ML12083A152: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML12083A152
| number = ML12083A152
| issue date = 03/05/2012
| issue date = 03/05/2012
| title = Watts Bar, Unit 2 - Final Safety Analysis Report, Amendment 108. Chapter 2 - Figure 2.4-65 Through 2.4-247
| title = Final Safety Analysis Report, Amendment 108. Chapter 2 - Figure 2.4-65 Through 2.4-247
| author name =  
| author name =  
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:HYDROLOGIC ENGINEERING2.4-196WATTS BARWBNP-108Figure 2.4-65 thru Figure 2.4-67 Are Not Used 2.4-197 HYDROLOGIC ENGINEERINGWATTS BARWBNP-108THIS PAGE INTENTIONALLY BLANK 2.4-198HYDROLOGIC ENGINEERINGWATTS BARWBNP-108????Figure 2.4-68  Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Watts Bar Dam HYDROLOGIC ENGINEERING2.4-199WATTS BARWBNP-108Figure 2.4-69  Deleted by Amendment 108 2.4-200 HYDROLOGIC ENGINEERINGWATTS BAR WBNP-108Figure 2.4-70  Deleted by Amendment 83 HYDROLOGIC ENGINEERING2.4-201WATTS BARWBNP-108Figure 2.4-71  Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Fort Loudoun Dam 2.4-202HYDROLOGIC ENGINEERINGWATTS BARWBNP-108Figure 2.4-72  Embankment Results Of Analysis For Operating Basis Earthquake - Fort Loudoun Dam HYDROLOGIC ENGINEERING2.4-203WATTS BARWBNP-108Figure 2.4-73  Deleted by Amendment 103 2.4-204HYDROLOGIC ENGINEERINGWATTS BARWBNP-108Figure 2.4-74  Deleted by Amendment 108 HYDROLOGIC ENGINEERING2.4-205WATTS BARWBNP-108Figure 2.4-75  Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-206WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-76  Analysis For OBE & 1/2 PMF Assumed Condition of Dam After Failure Norris Dam
{{#Wiki_filter:WATTS BAR                                              WBNP-108 Figure 2.4-65 thru Figure 2.4-67 Are Not Used HYDROLOGIC ENGINEERING                                    2.4-196


HYDROLOGIC ENGINEERING2.4-207WATTS BARWBNP-108Figure 2.4-77 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake -Cherokee Dam HYDROLOGIC ENGINEERING2.4-208WATTS BARWBNP-108Figure 2.4-78 Embankment Results of Analysis For Operating Basis Earthquake - Cherokee Dam HYDROLOGIC ENGINEERING2.4-209WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-79 Assumed Condition of Dam After Failure PBE And 1/2 Probable Max Flood - Cherokee Dam HYDROLOGIC ENGINEERING2.4-210WATTS BARWBNP-108Figure 2.4-80 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake - Douglas Dam HYDROLOGIC ENGINEERING2.4-211WATTS BARWBNP-108Figure 2.4-81 Saddle Dam No. 1 Results of Analysis For Operating Basis Earthquake - Douglas Dam HYDROLOGIC ENGINEERING2.4-212WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-82 Douglas Dam Assumed Condition of Dam After Failure aBE And 1/2 Probable Maximum Flood - Douglas Project HYDROLOGIC ENGINEERING2.4-213WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-83 Fontana Dam Assumed Condition of Dam after Failure OBE And 1/2 Probable Maximum Flood HYDROLOGIC ENGINEERING2.4-214WATTS BAR WBNP-108Figure 2.4-84 Deleted by Amendment 63 HYDROLOGIC ENGINEERING2.4-215WATTS BAR WBNP-108Figure 2.4-85 Deleted by Amendment 63 HYDROLOGIC ENGINEERING2.4-216WATTS BARWBNP-108Figure 2.4-86 Spillway Results of Analysis For SSE Earthquake Fort Loudoun Dam HYDROLOGIC ENGINEERING2.4-217WATTS BARWBNP-108 Figure 2.4-87 Embankment Results of Analysis For SSE Earthquake Fort Loudoun Dam HYDROLOGIC ENGINEERING2.4-218WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-88 Fort Loudoun Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood - Fort Loudoun Dam HYDROLOGIC ENGINEERING2.4-219WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-89 Tellico Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood Tellico Project HYDROLOGIC ENGINEERING2.4-220WATTS BARWBNP-108Security-Related Information - Withheld Under 10CFR2.390Figure 2.4-90 Norris Dam SSE + 25 Year Flood Judged Condition of Dam After Failure - Norris Dam HYDROLOGIC ENGINEERING2.4-221WATTS BAR WBNP-108Figure 2.4-91 SSE With Epicenter In North Knoxville Vicinity HYDROLOGIC ENGINEERING2.4-222WATTS BARWBNP-108Figure 2.4-92 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-223WATTS BAR WBNP-108Figure 2.4-93 SSE With Epicenter In West Knoxville Vicinity HYDROLOGIC ENGINEERING2.4-224WATTS BARWBNP-108Figure 2.4-94 Location of SSE For Simultaneous Failure of The Douglas and Fontana Dams HYDROLOGIC ENGINEERING2.4-225WATTS BAR WBNP-108Figure 2.4-95 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-226WATTS BARWBNP-108Figure 2.4-96 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-227WATTS BARWBNP-108Figure 2.4-97 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-228WATTS BARWBNP-108Figure 2.4-98 Not Used HYDROLOGIC ENGINEERING2.4-229WATTS BARWBNP-108Figure 2.4-99 Grading Plan Intake Channel HYDROLOGIC ENGINEERING2.4-230WATTS BAR WBNP-108Figure 2.4-100 Deleted by Amendment 83 HYDROLOGIC ENGINEERING2.4-231WATTS BAR WBNP-108Figure 2.4-101 Deleted by Amendment 33 HYDROLOGIC ENGINEERING2.4-232WATTS BAR WBNP-108Figure 2.4-102 Wells And Spring Inventory Within 2-Mile Radius of Watts Bar Nuclear Plant Site HYDROLOGIC ENGINEERING2.4-233WATTS BAR WBNP-108Figure 2.4-103 Water-Level Fluctuations In Observation Wells at The Watts Bar Site HYDROLOGIC ENGINEERING2.4-234WATTS BAR WBNP-108Figure 2.4-104 Locations of Ground - Water Observation Wells HYDROLOGIC ENGINEERING2.4-235WATTS BAR WBNP-108Figure 2.4-105 Generalized Water-Table Contour Map January 1972 HYDROLOGIC ENGINEERING2.4-236WATTS BARWBNP-108Figure 2.4-106 Mechanical - Flow Diagram Fuel Pool Cooling and Cleaning System HYDROLOGIC ENGINEERING2.4-237WATTS BARWBNP-108Figure 2.4-107 Powerhouse Units 1 & 2 Flow Diagram - Residual Heat Removal System HYDROLOGIC ENGINEERING2.4-238WATTS BARWBNP-108Figure 2.4-108 Schematic Flow Diagram Flood Protection Provisions Open Reactor Cooling (Unit 1 Shown, Unit 2 Similar)
WATTS BAR                                            WBNP-108 THIS PAGE INTENTIONALLY BLANK 2.4-197                                HYDROLOGIC ENGINEERING
HYDROLOGIC ENGINEERING2.4-239WATTS BARWBNP-108Figure 2.4-109 Schematic Flow Diagram Flood Protection Provisions Natural Convection Cooling (Unit 1 Shown, Unit 2 Similar)
 
HYDROLOGIC ENGINEERING2.4-240WATTS BARWBNP-108Figure 2.4-110 (Sheet 1)   Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Winter Events HYDROLOGIC ENGINEERING2.4-241WATTS BARWBNP-108Figure 2.4-110 (Sheet 2)   Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Summer Events 2.4-242HYDROLOGIC ENGINEERINGWATTS BARWBNP-108Figure 2.4-111 Deleted by Amendment 103 HYDROLOGIC ENGINEERING2.4-243WATTS BAR WBNP-108Figure 2.4-112 OBE with Epicenter Within Area Shown HYDROLOGIC ENGINEERING2.4-244WATTS BARWBNP-108Figure 2.4-113 Deleted by Amendment 107 2.4-245HYDROLOGIC ENGINEERINGWATTS BARWBNP-108Figure 2.4-114 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year FloodFailure Wave at Watts Bar Nuclear Plant HYDROLOGIC ENGINEERING2.4-246WATTS BARWBNP-108Figure 2.4-115 OBE Failure of Norris and Tellico Dams with 1/2 PMF EventFailure Wave at Watts Bar Nuclear Plant HYDROLOGIC ENGINEERING2.4-247WATTS BARWBNP-108Figure 2.4-116 OBE Failure of Cherokee, Douglas and Tellico Dams with 1/2 PMF EventFailure Wave at Watts Bar Nuclear Plant}}
                                                                          ????
2.4-198 WATTS BAR Figure 2.4-68 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Watts Bar Dam WBNP-108 HYDROLOGIC ENGINEERING
 
WATTS BAR                                                        WBNP-108 Figure 2.4-69 Deleted by Amendment 108 HYDROLOGIC ENGINEERING                                                2.4-199
 
WATTS BAR                                                  WBNP-108 Figure 2.4-70 Deleted by Amendment 83 2.4-200                                        HYDROLOGIC ENGINEERING
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-71 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Fort Loudoun Dam WBNP-108 2.4-201
 
2.4-202 WATTS BAR Figure 2.4-72 Embankment Results Of Analysis For Operating Basis Earthquake - Fort Loudoun Dam WBNP-108 HYDROLOGIC ENGINEERING
 
WATTS BAR                WBNP-108 Figure 2.4-73 Deleted by Amendment 103 HYDROLOGIC ENGINEERING                                            2.4-203
 
WATTS BAR              WBNP-108 Figure 2.4-74 Deleted by Amendment 108 2.4-204    HYDROLOGIC ENGINEERING
 
WATTS BAR                  WBNP-108 Figure 2.4-75 Deleted by Amendment 103 HYDROLOGIC ENGINEERING                                            2.4-205
 
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR                                                                          WBNP-108 Figure 2.4-76 Analysis For OBE & 1/2 PMF Assumed Condition of Dam After Failure Norris Dam HYDROLOGIC ENGINEERING                                                                                              2.4-206
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-77 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake -Cherokee Dam WBNP-108 2.4-207
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-78 Embankment Results of Analysis For Operating Basis Earthquake - Cherokee Dam WBNP-108 2.4-208
 
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR                                                                          WBNP-108 Figure 2.4-79 Assumed Condition of Dam After Failure PBE And 1/2 Probable Max Flood - Cherokee Dam HYDROLOGIC ENGINEERING                                                                                                2.4-209
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-80 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake - Douglas Dam WBNP-108 2.4-210
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-81 Saddle Dam No. 1 Results of Analysis For Operating Basis Earthquake - Douglas Dam WBNP-108 2.4-211
 
WATTS BAR HYDROLOGIC ENGINEERING Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-82 Douglas Dam Assumed Condition of Dam After Failure aBE And 1/2 Probable Maximum Flood - Douglas Project WBNP-108 2.4-212
 
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR                                                                                                    WBNP-108 Figure 2.4-83 Fontana Dam Assumed Condition of Dam after Failure OBE And 1/2 Probable Maximum Flood HYDROLOGIC ENGINEERING                                                                                                                                                                    2.4-213
 
WATTS BAR                                                   WBNP-108 Figure 2.4-84 Deleted by Amendment 63 HYDROLOGIC ENGINEERING                                          2.4-214
 
WATTS BAR                                                   WBNP-108 Figure 2.4-85 Deleted by Amendment 63 HYDROLOGIC ENGINEERING                                          2.4-215
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-86 Spillway Results of Analysis For SSE Earthquake Fort Loudoun Dam WBNP-108 2.4-216
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-87 Embankment Results of Analysis For SSE Earthquake Fort Loudoun Dam WBNP-108 2.4-217
 
WATTS BAR HYDROLOGIC ENGINEERING Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-88 Fort Loudoun Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood - Fort Loudoun Dam WBNP-108 2.4-218
 
WATTS BAR HYDROLOGIC ENGINEERING Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-89 Tellico Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood Tellico Project WBNP-108 2.4-219
 
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR                                                                                                                                                                            WBNP-108 Figure 2.4-90 Norris Dam SSE + 25 Year Flood Judged Condition of Dam After Failure - Norris Dam HYDROLOGIC ENGINEERING                                                                                                                                                                    2.4-220
 
WATTS BAR                                                                           WBNP-108 Figure 2.4-91 SSE With Epicenter In North Knoxville Vicinity HYDROLOGIC ENGINEERING                                                                2.4-221
 
WATTS BAR                WBNP-108 Figure 2.4-92 Deleted by Amendment 103 HYDROLOGIC ENGINEERING                  2.4-222
 
WATTS BAR                                                                         WBNP-108 Figure 2.4-93 SSE With Epicenter In West Knoxville Vicinity HYDROLOGIC ENGINEERING                                                                2.4-223
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-94 Location of SSE For Simultaneous Failure of The Douglas and Fontana Dams WBNP-108 2.4-224
 
WATTS BAR                                                     WBNP-108 Figure 2.4-95 Deleted by Amendment 103 HYDROLOGIC ENGINEERING                                          2.4-225
 
WATTS BAR                WBNP-108 Figure 2.4-96 Deleted by Amendment 103 HYDROLOGIC ENGINEERING                  2.4-226
 
WATTS BAR                WBNP-108 Figure 2.4-97 Deleted by Amendment 103 HYDROLOGIC ENGINEERING                  2.4-227
 
WATTS BAR                          WBNP-108 Figure 2.4-98 Not Used HYDROLOGIC ENGINEERING                  2.4-228
 
WATTS BAR                WBNP-108 Figure 2.4-99 Grading Plan Intake Channel HYDROLOGIC ENGINEERING                  2.4-229
 
WATTS BAR                                                     WBNP-108 Figure 2.4-100 Deleted by Amendment 83 HYDROLOGIC ENGINEERING                                          2.4-230
 
WATTS BAR                                                     WBNP-108 Figure 2.4-101 Deleted by Amendment 33 HYDROLOGIC ENGINEERING                                          2.4-231
 
WATTS BAR                                                                                                             WBNP-108 Figure 2.4-102 Wells And Spring Inventory Within 2-Mile Radius of Watts Bar Nuclear Plant Site HYDROLOGIC ENGINEERING                                                                                                  2.4-232
 
WATTS BAR                                                                                                 WBNP-108 Figure 2.4-103 Water-Level Fluctuations In Observation Wells at The Watts Bar Site HYDROLOGIC ENGINEERING                                                                                      2.4-233
 
WATTS BAR                                                                           WBNP-108 Figure 2.4-104 Locations of Ground - Water Observation Wells HYDROLOGIC ENGINEERING                                                                2.4-234
 
WATTS BAR                                                                             WBNP-108 Figure 2.4-105 Generalized Water-Table Contour Map January 1972 HYDROLOGIC ENGINEERING                                                                    2.4-235
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-106 Mechanical - Flow Diagram Fuel Pool Cooling and Cleaning System WBNP-108 2.4-236
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-107 Powerhouse Units 1 & 2 Flow Diagram - Residual Heat Removal System WBNP-108 2.4-237
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-108 Schematic Flow Diagram Flood Protection Provisions Open Reactor Cooling (Unit 1 Shown, Unit 2 Similar)
WBNP-108 2.4-238
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-109 Schematic Flow Diagram Flood Protection Provisions Natural Convection Cooling (Unit 1 Shown, Unit 2 Similar)
WBNP-108 2.4-239
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-110 (Sheet 1)   Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Winter Events WBNP-108 2.4-240
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-110 (Sheet 2)   Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Summer Events WBNP-108 2.4-241
 
WATTS BAR              WBNP-108 Figure 2.4-111 Deleted by Amendment 103 2.4-242    HYDROLOGIC ENGINEERING
 
WATTS BAR                                                                 WBNP-108 Figure 2.4-112 OBE with Epicenter Within Area Shown HYDROLOGIC ENGINEERING                                                        2.4-243
 
WATTS BAR                                                          WBNP-108 Figure 2.4-113 Deleted by Amendment 107 HYDROLOGIC ENGINEERING                                                2.4-244
 
2.4-245 WATTS BAR Figure 2.4-114 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year Flood Failure Wave at Watts Bar Nuclear Plant WBNP-108 HYDROLOGIC ENGINEERING
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-115 OBE Failure of Norris and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant WBNP-108 2.4-246
 
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-116 OBE Failure of Cherokee, Douglas and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant WBNP-108 2.4-247}}

Latest revision as of 07:29, 12 November 2019

Final Safety Analysis Report, Amendment 108. Chapter 2 - Figure 2.4-65 Through 2.4-247
ML12083A152
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/05/2012
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML12083A152 (52)


Text

WATTS BAR WBNP-108 Figure 2.4-65 thru Figure 2.4-67 Are Not Used HYDROLOGIC ENGINEERING 2.4-196

WATTS BAR WBNP-108 THIS PAGE INTENTIONALLY BLANK 2.4-197 HYDROLOGIC ENGINEERING

????

2.4-198 WATTS BAR Figure 2.4-68 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Watts Bar Dam WBNP-108 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-108 Figure 2.4-69 Deleted by Amendment 108 HYDROLOGIC ENGINEERING 2.4-199

WATTS BAR WBNP-108 Figure 2.4-70 Deleted by Amendment 83 2.4-200 HYDROLOGIC ENGINEERING

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-71 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Fort Loudoun Dam WBNP-108 2.4-201

2.4-202 WATTS BAR Figure 2.4-72 Embankment Results Of Analysis For Operating Basis Earthquake - Fort Loudoun Dam WBNP-108 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-108 Figure 2.4-73 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-203

WATTS BAR WBNP-108 Figure 2.4-74 Deleted by Amendment 108 2.4-204 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-108 Figure 2.4-75 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-205

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-108 Figure 2.4-76 Analysis For OBE & 1/2 PMF Assumed Condition of Dam After Failure Norris Dam HYDROLOGIC ENGINEERING 2.4-206

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-77 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake -Cherokee Dam WBNP-108 2.4-207

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-78 Embankment Results of Analysis For Operating Basis Earthquake - Cherokee Dam WBNP-108 2.4-208

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-108 Figure 2.4-79 Assumed Condition of Dam After Failure PBE And 1/2 Probable Max Flood - Cherokee Dam HYDROLOGIC ENGINEERING 2.4-209

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-80 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake - Douglas Dam WBNP-108 2.4-210

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-81 Saddle Dam No. 1 Results of Analysis For Operating Basis Earthquake - Douglas Dam WBNP-108 2.4-211

WATTS BAR HYDROLOGIC ENGINEERING Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-82 Douglas Dam Assumed Condition of Dam After Failure aBE And 1/2 Probable Maximum Flood - Douglas Project WBNP-108 2.4-212

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-108 Figure 2.4-83 Fontana Dam Assumed Condition of Dam after Failure OBE And 1/2 Probable Maximum Flood HYDROLOGIC ENGINEERING 2.4-213

WATTS BAR WBNP-108 Figure 2.4-84 Deleted by Amendment 63 HYDROLOGIC ENGINEERING 2.4-214

WATTS BAR WBNP-108 Figure 2.4-85 Deleted by Amendment 63 HYDROLOGIC ENGINEERING 2.4-215

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-86 Spillway Results of Analysis For SSE Earthquake Fort Loudoun Dam WBNP-108 2.4-216

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-87 Embankment Results of Analysis For SSE Earthquake Fort Loudoun Dam WBNP-108 2.4-217

WATTS BAR HYDROLOGIC ENGINEERING Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-88 Fort Loudoun Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood - Fort Loudoun Dam WBNP-108 2.4-218

WATTS BAR HYDROLOGIC ENGINEERING Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-89 Tellico Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood Tellico Project WBNP-108 2.4-219

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-108 Figure 2.4-90 Norris Dam SSE + 25 Year Flood Judged Condition of Dam After Failure - Norris Dam HYDROLOGIC ENGINEERING 2.4-220

WATTS BAR WBNP-108 Figure 2.4-91 SSE With Epicenter In North Knoxville Vicinity HYDROLOGIC ENGINEERING 2.4-221

WATTS BAR WBNP-108 Figure 2.4-92 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-222

WATTS BAR WBNP-108 Figure 2.4-93 SSE With Epicenter In West Knoxville Vicinity HYDROLOGIC ENGINEERING 2.4-223

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-94 Location of SSE For Simultaneous Failure of The Douglas and Fontana Dams WBNP-108 2.4-224

WATTS BAR WBNP-108 Figure 2.4-95 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-225

WATTS BAR WBNP-108 Figure 2.4-96 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-226

WATTS BAR WBNP-108 Figure 2.4-97 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-227

WATTS BAR WBNP-108 Figure 2.4-98 Not Used HYDROLOGIC ENGINEERING 2.4-228

WATTS BAR WBNP-108 Figure 2.4-99 Grading Plan Intake Channel HYDROLOGIC ENGINEERING 2.4-229

WATTS BAR WBNP-108 Figure 2.4-100 Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-230

WATTS BAR WBNP-108 Figure 2.4-101 Deleted by Amendment 33 HYDROLOGIC ENGINEERING 2.4-231

WATTS BAR WBNP-108 Figure 2.4-102 Wells And Spring Inventory Within 2-Mile Radius of Watts Bar Nuclear Plant Site HYDROLOGIC ENGINEERING 2.4-232

WATTS BAR WBNP-108 Figure 2.4-103 Water-Level Fluctuations In Observation Wells at The Watts Bar Site HYDROLOGIC ENGINEERING 2.4-233

WATTS BAR WBNP-108 Figure 2.4-104 Locations of Ground - Water Observation Wells HYDROLOGIC ENGINEERING 2.4-234

WATTS BAR WBNP-108 Figure 2.4-105 Generalized Water-Table Contour Map January 1972 HYDROLOGIC ENGINEERING 2.4-235

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-106 Mechanical - Flow Diagram Fuel Pool Cooling and Cleaning System WBNP-108 2.4-236

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-107 Powerhouse Units 1 & 2 Flow Diagram - Residual Heat Removal System WBNP-108 2.4-237

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-108 Schematic Flow Diagram Flood Protection Provisions Open Reactor Cooling (Unit 1 Shown, Unit 2 Similar)

WBNP-108 2.4-238

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-109 Schematic Flow Diagram Flood Protection Provisions Natural Convection Cooling (Unit 1 Shown, Unit 2 Similar)

WBNP-108 2.4-239

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-110 (Sheet 1) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Winter Events WBNP-108 2.4-240

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-110 (Sheet 2) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Summer Events WBNP-108 2.4-241

WATTS BAR WBNP-108 Figure 2.4-111 Deleted by Amendment 103 2.4-242 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-108 Figure 2.4-112 OBE with Epicenter Within Area Shown HYDROLOGIC ENGINEERING 2.4-243

WATTS BAR WBNP-108 Figure 2.4-113 Deleted by Amendment 107 HYDROLOGIC ENGINEERING 2.4-244

2.4-245 WATTS BAR Figure 2.4-114 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year Flood Failure Wave at Watts Bar Nuclear Plant WBNP-108 HYDROLOGIC ENGINEERING

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-115 OBE Failure of Norris and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant WBNP-108 2.4-246

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-116 OBE Failure of Cherokee, Douglas and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant WBNP-108 2.4-247