{{#Wiki_filter:January 31, 2008 Mr. John C. Butler, Director Safety Focused Regulation Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006 3708  
{{#Wiki_filter:January 31, 2008 Mr. John C. Butler, Director Safety Focused Regulation Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006 3708


==SUBJECT:==
==SUBJECT:==
REQUEST FOR EXTENSION OF THE REVIEW TIME FOR THE DRAFT SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE (NEI) TOPICAL REPORT (TR) 94-01, REVISION 2, "INDUSTRY GUIDELINE FOR IMPLEMENTING PERFORMANCE-BASED OPTION OF 10 CFR PART 50
REQUEST FOR EXTENSION OF THE REVIEW TIME FOR THE DRAFT SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE (NEI) TOPICAL REPORT (TR) 94-01, REVISION 2, "INDUSTRY GUIDELINE FOR IMPLEMENTING PERFORMANCE-BASED OPTION OF 10 CFR PART 50
[TITLE 10 OF THE CODE OF FEDERAL REGULATIONS], APPENDIX J" AND ELECTRIC POWER RESEARCH INSTITUTE (EPRI) REPORT NO. 1009325, REVISION 2, AUGUST 2007, "RISK IMPACT ASSESSMENT OF EXTENDED INTEGRATED LEAK RATE TESTING INTERVALS" (TAC NO. MC9663)  
[TITLE 10 OF THE CODE OF FEDERAL REGULATIONS], APPENDIX J" AND ELECTRIC POWER RESEARCH INSTITUTE (EPRI) REPORT NO. 1009325, REVISION 2, AUGUST 2007, "RISK IMPACT ASSESSMENT OF EXTENDED INTEGRATED LEAK RATE TESTING INTERVALS" (TAC NO. MC9663)


==Dear Mr. Riley:==
==Dear Mr. Riley:==
Line 28: Line 28:
By letter dated December 19, 2007, NEI submitted a request for additional time for review of and comment on the U.S. Nuclear Regulatory Commission (NRC) draft safety evaluation (SE) for NEI TR 94-01, Revision 2, and EPRI Report No. 1009325, Revision 2. In this letter you requested "a short extension of no more than 60 days," and in a public meeting on January 17, 2008, you identified a date of March 3, 2008, for providing your comments. We accept this request for additional time for review of the draft SE for TR 94-01, Revision 2, and EPRI Report No. 1009325, Revision 2, and agree to identify how we propose to resolve your comments prior to issuance of the final SE. We understand that NEI may, or may not, wish to withdraw TR 94-01, Revision 2, and EPRI Report No. 1009325, Revision 2, based on how we propose to resolve comments on this draft SE and commit to allow you to do so prior to issuance of the final SE.
By letter dated December 19, 2007, NEI submitted a request for additional time for review of and comment on the U.S. Nuclear Regulatory Commission (NRC) draft safety evaluation (SE) for NEI TR 94-01, Revision 2, and EPRI Report No. 1009325, Revision 2. In this letter you requested "a short extension of no more than 60 days," and in a public meeting on January 17, 2008, you identified a date of March 3, 2008, for providing your comments. We accept this request for additional time for review of the draft SE for TR 94-01, Revision 2, and EPRI Report No. 1009325, Revision 2, and agree to identify how we propose to resolve your comments prior to issuance of the final SE. We understand that NEI may, or may not, wish to withdraw TR 94-01, Revision 2, and EPRI Report No. 1009325, Revision 2, based on how we propose to resolve comments on this draft SE and commit to allow you to do so prior to issuance of the final SE.
If you have any questions regarding this matter, please contact Jon Thompson at 301-414-1119 prior to February 15, 2008, or Tanya Mensah at 301-415-3610 subsequent to that date.
If you have any questions regarding this matter, please contact Jon Thompson at 301-414-1119 prior to February 15, 2008, or Tanya Mensah at 301-415-3610 subsequent to that date.
Sincerely,   /RA/ Ho K. Nieh, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689  
Sincerely,
                                                        /RA/
Ho K. Nieh, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page


cc:  See next page
ML080300133                                            NRR-106 OFFICE    PSPB/PM        PSPB/LA        PSPB/BC          DPR/DD NAME      JThompson      DBaxley        SRosenberg      HNieh DATE      1/31/2008      1/30/2008      1/31/2008        1/31/2008


ML080300133 NRR-106  OFFICE  PSPB/PM  PSPB/LA  PSPB/BC  DPR/DD NAME  JThompson DBaxley  SRosenberg HNieh DATE  1/31/2008 1/30/2008 1/31/2008 1/31/2008 Nuclear Energy Institute       Project No. 689 cc: Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org
Nuclear Energy Institute                                         Project No. 689 cc:
 
Mr. Anthony Pietrangelo, Vice President   Nuclear Energy Institute Regulatory Affairs                       1776 I Street, NW, Suite 400 Nuclear Energy Institute                 Washington, DC 20006-3708 1776 I Street, NW, Suite 400             am@nei.org Washington, DC 20006-3708 arp@nei.org                               Mr. Jay Thayer, Vice President Nuclear Operations Mr. Jack Roe, Director                   Nuclear Energy Institute Operations Support                       1776 I Street, NW, Suite 400 Nuclear Energy Institute                 Washington, DC 20006-3708 1776 I Street, NW, Suite 400             jkt@nei.org Washington, DC 20006-3708 jwr@nei.org                               Mr. John Butler, Director Safety-Focused Regulation Mr. Charles B. Brinkman                   Nuclear Energy Institute Washington Operations                     1776 I Street, NW, Suite 400 ABB-Combustion Engineering, Inc.         Washington, DC 20006-3708 12300 Twinbrook Parkway, Suite 330       jcb@nei.org Rockville, MD 20852 brinkmcb@westinghouse.com                 Mike Melton, Senior Project Manager 1776 I Street, NW, Suite 400 Mr. Gary L. Vine, Executive Director     Washington, DC 20006-3708 Federal and Industry Activities,         man@nei.org Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering}}
Mr. Jack Roe, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org
 
Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc. 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com
 
Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. Jay Thayer, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jkt@nei.org Mr. John Butler, Director Safety-Focused Regulation Nuclear Energy Institute  1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org 
 
Mike Melton, Senior Project Manager 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 man@nei.org}}

Revision as of 21:04, 14 November 2019

Request for Extension of the Review Time for the Draft Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR) 94-01, Revision 2 and EPRI No. 1009325, Revision 2
ML080300133
Person / Time
Site: Nuclear Energy Institute
Issue date: 01/31/2008
From: Ho Nieh
NRC/NRR/ADRO/DPR
To: Butler J
Nuclear Energy Institute
Thompson, J.H. NRR/DPR/PSPB 415-1119
References
TAC MC9663
Download: ML080300133 (4)


Text

January 31, 2008 Mr. John C. Butler, Director Safety Focused Regulation Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006 3708

SUBJECT:

REQUEST FOR EXTENSION OF THE REVIEW TIME FOR THE DRAFT SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE (NEI) TOPICAL REPORT (TR) 94-01, REVISION 2, "INDUSTRY GUIDELINE FOR IMPLEMENTING PERFORMANCE-BASED OPTION OF 10 CFR PART 50

[TITLE 10 OF THE CODE OF FEDERAL REGULATIONS], APPENDIX J" AND ELECTRIC POWER RESEARCH INSTITUTE (EPRI) REPORT NO. 1009325, REVISION 2, AUGUST 2007, "RISK IMPACT ASSESSMENT OF EXTENDED INTEGRATED LEAK RATE TESTING INTERVALS" (TAC NO. MC9663)

Dear Mr. Riley:

By letter dated December 19, 2007, NEI submitted a request for additional time for review of and comment on the U.S. Nuclear Regulatory Commission (NRC) draft safety evaluation (SE) for NEI TR 94-01, Revision 2, and EPRI Report No. 1009325, Revision 2. In this letter you requested "a short extension of no more than 60 days," and in a public meeting on January 17, 2008, you identified a date of March 3, 2008, for providing your comments. We accept this request for additional time for review of the draft SE for TR 94-01, Revision 2, and EPRI Report No. 1009325, Revision 2, and agree to identify how we propose to resolve your comments prior to issuance of the final SE. We understand that NEI may, or may not, wish to withdraw TR 94-01, Revision 2, and EPRI Report No. 1009325, Revision 2, based on how we propose to resolve comments on this draft SE and commit to allow you to do so prior to issuance of the final SE.

If you have any questions regarding this matter, please contact Jon Thompson at 301-414-1119 prior to February 15, 2008, or Tanya Mensah at 301-415-3610 subsequent to that date.

Sincerely,

/RA/

Ho K. Nieh, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page

ML080300133 NRR-106 OFFICE PSPB/PM PSPB/LA PSPB/BC DPR/DD NAME JThompson DBaxley SRosenberg HNieh DATE 1/31/2008 1/30/2008 1/31/2008 1/31/2008

Nuclear Energy Institute Project No. 689 cc:

Mr. Anthony Pietrangelo, Vice President Nuclear Energy Institute Regulatory Affairs 1776 I Street, NW, Suite 400 Nuclear Energy Institute Washington, DC 20006-3708 1776 I Street, NW, Suite 400 am@nei.org Washington, DC 20006-3708 arp@nei.org Mr. Jay Thayer, Vice President Nuclear Operations Mr. Jack Roe, Director Nuclear Energy Institute Operations Support 1776 I Street, NW, Suite 400 Nuclear Energy Institute Washington, DC 20006-3708 1776 I Street, NW, Suite 400 jkt@nei.org Washington, DC 20006-3708 jwr@nei.org Mr. John Butler, Director Safety-Focused Regulation Mr. Charles B. Brinkman Nuclear Energy Institute Washington Operations 1776 I Street, NW, Suite 400 ABB-Combustion Engineering, Inc. Washington, DC 20006-3708 12300 Twinbrook Parkway, Suite 330 jcb@nei.org Rockville, MD 20852 brinkmcb@westinghouse.com Mike Melton, Senior Project Manager 1776 I Street, NW, Suite 400 Mr. Gary L. Vine, Executive Director Washington, DC 20006-3708 Federal and Industry Activities, man@nei.org Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering