ML11362A379: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/19/2011
| issue date = 12/19/2011
| title = Response to an Apparent Violation in Inspections Report 05000259-11-011, 05000260-11-011, 05000296-11-011; EA-11-252
| title = Response to an Apparent Violation in Inspections Report 05000259-11-011, 05000260-11-011, 05000296-11-011; EA-11-252
| author name = Shea J W
| author name = Shea J
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = Letter, Licensee Response to Notice of Violation
| document type = Letter, Licensee Response to Notice of Violation
| page count = 6
| page count = 6
| project =
| stage = Other
}}
}}
See also: [[followed by::IR 05000259/2011011]]


=Text=
=Text=
{{#Wiki_filter:Tennessee  
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 19, 2011 10 CFR 2.201 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Valley Authority, 1101 Market Street, Chattanooga, Tennessee  
 
37402 December 19, 2011 10 CFR 2.201 ATTN: Document Control Desk U.S. Nuclear Regulatory  
==Subject:==
Commission
Response to an Apparent Violation in Inspection Report 05000259/2011011, 0500026012011011, 0500029612011011; EA-1 1-252
Washington, D.C. 20555-0001
 
Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating  
==Reference:==
License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Subject: Response to an Apparent Violation  
Letter from NRC to TVA, "Browns Ferry Nuclear Plant - NRC Inspection Procedure 95003 Supplemental Inspection Report 05000259/2011011, 05000260/2011011, and 05000296/2011011 (Part 1)," dated November 17, 2011 In accordance with the reference letter, the Tennessee Valley Authority (TVA) is required to submit a response to the Notice of Violation EA-1 1-252 within 30 days of the date of the letter which transmitted the notice of violation, i.e., by December 17, 2011. Because December 17, 2011 fell on a Saturday, TVA's response is being submitted on December 19, 2011. The TVA response to this notice of violation is provided in the enclosure in accordance with 10 CFR 2.201.
in Inspection  
There are no new regulatory commitments contained in this response. Should you have any questions concerning this submittal, please contact Tom Hess at (423) 751-3487.
Report 05000259/2011011, 0500026012011011, 0500029612011011;  
L    n u lly ,         Nuclear Licensing Rse aeCorporate
EA-1 1-252 Reference:  
 
Letter from NRC to TVA, "Browns Ferry Nuclear Plant -NRC Inspection
U.S. Nuclear Regulatory Commission Page 2 December 19, 2011
Procedure  
 
95003 Supplemental  
==Enclosure:==
Inspection  
Response to an Apparent Violation in Inspection Report 05000259/2011011, 05000260/2011011, 05000296/2011011; EA- 11-252 cc (Enclosure):
Report 05000259/2011011, 05000260/2011011, and 05000296/2011011 (Part 1)," dated November 17, 2011 In accordance  
NRC Regional Administrator - Region II NRC Director, Office of Enforcement NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant
with the reference  
 
letter, the Tennessee  
ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant, Units 1, 2, and 3 Response to an Apparent Violation in Inspection Report 05000259/2011011, 05000260/2011011, 05000296/2011011; EA-11-252
Valley Authority (TVA) is required to submit a response to the Notice of Violation  
 
EA-1 1-252 within 30 days of the date of the letter which transmitted  
Response to an Apparent Violation in Inspection Report 0500025912011011, 0500026012011011, 05000296/2011011; EA-1 1-252 Restatement of Violation Title 10 CFR 50.9 requires, in part, that information provided to the Commission by an applicant for a license or by a licensee or information required by statute or by the Commission's regulations, orders, or license conditions to be maintained by the applicant or the licensee shall be complete and accurate in all material respects.
the notice of violation, i.e., by December 17, 2011. Because December 17, 2011 fell on a Saturday, TVA's response is being submitted  
Contrary to the above, on January 6, 1997, TVA provided information to the Commission that was not complete and accurate in all material respects. Specifically, in a letter dated October 7, 1996, the NRC asked TVA to further consider and respond to questions about whether valves FCV-74-52 and FCV-74-66 had a redundant safety function to close to allow operation of the suppression pool cooling mode of the RHR System. In a letter dated January 6, 1997, TVA responded that "Closure of valves FCV-74-52 and FCV-74-66 is not required by plant procedures to operate the RHR system in the suppression pool cooling mode. Therefore, these valves have no 'redundant' safety function and will not be included in the GL-89-10 program." This information was inaccurate because the FCV-74-52 and FCV-74-66 valves do have a safety function to shut to operate the RHR system in the suppression pool cooling mode as described in EOI Appendix-17A, "RHR System Operation Suppression Pool Cooling," and should therefore have been included in Browns Ferry's GL 89-10 MOV monitoring program.
on December 19, 2011. The TVA response to this notice of violation  
Additionally, The NRC identified that incomplete and inaccurate information was also provided in a letter dated May 5, 2004. This letter stated that "TVA's review and documentation of the design basis for the operation of each Unit 1 MOV within the scope of the GL 89-10 program, the methods for determining and adjusting its switch settings, testing, surveillance and maintenance are the same as with the Units 2 and 3 program."
is provided in the enclosure  
This information was material to the NRC because it was used, in part, as the basis for determining that valves FCV-74-52 and FCV-74-66 did not meet the conditions necessary that would require them to be in Browns Ferry's GL 89-10 MOV monitoring program. The issue was preliminarily determined to be an apparent violation of 10 CFR 50.9 (AV 05000259, 260, 296/2011011-02; Inaccurate Information Provided Regarding Scoping of Motor Operated Valves in the Generic Letter 89-10 Program). This issue was entered into BFN's CAP as SR 435463, "95003 - PER 430439 documented that Units 1, 2, and 3 RHR Outboard Injection Valves, FCV-74-52 and FCV-74-66, Should have been Included in the Scope of the GL 89-10 Program. The Purpose of this SR is to Assess the Technical Basis and Adequacy of the NRC Correspondence for the GL 89-10 Scope removal of These Valves in the mid 1990's."
in accordance  
 
with 10 CFR 2.201.There are no new regulatory  
===Background===
commitments  
Tennesse Valley Authority (TVA) incorrectly determined that flow control valves FCV-74-52 and FCV-74-66 were "passive" based on operating in their safety position during normal alignment.
contained  
Additionally, TVA failed to identify that FCV-74-52 and FCV-74-66 are required to be closed to enable Residual Heat Removal (RHR) to operate to the suppression pool cooling mode, per Emergency Operating Instruction (EOI) Appendix-1 7A.
in this response.  
E- 1 of 3
Should you have any questions  
 
concerning  
Response to an Apparent Violation in Inspection Report 05000259/2011011, 05000260/2011011, 0500029612011011; EA-1 1-252 By letter dated January 6, 1997, TVA responded to NRC inspector follow-up item 50-260, 296/95-19-01 regarding the reduced scope of motor-operated valves (MOVs) in the NRC Generic Letter 89-10, "Safety-Related Motor-Operated Valve Testing and Surveillance,"
this submittal, please contact Tom Hess at (423) 751-3487.R e s u l l y , L n aeCorporate  
program for Browns Ferry Nuclear Plant (BFN) Units 2 and 3. This letter stated in part that "Closure of valves FCV-74-52 and FCV-74-66 is not required by plant procedures to operate the RHR system in the suppression pool cooling mode.. ." As a result, FCV-74-52 and FCV-74-66 were removed from the GL 89-10 program in 1997, in accordance with Supplement 1 to GL 89-10.
Nuclear Licensing
As identified during the root cause analysis being conducted to address the issues associated with the failure of FCV-74-66 in BFN Unit 1, TVA discovered that the statement "Closure of valves FCV-74-52 and FCV-74-66 is not required by plant procedures to operate the RHR system in the suppression pool cooling mode. . ." was inaccurate. Specifically, the revision of the EOI, Appendix 17A, that was in place in January 1997 included a step to verify that the FCV-74-52 or FCV-74-66 valve was closed as part of performing the steps to place the RHR system in the suppression pool cooling mode. As required by 10 CFR 50.9(b), TVA provided written notification to the NRC by letter dated October 20, 2011, acknowledging the inaccuracy of its January 6, 1997 letter. Additionally, TVA provided written notification to the NRC by letter dated December 19, 2011, acknowledging the inaccuracy of its May 5, 2004 letter.
U.S. Nuclear Regulatory  
With respect to FCV-74-52 and FCV-74-66 and the GL 89-10 program, TVA will implement the following actions:
Commission
    " Add 1, 2, 3 - FCV-74-52 and 1, 2, 3 -FCV-74-66 to the GL 89-10 program.
Page 2 December 19, 2011 Enclosure:  
* Develop or revise an existing procedure to specifically provide the criteria for determining GL 89-10 program scope, including active/passive classification.
Response to an Apparent Violation  
Reason for the Violation The reasons for this violation of 10 CFR 50.9 are:
in Inspection  
STVA failed to apply adequate technical rigor to the review process for regulatory submittals. The responsible licensing engineer was requested by a reviewer of the January 1997 submittal to verify the statement regarding closure of valves FCV-74-52 and FCV-74-66. Verification was done through verbal confirmation from Engineering without documentation supporting the conclusion.
Report 05000259/2011011, 05000260/2011011, 05000296/2011011;  
FVA procedures did not contain sufficient details governing the verification process for regulatory submittals. TVA procedures in place at the time of the 1997 letter only provided guidance on acceptable methods of verification. In addition, the procedure stated that method of verification remained at the discretion of the technical lead; not the responsible licensing engineer.
EA- 11-252 cc (Enclosure):
E- 2 of 3
NRC Regional Administrator  
 
-Region II NRC Director, Office of Enforcement
Response to an Apparent Violation in Inspection Report 05000259/2011011, 05000260/2011011, 0500029612011011; EA-1 1-252 TVA personnel assigned to the BFN Unit 1 restart licensing failed to follow procedures governing the verification process for regulatory submittals. The information provided in the May 5, 2004 letter related to BFN Unit 1 was verified to the extent required to ensure the BFN Unit 1 valves were described in a manner equivalent to the BFN Units 2 and 3 valves. As stated in the 2004 letter, the basis for excluding the BFN Unit 1 valves from the GL 89-10 program was the same as the BFN Units 2 and 3 valves.
NRC Senior Resident Inspector  
Corrective Steps That Have Been Taken and Results Achieved As stated above, TVA provided written notification to the NRC by letter dated October 20, 2011, acknowledging the inaccuracy of its January 6, 1997 letter, in accordance with 10 CFR 50.9(b).
-Browns Ferry Nuclear Plant NRC Project Manager -Browns Ferry Nuclear Plant  
Additionally, TVA provided written notification to the NRC by letter dated December 19, 2011, acknowledging the inaccuracy of its May 5, 2004 letter Procedural requirements in TVA procedure BP-213, "Managing TVA's Interface with NRC,"
ENCLOSURE Tennessee  
governing the verification of information contained in NRC submittals were enhanced in 2002.
Valley Authority Browns Ferry Nuclear Plant, Units 1, 2, and 3 Response to an Apparent Violation  
These enhancements, included the following, are contained in the current revision of BP-213:
in Inspection  
* Designating oversight responsibility for the submittal verification process to Licensing.
Report 05000259/2011011, 05000260/2011011, 05000296/2011011;  
    "   Specifying which NRC submittals require verification.
EA-11-252  
* Describing which types of statements in NRC submittals require verification.
Response to an Apparent Violation  
* Providing detailed requirements for verification packages.
in Inspection  
With respect to the failure of BFN Unit 1 restart licensing personnel to follow the procedure governing the verification process for regulatory submittals (i.e. BP-213), procedure use and adherence has since been reinforced as one of TVA's fundamental human performance tools.
Report 0500025912011011, 0500026012011011, 05000296/2011011;  
Management expectations regarding procedure use and adherence are communicated regularly through TVA Nuclear corporate and site communications and are further reinforced through TVA's Nuclear Fleet Focus Handbook.
EA-1 1-252 Restatement  
Corrective Steps That Will Be Taken to Avoid Future Violations All identified corrective actions to avoid future violations have been implemented.
of Violation Title 10 CFR 50.9 requires, in part, that information  
Date When Full Compliance Will Be Achieved For the 10 CFR 50.9 violation described in EA-1 1-252, TVA achieved full compliance with the October 20, 2011 and December 19, 2011 NRC notification letters.
provided to the Commission  
E-3 of 3}}
by an applicant  
for a license or by a licensee or information  
required by statute or by the Commission's  
regulations, orders, or license conditions  
to be maintained  
by the applicant  
or the licensee shall be complete and accurate in all material respects.Contrary to the above, on January 6, 1997, TVA provided information  
to the Commission  
that was not complete and accurate in all material respects.  
Specifically, in a letter dated October 7, 1996, the NRC asked TVA to further consider and respond to questions  
about whether valves FCV-74-52  
and FCV-74-66  
had a redundant  
safety function to close to allow operation  
of the suppression  
pool cooling mode of the RHR System. In a letter dated January 6, 1997, TVA responded  
that "Closure of valves FCV-74-52 and FCV-74-66  
is not required by plant procedures  
to operate the RHR system in the suppression  
pool cooling mode. Therefore, these valves have no 'redundant'  
safety function and will not be included in the GL-89-10 program." This information  
was inaccurate  
because the FCV-74-52  
and FCV-74-66  
valves do have a safety function to shut to operate the RHR system in the suppression  
pool cooling mode as described  
in EOI Appendix-17A, "RHR System Operation  
Suppression  
Pool Cooling," and should therefore  
have been included in Browns Ferry's GL 89-10 MOV monitoring  
program.Additionally, The NRC identified  
that incomplete  
and inaccurate  
information  
was also provided in a letter dated May 5, 2004. This letter stated that "TVA's review and documentation  
of the design basis for the operation  
of each Unit 1 MOV within the scope of the GL 89-10 program, the methods for determining  
and adjusting  
its switch settings, testing, surveillance  
and maintenance  
are the same as with the Units 2 and 3 program." This information  
was material to the NRC because it was used, in part, as the basis for determining  
that valves FCV-74-52  
and FCV-74-66  
did not meet the conditions
necessary  
that would require them to be in Browns Ferry's GL 89-10 MOV monitoring
program. The issue was preliminarily  
determined  
to be an apparent violation  
of 10 CFR 50.9 (AV 05000259, 260, 296/2011011-02;  
Inaccurate  
Information  
Provided Regarding Scoping of Motor Operated Valves in the Generic Letter 89-10 Program).  
This issue was entered into BFN's CAP as SR 435463, "95003 -PER 430439 documented  
that Units 1, 2, and 3 RHR Outboard Injection  
Valves, FCV-74-52  
and FCV-74-66, Should have been Included in the Scope of the GL 89-10 Program. The Purpose of this SR is to Assess the Technical  
Basis and Adequacy of the NRC Correspondence  
for the GL 89-10 Scope removal of These Valves in the mid 1990's." Background
Tennesse Valley Authority (TVA) incorrectly  
determined  
that flow control valves FCV-74-52  
and FCV-74-66  
were "passive" based on operating  
in their safety position during normal alignment.
Additionally, TVA failed to identify that FCV-74-52  
and FCV-74-66  
are required to be closed to enable Residual Heat Removal (RHR) to operate to the suppression  
pool cooling mode, per Emergency  
Operating  
Instruction (EOI) Appendix-1  
7A.E- 1 of 3  
Response to an Apparent Violation  
in Inspection  
Report 05000259/2011011, 05000260/2011011, 0500029612011011;  
EA-1 1-252 By letter dated January 6, 1997, TVA responded  
to NRC inspector  
follow-up  
item 50-260, 296/95-19-01  
regarding  
the reduced scope of motor-operated  
valves (MOVs) in the NRC Generic Letter 89-10, "Safety-Related  
Motor-Operated  
Valve Testing and Surveillance," program for Browns Ferry Nuclear Plant (BFN) Units 2 and 3. This letter stated in part that"Closure of valves FCV-74-52  
and FCV-74-66  
is not required by plant procedures  
to operate the RHR system in the suppression  
pool cooling mode.. ." As a result, FCV-74-52  
and FCV-74-66 were removed from the GL 89-10 program in 1997, in accordance  
with Supplement  
1 to GL 89-10.As identified  
during the root cause analysis being conducted  
to address the issues associated
with the failure of FCV-74-66  
in BFN Unit 1, TVA discovered  
that the statement "Closure of valves FCV-74-52  
and FCV-74-66  
is not required by plant procedures  
to operate the RHR system in the suppression  
pool cooling mode. .." was inaccurate.  
Specifically, the revision of the EOI, Appendix 17A, that was in place in January 1997 included a step to verify that the FCV-74-52  
or FCV-74-66  
valve was closed as part of performing  
the steps to place the RHR system in the suppression  
pool cooling mode. As required by 10 CFR 50.9(b), TVA provided written notification  
to the NRC by letter dated October 20, 2011, acknowledging  
the inaccuracy
of its January 6, 1997 letter. Additionally, TVA provided written notification  
to the NRC by letter dated December 19, 2011, acknowledging  
the inaccuracy  
of its May 5, 2004 letter.With respect to FCV-74-52  
and FCV-74-66  
and the GL 89-10 program, TVA will implement  
the following  
actions: " Add 1, 2, 3 -FCV-74-52  
and 1, 2, 3 -FCV-74-66  
to the GL 89-10 program.* Develop or revise an existing procedure  
to specifically  
provide the criteria for determining  
GL 89-10 program scope, including  
active/passive  
classification.
Reason for the Violation The reasons for this violation  
of 10 CFR 50.9 are: STVA failed to apply adequate technical  
rigor to the review process for regulatory
submittals.  
The responsible  
licensing  
engineer was requested  
by a reviewer of the January 1997 submittal  
to verify the statement  
regarding  
closure of valves FCV-74-52 and FCV-74-66.  
Verification  
was done through verbal confirmation  
from Engineering
without documentation  
supporting  
the conclusion.
F VA procedures  
did not contain sufficient  
details governing  
the verification  
process for regulatory  
submittals.  
TVA procedures  
in place at the time of the 1997 letter only provided guidance on acceptable  
methods of verification.  
In addition, the procedure stated that method of verification  
remained at the discretion  
of the technical  
lead; not the responsible  
licensing  
engineer.E- 2 of 3  
Response to an Apparent Violation  
in Inspection  
Report 05000259/2011011, 05000260/2011011, 0500029612011011;  
EA-1 1-252 TVA personnel  
assigned to the BFN Unit 1 restart licensing  
failed to follow procedures
governing  
the verification  
process for regulatory  
submittals.  
The information  
provided in the May 5, 2004 letter related to BFN Unit 1 was verified to the extent required to ensure the BFN Unit 1 valves were described  
in a manner equivalent  
to the BFN Units 2 and 3 valves. As stated in the 2004 letter, the basis for excluding  
the BFN Unit 1 valves from the GL 89-10 program was the same as the BFN Units 2 and 3 valves.Corrective  
Steps That Have Been Taken and Results Achieved As stated above, TVA provided written notification  
to the NRC by letter dated October 20, 2011, acknowledging  
the inaccuracy  
of its January 6, 1997 letter, in accordance  
with 10 CFR 50.9(b).Additionally, TVA provided written notification  
to the NRC by letter dated December 19, 2011, acknowledging  
the inaccuracy  
of its May 5, 2004 letter Procedural  
requirements  
in TVA procedure  
BP-213, "Managing  
TVA's Interface  
with NRC," governing  
the verification  
of information  
contained  
in NRC submittals  
were enhanced in 2002.These enhancements, included the following, are contained  
in the current revision of BP-213:* Designating  
oversight  
responsibility  
for the submittal  
verification  
process to Licensing." Specifying  
which NRC submittals  
require verification.
* Describing  
which types of statements  
in NRC submittals  
require verification.
* Providing  
detailed requirements  
for verification  
packages.With respect to the failure of BFN Unit 1 restart licensing  
personnel  
to follow the procedure governing  
the verification  
process for regulatory  
submittals (i.e. BP-213), procedure  
use and adherence  
has since been reinforced  
as one of TVA's fundamental  
human performance  
tools.Management  
expectations  
regarding  
procedure  
use and adherence  
are communicated  
regularly through TVA Nuclear corporate  
and site communications  
and are further reinforced  
through TVA's Nuclear Fleet Focus Handbook.Corrective  
Steps That Will Be Taken to Avoid Future Violations
All identified  
corrective  
actions to avoid future violations  
have been implemented.
Date When Full Compliance  
Will Be Achieved For the 10 CFR 50.9 violation  
described  
in EA-1 1-252, TVA achieved full compliance  
with the October 20, 2011 and December 19, 2011 NRC notification  
letters.E-3 of 3
}}

Latest revision as of 10:11, 12 November 2019

Response to an Apparent Violation in Inspections Report 05000259-11-011, 05000260-11-011, 05000296-11-011; EA-11-252
ML11362A379
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/19/2011
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, NRC/RGN-II
References
EA-11-252 IR-11-011
Download: ML11362A379 (6)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 19, 2011 10 CFR 2.201 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Response to an Apparent Violation in Inspection Report 05000259/2011011, 0500026012011011, 0500029612011011; EA-1 1-252

Reference:

Letter from NRC to TVA, "Browns Ferry Nuclear Plant - NRC Inspection Procedure 95003 Supplemental Inspection Report 05000259/2011011, 05000260/2011011, and 05000296/2011011 (Part 1)," dated November 17, 2011 In accordance with the reference letter, the Tennessee Valley Authority (TVA) is required to submit a response to the Notice of Violation EA-1 1-252 within 30 days of the date of the letter which transmitted the notice of violation, i.e., by December 17, 2011. Because December 17, 2011 fell on a Saturday, TVA's response is being submitted on December 19, 2011. The TVA response to this notice of violation is provided in the enclosure in accordance with 10 CFR 2.201.

There are no new regulatory commitments contained in this response. Should you have any questions concerning this submittal, please contact Tom Hess at (423) 751-3487.

L n u lly , Nuclear Licensing Rse aeCorporate

U.S. Nuclear Regulatory Commission Page 2 December 19, 2011

Enclosure:

Response to an Apparent Violation in Inspection Report 05000259/2011011, 05000260/2011011, 05000296/2011011; EA- 11-252 cc (Enclosure):

NRC Regional Administrator - Region II NRC Director, Office of Enforcement NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant

ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant, Units 1, 2, and 3 Response to an Apparent Violation in Inspection Report 05000259/2011011, 05000260/2011011, 05000296/2011011; EA-11-252

Response to an Apparent Violation in Inspection Report 0500025912011011, 0500026012011011, 05000296/2011011; EA-1 1-252 Restatement of Violation Title 10 CFR 50.9 requires, in part, that information provided to the Commission by an applicant for a license or by a licensee or information required by statute or by the Commission's regulations, orders, or license conditions to be maintained by the applicant or the licensee shall be complete and accurate in all material respects.

Contrary to the above, on January 6, 1997, TVA provided information to the Commission that was not complete and accurate in all material respects. Specifically, in a letter dated October 7, 1996, the NRC asked TVA to further consider and respond to questions about whether valves FCV-74-52 and FCV-74-66 had a redundant safety function to close to allow operation of the suppression pool cooling mode of the RHR System. In a letter dated January 6, 1997, TVA responded that "Closure of valves FCV-74-52 and FCV-74-66 is not required by plant procedures to operate the RHR system in the suppression pool cooling mode. Therefore, these valves have no 'redundant' safety function and will not be included in the GL-89-10 program." This information was inaccurate because the FCV-74-52 and FCV-74-66 valves do have a safety function to shut to operate the RHR system in the suppression pool cooling mode as described in EOI Appendix-17A, "RHR System Operation Suppression Pool Cooling," and should therefore have been included in Browns Ferry's GL 89-10 MOV monitoring program.

Additionally, The NRC identified that incomplete and inaccurate information was also provided in a letter dated May 5, 2004. This letter stated that "TVA's review and documentation of the design basis for the operation of each Unit 1 MOV within the scope of the GL 89-10 program, the methods for determining and adjusting its switch settings, testing, surveillance and maintenance are the same as with the Units 2 and 3 program."

This information was material to the NRC because it was used, in part, as the basis for determining that valves FCV-74-52 and FCV-74-66 did not meet the conditions necessary that would require them to be in Browns Ferry's GL 89-10 MOV monitoring program. The issue was preliminarily determined to be an apparent violation of 10 CFR 50.9 (AV 05000259, 260, 296/2011011-02; Inaccurate Information Provided Regarding Scoping of Motor Operated Valves in the Generic Letter 89-10 Program). This issue was entered into BFN's CAP as SR 435463, "95003 - PER 430439 documented that Units 1, 2, and 3 RHR Outboard Injection Valves, FCV-74-52 and FCV-74-66, Should have been Included in the Scope of the GL 89-10 Program. The Purpose of this SR is to Assess the Technical Basis and Adequacy of the NRC Correspondence for the GL 89-10 Scope removal of These Valves in the mid 1990's."

Background

Tennesse Valley Authority (TVA) incorrectly determined that flow control valves FCV-74-52 and FCV-74-66 were "passive" based on operating in their safety position during normal alignment.

Additionally, TVA failed to identify that FCV-74-52 and FCV-74-66 are required to be closed to enable Residual Heat Removal (RHR) to operate to the suppression pool cooling mode, per Emergency Operating Instruction (EOI) Appendix-1 7A.

E- 1 of 3

Response to an Apparent Violation in Inspection Report 05000259/2011011, 05000260/2011011, 0500029612011011; EA-1 1-252 By letter dated January 6, 1997, TVA responded to NRC inspector follow-up item 50-260, 296/95-19-01 regarding the reduced scope of motor-operated valves (MOVs) in the NRC Generic Letter 89-10, "Safety-Related Motor-Operated Valve Testing and Surveillance,"

program for Browns Ferry Nuclear Plant (BFN) Units 2 and 3. This letter stated in part that "Closure of valves FCV-74-52 and FCV-74-66 is not required by plant procedures to operate the RHR system in the suppression pool cooling mode.. ." As a result, FCV-74-52 and FCV-74-66 were removed from the GL 89-10 program in 1997, in accordance with Supplement 1 to GL 89-10.

As identified during the root cause analysis being conducted to address the issues associated with the failure of FCV-74-66 in BFN Unit 1, TVA discovered that the statement "Closure of valves FCV-74-52 and FCV-74-66 is not required by plant procedures to operate the RHR system in the suppression pool cooling mode. . ." was inaccurate. Specifically, the revision of the EOI, Appendix 17A, that was in place in January 1997 included a step to verify that the FCV-74-52 or FCV-74-66 valve was closed as part of performing the steps to place the RHR system in the suppression pool cooling mode. As required by 10 CFR 50.9(b), TVA provided written notification to the NRC by letter dated October 20, 2011, acknowledging the inaccuracy of its January 6, 1997 letter. Additionally, TVA provided written notification to the NRC by letter dated December 19, 2011, acknowledging the inaccuracy of its May 5, 2004 letter.

With respect to FCV-74-52 and FCV-74-66 and the GL 89-10 program, TVA will implement the following actions:

" Add 1, 2, 3 - FCV-74-52 and 1, 2, 3 -FCV-74-66 to the GL 89-10 program.

  • Develop or revise an existing procedure to specifically provide the criteria for determining GL 89-10 program scope, including active/passive classification.

Reason for the Violation The reasons for this violation of 10 CFR 50.9 are:

STVA failed to apply adequate technical rigor to the review process for regulatory submittals. The responsible licensing engineer was requested by a reviewer of the January 1997 submittal to verify the statement regarding closure of valves FCV-74-52 and FCV-74-66. Verification was done through verbal confirmation from Engineering without documentation supporting the conclusion.

FVA procedures did not contain sufficient details governing the verification process for regulatory submittals. TVA procedures in place at the time of the 1997 letter only provided guidance on acceptable methods of verification. In addition, the procedure stated that method of verification remained at the discretion of the technical lead; not the responsible licensing engineer.

E- 2 of 3

Response to an Apparent Violation in Inspection Report 05000259/2011011, 05000260/2011011, 0500029612011011; EA-1 1-252 TVA personnel assigned to the BFN Unit 1 restart licensing failed to follow procedures governing the verification process for regulatory submittals. The information provided in the May 5, 2004 letter related to BFN Unit 1 was verified to the extent required to ensure the BFN Unit 1 valves were described in a manner equivalent to the BFN Units 2 and 3 valves. As stated in the 2004 letter, the basis for excluding the BFN Unit 1 valves from the GL 89-10 program was the same as the BFN Units 2 and 3 valves.

Corrective Steps That Have Been Taken and Results Achieved As stated above, TVA provided written notification to the NRC by letter dated October 20, 2011, acknowledging the inaccuracy of its January 6, 1997 letter, in accordance with 10 CFR 50.9(b).

Additionally, TVA provided written notification to the NRC by letter dated December 19, 2011, acknowledging the inaccuracy of its May 5, 2004 letter Procedural requirements in TVA procedure BP-213, "Managing TVA's Interface with NRC,"

governing the verification of information contained in NRC submittals were enhanced in 2002.

These enhancements, included the following, are contained in the current revision of BP-213:

  • Designating oversight responsibility for the submittal verification process to Licensing.

" Specifying which NRC submittals require verification.

  • Describing which types of statements in NRC submittals require verification.
  • Providing detailed requirements for verification packages.

With respect to the failure of BFN Unit 1 restart licensing personnel to follow the procedure governing the verification process for regulatory submittals (i.e. BP-213), procedure use and adherence has since been reinforced as one of TVA's fundamental human performance tools.

Management expectations regarding procedure use and adherence are communicated regularly through TVA Nuclear corporate and site communications and are further reinforced through TVA's Nuclear Fleet Focus Handbook.

Corrective Steps That Will Be Taken to Avoid Future Violations All identified corrective actions to avoid future violations have been implemented.

Date When Full Compliance Will Be Achieved For the 10 CFR 50.9 violation described in EA-1 1-252, TVA achieved full compliance with the October 20, 2011 and December 19, 2011 NRC notification letters.

E-3 of 3