ML12156A334: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Fermi2Power-FlowMap101020203030404050506060707080809090100100110110101020203030404050506060707080809090100100110110ScramRegion-IFOPRMisINOPExitRegion-IFOPRMisINOPRROscillation(49.0%to54.0%Speed)MELLL-100%RL-90%RL-80%RL-70%RL-81%FlowNatCirc(Approx)MinSpeedICFRegionPercentCoreFlow(basedonProcessComputerpoint)Approvedby:Supervisor,ReactorEngineering/Date P e r c e n tP o w e r Form 78.000.09 Att 3 P1/1 082905  IP:  I DTC: TGCHEM File: 1327.01 OFFGAS LOG RADIATION MONITORS CONVERSION FACTORS FOR TECHNICAL SPECIFICATIONS Date Time 1. Obtain the following information from Attachment 1:
{{#Wiki_filter:Fermi 2 Power-Flow Map 10            20            30              40          50  60  70    80                90                100                  110 Scram Region - IF OPRM is INOP 110                                                                                                                                              110 Exit Region - IF OPRM is INOP RR Oscillation (49.0% to 54.0% Speed)                                   81% Flow 100                                                                                                                                              100 90                                                                                                                                                90 80                                                                                                                                                80 70                                                                                                                                                70 ICF 60                                                                                                                            Region            60 MELLL -
: a. Radioactivity Rate (Step 5):   mCi/sec b. Offgas Flow Rate (Step 1c):   cfm c. Rad Monitor Readings (Step 1b) D11-K601A   mr/hr D11-K601B   mr/hr 2. Perform the following conve rsion factor calculations:
50                              100% RL -                                                                                                         50 90% RL -
D11-K601A Conversion Factor Offgas   D11-K601A mCi/sec   Radioactivity   Flow Rate   Reading mr/hr x cfm =  Rate (mCi/sec) /   (cfm) x  (mr/hr)  
40                              80% RL -                                                                                                         40 70% RL -
  = / ( x )
30                                                                                                                                                30 20                                                                                                                                                20 Nat Circ        Min Speed Percent Power (Approx) 10                                                                                                                                                10 10            20            30              40          50  60  70    80                90                100                  110 Percent Core Flow (based on Process Computer point)
D11-K601B Conversion Factor Offgas   D11-K601B mCi/sec   Radioactivity   Flow Rate   Reading mr/hr x cfm =  Rate (mCi/sec) /   (cfm) x (mr/hr)  
Approved by:
  =   / ( x )
Supervisor, Reactor Engineering / Date
 
OFFGAS LOG RADIATION MONITORS CONVERSION FACTORS FOR TECHNICAL SPECIFICATIONS Date Time
: 1. Obtain the following information from Attachment 1:
: a. Radioactivity Rate (Step 5):                             mCi/sec
: b. Offgas Flow Rate (Step 1c):                               cfm
: c. Rad Monitor Readings (Step 1b)
D11-K601A                                                 mr/hr D11-K601B                                                 mr/hr
: 2. Perform the following conversion factor calculations:
D11-K601A Conversion Factor Offgas           D11-K601A mCi/sec                 Radioactivity               Flow Rate         Reading mr/hr x cfm         =  Rate (mCi/sec)         /   (cfm)         x  (mr/hr)
    =                                             /   (             x                   )
D11-K601B Conversion Factor Offgas           D11-K601B mCi/sec                 Radioactivity               Flow Rate         Reading mr/hr x cfm         =  Rate (mCi/sec)         /   (cfm)         x   (mr/hr)
    =                                             /   (             x                   )
Detach bottom portion and post on Control Room Panel H11-P601 next to Offgas Log Radiation Monitors Recorder D11-R601.
Detach bottom portion and post on Control Room Panel H11-P601 next to Offgas Log Radiation Monitors Recorder D11-R601.
CONVERSION FACTOR l mCi/sec   l mCi/sec Rad Monitor l mr/hr x cfm Rad Monitor lmr/hr x cfm D11-K601A l     D11-K601B l THESE CONVERSION FACTORS ARE TO BE USED TO OBTAIN A mCi/sec RELEASE RATE FROM OFFGAS LOG RADIATION MONITORS.
CONVERSION FACTOR l mCi/sec                                 l mCi/sec Rad Monitor         l mr/hr x cfm             Rad Monitor     lmr/hr x cfm D11-K601A       l     3.15 X 10-3            D11-K601B     l 3.01 X 10-3 THESE CONVERSION FACTORS ARE TO BE USED TO OBTAIN A mCi/sec RELEASE RATE FROM OFFGAS LOG RADIATION MONITORS.
TO USE CONVERSION FACTORS, MULTIPLY FACTOR BY CURRENT OFFGAS LOG RADIATION MONITOR READING (mr/hr) AND CURRENT OFFGAS FLOW RATE (cfm): mCi/sec = FACTOR x MONITOR READING x OFFGAS FLOW*
TO USE CONVERSION FACTORS, MULTIPLY FACTOR BY CURRENT OFFGAS LOG RADIATION MONITOR READING (mr/hr) AND CURRENT OFFGAS FLOW RATE (cfm):
mCi/sec = FACTOR x MONITOR READING x OFFGAS FLOW*
* Flow as read from N62-R808, O/G Outlet Flow Rec pen labeled Charcoal Unit 1-6.
* Flow as read from N62-R808, O/G Outlet Flow Rec pen labeled Charcoal Unit 1-6.
Performed By Date   Approved By Date Chemist/designee Noted By Date SM DC Sources-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources-Operating LCO 3.8.4 The Division I and Division II DC electrical power subsystems shall be OPERABLE.APPLICABILITY:
Performed By                               Date Approved By                               Date Chemist/designee Noted By                                   Date SM Form 78.000.09 Att 3 P1/1 082905          IP: I          DTC: TGCHEM      File: 1327.01
MODES 1, 2. and 3.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One battery charger A.1 Restore battery 4 hours inoperable, charger to OPERABLE status.B. One DC electrical B.1 Restore DC electrical 2 hours power subsystem power subsystem to inoperable for reasons OPERABLE status.other than Condition A.C. Required Action and C.1 Be in MODE 3. 12 hours Associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours FERMI UNIT 2 3.8-16 Amendment No. 134 DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 7 days 125.7 V on float charge.SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.
 
OR Verify each battery cell-to-cell and terminal connection resistance is 5 1.5E-4 ohm.SR 3.8.4.3 Verify battery cells, cell plates, and 18 months racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.
DC Sources-Operating 3.8.4 3.8   ELECTRICAL POWER SYSTEMS 3.8.4   DC Sources-Operating LCO   3.8.4       The Division I and Division II DC electrical power subsystems shall be OPERABLE.
SR 3.8.4.4 Remove visible corrosion and verify battery 18 months cell to cell and terminal connections are coated with anti-corrosion material.SR 3.8.4.5 Verify each battery cell-to-cell and 18 months terminal connection resistance is< 1.5E-4 ohm.SR 3.8.4.6 Verify each required battery charger 18 months supplies 2 100 amps at 124.7 V for> 4 hours.(continued)
APPLICABILITY:     MODES 1, 2. and 3.
FERMI -UNIT 2 3.8-17 Amendment No. lgl, 136 DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
ACTIONS CONDITION                   REQUIRED ACTION             COMPLETION TIME A. One battery charger       A.1     Restore battery           4 hours inoperable,                         charger to OPERABLE status.
SURVEILLANCE FREQUENCY SR 3.8.4.7 ------------------.
B. One DC electrical           B.1     Restore DC electrical     2 hours power subsystem                     power subsystem to inoperable for reasons             OPERABLE status.
NOTE--------------
other than Condition A.
The performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.---------------------------------  
C. Required Action and         C.1     Be in MODE 3.             12 hours Associated Completion Time not met.             AND C.2     Be in MODE 4.             36 hours FERMI   UNIT 2                         3.8-16                     Amendment No. 134
------Verify battery capacity is adequate to 18 months supply, and maintain in OPERABLE status, the actual or simulated emergency loads for the design duty cycle when subjected to a battery service test.SR 3.8.4.8 -------------------
 
NOTE--------------  
DC Sources-   Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE                             FREQUENCY SR 3.8.4.1   Verify battery terminal voltage is             7 days
-. ..-This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.--------------  
                &#x17d; 125.7 V on float charge.
------------------------
SR 3.8.4.2   Verify no visible corrosion at battery         92 days terminals and connectors.
Verify battery capacity is M 80% of the 60 months manufacturer's rating when subjected to a performance discharge test. AND 18 months when battery shows degradation or has reached 85%of expected life FERMI UNIT 2 3.8-18 Amendment No. 134}}
OR Verify each battery cell-to-cell and terminal connection resistance is 5 1.5E-4 ohm.
SR 3.8.4.3   Verify battery cells, cell plates, and         18 months racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.
SR 3.8.4.4     Remove visible corrosion and verify battery   18 months cell to cell and terminal connections are coated with anti-corrosion material.
SR 3.8.4.5   Verify each battery cell-to-cell and           18 months terminal connection resistance is
                < 1.5E-4 ohm.
SR 3.8.4.6   Verify each required battery charger           18 months supplies 2 100 amps at &#x17d; 124.7 V for
                > 4 hours.
(continued)
FERMI - UNIT 2                         3.8-17             Amendment No. lgl, 136
 
DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS     (continued)
SURVEILLANCE                             FREQUENCY SR 3.8.4.7       ------------------. NOTE--------------
The performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.
                    --------------------------------- ------
Verify battery capacity is adequate to           18 months supply, and maintain in OPERABLE status, the actual or simulated emergency loads for the design duty cycle when subjected to a battery service test.
SR 3.8.4.8     ------------------- NOTE-------------- -.
                                                          . .-
This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
                  --------------   ------------------------
Verify battery capacity is     80%
M of the         60 months manufacturer's rating when subjected to a performance discharge test.                       AND 18 months when battery shows degradation or has reached 85%
of expected life FERMI   UNIT 2                         3.8-18                   Amendment No. 134}}

Revision as of 02:58, 12 November 2019

2012 Fermi Power Plant Initial License Examination Administered Written Exam Handouts
ML12156A334
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/30/2012
From: Bielby M
Operations Branch III
To:
Detroit Edison
Shared Package
ML11354A133 List:
References
Download: ML12156A334 (5)


Text

Fermi 2 Power-Flow Map 10 20 30 40 50 60 70 80 90 100 110 Scram Region - IF OPRM is INOP 110 110 Exit Region - IF OPRM is INOP RR Oscillation (49.0% to 54.0% Speed) 81% Flow 100 100 90 90 80 80 70 70 ICF 60 Region 60 MELLL -

50 100% RL - 50 90% RL -

40 80% RL - 40 70% RL -

30 30 20 20 Nat Circ Min Speed Percent Power (Approx) 10 10 10 20 30 40 50 60 70 80 90 100 110 Percent Core Flow (based on Process Computer point)

Approved by:

Supervisor, Reactor Engineering / Date

OFFGAS LOG RADIATION MONITORS CONVERSION FACTORS FOR TECHNICAL SPECIFICATIONS Date Time

1. Obtain the following information from Attachment 1:
a. Radioactivity Rate (Step 5): mCi/sec
b. Offgas Flow Rate (Step 1c): cfm
c. Rad Monitor Readings (Step 1b)

D11-K601A mr/hr D11-K601B mr/hr

2. Perform the following conversion factor calculations:

D11-K601A Conversion Factor Offgas D11-K601A mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr)

= / ( x )

D11-K601B Conversion Factor Offgas D11-K601B mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr)

= / ( x )

Detach bottom portion and post on Control Room Panel H11-P601 next to Offgas Log Radiation Monitors Recorder D11-R601.

CONVERSION FACTOR l mCi/sec l mCi/sec Rad Monitor l mr/hr x cfm Rad Monitor lmr/hr x cfm D11-K601A l 3.15 X 10-3 D11-K601B l 3.01 X 10-3 THESE CONVERSION FACTORS ARE TO BE USED TO OBTAIN A mCi/sec RELEASE RATE FROM OFFGAS LOG RADIATION MONITORS.

TO USE CONVERSION FACTORS, MULTIPLY FACTOR BY CURRENT OFFGAS LOG RADIATION MONITOR READING (mr/hr) AND CURRENT OFFGAS FLOW RATE (cfm):

mCi/sec = FACTOR x MONITOR READING x OFFGAS FLOW*

  • Flow as read from N62-R808, O/G Outlet Flow Rec pen labeled Charcoal Unit 1-6.

Performed By Date Approved By Date Chemist/designee Noted By Date SM Form 78.000.09 Att 3 P1/1 082905 IP: I DTC: TGCHEM File: 1327.01

DC Sources-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources-Operating LCO 3.8.4 The Division I and Division II DC electrical power subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2. and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One battery charger A.1 Restore battery 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable, charger to OPERABLE status.

B. One DC electrical B.1 Restore DC electrical 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem power subsystem to inoperable for reasons OPERABLE status.

other than Condition A.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> FERMI UNIT 2 3.8-16 Amendment No. 134

DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 7 days

Ž 125.7 V on float charge.

SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.

OR Verify each battery cell-to-cell and terminal connection resistance is 5 1.5E-4 ohm.

SR 3.8.4.3 Verify battery cells, cell plates, and 18 months racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.

SR 3.8.4.4 Remove visible corrosion and verify battery 18 months cell to cell and terminal connections are coated with anti-corrosion material.

SR 3.8.4.5 Verify each battery cell-to-cell and 18 months terminal connection resistance is

< 1.5E-4 ohm.

SR 3.8.4.6 Verify each required battery charger 18 months supplies 2 100 amps at Ž 124.7 V for

> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

(continued)

FERMI - UNIT 2 3.8-17 Amendment No. lgl, 136

DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.4.7 ------------------. NOTE--------------

The performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.


------

Verify battery capacity is adequate to 18 months supply, and maintain in OPERABLE status, the actual or simulated emergency loads for the design duty cycle when subjected to a battery service test.

SR 3.8.4.8 ------------------- NOTE-------------- -.

. .-

This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.


------------------------

Verify battery capacity is 80%

M of the 60 months manufacturer's rating when subjected to a performance discharge test. AND 18 months when battery shows degradation or has reached 85%

of expected life FERMI UNIT 2 3.8-18 Amendment No. 134