ML070650490: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:00001" | {{#Wiki_filter:00001" | ||
----- ---------iZýFil GRAND OPENING! | - ---- | ||
--------- | |||
iZý Fil GRAND OPENING! | |||
- | Cos & Scheul Stats Pln A Prp for Shtdw Bt .Y/ IC-DFD Finlysem | ||
&Euldn F | |||
Fuel Shipment ISFSI Dismantlement | |||
Scedl Sttu | |||
*Sumta SceueSwes Fia Site Sure SE06 FE072 FuelShiped t DO MAY2 MA12 ISaS De oihd/rjc OC 1 OC 1 0S aCamplete | |||
Project Challenges" Improve safety culture and maintain schedule" Balance disposal cost vs schedule impact-Steam drum enclosure remediation | 6cedl E E £nc Decon~~~ | ||
-Interior concrete between 599 and 585 levels-Radwaste vault" Send waste to Duratek at a steady pace r-I I I}} | & SuvyItro ocee1 Sper Dismnlmn (5) | ||
Inero Co ceeD m lto98 Toa Vaiac 22 | |||
Esimt Comarso Bi Roc PoIin | |||
-ar YO Doll in Milin Inrmna SN $7. $7. 0 Cost | |||
Esimt Acta Remann Inrmna SN $7. $5. $2. | |||
Inrmna Securit | |||
Fundin Stau Deomisonn - Reann CsS2. | |||
Difrec (fndn - esiae $2.7 | |||
II ,I~. ~ | |||
-I | |||
4 | |||
- V | |||
I T i | |||
Project Challenges | |||
" Improve safety culture and maintain schedule | |||
" Balance disposal cost vs schedule impact | |||
- Steam drum enclosure remediation | |||
- Interior concrete between 599 and 585 levels | |||
- Radwaste vault | |||
" Send waste to Duratek at a steady pace | |||
r-I I | |||
I}} |
Revision as of 09:49, 23 November 2019
ML070650490 | |
Person / Time | |
---|---|
Site: | Big Rock Point File:Consumers Energy icon.png |
Issue date: | 07/15/2005 |
From: | - No Known Affiliation |
To: | NRC/FSME |
References | |
Download: ML070650490 (22) | |
Text
00001"
- ----
iZý Fil GRAND OPENING!
Cos & Scheul Stats Pln A Prp for Shtdw Bt .Y/ IC-DFD Finlysem
&Euldn F
Fuel Shipment ISFSI Dismantlement
Scedl Sttu
- Sumta SceueSwes Fia Site Sure SE06 FE072 FuelShiped t DO MAY2 MA12 ISaS De oihd/rjc OC 1 OC 1 0S aCamplete
6cedl E E £nc Decon~~~
& SuvyItro ocee1 Sper Dismnlmn (5)
Inero Co ceeD m lto98 Toa Vaiac 22
Esimt Comarso Bi Roc PoIin
-ar YO Doll in Milin Inrmna SN $7. $7. 0 Cost
Esimt Acta Remann Inrmna SN $7. $5. $2.
Inrmna Securit
Fundin Stau Deomisonn - Reann CsS2.
Difrec (fndn - esiae $2.7
II ,I~. ~
-I
4
- V
I T i
Project Challenges
" Improve safety culture and maintain schedule
" Balance disposal cost vs schedule impact
- Steam drum enclosure remediation
- Interior concrete between 599 and 585 levels
- Radwaste vault
" Send waste to Duratek at a steady pace
r-I I
I