Houston L. Rubenstein THRU:                B. J. Youngblood, Chief #I Licensing Branch No. 1I'Ll Division of Licensing        rT FROM:                Joseph J. Holonich, Project Manager Licensing Branch No. 1 Division of Licensing Paul W. O'Connor, Project Manager Licensing Branch No, I Division of Licensing


==SUBJECT:==
==SUBJECT:==
B. J. Youngblood, Chief #I Licensing Branch No. 1 I'Ll Division of Licensing rT Joseph J. Holonich, Project Manager Licensing Branch No. 1 Division of Licensing Paul W. O'Connor, Project Manager Licensing Branch No, I Division of Licensing DAILY HIGHLIGHT CALLAWAY PLANT, U-;It I/WOLF CREEK GENERAqTIhG STATION On August 14, 1984, Union Electric Company and Kansas Gas and Electric Ccpany met '4th the appropriate NRR Assistant Directors to appeal the staff's position on their sato shutdown analysis.
DAILY HIGHLIGHT CALLAWAY PLANT, U-;It I/WOLF CREEK GENERAqTIhG STATION On August 14, 1984, Union Electric Company and Kansas Gas and Electric Ccpany met '4th the appropriate NRR Assistant Directors to appeal the staff's position on their sato shutdown analysis. The meeting resulted in the staff and the utilities agreeing that the problem may not be as severe as or1ginally believed and to hold a meoting betweon the cognizant reviewers and utilities today to discuss the issue. In addition, the utilities intend 0400200i6 1004080 Cl     Af)OCK 0.0   CF
The meeting resulted in the staff and the utilities agreeing that the problem may not be as severe as or1ginally believed and to hold a meoting betweon the cognizant reviewers and utilities today to discuss the issue. In addition, the utilities intend 0400200i6 1 004080 Cl Af)OCK 0.0 CF>1--  
                                                                                                        >1
..; I-e 2- AUG 1 5 14 to describe the compensatory measures that will be in place to ensure that the plant meets all the applicable regulatory requirements until any Itional modifications which may be needed are complete.
                                                - -
Based on this it v- luded that an appeal decision was not needed. If the problem still canno resolved by the reviewers, the utilities will continue to pursue the dpeal with the Assistant Directors.
 
OXI caZ s:; 6Wfl Joseph J. Holonich, Project Manager Licensing Branch No. I Division of Licensing NI ORIO13ALS
. . ; I
:;3T3 ( //.- /' I Paul W. O'Connor, Projct Manaocr Licensing Branch Ho. I Dtvision of Licensing.i^Hand Carry DISTRIBUTION:
  -e 2-AUG 1 5 14 to describe the compensatory measures that will be in place to ensure that the plant meets all the applicable regulatory requirements until any       Itional modifications which may be needed are complete. Based on this it v-         luded that an appeal decision was not needed. If the problem still canno resolved by the reviewers, the utilities will continue to pursue the dpeal with the Assistant Directors.
ockct.Fle LB01 R/F SBlack MRushbrook JHolonich PO'Connor Gleyer LBOJRo0 Ipch:kab 8/ /84 PWO'Copnor 08/ XS /84/I LBO OJY lood 08/ /84-w}}
OXIcaZ s:;6Wfl Joseph J. Holonich, Project Manager Licensing Branch No. I Division of Licensing   NI ORIO13ALS :;3T3   (   //.- /' I .i Paul W. O'Connor, Projct Manaocr Licensing Branch Ho. I Dtvision of Licensing
        ^Hand Carry DISTRIBUTION:
ockct.Fle LB01 R/F SBlack MRushbrook JHolonich PO'Connor                                   /I Gleyer LBOŽ                                LBO JRo0 Ipch:kab   PWO'Copnor          OJY      lood 8/   /84       08/ XS /84           08/   /84
                                              -w}}

Revision as of 22:14, 23 November 2019

Memo from J. Holonich, NRR, to H. Denton, Et Al., NRR, Daily Highlight
ML060690168
Person / Time
Site: Wolf Creek, Callaway  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/15/1984
From: Joseph Holonich, O'Connor P
Office of Nuclear Reactor Regulation
To: Case E, Harold Denton, Edison G, Eisenhut D, Johnston W, Miraglia F, Novak T, Rubenstein L, Thompson H
Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0095 NUDOCS 8408200610
Download: ML060690168 (2)


Text

.: - - - , X I so It#o&, '

471Mc~w0'0-cZ

'UNITED ITATES

.7 . I NUCLEAR REGULATrORY COMMISSION

    • 4*, .0 WASHJNOTONI, D. C.20551 FIG 15 84 Docket lHos. STN 50-482 AO%.* .

and STH 50-483 MEMORANDUM FOR: H. Denton, tlRR* R. Vollmer, DE E. Case, NRR* D. Muller, DSI (Acting)

G. Edison, NRR* T. Speis, DST D. Elsenhut, DL B. Snyder, TMIPO T. Novak, DL* G. Ho ohan, ORAB F. MIlraglia, DL G. Lainas, DL H. Thompson, DHFS D. Crutchfitld, DL W. Johnston W. Houston L. Rubenstein THRU: B. J. Youngblood, Chief #I Licensing Branch No. 1I'Ll Division of Licensing rT FROM: Joseph J. Holonich, Project Manager Licensing Branch No. 1 Division of Licensing Paul W. O'Connor, Project Manager Licensing Branch No, I Division of Licensing

SUBJECT:

DAILY HIGHLIGHT CALLAWAY PLANT, U-;It I/WOLF CREEK GENERAqTIhG STATION On August 14, 1984, Union Electric Company and Kansas Gas and Electric Ccpany met '4th the appropriate NRR Assistant Directors to appeal the staff's position on their sato shutdown analysis. The meeting resulted in the staff and the utilities agreeing that the problem may not be as severe as or1ginally believed and to hold a meoting betweon the cognizant reviewers and utilities today to discuss the issue. In addition, the utilities intend 0400200i6 1004080 Cl Af)OCK 0.0 CF

>1

- -

. . ; I

-e 2-AUG 1 5 14 to describe the compensatory measures that will be in place to ensure that the plant meets all the applicable regulatory requirements until any Itional modifications which may be needed are complete. Based on this it v- luded that an appeal decision was not needed. If the problem still canno resolved by the reviewers, the utilities will continue to pursue the dpeal with the Assistant Directors.

OXIcaZ s:;6Wfl Joseph J. Holonich, Project Manager Licensing Branch No. I Division of Licensing NI ORIO13ALS :;3T3 ( //.- /' I .i Paul W. O'Connor, Projct Manaocr Licensing Branch Ho. I Dtvision of Licensing

^Hand Carry DISTRIBUTION:

ockct.Fle LB01 R/F SBlack MRushbrook JHolonich PO'Connor /I Gleyer LBOŽ LBO JRo0 Ipch:kab PWO'Copnor OJY lood 8/ /84 08/ XS /84 08/ /84

-w