ML12167A062: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Davis Besse 17RFO Eddy Current Exam Scope SG 2-ASG 1-BInspection of all newly installed repair rolls.00Periphery AFW Header to tube gap analysis to determine if the header is moving.336378 Full length bobbin examination of all in-service non-sleeved tubing.1455214868 Full length bobbin examination of 100% of sleeves and of tubing below sleeves.199212+Point TM exam of the sleeve at the point of entry (USE) and parent tube pressure boundary portion extending approximately 6 inches past the sleeve end (LSE) of 100% of the sleeves (the parent tube between the bottom of the upper most sleeve roll and the top of the middle sleeve roll may be excluded from inspection since it is not a pressure boundary).199212+Point TM inspection of non-sleeved in-service upper tube roll expansions (100%) including non stress relieved upper repair roll expansions and factory re-rolls.1455214868+Point TM coil examination of 20% of the non-sleeved in-service tubes in the upper tube sheet region from tube end including tube end, upper roll expansion and crevice to upper tube sheet exit.29112974+Point TM inspection of 20% of the in-service stress relieved lower tube roll expansions and tube ends in OTSG 2-A. (including tube 127-67 with NSRT)29510+Point TM inspection of in-service stress relieved lower tube roll expansions and tube ends in S/G 1-B 100%.015080+Point TM coil examination of the tubes bordering the sleeve region.8685+Point TM coil examination of all of the flaw-like indications (I codes, TWD per 4.1.3.G and 4.2.3.G and new DNT) reported from bobbin.550 estimate530 estimate+Point TM coil examination of all NQS and MBM indications above 10S -2".220 estimate240 estimate+Point TM coil examination of all dent indications below 14S (100% sample of all previously reported and new dents using a 2.5 volt bobbin threshold).350 estimate300 estimate+Point TM coil examination of all dent indications greater than or equal to 1 volt above 14S in the non-periphery region.330 estimate430 estimate+Point TM coil examination of all dent indications greater than or equal to 0.5 volts above 14S in the periphery region.29 estimate19 estimate+Point TM coil sample inspection of lower tubesheet sludge pile region tubes.14451687Sleeve Bobbin and +Point TM coil inspection of all previously identified geometric distortions (40 tubes SG 1-B).040+Point TM coil inspection of all previously identified and new magnetic stain (MAG) indications (22 tubes SG 1-B)022Visual Plug exams of all Plugs in Upper and Lower (100%)1412754Total Examinations4012252699Page 1 of 11Results as of : 6:57 AM,5/23/2012 SGCountRowTubeIndVoltsTSPInch1ProbeDepthAx LenDeg Mode2-A12292MAI1.97UTE-2.99520PP840.19ReRoll Transition PWSCC2-A22989MAI0.97UTE-3.62520PP720.22ReRoll Transition PWSCC 2-A32881MAI0.58UTE-3.50520PP800.17ReRoll Transition PWSCC 2-A43079MAI1.34UTE-2.97520PP580.19ReRoll Transition PWSCC2-A58152SAI0.10UTS-4.73520PP560.20Groove IGA2-A6106105MAI1.44UTE-3.39520PP740.25ReRoll Transition PWSCC 2-A791121MAI1.23UTE-3.24520PP820.21ReRoll Transition PWSCC 2-A8689MAI1.02UTE-3.12520PP890.19ReRoll Transition PWSCC 2-A9897MAI1.17UTE-3.03520PP560.18ReRoll Transition PWSCC2-A10836MAI1.03UTE-3.13520PP950.22ReRoll Transition PWSCC2-A117546SAI1.03UTE-5.00520PP420.15ReRoll Transition PWSCC 2-A122682MAI1.09UTE-3.41520PP960.27ReRoll Transition PWSCC 2-A1310318SAI0.54UTE-3.13520PP650.17ReRoll Transition PWSCC 2-A142116MAI0.51UTE-2.98520PP460.19ReRoll Transition PWSCC2-A151063MAI2.67UTE-3.47520PP420.27ReRoll Transition PWSCC2-A162148MAI0.73UTE-3.26520PP970.24ReRoll Transition PWSCC 2-A17114109MAI1.72UTE-3.26520PP720.22ReRoll Transition PWSCC 2-A18118103MAI0.82UTE-3.12520PP800.17ReRoll Transition PWSCC 2-A192451MAI1.75UTE-3.24520PP990.23ReRoll Transition PWSCC 2-A202218MAI1.30UTE-3.53520PP1000.26ReRoll Transition PWSCC2-A211813MAI0.33UTE-3.07520PP920.22ReRoll Transition PWSCC2-A22116MAI2.05UTE-3.06520PP920.18ReRoll Transition PWSCC 2-A23589MAI1.97UTE-3.54520PP690.23ReRoll Transition PWSCC 2-A2415116SAI0.1215S3.44520PP510.32Groove IGA 2-A2514920SAI0.0915S1.48520PP420.35Groove IGA 2-A261511MAI0.79UTE-3.35520PP780.17ReRoll Transition PWSCC 2-A273626MAI1.04UTE-3.56520PP960.21ReRoll Transition PWSCC 2-A28988SAI1.03UTE-3.13520PP650.21ReRoll Transition PWSCC 2-A29926SAI0.95UTE-4.87520PP570.14ReRoll Transition PWSCC 2-A30927SAI1.65UTE-3.09520PP780.22ReRoll Transition PWSCC 1-B31108106MAI0.58UTE-3.41520PP730.16ReRoll Transition PWSCC 1-B32113110MAI0.45UTE-3.10520PP650.26ReRoll Transition PWSCC 1-B3310974MAI0.72UTE-3.00520PP880.16ReRoll Transition PWSCC 1-B34923SAI0.90UTE-3.00520PP760.17ReRoll Transition PWSCC 1-B352190SAI0.2714S31.50520PP540.58Groove IGA 1-B36109116SAI0.3210S-2.23520PP191.59Groove IGA 1-B37113116SAI0.1012S-15.25520PP150.30Groove IGA 1-B386660SAI0.67UTE-1.46520PP630.14Roll Transition PWSCC 1-B3912794SAI0.1815S1.44520PP140.60Groove IGA 1-B407758MAI0.63UTE-1.44520PP620.18Roll Transition PWSCC 1-B4113073SAI0.73UTE-4.74520PP550.12ReRoll Transition PWSCC 1-B427788SAI0.54UTE-1.47520PP530.18Roll Transition PWSCC 1-B4312062SAI0.85UTE-1.60520PP790.14Roll Transition PWSCC 1-B44104118MAI1.74UTE-5.24520PP640.17ReRoll Transition PWSCC 1-B45104118MAI1.79UTE-3.21520PP920.24ReRoll Transition PWSCC 1-B46104114MAI2.27UTE-3.40520PP600.22ReRoll Transition PWSCC 1-B475336SAI0.56UTE-1.51520PP690.18Roll Transition PWSCC 1-B4810091SAI0.45UTE-1.54520PP840.18Roll Transition PWSCC 1-B4989126MAI1.66UTE-2.98520PP990.27ReRoll Transition PWSCC 1-B509354MAI0.87UTE-1.33520PP570.23Roll Transition PWSCC 1-B51102117SAI0.62LTE1.36520PP650.13Roll Transition PWSCC 1-B52546SAI0.3315S4.83520PP310.87Groove IGA 1-B53546SAI0.3215S4.55520PP311.93Groove IGA 1-B54546SAI0.1515S2.77520PP460.28Groove IGA 1-B55546SAI0.2315S4.07520PP250.76Groove IGA 1-B561577SAI0.2015S2.53520PP630.17Groove IGA 1-B57113116SAI0.1610S7.68520PP20.63Groove IGA 1-B58113116SAI0.1210S8.67520PP470.48Groove IGA 1-B59113116SAI0.0910S10.91520PP310.60Groove IGA 1-B60113116SAI0.0810S11.63520PP80.31Groove IGA 1-B61113116SAI0.1313S-17.27520PP580.19Groove IGA 1-B62113116SAI0.1113S-18.45520PP700.22Groove IGA 1-B63113116SAI0.1113S-15.60520PP350.43Groove IGA 1-B6484116MAI1.99UTE-3.20520PP890.37ReRoll Transition PWSCC Davis-Besse 17 RFO May 2012 Axial IndicationsPage 2 of 11Results as of : 6:57 AM,5/23/2012 SGCountRowTubeIndVoltsTSPInch1ProbeDepthAx LenDeg Mode Davis-Besse 17 RFO May 2012 Axial Indications1-B655394MAI1.57UTE-3.33520PP560.22ReRoll Transition PWSCC1-B663818MAI0.81UTE-2.95520PP900.24ReRoll Transition PWSCC 1-B6737102SAI0.59UTE-1.88520PP890.17Roll Transition PWSCC 1-B688356MAI1.23UTE-1.56520PP620.18Roll Transition PWSCC 1-B698655SAI0.90UTE-0.99520PP690.20Tube End PWSCC 1-B706650MAI1.01UTE-1.46520PP690.15Roll Transition PWSCC 1-B7112465SAI0.1114S1.50520PP850.29Groove IGA 1-B722997SAI0.70UTE-1.60520PP490.13Roll Transition PWSCC 1-B738656SAI0.48UTE-1.47520PP550.15Roll Transition PWSCC 1-B748658MAI0.73UTE-1.51520PP650.23Roll Transition PWSCC 1-B7527100SAI0.2715S-1.33520PP150.61Groove IGA 1-B76842SAI1.25UTE-3.02520PP1000.17ReRoll Transition PWSCC 1-B772983SAI0.41UTE-3.20520PP470.12ReRoll Transition PWSCC 1-B7810050SAI0.53UTE-1.21520PP580.12Roll Transition PWSCC 1-B798768SAI1.25UTE-1.77520PP650.20Roll Transition PWSCCPage 3 of 11Results as of : 6:57 AM,5/23/2012 S/GCountRowTubeInd VoltsTSPInchProbe%T WCi ExtDegradation MechanismSection aSection bSection c1-B142111SCI0.36LTE1.43520PP390.2Roll Trans PWSCC x1-B14577SCI0.46LTE1.52520PP560.16Roll Trans PWSCC x 1-B14586SCI2.34UTE-0.11520PP960.53Tube End PWSCC x 1-B14878MCI0.87LTE1.52520PP350.62Roll Trans PWSCC x 1-B15078SCI0.49LTE1.59520PP990.37Roll Trans PWSCC x 1-B15179MCI0.27LTE1.6520PP981.09Roll Trans PWSCC x 1-B15276MCI0.35LTE1.53520PP731.09Roll Trans PWSCC x 1-B15380MCI0.54LTE1.57520PP991.1Roll Trans PWSCC x 1-B15479MCI0.4LTE1.62520PP941.03Roll Trans PWSCC x 1-B15677SCI0.78LTE1.59520PP980.51Roll Trans PWSCC x 1-B15780SCI0.23LTE1.53520PP980.3Roll Trans PWSCC x 1-B15879SCI0.4LTE1.63520PP890.44Roll Trans PWSCC x 1-B15930SCI0.56LTE1.49520PP580.18Roll Trans PWSCC x 1-B16279MCI0.75LTE1.65520PP311.18Roll Trans PWSCC x 1-B16530SCI0.26LTE1.58520PP320.18Roll Trans PWSCC x 1-B16530SCI0.72LTE1.5520PP460.21Roll Trans PWSCC x 1-B16681SCI0.75LTE1.65520PP650.2Roll Trans PWSCC x 1-B17375SCI0.61LTE1.52520PP980.11Roll Trans PWSCC x 1-B17768MCI0.92LTE1.6520PP660.23Roll Trans PWSCC x 1-B17769SCI0.52LTE1.5520PP680.31Roll Trans PWSCC x 1-B17868MCI0.67LTE1.6520PP960.25Roll Trans PWSCC x 1-B18256SCI0.96LTE1.53520PP640.4Roll Trans PWSCC x 1-B18473SCI0.46LTE1.51520PP680.15Roll Trans PWSCC x 1-B18475MCI0.7LTE1.59520PP510.18Roll Trans PWSCC x 1-B18653SCI0.45LTE1.6520PP510.18Roll Trans PWSCC x 1-B18654MCI1.09LTE1.59520PP680.73Roll Trans PWSCC x 1-B18669MCI0.6LTE1.63520PP630.18Roll Trans PWSCC x 1-B18774MCI0.41LTE1.73520PP660.2Roll Trans PWSCC x0.0589 1-B18959SCI0.79LTE1.61520PP480.23Roll Trans PWSCC x 1-B19453MCI0.56LTE1.58520PP990.37Roll Trans PWSCC x 1-B19893SCI0.43LTE1.58520PP520.23Roll Trans PWSCCx0.0544 1-B110070MCI0.4LTE1.6520PP630.2Roll Trans PWSCCx1-B110669SCI0.72LTE1.79520PP660.18Roll Trans PWSCC x1-B114226SVI1.87UTE-2.35520PP470.27ID Mechanicalx2-A12015SCI0.44UTE-3.2520PP330.36Reroll Trans PWSCCx 2-A12085SCI1.88UTE-0.28520PP370.51Tube End PWSCCx 2-A14461SCI0.95UTE-1.94520PP680.21Roll Trans PWSCCx 2-A1899SCI1.09UTE-3.14520PP430.47Reroll Trans PWSCCx 2-A1101124SCI1.83UTE-0.2520PP950.58Tube End PWSCCx 2-A1104107SCI0.83UTE-2.98520PP771.22Reroll Trans PWSCCx 2-A11331SCI0.84UTE-0.26520PP810.23Tube End PWSCCx2-A11517SCI2.43UTE-0.3520PP600.43Tube End PWSCC x Davis-Besse 17RFO May 2012 2.C(7) Steam Generator Tube Circumferential Crack ReportPage 4 of 11Results as of : 6:57 AM,5/23/2012 SGRowTubeIndVoltsTSPInch1ProbeDepthAx LenCirc LenDeg Mode1-B14226SVI1.87UTE-2.35520PP470.220.27ID MechanicalDavis-Besse 17 RFO May 2012Volumetric Indications (Not in Previously Rerolled Tubes)Page 5 of 11Results as of : 6:57 AM,5/23/2012 SGCountRowTubeIndVoltsTSPInch1Probe2-A14545SAA0.91UTE-0.30520PP2-A28410SAA1.83UTE-0.21520PP 2-A314232MAA0.87UTE-0.20520PP 2-A414625SAA1.40UTE-0.26520PP 2-A536113SAA1.64UTE-0.23520PP 2-A6642SAA1.22UTE-0.18520PP 2-A7122104MAA2.17UTE-0.28520PP 2-A8115107MAA1.66UTE-0.25520PP 2-A9116107MAA1.47UTE-0.23520PP2-A101308SAA2.44UTE-0.33520PP2-A111307SAA2.10UTE-0.31520PP2-A129719MAA1.83UTE-0.23520PP 2-A139249SAA0.86UTE-0.30520PP 2-A1470116SAA1.25UTE-0.27520PP 2-A1586100SAA1.05UTE-0.26520PP 2-A1686122MAA1.62UTE-0.38520PP 2-A1786123MAA1.58UTE-0.25520PP 2-A1887100SAA1.34UTE-0.24520PP 2-A1913670SAA2.38UTE-0.31520PP 2-A2013668MAA1.81UTE-0.33520PP 2-A2113772MAA1.96UTE-0.33520PP2-A2213765SAA0.91UTE-0.34520PP2-A2313866SAA1.86UTE-0.32520PP2-A2413865SAA1.97UTE-0.33520PP 2-A2513963MAA1.73UTE-0.30520PP 2-A26126MAA1.64UTE-0.31520PP 2-A27814SAA2.51UTE-0.27520PP 2-A28622SAA1.03UTE-0.29520PP 2-A2957SAA3.18UTE-0.24520PP 2-A3012171SAA0.72UTE-0.32520PP 2-A312578SAA0.81UTE-0.32520PP 2-A326540SAA3.11UTE-0.10520PP 2-A33331SAA2.35UTE-0.28520PP 2-A34546SAA2.08UTE-0.32520PP 2-A35960SAA2.49UTE-0.20520PP 2-A363861MAA1.46UTE-0.28520PP 2-A373687SAA1.01UTE-0.29520PP 2-A383787SAA0.99UTE-0.32520PP 2-A393385SAA1.13UTE-0.34520PP 2-A402480MAA1.34UTE-0.24520PP 2-A418411SAA2.36UTE-0.23520PP 2-A428521SAA1.80UTE-0.25520PP 2-A438431SAA0.79UTE-0.31520PP 2-A441081SAA3.00UTE-0.31520PP 2-A45108115SAA1.47UTE-0.31520PP 2-A461264SAA0.98UTE-0.35520PP 2-A471342SAA0.68UTE-0.38520PP 2-A481466SAA1.71UTE-0.37520PP 2-A491874SAA1.54UTE-0.27520PP 2-A502046SAA1.48UTE-0.37520PP Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)Page 6 of 11Results as of : 6:57 AM,5/23/2012 SGCountRowTubeIndVoltsTSPInch1Probe Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)2-A512552SAA1.59UTE-0.34520PP 2-A522559SAA1.32UTE-0.31520PP 2-A538112MAA1.17UTE-0.07520PP 2-A54829MAA1.32UTE-0.25520PP 2-A558220MAA1.10UTE-0.30520PP 2-A568620SAA1.49UTE-0.25520PP2-A578221SAA1.44UTE-0.21520PP2-A588610SAA2.46UTE-0.21520PP2-A598910MAA1.04UTE-0.22520PP 2-A602577SAA2.08UTE-0.29520PP 2-A612883SAA1.95UTE-0.31520PP 2-A622983SAA1.99UTE-0.25520PP 2-A632647SAA1.92UTE-0.28520PP2-A643392SAA1.04UTE-0.28520PP2-A652687SAA1.99UTE-0.29520PP 2-A66530MAA3.11UTE-0.38520PP2-A67632SAA2.06UTE-0.32520PP2-A681772MAA1.93UTE-0.26520PP 2-A691873SAA1.18UTE-0.27520PP 2-A701947SAA1.68UTE-0.31520PP 2-A712047SAA1.53UTE-0.27520PP 2-A722393SAA1.39UTE-0.25520PP 2-A7312778SAA1.24UTE-0.34520PP 2-A741288MAA2.09UTE-0.29520PP 2-A752138SAA1.38UTE-0.16520PP 2-A76542MAA1.45UTE-0.31520PP 2-A771084SAA1.14UTE-0.24520PP 2-A78117107MAA2.07UTE-0.31520PP 2-A791113SAA2.43UTE-0.34520PP 2-A801074MAA1.13UTE-0.25520PP 2-A811036MAA2.09UTE-0.23520PP 2-A823725SAA1.15UTE-0.27520PP 2-A833942SAA1.18UTE-0.27520PP 2-A841037MAA2.26UTE-0.29520PP 2-A851065SAA2.33UTE-0.27520PP 2-A86107111MAA1.49UTE-0.22520PP 2-A87109105MAA1.63UTE-0.24520PP 2-A88110110SAA1.50UTE-0.26520PP 2-A89110106SAA2.64UTE-0.25520PP 2-A90110104MAA1.66UTE-0.26520PP 2-A91112105SAA1.91UTE-0.30520PP 2-A9211498SAA1.20UTE-0.25520PP 2-A9315027SAA2.03UTE-0.24520PP 2-A941612MAA1.64UTE-0.30520PP 2-A951222SAA0.99UTE-0.33520PP 2-A96712SAA1.57UTE-0.34520PP 2-A97519SAA2.43UTE-0.31520PP 2-A98417SAA1.79UTE-0.34520PP 2-A99313SAA2.82UTE-0.32520PP 2-A10014745SAA1.05UTE-0.28520PPPage 7 of 11Results as of : 6:57 AM,5/23/2012 SGCountRowTubeIndVoltsTSPInch1Probe Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)2-A1011112MAA1.35UTE-0.27520PP 2-A1021101SAA2.11UTE-0.33520PP 2-A1031093MAA2.56UTE-0.31520PP 2-A1041095SAA0.99UTE-0.31520PP 2-A1051075MAA1.55UTE-0.30520PP 2-A1061073SAA1.04UTE-0.34520PP 2-A10710522SAA1.49UTE-0.28520PP 2-A1081026SAA1.74UTE-0.14520PP 2-A109906SAA1.86UTE-0.27520PP 2-A1106254SAA0.98UTE-0.38520PP 2-A111445SAA1.11UTE-0.24520PP 2-A112444SAA1.85UTE-0.16520PP 2-A11312013SAA1.81UTE-0.18520PP 2-A114493SAA2.51UTE-0.21520PP 2-A115516MAA1.39UTE-0.22520PP 2-A1164189SAA1.21UTE-0.26520PP 2-A117105MAA1.52UTE-0.29520PP 2-A118487SAA1.25UTE-0.27520PP 2-A11913071SAA1.52UTE-0.34520PP 2-A12013680SAA1.67UTE-0.31520PP 2-A12110994SAA1.43UTE-0.29520PP 2-A122109110SAA1.66UTE-0.40520PP 2-A123109112SAA0.88UTE-0.30520PP 2-A124110105MAA2.70UTE-0.21520PP 2-A12512678MAA1.73UTE-0.30520PP 2-A1262031SAA1.01UTE-0.31520PP 2-A1271939MAA1.57UTE-0.29520PP 2-A1281815MAA2.08UTE-0.35520PP 2-A12912783SAA2.08UTE-0.28520PP 2-A13013174SAA2.22UTE-0.29520PP 2-A13113378MAA2.25UTE-0.26520PP 2-A13213366SAA2.04UTE-0.27520PP 2-A13313768SAA1.88UTE-0.24520PP 2-A1343458SAA1.47UTE-0.26520PP 2-A1353122SAA2.07UTE-0.27520PP 2-A1362535SAA1.94UTE-0.25520PP 2-A1376646MAA1.03UTE-0.37520PP 2-A13813268SAA1.76UTE-0.28520PP 2-A13913247SAA1.99UTE-0.32520PP 2-A14014628SAA2.09UTE-0.31520PP 2-A14112411SAA1.34UTE-0.22520PP 2-A142978MAA2.28UTE-0.30520PP 2-A143122100SAA2.47UTE-0.29520PP 2-A144123101MAA2.65UTE-0.26520PP 2-A1451298SAA1.62UTE-0.33520PP 2-A14611598SAA1.68UTE-0.28520PP 2-A14713175SAA0.90UTE-0.30520PP 2-A14813381SAA1.69UTE-0.31520PP 2-A14913470MAA0.89UTE-0.30520PP 2-A15013568MAA0.71UTE-0.40520PPPage 8 of 11Results as of : 6:57 AM,5/23/2012 SGCountRowTubeIndVoltsTSPInch1Probe Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)2-A151584SAA2.39UTE-0.26520PP 2-A152632SAA2.43UTE-0.28520PP 2-A15313264MAA2.12UTE-0.28520PP 2-A15413260SAA2.25UTE-0.32520PP 1-B155103120SAA1.97UTE-0.44520PP 1-B156107110SAA2.27UTE-0.11520PP 1-B1573167MAA1.18UTE-0.26520PP 1-B158101119SAA1.12UTE-0.32520PP 1-B159102113SAA1.23UTE-0.23520PP 1-B160103117SAA1.79UTE-0.38520PP 1-B161103118SAA1.92UTE-0.38520PP 1-B1625544MAA1.54UTE-0.30520PP 1-B1636799SAA2.08UTE-0.23520PP 1-B1643687SAA2.02UTE-0.24520PP 1-B1651048SAA3.74UTE-0.31520PP 1-B1661045SAA1.21UTE-0.33520PP 1-B1671452SAA1.49UTE-0.14520PP 1-B1682055SAA1.44UTE-0.22520PP 1-B1692581SAA1.06UTE-0.21520PP 1-B1702864SAA1.22UTE-0.22520PP 1-B1712866SAA1.03UTE-0.34520PP 1-B1723625MAA1.33UTE-0.30460PP 1-B1735979MAA2.12LTE0.40520PP 1-B1744013MAA2.19UTE-0.32520PP 1-B17578112SAA1.18UTE-0.32520PP 1-B1761209SAA0.74UTE-0.29520PP 1-B1771205SAA1.24UTE-0.23520PP 1-B1782893MAA1.88UTE-0.25520PP 1-B1797053SAA1.37UTE-0.39520PP 1-B1807159SAA2.33UTE-0.28520PP 1-B18112949SAA0.86UTE-0.30520PP 1-B1822994SAA1.30UTE-0.31520PP 1-B1837439SAA0.97UTE-0.41520PP 1-B1846550SAA1.56UTE-0.49520PP 1-B1856629SAA1.64UTE-0.30520PP 1-B1862914SAA2.81UTE-0.30520PP 1-B187944MAA2.40UTE-0.32520PP 1-B1881351SAA1.88UTE-0.26520PP 1-B1891754SAA2.18UTE-0.25520PP 1-B1903095SAA1.81UTE-0.30520PP 1-B1916751SAA1.76UTE-0.44520PP 1-B1926326MAA1.10UTE-0.35520PP 1-B1936249SAA0.75UTE-0.41520PP 1-B1942260SAA2.92UTE-0.27520PP 1-B1952479SAA0.68UTE-0.32520PP 1-B1965832SAA2.49UTE-0.25520PP 1-B197104119SAA1.38UTE-0.32520PP 1-B19810155SAA1.31UTE-0.42520PP 1-B1993772SAA1.67UTE-0.22520PP 1-B2004292SAA1.54UTE-0.16520PPPage 9 of 11Results as of : 6:57 AM,5/23/2012 SGCountRowTubeIndVoltsTSPInch1Probe Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)1-B2014290SAA2.10UTE-0.23520PP 1-B2021350SAA1.57UTE-0.27520PP 1-B2031352SAA1.69UTE-0.26520PP 1-B2042865MAA1.73UTE-0.34520PP 1-B2055678SAA2.66UTE-0.39520PP 1-B2065780SAA1.34UTE-0.26520PP 1-B2079945SAA1.24UTE-0.23520PP 1-B2081046SAA2.14UTE-0.34520PP 1-B2093298SAA1.13UTE-0.31520PP 1-B210327SAA1.17UTE-0.26520PP 1-B211740SAA1.86UTE-0.25520PP 1-B2129827SAA1.04UTE-0.29520PP 1-B2134876MAA1.06UTE-0.27520PP 1-B2145899MAA0.79UTE-0.28520PP 1-B21555109SAA1.02UTE-0.35520PP 1-B2165597SAA1.24UTE-0.21520PP 1-B2174878MAA2.07UTE-0.35520PP 1-B2183688SAA1.90UTE-0.27520PP 1-B2191077SAA0.92UTE-0.26520PP 1-B22038102SAA1.75UTE-0.25520PP 1-B22138112SAA1.17UTE-0.21520PP 1-B2223989SAA2.07UTE-0.26520PP 1-B2234271SAA0.93UTE-0.34520PP 1-B2244375MAA1.64UTE-0.14520PP 1-B22543107SAA1.48UTE-0.24520PP 1-B2265278SAA1.09UTE-0.30520PP 1-B2275753SAA1.91UTE-0.31520PP 1-B22814615MAA2.02UTE-0.23520PP 1-B22914713SAA2.22UTE-0.23520PP 1-B2305878SAA1.91UTE-0.47520PP 1-B2316081SAA1.09UTE-0.45520PP 1-B2321654SAA0.90UTE-0.22520PP 1-B2331874SAA1.07UTE-0.31520PP 1-B2341856SAA1.49UTE-0.26520PP 1-B23510026SAA2.05UTE-0.29520PP 1-B2367352SAA2.16UTE-0.43520PP 1-B23710050MAA2.14UTE-0.25520PP 1-B23810056SAA1.73UTE-0.23520PP 1-B2391199SAA1.83UTE-0.35520PP 1-B24010049SAA0.96UTE-0.29520PP 1-B24111248SAA0.93UTE-0.21520PP 1-B24211346SAA1.56UTE-0.21520PPPage 10 of 11Results as of : 6:57 AM,5/23/2012 SGRowTubeDepth VoltsTSPInch1Prev Depth2-A162291.5113S-0.70211-B671261.7112S-0.0423 2-A14633231.1010S0.6417 2-A131231.0613S-0.6716 2-A14736231.1110S0.6623 2-A122210.8413S-0.7214 2-A111190.7413S-0.7612 2-A521191.0013S-0.6420 2-A86127180.7314S-0.70122-A152180.7213S-0.7313Davis-Besse 17 RFO May 2012Top 10 Wear Calls By Bobbin DepthPage 11 of 11Results as of : 6:57 AM,5/23/2012}}
{{#Wiki_filter:Davis Besse 17RFO Eddy Current Exam Scope                                                                     SG 2-A              SG 1-B Inspection of all newly installed repair rolls.                                                                   0                    0 Periphery AFW Header to tube gap analysis to determine if the header is moving.                                 336                  378 Full length bobbin examination of all in-service non-sleeved tubing.                                           14552                14868 Full length bobbin examination of 100% of sleeves and of tubing below sleeves.                                   199                  212 TM
+Point exam of the sleeve at the point of entry (USE) and parent tube pressure boundary portion extending approximately 6 inches past the sleeve end (LSE) of 100% of the sleeves (the parent tube 199                  212 between the bottom of the upper most sleeve roll and the top of the middle sleeve roll may be excluded from inspection since it is not a pressure boundary).
+PointTM inspection of non-sleeved in-service upper tube roll expansions (100%) including non stress 14552                14868 relieved upper repair roll expansions and factory re-rolls.
+PointTM coil examination of 20% of the non-sleeved in-service tubes in the upper tube sheet region 2911                2974 from tube end including tube end, upper roll expansion and crevice to upper tube sheet exit.
+PointTM inspection of 20% of the in-service stress relieved lower tube roll expansions and tube ends in 2951                    0 OTSG 2-A. (including tube 127-67 with NSRT)
+PointTM inspection of in-service stress relieved lower tube roll expansions and tube ends in S/G 1-B 0                15080 100%.
+PointTM coil examination of the tubes bordering the sleeve region.                                               86                  85 TM
+Point coil examination of all of the flaw-like indications (I codes, TWD per 4.1.3.G and 4.2.3.G and 550 estimate        530 estimate new DNT) reported from bobbin.
+PointTM coil examination of all NQS and MBM indications above 10S -2.                                     220 estimate         240 estimate TM
+Point coil examination of all dent indications below 14S (100% sample of all previously reported 350 estimate        300 estimate and new dents using a 2.5 volt bobbin threshold).
+PointTM coil examination of all dent indications greater than or equal to 1 volt above 14S in the non-330 estimate        430 estimate periphery region.
+PointTM coil examination of all dent indications greater than or equal to 0.5 volts above 14S in the 29 estimate          19 estimate periphery region.
+PointTM coil sample inspection of lower tubesheet sludge pile region tubes.                                     1445                1687 TM Sleeve Bobbin and +Point       coil inspection of all previously identified geometric distortions (40 tubes 0                  40 SG 1-B).
+PointTM coil inspection of all previously identified and new magnetic stain (MAG) indications (22 0                  22 tubes SG 1-B)
Visual Plug exams of all Plugs in Upper and Lower (100%)                                                         1412                  754 Total Examinations                                                                                            40122                52699 Page 1 of 11                          Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17 RFO May 2012 Axial Indications SG  Count Row Tube Ind Volts    TSP        Inch1  Probe Depth Ax Len              Deg Mode 2-A  1    22  92  MAI 1.97      UTE          -2.99  520PP  84    0.19      ReRoll Transition PWSCC 2-A  2    29  89  MAI 0.97      UTE          -3.62  520PP  72    0.22      ReRoll Transition PWSCC 2-A  3    28  81  MAI 0.58      UTE          -3.50  520PP  80    0.17      ReRoll Transition PWSCC 2-A  4    30  79  MAI 1.34      UTE          -2.97  520PP  58    0.19      ReRoll Transition PWSCC 2-A  5    81  52  SAI 0.10      UTS          -4.73  520PP  56    0.20              Groove IGA 2-A  6  106  105 MAI 1.44      UTE          -3.39  520PP  74    0.25      ReRoll Transition PWSCC 2-A  7    91  121 MAI 1.23      UTE          -3.24  520PP  82    0.21      ReRoll Transition PWSCC 2-A  8    68  9  MAI 1.02      UTE          -3.12  520PP  89    0.19      ReRoll Transition PWSCC 2-A  9    89  7  MAI 1.17      UTE          -3.03  520PP  56    0.18      ReRoll Transition PWSCC 2-A  10    83  6  MAI 1.03      UTE          -3.13  520PP  95    0.22      ReRoll Transition PWSCC 2-A  11    75  46  SAI 1.03      UTE          -5.00  520PP  42    0.15      ReRoll Transition PWSCC 2-A  12    26  82  MAI 1.09      UTE          -3.41  520PP  96    0.27      ReRoll Transition PWSCC 2-A  13  103  18  SAI 0.54      UTE          -3.13  520PP  65    0.17      ReRoll Transition PWSCC 2-A  14    21  16  MAI 0.51      UTE          -2.98  520PP  46    0.19      ReRoll Transition PWSCC 2-A  15  106  3  MAI 2.67      UTE          -3.47  520PP  42    0.27      ReRoll Transition PWSCC 2-A  16    21  48  MAI 0.73      UTE          -3.26  520PP  97    0.24      ReRoll Transition PWSCC 2-A  17  114  109 MAI 1.72      UTE          -3.26  520PP  72    0.22      ReRoll Transition PWSCC 2-A  18  118  103 MAI 0.82      UTE          -3.12  520PP  80    0.17      ReRoll Transition PWSCC 2-A  19    24  51  MAI 1.75      UTE          -3.24  520PP  99    0.23      ReRoll Transition PWSCC 2-A  20    22  18  MAI 1.30      UTE          -3.53  520PP  100  0.26      ReRoll Transition PWSCC 2-A  21    18  13  MAI 0.33      UTE          -3.07  520PP  92    0.22      ReRoll Transition PWSCC 2-A  22    11  6  MAI 2.05      UTE          -3.06  520PP  92    0.18      ReRoll Transition PWSCC 2-A  23    58  9  MAI 1.97      UTE          -3.54  520PP  69    0.23      ReRoll Transition PWSCC 2-A  24  151  16  SAI 0.12      15S          3.44  520PP  51    0.32              Groove IGA 2-A  25  149  20  SAI 0.09      15S          1.48  520PP  42    0.35              Groove IGA 2-A  26    15  11  MAI 0.79      UTE          -3.35  520PP  78    0.17      ReRoll Transition PWSCC 2-A  27    36  26  MAI 1.04      UTE          -3.56  520PP  96    0.21      ReRoll Transition PWSCC 2-A  28    98  8  SAI 1.03      UTE          -3.13  520PP  65    0.21      ReRoll Transition PWSCC 2-A  29    92  6  SAI 0.95      UTE          -4.87  520PP  57    0.14      ReRoll Transition PWSCC 2-A  30    92  7  SAI 1.65      UTE          -3.09  520PP  78    0.22      ReRoll Transition PWSCC 1-B  31  108  106 MAI 0.58      UTE          -3.41  520PP  73    0.16      ReRoll Transition PWSCC 1-B  32  113  110 MAI 0.45      UTE          -3.10  520PP  65    0.26      ReRoll Transition PWSCC 1-B  33  109  74  MAI 0.72      UTE          -3.00  520PP  88    0.16      ReRoll Transition PWSCC 1-B  34    9  23  SAI 0.90      UTE          -3.00  520PP  76    0.17      ReRoll Transition PWSCC 1-B  35    21  90  SAI 0.27      14S        31.50  520PP  54    0.58              Groove IGA 1-B  36  109  116 SAI 0.32      10S        -2.23  520PP  19    1.59              Groove IGA 1-B  37  113  116 SAI 0.10      12S        -15.25  520PP  15    0.30              Groove IGA 1-B  38    66  60  SAI 0.67      UTE          -1.46  520PP  63    0.14        Roll Transition PWSCC 1-B  39  127  94  SAI 0.18      15S          1.44  520PP  14    0.60              Groove IGA 1-B  40    77  58  MAI 0.63      UTE          -1.44  520PP  62    0.18        Roll Transition PWSCC 1-B  41  130  73  SAI 0.73      UTE          -4.74  520PP  55    0.12      ReRoll Transition PWSCC 1-B  42    77  88  SAI 0.54      UTE          -1.47  520PP  53    0.18        Roll Transition PWSCC 1-B  43  120  62  SAI 0.85      UTE          -1.60  520PP  79    0.14        Roll Transition PWSCC 1-B  44  104  118 MAI 1.74      UTE          -5.24  520PP  64    0.17      ReRoll Transition PWSCC 1-B  45  104  118 MAI 1.79      UTE          -3.21  520PP  92    0.24      ReRoll Transition PWSCC 1-B  46  104  114 MAI 2.27      UTE          -3.40  520PP  60    0.22      ReRoll Transition PWSCC 1-B  47    53  36  SAI 0.56      UTE          -1.51  520PP  69    0.18        Roll Transition PWSCC 1-B  48  100  91  SAI 0.45      UTE          -1.54  520PP  84    0.18        Roll Transition PWSCC 1-B  49    89  126 MAI 1.66      UTE          -2.98  520PP  99    0.27      ReRoll Transition PWSCC 1-B  50    93  54  MAI 0.87      UTE          -1.33  520PP  57    0.23        Roll Transition PWSCC 1-B  51  102  117 SAI 0.62      LTE          1.36  520PP  65    0.13        Roll Transition PWSCC 1-B  52    5  46  SAI 0.33      15S          4.83  520PP  31    0.87              Groove IGA 1-B  53    5  46  SAI 0.32      15S          4.55  520PP  31    1.93              Groove IGA 1-B  54    5  46  SAI 0.15      15S          2.77  520PP  46    0.28              Groove IGA 1-B  55    5  46  SAI 0.23      15S          4.07  520PP  25    0.76              Groove IGA 1-B  56    15  77  SAI 0.20      15S          2.53  520PP  63    0.17              Groove IGA 1-B  57  113  116 SAI 0.16      10S          7.68  520PP  2    0.63              Groove IGA 1-B  58  113  116 SAI 0.12      10S          8.67  520PP  47    0.48              Groove IGA 1-B  59  113  116 SAI 0.09      10S        10.91  520PP  31    0.60              Groove IGA 1-B  60  113  116 SAI 0.08      10S        11.63  520PP  8    0.31              Groove IGA 1-B  61  113  116 SAI 0.13      13S        -17.27  520PP  58    0.19              Groove IGA 1-B  62  113  116 SAI 0.11      13S        -18.45  520PP  70    0.22              Groove IGA 1-B  63  113  116 SAI 0.11      13S        -15.60  520PP  35    0.43              Groove IGA 1-B  64    84  116 MAI 1.99      UTE          -3.20  520PP  89    0.37      ReRoll Transition PWSCC Page 2 of 11                  Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17 RFO May 2012 Axial Indications SG  Count Row Tube Ind Volts    TSP        Inch1  Probe Depth Ax Len              Deg Mode 1-B  65    53  94  MAI 1.57      UTE          -3.33  520PP  56    0.22      ReRoll Transition PWSCC 1-B  66    38  18  MAI 0.81      UTE          -2.95  520PP  90    0.24      ReRoll Transition PWSCC 1-B  67    37  102 SAI 0.59      UTE          -1.88  520PP  89    0.17        Roll Transition PWSCC 1-B  68    83  56  MAI 1.23      UTE          -1.56  520PP  62    0.18        Roll Transition PWSCC 1-B  69    86  55  SAI 0.90      UTE          -0.99  520PP  69    0.20            Tube End PWSCC 1-B  70    66  50  MAI 1.01      UTE          -1.46  520PP  69    0.15        Roll Transition PWSCC 1-B  71  124  65  SAI 0.11      14S          1.50  520PP  85    0.29              Groove IGA 1-B  72    29  97  SAI 0.70      UTE          -1.60  520PP  49    0.13        Roll Transition PWSCC 1-B  73    86  56  SAI 0.48      UTE          -1.47  520PP  55    0.15        Roll Transition PWSCC 1-B  74    86  58  MAI 0.73      UTE          -1.51  520PP  65    0.23        Roll Transition PWSCC 1-B  75    27  100 SAI 0.27      15S        -1.33  520PP  15    0.61              Groove IGA 1-B  76    8  42  SAI 1.25      UTE          -3.02  520PP  100  0.17      ReRoll Transition PWSCC 1-B  77    29  83  SAI 0.41      UTE          -3.20  520PP  47    0.12      ReRoll Transition PWSCC 1-B  78  100  50  SAI 0.53      UTE          -1.21  520PP  58    0.12        Roll Transition PWSCC 1-B  79    87  68  SAI 1.25      UTE          -1.77  520PP  65    0.20        Roll Transition PWSCC Page 3 of 11                  Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17RFO May 2012 2.C(7) Steam Generator Tube Circumferential Crack Report S/G Count Row Tube Ind Volts TSP  Inch  Probe %TW Ci Ext      Degradation Mechanism      Section a    Section b      Section c 1-B  1    42  111 SCI 0.36 LTE  1.43  520PP    39    0.2  Roll Trans PWSCC                                 x 1-B  1    45  77 SCI 0.46 LTE  1.52  520PP    56    0.16 Roll Trans PWSCC                                 x 1-B  1    45  86 SCI 2.34 UTE  -0.11  520PP    96    0.53 Tube End PWSCC                                   x 1-B  1    48  78 MCI 0.87 LTE  1.52  520PP    35    0.62 Roll Trans PWSCC                                 x 1-B  1    50  78 SCI 0.49 LTE  1.59  520PP    99    0.37 Roll Trans PWSCC                                 x 1-B  1    51  79 MCI 0.27 LTE    1.6 520PP    98    1.09 Roll Trans PWSCC                                 x 1-B  1    52  76 MCI 0.35 LTE  1.53  520PP    73    1.09 Roll Trans PWSCC                                 x 1-B  1    53  80 MCI 0.54 LTE  1.57  520PP    99    1.1  Roll Trans PWSCC                                 x 1-B  1    54  79 MCI 0.4 LTE    1.62  520PP    94    1.03 Roll Trans PWSCC                                 x 1-B  1    56  77 SCI 0.78 LTE  1.59  520PP    98    0.51 Roll Trans PWSCC                                 x 1-B  1    57  80 SCI 0.23 LTE  1.53  520PP    98    0.3  Roll Trans PWSCC                                 x 1-B  1    58  79 SCI  0.4 LTE  1.63  520PP    89    0.44 Roll Trans PWSCC                                 x 1-B  1    59  30 SCI 0.56 LTE  1.49  520PP    58    0.18 Roll Trans PWSCC                                 x 1-B  1    62  79 MCI 0.75 LTE  1.65  520PP    31    1.18 Roll Trans PWSCC                                 x 1-B  1    65  30 SCI 0.26 LTE  1.58  520PP    32    0.18 Roll Trans PWSCC                                 x 1-B  1    65  30 SCI 0.72 LTE    1.5 520PP    46    0.21 Roll Trans PWSCC                                 x 1-B  1    66  81 SCI 0.75 LTE  1.65  520PP    65    0.2  Roll Trans PWSCC                                 x 1-B  1    73  75 SCI 0.61 LTE  1.52  520PP    98    0.11 Roll Trans PWSCC                                 x 1-B  1    77  68 MCI 0.92 LTE    1.6 520PP    66    0.23 Roll Trans PWSCC                                 x 1-B  1    77  69 SCI 0.52 LTE    1.5 520PP    68    0.31 Roll Trans PWSCC                                 x 1-B  1    78  68 MCI 0.67 LTE    1.6 520PP    96    0.25 Roll Trans PWSCC                                 x 1-B  1    82  56 SCI 0.96 LTE  1.53  520PP    64    0.4  Roll Trans PWSCC                                 x 1-B  1    84  73 SCI 0.46 LTE  1.51  520PP    68    0.15 Roll Trans PWSCC                                 x 1-B  1    84  75 MCI 0.7 LTE    1.59  520PP    51    0.18 Roll Trans PWSCC                                 x 1-B  1    86  53 SCI 0.45 LTE    1.6 520PP    51    0.18 Roll Trans PWSCC                                 x 1-B  1    86  54 MCI 1.09 LTE  1.59  520PP    68    0.73 Roll Trans PWSCC                                 x 1-B  1    86  69 MCI 0.6 LTE    1.63  520PP    63    0.18 Roll Trans PWSCC                                 x 1-B  1    87  74 MCI 0.41 LTE  1.73  520PP    66    0.2  Roll Trans PWSCC                                 x          0.0589 1-B  1    89  59 SCI 0.79 LTE  1.61  520PP    48    0.23 Roll Trans PWSCC                                 x 1-B  1    94  53 MCI 0.56 LTE  1.58  520PP    99    0.37 Roll Trans PWSCC                                 x 1-B  1    98  93 SCI 0.43 LTE  1.58  520PP    52    0.23 Roll Trans PWSCC                                x          0.0544 1-B  1  100  70 MCI 0.4 LTE      1.6 520PP    63    0.2  Roll Trans PWSCC                                x 1-B  1  106  69 SCI 0.72 LTE  1.79  520PP    66    0.18 Roll Trans PWSCC                                 x 1-B  1  142  26 SVI 1.87 UTE  -2.35  520PP    47    0.27 ID Mechanical                                    x 2-A  1    20  15 SCI 0.44 UTE    -3.2 520PP    33    0.36 Reroll Trans PWSCC                              x 2-A  1    20  85 SCI 1.88 UTE  -0.28  520PP    37    0.51 Tube End PWSCC                                  x 2-A  1    44  61 SCI 0.95 UTE  -1.94  520PP    68    0.21 Roll Trans PWSCC                                x 2-A  1    89  9 SCI 1.09 UTE  -3.14  520PP    43    0.47 Reroll Trans PWSCC                              x 2-A  1  101 124 SCI 1.83 UTE    -0.2 520PP    95    0.58 Tube End PWSCC                                  x 2-A  1  104 107 SCI 0.83 UTE  -2.98  520PP    77    1.22 Reroll Trans PWSCC                              x 2-A  1  133  1 SCI 0.84 UTE  -0.26  520PP    81    0.23 Tube End PWSCC                                  x 2-A  1  151  7 SCI 2.43 UTE    -0.3 520PP    60    0.43 Tube End PWSCC                                   x Page 4 of 11                            Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17 RFO May 2012 Volumetric Indications (Not in Previously Rerolled Tubes)
SG Row Tube  Ind Volts      TSP        Inch1        Probe        Depth    Ax Len      Circ Len      Deg Mode 1-B  142  26  SVI  1.87    UTE            -2.35    520PP            47      0.22          0.27      ID Mechanical Page 5 of 11                          Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)
SG  Count    Row      Tube        Ind      Volts      TSP        Inch1        Probe 2-A  1      45        45        SAA        0.91      UTE          -0.30        520PP 2-A  2      84        10        SAA        1.83      UTE          -0.21        520PP 2-A  3      142        32        MAA        0.87      UTE          -0.20        520PP 2-A  4      146        25        SAA        1.40      UTE          -0.26        520PP 2-A  5      36        113        SAA        1.64      UTE          -0.23        520PP 2-A  6      64          2        SAA        1.22      UTE          -0.18        520PP 2-A  7      122        104        MAA        2.17      UTE          -0.28        520PP 2-A  8      115        107        MAA        1.66      UTE          -0.25        520PP 2-A  9      116        107        MAA        1.47      UTE          -0.23        520PP 2-A  10      130          8        SAA        2.44      UTE          -0.33        520PP 2-A  11      130          7        SAA        2.10      UTE          -0.31        520PP 2-A  12      97        19        MAA        1.83      UTE          -0.23        520PP 2-A  13      92        49        SAA        0.86      UTE          -0.30        520PP 2-A  14      70        116        SAA        1.25      UTE          -0.27        520PP 2-A  15      86        100        SAA        1.05      UTE          -0.26        520PP 2-A  16      86        122        MAA        1.62      UTE          -0.38        520PP 2-A  17      86        123        MAA        1.58      UTE          -0.25        520PP 2-A  18      87        100        SAA        1.34      UTE          -0.24        520PP 2-A  19      136        70        SAA        2.38      UTE          -0.31        520PP 2-A  20      136        68        MAA        1.81      UTE          -0.33        520PP 2-A  21      137        72        MAA        1.96      UTE          -0.33        520PP 2-A  22      137        65        SAA        0.91      UTE          -0.34        520PP 2-A  23      138        66        SAA        1.86      UTE          -0.32        520PP 2-A  24      138        65        SAA        1.97      UTE          -0.33        520PP 2-A  25      139        63        MAA        1.73      UTE          -0.30        520PP 2-A  26      12          6        MAA        1.64      UTE          -0.31        520PP 2-A  27        8        14        SAA        2.51      UTE          -0.27        520PP 2-A  28        6        22        SAA        1.03      UTE          -0.29        520PP 2-A  29        5          7        SAA        3.18      UTE          -0.24        520PP 2-A  30      121        71        SAA        0.72      UTE          -0.32        520PP 2-A  31      25        78        SAA        0.81      UTE          -0.32        520PP 2-A  32      65        40        SAA        3.11      UTE          -0.10        520PP 2-A  33        3        31        SAA        2.35      UTE          -0.28        520PP 2-A  34        5        46        SAA        2.08      UTE          -0.32        520PP 2-A  35        9        60        SAA        2.49      UTE          -0.20        520PP 2-A  36      38        61        MAA        1.46      UTE          -0.28        520PP 2-A  37      36        87        SAA        1.01      UTE          -0.29        520PP 2-A  38      37        87        SAA        0.99      UTE          -0.32        520PP 2-A  39      33        85        SAA        1.13      UTE          -0.34        520PP 2-A  40      24        80        MAA        1.34      UTE          -0.24        520PP 2-A  41      84        11        SAA        2.36      UTE          -0.23        520PP 2-A  42      85        21        SAA        1.80      UTE          -0.25        520PP 2-A  43      84        31        SAA        0.79      UTE          -0.31        520PP 2-A  44      108          1        SAA        3.00      UTE          -0.31        520PP 2-A  45      108        115        SAA        1.47      UTE          -0.31        520PP 2-A  46      12        64        SAA        0.98      UTE          -0.35        520PP 2-A  47      13        42        SAA        0.68      UTE          -0.38        520PP 2-A  48      14        66        SAA        1.71      UTE          -0.37        520PP 2-A  49      18        74        SAA        1.54      UTE          -0.27        520PP 2-A  50      20        46        SAA        1.48      UTE          -0.37        520PP Page 6 of 11                    Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)
SG  Count    Row      Tube        Ind      Volts      TSP        Inch1        Probe 2-A  51      25        52        SAA        1.59      UTE          -0.34        520PP 2-A  52      25        59        SAA        1.32      UTE          -0.31        520PP 2-A  53      81        12        MAA        1.17      UTE          -0.07        520PP 2-A  54      82          9        MAA        1.32      UTE          -0.25        520PP 2-A  55      82        20        MAA        1.10      UTE          -0.30        520PP 2-A  56      86        20        SAA        1.49      UTE          -0.25        520PP 2-A  57      82        21        SAA        1.44      UTE          -0.21        520PP 2-A  58      86        10        SAA        2.46      UTE          -0.21        520PP 2-A  59      89        10        MAA        1.04      UTE          -0.22        520PP 2-A  60      25        77        SAA        2.08      UTE          -0.29        520PP 2-A  61      28        83        SAA        1.95      UTE          -0.31        520PP 2-A  62      29        83        SAA        1.99      UTE          -0.25        520PP 2-A  63      26        47        SAA        1.92      UTE          -0.28        520PP 2-A  64      33        92        SAA        1.04      UTE          -0.28        520PP 2-A  65      26        87        SAA        1.99      UTE          -0.29        520PP 2-A  66      5        30        MAA        3.11      UTE          -0.38        520PP 2-A  67      6        32        SAA        2.06      UTE          -0.32        520PP 2-A  68      17        72        MAA        1.93      UTE          -0.26        520PP 2-A  69      18        73        SAA        1.18      UTE          -0.27        520PP 2-A  70      19        47        SAA        1.68      UTE          -0.31        520PP 2-A  71      20        47        SAA        1.53      UTE          -0.27        520PP 2-A  72      23        93        SAA        1.39      UTE          -0.25        520PP 2-A  73    127        78        SAA        1.24      UTE          -0.34        520PP 2-A  74    128          8        MAA        2.09      UTE          -0.29        520PP 2-A  75      21        38        SAA        1.38      UTE          -0.16        520PP 2-A  76      54          2        MAA        1.45      UTE          -0.31        520PP 2-A  77    108          4        SAA        1.14      UTE          -0.24        520PP 2-A  78    117        107        MAA        2.07      UTE          -0.31        520PP 2-A  79    111          3        SAA        2.43      UTE          -0.34        520PP 2-A  80    107          4        MAA        1.13      UTE          -0.25        520PP 2-A  81    103          6        MAA        2.09      UTE          -0.23        520PP 2-A  82      37        25        SAA        1.15      UTE          -0.27        520PP 2-A  83      39        42        SAA        1.18      UTE          -0.27        520PP 2-A  84    103          7        MAA        2.26      UTE          -0.29        520PP 2-A  85    106          5        SAA        2.33      UTE          -0.27        520PP 2-A  86    107        111        MAA        1.49      UTE          -0.22        520PP 2-A  87    109        105        MAA        1.63      UTE          -0.24        520PP 2-A  88    110        110        SAA        1.50      UTE          -0.26        520PP 2-A  89    110        106        SAA        2.64      UTE          -0.25        520PP 2-A  90    110        104        MAA        1.66      UTE          -0.26        520PP 2-A  91    112        105        SAA        1.91      UTE          -0.30        520PP 2-A  92    114        98        SAA        1.20      UTE          -0.25        520PP 2-A  93    150        27        SAA        2.03      UTE          -0.24        520PP 2-A  94      16        12        MAA        1.64      UTE          -0.30        520PP 2-A  95      12        22        SAA        0.99      UTE          -0.33        520PP 2-A  96      7        12        SAA        1.57      UTE          -0.34        520PP 2-A  97      5        19        SAA        2.43      UTE          -0.31        520PP 2-A  98      4        17        SAA        1.79      UTE          -0.34        520PP 2-A  99      3        13        SAA        2.82      UTE          -0.32        520PP 2-A  100    147        45        SAA        1.05      UTE          -0.28        520PP Page 7 of 11                    Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)
SG  Count    Row      Tube        Ind      Volts      TSP        Inch1        Probe 2-A  101    111          2        MAA        1.35      UTE          -0.27        520PP 2-A  102    110          1        SAA        2.11      UTE          -0.33        520PP 2-A  103    109          3        MAA        2.56      UTE          -0.31        520PP 2-A  104    109          5        SAA        0.99      UTE          -0.31        520PP 2-A  105    107          5        MAA        1.55      UTE          -0.30        520PP 2-A  106    107          3        SAA        1.04      UTE          -0.34        520PP 2-A  107    105        22        SAA        1.49      UTE          -0.28        520PP 2-A  108    102          6        SAA        1.74      UTE          -0.14        520PP 2-A  109      90          6        SAA        1.86      UTE          -0.27        520PP 2-A  110      62        54        SAA        0.98      UTE          -0.38        520PP 2-A  111      44          5        SAA        1.11      UTE          -0.24        520PP 2-A  112      44          4        SAA        1.85      UTE          -0.16        520PP 2-A  113    120        13        SAA        1.81      UTE          -0.18        520PP 2-A  114      49          3        SAA        2.51      UTE          -0.21        520PP 2-A  115      51          6        MAA        1.39      UTE          -0.22        520PP 2-A  116      41        89        SAA        1.21      UTE          -0.26        520PP 2-A  117      10          5        MAA        1.52      UTE          -0.29        520PP 2-A  118      48          7        SAA        1.25      UTE          -0.27        520PP 2-A  119    130        71        SAA        1.52      UTE          -0.34        520PP 2-A  120    136        80        SAA        1.67      UTE          -0.31        520PP 2-A  121    109        94        SAA        1.43      UTE          -0.29        520PP 2-A  122    109        110        SAA        1.66      UTE          -0.40        520PP 2-A  123    109        112        SAA        0.88      UTE          -0.30        520PP 2-A  124    110        105        MAA        2.70      UTE          -0.21        520PP 2-A  125    126        78        MAA        1.73      UTE          -0.30        520PP 2-A  126      20        31        SAA        1.01      UTE          -0.31        520PP 2-A  127      19        39        MAA        1.57      UTE          -0.29        520PP 2-A  128      18        15        MAA        2.08      UTE          -0.35        520PP 2-A  129    127        83        SAA        2.08      UTE          -0.28        520PP 2-A  130    131        74        SAA        2.22      UTE          -0.29        520PP 2-A  131    133        78        MAA        2.25      UTE          -0.26        520PP 2-A  132    133        66        SAA        2.04      UTE          -0.27        520PP 2-A  133    137        68        SAA        1.88      UTE          -0.24        520PP 2-A  134      34        58        SAA        1.47      UTE          -0.26        520PP 2-A  135      31        22        SAA        2.07      UTE          -0.27        520PP 2-A  136      25        35        SAA        1.94      UTE          -0.25        520PP 2-A  137      66        46        MAA        1.03      UTE          -0.37        520PP 2-A  138    132        68        SAA        1.76      UTE          -0.28        520PP 2-A  139    132        47        SAA        1.99      UTE          -0.32        520PP 2-A  140    146        28        SAA        2.09      UTE          -0.31        520PP 2-A  141    124        11        SAA        1.34      UTE          -0.22        520PP 2-A  142      97          8        MAA        2.28      UTE          -0.30        520PP 2-A  143    122        100        SAA        2.47      UTE          -0.29        520PP 2-A  144    123        101        MAA        2.65      UTE          -0.26        520PP 2-A  145    129          8        SAA        1.62      UTE          -0.33        520PP 2-A  146    115        98        SAA        1.68      UTE          -0.28        520PP 2-A  147    131        75        SAA        0.90      UTE          -0.30        520PP 2-A  148    133        81        SAA        1.69      UTE          -0.31        520PP 2-A  149    134        70        MAA        0.89      UTE          -0.30        520PP 2-A  150    135        68        MAA        0.71      UTE          -0.40        520PP Page 8 of 11                    Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)
SG  Count    Row      Tube        Ind      Volts      TSP        Inch1        Probe 2-A  151      58          4        SAA        2.39      UTE          -0.26        520PP 2-A  152      63          2        SAA        2.43      UTE          -0.28        520PP 2-A  153    132        64        MAA        2.12      UTE          -0.28        520PP 2-A  154    132        60        SAA        2.25      UTE          -0.32        520PP 1-B  155    103        120        SAA        1.97      UTE          -0.44        520PP 1-B  156    107        110        SAA        2.27      UTE          -0.11        520PP 1-B  157      31        67        MAA        1.18      UTE          -0.26        520PP 1-B  158    101        119        SAA        1.12      UTE          -0.32        520PP 1-B  159    102        113        SAA        1.23      UTE          -0.23        520PP 1-B  160    103        117        SAA        1.79      UTE          -0.38        520PP 1-B  161    103        118        SAA        1.92      UTE          -0.38        520PP 1-B  162      55        44        MAA        1.54      UTE          -0.30        520PP 1-B  163      67        99        SAA        2.08      UTE          -0.23        520PP 1-B  164      36        87        SAA        2.02      UTE          -0.24        520PP 1-B  165      10        48        SAA        3.74      UTE          -0.31        520PP 1-B  166      10        45        SAA        1.21      UTE          -0.33        520PP 1-B  167      14        52        SAA        1.49      UTE          -0.14        520PP 1-B  168      20        55        SAA        1.44      UTE          -0.22        520PP 1-B  169      25        81        SAA        1.06      UTE          -0.21        520PP 1-B  170      28        64        SAA        1.22      UTE          -0.22        520PP 1-B  171      28        66        SAA        1.03      UTE          -0.34        520PP 1-B  172      36        25        MAA        1.33      UTE          -0.30        460PP 1-B  173      59        79        MAA        2.12        LTE        0.40        520PP 1-B  174      40        13        MAA        2.19      UTE          -0.32        520PP 1-B  175      78        112        SAA        1.18      UTE          -0.32        520PP 1-B  176    120          9        SAA        0.74      UTE          -0.29        520PP 1-B  177    120          5        SAA        1.24      UTE          -0.23        520PP 1-B  178      28        93        MAA        1.88      UTE          -0.25        520PP 1-B  179      70        53        SAA        1.37      UTE          -0.39        520PP 1-B  180      71        59        SAA        2.33      UTE          -0.28        520PP 1-B  181    129        49        SAA        0.86      UTE          -0.30        520PP 1-B  182      29        94        SAA        1.30      UTE          -0.31        520PP 1-B  183      74        39        SAA        0.97      UTE          -0.41        520PP 1-B  184      65        50        SAA        1.56      UTE          -0.49        520PP 1-B  185      66        29        SAA        1.64      UTE          -0.30        520PP 1-B  186      29        14        SAA        2.81      UTE          -0.30        520PP 1-B  187      9        44        MAA        2.40      UTE          -0.32        520PP 1-B  188      13        51        SAA        1.88      UTE          -0.26        520PP 1-B  189      17        54        SAA        2.18      UTE          -0.25        520PP 1-B  190      30        95        SAA        1.81      UTE          -0.30        520PP 1-B  191      67        51        SAA        1.76      UTE          -0.44        520PP 1-B  192      63        26        MAA        1.10      UTE          -0.35        520PP 1-B  193      62        49        SAA        0.75      UTE          -0.41        520PP 1-B  194      22        60        SAA        2.92      UTE          -0.27        520PP 1-B  195      24        79        SAA        0.68      UTE          -0.32        520PP 1-B  196      58        32        SAA        2.49      UTE          -0.25        520PP 1-B  197    104        119        SAA        1.38      UTE          -0.32        520PP 1-B  198    101        55        SAA        1.31      UTE          -0.42        520PP 1-B  199      37        72        SAA        1.67      UTE          -0.22        520PP 1-B  200      42        92        SAA        1.54      UTE          -0.16        520PP Page 9 of 11                    Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)
SG  Count    Row      Tube        Ind      Volts      TSP        Inch1        Probe 1-B  201      42        90        SAA        2.10      UTE          -0.23        520PP 1-B  202      13        50        SAA        1.57      UTE          -0.27        520PP 1-B  203      13        52        SAA        1.69      UTE          -0.26        520PP 1-B  204      28        65        MAA        1.73      UTE          -0.34        520PP 1-B  205      56        78        SAA        2.66      UTE          -0.39        520PP 1-B  206      57        80        SAA        1.34      UTE          -0.26        520PP 1-B  207      99        45        SAA        1.24      UTE          -0.23        520PP 1-B  208      10        46        SAA        2.14      UTE          -0.34        520PP 1-B  209      32        98        SAA        1.13      UTE          -0.31        520PP 1-B  210      3        27        SAA        1.17      UTE          -0.26        520PP 1-B  211      7        40        SAA        1.86      UTE          -0.25        520PP 1-B  212      98        27        SAA        1.04      UTE          -0.29        520PP 1-B  213      48        76        MAA        1.06      UTE          -0.27        520PP 1-B  214      58        99        MAA        0.79      UTE          -0.28        520PP 1-B  215      55        109        SAA        1.02      UTE          -0.35        520PP 1-B  216      55        97        SAA        1.24      UTE          -0.21        520PP 1-B  217      48        78        MAA        2.07      UTE          -0.35        520PP 1-B  218      36        88        SAA        1.90      UTE          -0.27        520PP 1-B  219    107          7        SAA        0.92      UTE          -0.26        520PP 1-B  220      38        102        SAA        1.75      UTE          -0.25        520PP 1-B  221      38        112        SAA        1.17      UTE          -0.21        520PP 1-B  222      39        89        SAA        2.07      UTE          -0.26        520PP 1-B  223      42        71        SAA        0.93      UTE          -0.34        520PP 1-B  224      43        75        MAA        1.64      UTE          -0.14        520PP 1-B  225      43        107        SAA        1.48      UTE          -0.24        520PP 1-B  226      52        78        SAA        1.09      UTE          -0.30        520PP 1-B  227      57        53        SAA        1.91      UTE          -0.31        520PP 1-B  228    146        15        MAA        2.02      UTE          -0.23        520PP 1-B  229    147        13        SAA        2.22      UTE          -0.23        520PP 1-B  230      58        78        SAA        1.91      UTE          -0.47        520PP 1-B  231      60        81        SAA        1.09      UTE          -0.45        520PP 1-B  232      16        54        SAA        0.90      UTE          -0.22        520PP 1-B  233      18        74        SAA        1.07      UTE          -0.31        520PP 1-B  234      18        56        SAA        1.49      UTE          -0.26        520PP 1-B  235    100        26        SAA        2.05      UTE          -0.29        520PP 1-B  236      73        52        SAA        2.16      UTE          -0.43        520PP 1-B  237    100        50        MAA        2.14      UTE          -0.25        520PP 1-B  238    100        56        SAA        1.73      UTE          -0.23        520PP 1-B  239    119          9        SAA        1.83      UTE          -0.35        520PP 1-B  240    100        49        SAA        0.96      UTE          -0.29        520PP 1-B  241    112        48        SAA        0.93      UTE          -0.21        520PP 1-B  242    113        46        SAA        1.56      UTE          -0.21        520PP Page 10 of 11                    Results as of : 6:57 AM,5/23/2012 Enclosure 2
 
Davis-Besse 17 RFO May 2012 Top 10 Wear Calls By Bobbin Depth SG  Row Tube  Depth        Volts        TSP  Inch1        Prev Depth 2-A  16    2    29            1.51        13S  -0.70            21 1-B  67    1    26            1.71        12S  -0.04            23 2-A 146  33    23            1.10        10S    0.64            17 2-A  13    1    23            1.06        13S  -0.67            16 2-A 147  36    23            1.11        10S    0.66            23 2-A  12    2    21            0.84        13S  -0.72            14 2-A  11    1    19            0.74        13S  -0.76            12 2-A  52    1    19            1.00        13S  -0.64            20 2-A  86  127    18            0.73        14S  -0.70            12 2-A  15    2    18            0.72        13S  -0.73            13 Page 11 of 11              Results as of : 6:57 AM,5/23/2012 Enclosure 2}}

Latest revision as of 03:11, 12 November 2019

Enclosure - Davis-Besse 17RFO SG Tube Inspection Tables
ML12167A062
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/16/2012
From: Michael Mahoney
Plant Licensing Branch III
To: Allen B
FirstEnergy Nuclear Operating Co
Michael Mahoney
References
Download: ML12167A062 (11)


Text

Davis Besse 17RFO Eddy Current Exam Scope SG 2-A SG 1-B Inspection of all newly installed repair rolls. 0 0 Periphery AFW Header to tube gap analysis to determine if the header is moving. 336 378 Full length bobbin examination of all in-service non-sleeved tubing. 14552 14868 Full length bobbin examination of 100% of sleeves and of tubing below sleeves. 199 212 TM

+Point exam of the sleeve at the point of entry (USE) and parent tube pressure boundary portion extending approximately 6 inches past the sleeve end (LSE) of 100% of the sleeves (the parent tube 199 212 between the bottom of the upper most sleeve roll and the top of the middle sleeve roll may be excluded from inspection since it is not a pressure boundary).

+PointTM inspection of non-sleeved in-service upper tube roll expansions (100%) including non stress 14552 14868 relieved upper repair roll expansions and factory re-rolls.

+PointTM coil examination of 20% of the non-sleeved in-service tubes in the upper tube sheet region 2911 2974 from tube end including tube end, upper roll expansion and crevice to upper tube sheet exit.

+PointTM inspection of 20% of the in-service stress relieved lower tube roll expansions and tube ends in 2951 0 OTSG 2-A. (including tube 127-67 with NSRT)

+PointTM inspection of in-service stress relieved lower tube roll expansions and tube ends in S/G 1-B 0 15080 100%.

+PointTM coil examination of the tubes bordering the sleeve region. 86 85 TM

+Point coil examination of all of the flaw-like indications (I codes, TWD per 4.1.3.G and 4.2.3.G and 550 estimate 530 estimate new DNT) reported from bobbin.

+PointTM coil examination of all NQS and MBM indications above 10S -2. 220 estimate 240 estimate TM

+Point coil examination of all dent indications below 14S (100% sample of all previously reported 350 estimate 300 estimate and new dents using a 2.5 volt bobbin threshold).

+PointTM coil examination of all dent indications greater than or equal to 1 volt above 14S in the non-330 estimate 430 estimate periphery region.

+PointTM coil examination of all dent indications greater than or equal to 0.5 volts above 14S in the 29 estimate 19 estimate periphery region.

+PointTM coil sample inspection of lower tubesheet sludge pile region tubes. 1445 1687 TM Sleeve Bobbin and +Point coil inspection of all previously identified geometric distortions (40 tubes 0 40 SG 1-B).

+PointTM coil inspection of all previously identified and new magnetic stain (MAG) indications (22 0 22 tubes SG 1-B)

Visual Plug exams of all Plugs in Upper and Lower (100%) 1412 754 Total Examinations 40122 52699 Page 1 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17 RFO May 2012 Axial Indications SG Count Row Tube Ind Volts TSP Inch1 Probe Depth Ax Len Deg Mode 2-A 1 22 92 MAI 1.97 UTE -2.99 520PP 84 0.19 ReRoll Transition PWSCC 2-A 2 29 89 MAI 0.97 UTE -3.62 520PP 72 0.22 ReRoll Transition PWSCC 2-A 3 28 81 MAI 0.58 UTE -3.50 520PP 80 0.17 ReRoll Transition PWSCC 2-A 4 30 79 MAI 1.34 UTE -2.97 520PP 58 0.19 ReRoll Transition PWSCC 2-A 5 81 52 SAI 0.10 UTS -4.73 520PP 56 0.20 Groove IGA 2-A 6 106 105 MAI 1.44 UTE -3.39 520PP 74 0.25 ReRoll Transition PWSCC 2-A 7 91 121 MAI 1.23 UTE -3.24 520PP 82 0.21 ReRoll Transition PWSCC 2-A 8 68 9 MAI 1.02 UTE -3.12 520PP 89 0.19 ReRoll Transition PWSCC 2-A 9 89 7 MAI 1.17 UTE -3.03 520PP 56 0.18 ReRoll Transition PWSCC 2-A 10 83 6 MAI 1.03 UTE -3.13 520PP 95 0.22 ReRoll Transition PWSCC 2-A 11 75 46 SAI 1.03 UTE -5.00 520PP 42 0.15 ReRoll Transition PWSCC 2-A 12 26 82 MAI 1.09 UTE -3.41 520PP 96 0.27 ReRoll Transition PWSCC 2-A 13 103 18 SAI 0.54 UTE -3.13 520PP 65 0.17 ReRoll Transition PWSCC 2-A 14 21 16 MAI 0.51 UTE -2.98 520PP 46 0.19 ReRoll Transition PWSCC 2-A 15 106 3 MAI 2.67 UTE -3.47 520PP 42 0.27 ReRoll Transition PWSCC 2-A 16 21 48 MAI 0.73 UTE -3.26 520PP 97 0.24 ReRoll Transition PWSCC 2-A 17 114 109 MAI 1.72 UTE -3.26 520PP 72 0.22 ReRoll Transition PWSCC 2-A 18 118 103 MAI 0.82 UTE -3.12 520PP 80 0.17 ReRoll Transition PWSCC 2-A 19 24 51 MAI 1.75 UTE -3.24 520PP 99 0.23 ReRoll Transition PWSCC 2-A 20 22 18 MAI 1.30 UTE -3.53 520PP 100 0.26 ReRoll Transition PWSCC 2-A 21 18 13 MAI 0.33 UTE -3.07 520PP 92 0.22 ReRoll Transition PWSCC 2-A 22 11 6 MAI 2.05 UTE -3.06 520PP 92 0.18 ReRoll Transition PWSCC 2-A 23 58 9 MAI 1.97 UTE -3.54 520PP 69 0.23 ReRoll Transition PWSCC 2-A 24 151 16 SAI 0.12 15S 3.44 520PP 51 0.32 Groove IGA 2-A 25 149 20 SAI 0.09 15S 1.48 520PP 42 0.35 Groove IGA 2-A 26 15 11 MAI 0.79 UTE -3.35 520PP 78 0.17 ReRoll Transition PWSCC 2-A 27 36 26 MAI 1.04 UTE -3.56 520PP 96 0.21 ReRoll Transition PWSCC 2-A 28 98 8 SAI 1.03 UTE -3.13 520PP 65 0.21 ReRoll Transition PWSCC 2-A 29 92 6 SAI 0.95 UTE -4.87 520PP 57 0.14 ReRoll Transition PWSCC 2-A 30 92 7 SAI 1.65 UTE -3.09 520PP 78 0.22 ReRoll Transition PWSCC 1-B 31 108 106 MAI 0.58 UTE -3.41 520PP 73 0.16 ReRoll Transition PWSCC 1-B 32 113 110 MAI 0.45 UTE -3.10 520PP 65 0.26 ReRoll Transition PWSCC 1-B 33 109 74 MAI 0.72 UTE -3.00 520PP 88 0.16 ReRoll Transition PWSCC 1-B 34 9 23 SAI 0.90 UTE -3.00 520PP 76 0.17 ReRoll Transition PWSCC 1-B 35 21 90 SAI 0.27 14S 31.50 520PP 54 0.58 Groove IGA 1-B 36 109 116 SAI 0.32 10S -2.23 520PP 19 1.59 Groove IGA 1-B 37 113 116 SAI 0.10 12S -15.25 520PP 15 0.30 Groove IGA 1-B 38 66 60 SAI 0.67 UTE -1.46 520PP 63 0.14 Roll Transition PWSCC 1-B 39 127 94 SAI 0.18 15S 1.44 520PP 14 0.60 Groove IGA 1-B 40 77 58 MAI 0.63 UTE -1.44 520PP 62 0.18 Roll Transition PWSCC 1-B 41 130 73 SAI 0.73 UTE -4.74 520PP 55 0.12 ReRoll Transition PWSCC 1-B 42 77 88 SAI 0.54 UTE -1.47 520PP 53 0.18 Roll Transition PWSCC 1-B 43 120 62 SAI 0.85 UTE -1.60 520PP 79 0.14 Roll Transition PWSCC 1-B 44 104 118 MAI 1.74 UTE -5.24 520PP 64 0.17 ReRoll Transition PWSCC 1-B 45 104 118 MAI 1.79 UTE -3.21 520PP 92 0.24 ReRoll Transition PWSCC 1-B 46 104 114 MAI 2.27 UTE -3.40 520PP 60 0.22 ReRoll Transition PWSCC 1-B 47 53 36 SAI 0.56 UTE -1.51 520PP 69 0.18 Roll Transition PWSCC 1-B 48 100 91 SAI 0.45 UTE -1.54 520PP 84 0.18 Roll Transition PWSCC 1-B 49 89 126 MAI 1.66 UTE -2.98 520PP 99 0.27 ReRoll Transition PWSCC 1-B 50 93 54 MAI 0.87 UTE -1.33 520PP 57 0.23 Roll Transition PWSCC 1-B 51 102 117 SAI 0.62 LTE 1.36 520PP 65 0.13 Roll Transition PWSCC 1-B 52 5 46 SAI 0.33 15S 4.83 520PP 31 0.87 Groove IGA 1-B 53 5 46 SAI 0.32 15S 4.55 520PP 31 1.93 Groove IGA 1-B 54 5 46 SAI 0.15 15S 2.77 520PP 46 0.28 Groove IGA 1-B 55 5 46 SAI 0.23 15S 4.07 520PP 25 0.76 Groove IGA 1-B 56 15 77 SAI 0.20 15S 2.53 520PP 63 0.17 Groove IGA 1-B 57 113 116 SAI 0.16 10S 7.68 520PP 2 0.63 Groove IGA 1-B 58 113 116 SAI 0.12 10S 8.67 520PP 47 0.48 Groove IGA 1-B 59 113 116 SAI 0.09 10S 10.91 520PP 31 0.60 Groove IGA 1-B 60 113 116 SAI 0.08 10S 11.63 520PP 8 0.31 Groove IGA 1-B 61 113 116 SAI 0.13 13S -17.27 520PP 58 0.19 Groove IGA 1-B 62 113 116 SAI 0.11 13S -18.45 520PP 70 0.22 Groove IGA 1-B 63 113 116 SAI 0.11 13S -15.60 520PP 35 0.43 Groove IGA 1-B 64 84 116 MAI 1.99 UTE -3.20 520PP 89 0.37 ReRoll Transition PWSCC Page 2 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17 RFO May 2012 Axial Indications SG Count Row Tube Ind Volts TSP Inch1 Probe Depth Ax Len Deg Mode 1-B 65 53 94 MAI 1.57 UTE -3.33 520PP 56 0.22 ReRoll Transition PWSCC 1-B 66 38 18 MAI 0.81 UTE -2.95 520PP 90 0.24 ReRoll Transition PWSCC 1-B 67 37 102 SAI 0.59 UTE -1.88 520PP 89 0.17 Roll Transition PWSCC 1-B 68 83 56 MAI 1.23 UTE -1.56 520PP 62 0.18 Roll Transition PWSCC 1-B 69 86 55 SAI 0.90 UTE -0.99 520PP 69 0.20 Tube End PWSCC 1-B 70 66 50 MAI 1.01 UTE -1.46 520PP 69 0.15 Roll Transition PWSCC 1-B 71 124 65 SAI 0.11 14S 1.50 520PP 85 0.29 Groove IGA 1-B 72 29 97 SAI 0.70 UTE -1.60 520PP 49 0.13 Roll Transition PWSCC 1-B 73 86 56 SAI 0.48 UTE -1.47 520PP 55 0.15 Roll Transition PWSCC 1-B 74 86 58 MAI 0.73 UTE -1.51 520PP 65 0.23 Roll Transition PWSCC 1-B 75 27 100 SAI 0.27 15S -1.33 520PP 15 0.61 Groove IGA 1-B 76 8 42 SAI 1.25 UTE -3.02 520PP 100 0.17 ReRoll Transition PWSCC 1-B 77 29 83 SAI 0.41 UTE -3.20 520PP 47 0.12 ReRoll Transition PWSCC 1-B 78 100 50 SAI 0.53 UTE -1.21 520PP 58 0.12 Roll Transition PWSCC 1-B 79 87 68 SAI 1.25 UTE -1.77 520PP 65 0.20 Roll Transition PWSCC Page 3 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17RFO May 2012 2.C(7) Steam Generator Tube Circumferential Crack Report S/G Count Row Tube Ind Volts TSP Inch Probe %TW Ci Ext Degradation Mechanism Section a Section b Section c 1-B 1 42 111 SCI 0.36 LTE 1.43 520PP 39 0.2 Roll Trans PWSCC x 1-B 1 45 77 SCI 0.46 LTE 1.52 520PP 56 0.16 Roll Trans PWSCC x 1-B 1 45 86 SCI 2.34 UTE -0.11 520PP 96 0.53 Tube End PWSCC x 1-B 1 48 78 MCI 0.87 LTE 1.52 520PP 35 0.62 Roll Trans PWSCC x 1-B 1 50 78 SCI 0.49 LTE 1.59 520PP 99 0.37 Roll Trans PWSCC x 1-B 1 51 79 MCI 0.27 LTE 1.6 520PP 98 1.09 Roll Trans PWSCC x 1-B 1 52 76 MCI 0.35 LTE 1.53 520PP 73 1.09 Roll Trans PWSCC x 1-B 1 53 80 MCI 0.54 LTE 1.57 520PP 99 1.1 Roll Trans PWSCC x 1-B 1 54 79 MCI 0.4 LTE 1.62 520PP 94 1.03 Roll Trans PWSCC x 1-B 1 56 77 SCI 0.78 LTE 1.59 520PP 98 0.51 Roll Trans PWSCC x 1-B 1 57 80 SCI 0.23 LTE 1.53 520PP 98 0.3 Roll Trans PWSCC x 1-B 1 58 79 SCI 0.4 LTE 1.63 520PP 89 0.44 Roll Trans PWSCC x 1-B 1 59 30 SCI 0.56 LTE 1.49 520PP 58 0.18 Roll Trans PWSCC x 1-B 1 62 79 MCI 0.75 LTE 1.65 520PP 31 1.18 Roll Trans PWSCC x 1-B 1 65 30 SCI 0.26 LTE 1.58 520PP 32 0.18 Roll Trans PWSCC x 1-B 1 65 30 SCI 0.72 LTE 1.5 520PP 46 0.21 Roll Trans PWSCC x 1-B 1 66 81 SCI 0.75 LTE 1.65 520PP 65 0.2 Roll Trans PWSCC x 1-B 1 73 75 SCI 0.61 LTE 1.52 520PP 98 0.11 Roll Trans PWSCC x 1-B 1 77 68 MCI 0.92 LTE 1.6 520PP 66 0.23 Roll Trans PWSCC x 1-B 1 77 69 SCI 0.52 LTE 1.5 520PP 68 0.31 Roll Trans PWSCC x 1-B 1 78 68 MCI 0.67 LTE 1.6 520PP 96 0.25 Roll Trans PWSCC x 1-B 1 82 56 SCI 0.96 LTE 1.53 520PP 64 0.4 Roll Trans PWSCC x 1-B 1 84 73 SCI 0.46 LTE 1.51 520PP 68 0.15 Roll Trans PWSCC x 1-B 1 84 75 MCI 0.7 LTE 1.59 520PP 51 0.18 Roll Trans PWSCC x 1-B 1 86 53 SCI 0.45 LTE 1.6 520PP 51 0.18 Roll Trans PWSCC x 1-B 1 86 54 MCI 1.09 LTE 1.59 520PP 68 0.73 Roll Trans PWSCC x 1-B 1 86 69 MCI 0.6 LTE 1.63 520PP 63 0.18 Roll Trans PWSCC x 1-B 1 87 74 MCI 0.41 LTE 1.73 520PP 66 0.2 Roll Trans PWSCC x 0.0589 1-B 1 89 59 SCI 0.79 LTE 1.61 520PP 48 0.23 Roll Trans PWSCC x 1-B 1 94 53 MCI 0.56 LTE 1.58 520PP 99 0.37 Roll Trans PWSCC x 1-B 1 98 93 SCI 0.43 LTE 1.58 520PP 52 0.23 Roll Trans PWSCC x 0.0544 1-B 1 100 70 MCI 0.4 LTE 1.6 520PP 63 0.2 Roll Trans PWSCC x 1-B 1 106 69 SCI 0.72 LTE 1.79 520PP 66 0.18 Roll Trans PWSCC x 1-B 1 142 26 SVI 1.87 UTE -2.35 520PP 47 0.27 ID Mechanical x 2-A 1 20 15 SCI 0.44 UTE -3.2 520PP 33 0.36 Reroll Trans PWSCC x 2-A 1 20 85 SCI 1.88 UTE -0.28 520PP 37 0.51 Tube End PWSCC x 2-A 1 44 61 SCI 0.95 UTE -1.94 520PP 68 0.21 Roll Trans PWSCC x 2-A 1 89 9 SCI 1.09 UTE -3.14 520PP 43 0.47 Reroll Trans PWSCC x 2-A 1 101 124 SCI 1.83 UTE -0.2 520PP 95 0.58 Tube End PWSCC x 2-A 1 104 107 SCI 0.83 UTE -2.98 520PP 77 1.22 Reroll Trans PWSCC x 2-A 1 133 1 SCI 0.84 UTE -0.26 520PP 81 0.23 Tube End PWSCC x 2-A 1 151 7 SCI 2.43 UTE -0.3 520PP 60 0.43 Tube End PWSCC x Page 4 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17 RFO May 2012 Volumetric Indications (Not in Previously Rerolled Tubes)

SG Row Tube Ind Volts TSP Inch1 Probe Depth Ax Len Circ Len Deg Mode 1-B 142 26 SVI 1.87 UTE -2.35 520PP 47 0.22 0.27 ID Mechanical Page 5 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)

SG Count Row Tube Ind Volts TSP Inch1 Probe 2-A 1 45 45 SAA 0.91 UTE -0.30 520PP 2-A 2 84 10 SAA 1.83 UTE -0.21 520PP 2-A 3 142 32 MAA 0.87 UTE -0.20 520PP 2-A 4 146 25 SAA 1.40 UTE -0.26 520PP 2-A 5 36 113 SAA 1.64 UTE -0.23 520PP 2-A 6 64 2 SAA 1.22 UTE -0.18 520PP 2-A 7 122 104 MAA 2.17 UTE -0.28 520PP 2-A 8 115 107 MAA 1.66 UTE -0.25 520PP 2-A 9 116 107 MAA 1.47 UTE -0.23 520PP 2-A 10 130 8 SAA 2.44 UTE -0.33 520PP 2-A 11 130 7 SAA 2.10 UTE -0.31 520PP 2-A 12 97 19 MAA 1.83 UTE -0.23 520PP 2-A 13 92 49 SAA 0.86 UTE -0.30 520PP 2-A 14 70 116 SAA 1.25 UTE -0.27 520PP 2-A 15 86 100 SAA 1.05 UTE -0.26 520PP 2-A 16 86 122 MAA 1.62 UTE -0.38 520PP 2-A 17 86 123 MAA 1.58 UTE -0.25 520PP 2-A 18 87 100 SAA 1.34 UTE -0.24 520PP 2-A 19 136 70 SAA 2.38 UTE -0.31 520PP 2-A 20 136 68 MAA 1.81 UTE -0.33 520PP 2-A 21 137 72 MAA 1.96 UTE -0.33 520PP 2-A 22 137 65 SAA 0.91 UTE -0.34 520PP 2-A 23 138 66 SAA 1.86 UTE -0.32 520PP 2-A 24 138 65 SAA 1.97 UTE -0.33 520PP 2-A 25 139 63 MAA 1.73 UTE -0.30 520PP 2-A 26 12 6 MAA 1.64 UTE -0.31 520PP 2-A 27 8 14 SAA 2.51 UTE -0.27 520PP 2-A 28 6 22 SAA 1.03 UTE -0.29 520PP 2-A 29 5 7 SAA 3.18 UTE -0.24 520PP 2-A 30 121 71 SAA 0.72 UTE -0.32 520PP 2-A 31 25 78 SAA 0.81 UTE -0.32 520PP 2-A 32 65 40 SAA 3.11 UTE -0.10 520PP 2-A 33 3 31 SAA 2.35 UTE -0.28 520PP 2-A 34 5 46 SAA 2.08 UTE -0.32 520PP 2-A 35 9 60 SAA 2.49 UTE -0.20 520PP 2-A 36 38 61 MAA 1.46 UTE -0.28 520PP 2-A 37 36 87 SAA 1.01 UTE -0.29 520PP 2-A 38 37 87 SAA 0.99 UTE -0.32 520PP 2-A 39 33 85 SAA 1.13 UTE -0.34 520PP 2-A 40 24 80 MAA 1.34 UTE -0.24 520PP 2-A 41 84 11 SAA 2.36 UTE -0.23 520PP 2-A 42 85 21 SAA 1.80 UTE -0.25 520PP 2-A 43 84 31 SAA 0.79 UTE -0.31 520PP 2-A 44 108 1 SAA 3.00 UTE -0.31 520PP 2-A 45 108 115 SAA 1.47 UTE -0.31 520PP 2-A 46 12 64 SAA 0.98 UTE -0.35 520PP 2-A 47 13 42 SAA 0.68 UTE -0.38 520PP 2-A 48 14 66 SAA 1.71 UTE -0.37 520PP 2-A 49 18 74 SAA 1.54 UTE -0.27 520PP 2-A 50 20 46 SAA 1.48 UTE -0.37 520PP Page 6 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)

SG Count Row Tube Ind Volts TSP Inch1 Probe 2-A 51 25 52 SAA 1.59 UTE -0.34 520PP 2-A 52 25 59 SAA 1.32 UTE -0.31 520PP 2-A 53 81 12 MAA 1.17 UTE -0.07 520PP 2-A 54 82 9 MAA 1.32 UTE -0.25 520PP 2-A 55 82 20 MAA 1.10 UTE -0.30 520PP 2-A 56 86 20 SAA 1.49 UTE -0.25 520PP 2-A 57 82 21 SAA 1.44 UTE -0.21 520PP 2-A 58 86 10 SAA 2.46 UTE -0.21 520PP 2-A 59 89 10 MAA 1.04 UTE -0.22 520PP 2-A 60 25 77 SAA 2.08 UTE -0.29 520PP 2-A 61 28 83 SAA 1.95 UTE -0.31 520PP 2-A 62 29 83 SAA 1.99 UTE -0.25 520PP 2-A 63 26 47 SAA 1.92 UTE -0.28 520PP 2-A 64 33 92 SAA 1.04 UTE -0.28 520PP 2-A 65 26 87 SAA 1.99 UTE -0.29 520PP 2-A 66 5 30 MAA 3.11 UTE -0.38 520PP 2-A 67 6 32 SAA 2.06 UTE -0.32 520PP 2-A 68 17 72 MAA 1.93 UTE -0.26 520PP 2-A 69 18 73 SAA 1.18 UTE -0.27 520PP 2-A 70 19 47 SAA 1.68 UTE -0.31 520PP 2-A 71 20 47 SAA 1.53 UTE -0.27 520PP 2-A 72 23 93 SAA 1.39 UTE -0.25 520PP 2-A 73 127 78 SAA 1.24 UTE -0.34 520PP 2-A 74 128 8 MAA 2.09 UTE -0.29 520PP 2-A 75 21 38 SAA 1.38 UTE -0.16 520PP 2-A 76 54 2 MAA 1.45 UTE -0.31 520PP 2-A 77 108 4 SAA 1.14 UTE -0.24 520PP 2-A 78 117 107 MAA 2.07 UTE -0.31 520PP 2-A 79 111 3 SAA 2.43 UTE -0.34 520PP 2-A 80 107 4 MAA 1.13 UTE -0.25 520PP 2-A 81 103 6 MAA 2.09 UTE -0.23 520PP 2-A 82 37 25 SAA 1.15 UTE -0.27 520PP 2-A 83 39 42 SAA 1.18 UTE -0.27 520PP 2-A 84 103 7 MAA 2.26 UTE -0.29 520PP 2-A 85 106 5 SAA 2.33 UTE -0.27 520PP 2-A 86 107 111 MAA 1.49 UTE -0.22 520PP 2-A 87 109 105 MAA 1.63 UTE -0.24 520PP 2-A 88 110 110 SAA 1.50 UTE -0.26 520PP 2-A 89 110 106 SAA 2.64 UTE -0.25 520PP 2-A 90 110 104 MAA 1.66 UTE -0.26 520PP 2-A 91 112 105 SAA 1.91 UTE -0.30 520PP 2-A 92 114 98 SAA 1.20 UTE -0.25 520PP 2-A 93 150 27 SAA 2.03 UTE -0.24 520PP 2-A 94 16 12 MAA 1.64 UTE -0.30 520PP 2-A 95 12 22 SAA 0.99 UTE -0.33 520PP 2-A 96 7 12 SAA 1.57 UTE -0.34 520PP 2-A 97 5 19 SAA 2.43 UTE -0.31 520PP 2-A 98 4 17 SAA 1.79 UTE -0.34 520PP 2-A 99 3 13 SAA 2.82 UTE -0.32 520PP 2-A 100 147 45 SAA 1.05 UTE -0.28 520PP Page 7 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)

SG Count Row Tube Ind Volts TSP Inch1 Probe 2-A 101 111 2 MAA 1.35 UTE -0.27 520PP 2-A 102 110 1 SAA 2.11 UTE -0.33 520PP 2-A 103 109 3 MAA 2.56 UTE -0.31 520PP 2-A 104 109 5 SAA 0.99 UTE -0.31 520PP 2-A 105 107 5 MAA 1.55 UTE -0.30 520PP 2-A 106 107 3 SAA 1.04 UTE -0.34 520PP 2-A 107 105 22 SAA 1.49 UTE -0.28 520PP 2-A 108 102 6 SAA 1.74 UTE -0.14 520PP 2-A 109 90 6 SAA 1.86 UTE -0.27 520PP 2-A 110 62 54 SAA 0.98 UTE -0.38 520PP 2-A 111 44 5 SAA 1.11 UTE -0.24 520PP 2-A 112 44 4 SAA 1.85 UTE -0.16 520PP 2-A 113 120 13 SAA 1.81 UTE -0.18 520PP 2-A 114 49 3 SAA 2.51 UTE -0.21 520PP 2-A 115 51 6 MAA 1.39 UTE -0.22 520PP 2-A 116 41 89 SAA 1.21 UTE -0.26 520PP 2-A 117 10 5 MAA 1.52 UTE -0.29 520PP 2-A 118 48 7 SAA 1.25 UTE -0.27 520PP 2-A 119 130 71 SAA 1.52 UTE -0.34 520PP 2-A 120 136 80 SAA 1.67 UTE -0.31 520PP 2-A 121 109 94 SAA 1.43 UTE -0.29 520PP 2-A 122 109 110 SAA 1.66 UTE -0.40 520PP 2-A 123 109 112 SAA 0.88 UTE -0.30 520PP 2-A 124 110 105 MAA 2.70 UTE -0.21 520PP 2-A 125 126 78 MAA 1.73 UTE -0.30 520PP 2-A 126 20 31 SAA 1.01 UTE -0.31 520PP 2-A 127 19 39 MAA 1.57 UTE -0.29 520PP 2-A 128 18 15 MAA 2.08 UTE -0.35 520PP 2-A 129 127 83 SAA 2.08 UTE -0.28 520PP 2-A 130 131 74 SAA 2.22 UTE -0.29 520PP 2-A 131 133 78 MAA 2.25 UTE -0.26 520PP 2-A 132 133 66 SAA 2.04 UTE -0.27 520PP 2-A 133 137 68 SAA 1.88 UTE -0.24 520PP 2-A 134 34 58 SAA 1.47 UTE -0.26 520PP 2-A 135 31 22 SAA 2.07 UTE -0.27 520PP 2-A 136 25 35 SAA 1.94 UTE -0.25 520PP 2-A 137 66 46 MAA 1.03 UTE -0.37 520PP 2-A 138 132 68 SAA 1.76 UTE -0.28 520PP 2-A 139 132 47 SAA 1.99 UTE -0.32 520PP 2-A 140 146 28 SAA 2.09 UTE -0.31 520PP 2-A 141 124 11 SAA 1.34 UTE -0.22 520PP 2-A 142 97 8 MAA 2.28 UTE -0.30 520PP 2-A 143 122 100 SAA 2.47 UTE -0.29 520PP 2-A 144 123 101 MAA 2.65 UTE -0.26 520PP 2-A 145 129 8 SAA 1.62 UTE -0.33 520PP 2-A 146 115 98 SAA 1.68 UTE -0.28 520PP 2-A 147 131 75 SAA 0.90 UTE -0.30 520PP 2-A 148 133 81 SAA 1.69 UTE -0.31 520PP 2-A 149 134 70 MAA 0.89 UTE -0.30 520PP 2-A 150 135 68 MAA 0.71 UTE -0.40 520PP Page 8 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)

SG Count Row Tube Ind Volts TSP Inch1 Probe 2-A 151 58 4 SAA 2.39 UTE -0.26 520PP 2-A 152 63 2 SAA 2.43 UTE -0.28 520PP 2-A 153 132 64 MAA 2.12 UTE -0.28 520PP 2-A 154 132 60 SAA 2.25 UTE -0.32 520PP 1-B 155 103 120 SAA 1.97 UTE -0.44 520PP 1-B 156 107 110 SAA 2.27 UTE -0.11 520PP 1-B 157 31 67 MAA 1.18 UTE -0.26 520PP 1-B 158 101 119 SAA 1.12 UTE -0.32 520PP 1-B 159 102 113 SAA 1.23 UTE -0.23 520PP 1-B 160 103 117 SAA 1.79 UTE -0.38 520PP 1-B 161 103 118 SAA 1.92 UTE -0.38 520PP 1-B 162 55 44 MAA 1.54 UTE -0.30 520PP 1-B 163 67 99 SAA 2.08 UTE -0.23 520PP 1-B 164 36 87 SAA 2.02 UTE -0.24 520PP 1-B 165 10 48 SAA 3.74 UTE -0.31 520PP 1-B 166 10 45 SAA 1.21 UTE -0.33 520PP 1-B 167 14 52 SAA 1.49 UTE -0.14 520PP 1-B 168 20 55 SAA 1.44 UTE -0.22 520PP 1-B 169 25 81 SAA 1.06 UTE -0.21 520PP 1-B 170 28 64 SAA 1.22 UTE -0.22 520PP 1-B 171 28 66 SAA 1.03 UTE -0.34 520PP 1-B 172 36 25 MAA 1.33 UTE -0.30 460PP 1-B 173 59 79 MAA 2.12 LTE 0.40 520PP 1-B 174 40 13 MAA 2.19 UTE -0.32 520PP 1-B 175 78 112 SAA 1.18 UTE -0.32 520PP 1-B 176 120 9 SAA 0.74 UTE -0.29 520PP 1-B 177 120 5 SAA 1.24 UTE -0.23 520PP 1-B 178 28 93 MAA 1.88 UTE -0.25 520PP 1-B 179 70 53 SAA 1.37 UTE -0.39 520PP 1-B 180 71 59 SAA 2.33 UTE -0.28 520PP 1-B 181 129 49 SAA 0.86 UTE -0.30 520PP 1-B 182 29 94 SAA 1.30 UTE -0.31 520PP 1-B 183 74 39 SAA 0.97 UTE -0.41 520PP 1-B 184 65 50 SAA 1.56 UTE -0.49 520PP 1-B 185 66 29 SAA 1.64 UTE -0.30 520PP 1-B 186 29 14 SAA 2.81 UTE -0.30 520PP 1-B 187 9 44 MAA 2.40 UTE -0.32 520PP 1-B 188 13 51 SAA 1.88 UTE -0.26 520PP 1-B 189 17 54 SAA 2.18 UTE -0.25 520PP 1-B 190 30 95 SAA 1.81 UTE -0.30 520PP 1-B 191 67 51 SAA 1.76 UTE -0.44 520PP 1-B 192 63 26 MAA 1.10 UTE -0.35 520PP 1-B 193 62 49 SAA 0.75 UTE -0.41 520PP 1-B 194 22 60 SAA 2.92 UTE -0.27 520PP 1-B 195 24 79 SAA 0.68 UTE -0.32 520PP 1-B 196 58 32 SAA 2.49 UTE -0.25 520PP 1-B 197 104 119 SAA 1.38 UTE -0.32 520PP 1-B 198 101 55 SAA 1.31 UTE -0.42 520PP 1-B 199 37 72 SAA 1.67 UTE -0.22 520PP 1-B 200 42 92 SAA 1.54 UTE -0.16 520PP Page 9 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17 RFO May 2012 New Tube End Indications (Not in Previously Rerolled Tubes)

SG Count Row Tube Ind Volts TSP Inch1 Probe 1-B 201 42 90 SAA 2.10 UTE -0.23 520PP 1-B 202 13 50 SAA 1.57 UTE -0.27 520PP 1-B 203 13 52 SAA 1.69 UTE -0.26 520PP 1-B 204 28 65 MAA 1.73 UTE -0.34 520PP 1-B 205 56 78 SAA 2.66 UTE -0.39 520PP 1-B 206 57 80 SAA 1.34 UTE -0.26 520PP 1-B 207 99 45 SAA 1.24 UTE -0.23 520PP 1-B 208 10 46 SAA 2.14 UTE -0.34 520PP 1-B 209 32 98 SAA 1.13 UTE -0.31 520PP 1-B 210 3 27 SAA 1.17 UTE -0.26 520PP 1-B 211 7 40 SAA 1.86 UTE -0.25 520PP 1-B 212 98 27 SAA 1.04 UTE -0.29 520PP 1-B 213 48 76 MAA 1.06 UTE -0.27 520PP 1-B 214 58 99 MAA 0.79 UTE -0.28 520PP 1-B 215 55 109 SAA 1.02 UTE -0.35 520PP 1-B 216 55 97 SAA 1.24 UTE -0.21 520PP 1-B 217 48 78 MAA 2.07 UTE -0.35 520PP 1-B 218 36 88 SAA 1.90 UTE -0.27 520PP 1-B 219 107 7 SAA 0.92 UTE -0.26 520PP 1-B 220 38 102 SAA 1.75 UTE -0.25 520PP 1-B 221 38 112 SAA 1.17 UTE -0.21 520PP 1-B 222 39 89 SAA 2.07 UTE -0.26 520PP 1-B 223 42 71 SAA 0.93 UTE -0.34 520PP 1-B 224 43 75 MAA 1.64 UTE -0.14 520PP 1-B 225 43 107 SAA 1.48 UTE -0.24 520PP 1-B 226 52 78 SAA 1.09 UTE -0.30 520PP 1-B 227 57 53 SAA 1.91 UTE -0.31 520PP 1-B 228 146 15 MAA 2.02 UTE -0.23 520PP 1-B 229 147 13 SAA 2.22 UTE -0.23 520PP 1-B 230 58 78 SAA 1.91 UTE -0.47 520PP 1-B 231 60 81 SAA 1.09 UTE -0.45 520PP 1-B 232 16 54 SAA 0.90 UTE -0.22 520PP 1-B 233 18 74 SAA 1.07 UTE -0.31 520PP 1-B 234 18 56 SAA 1.49 UTE -0.26 520PP 1-B 235 100 26 SAA 2.05 UTE -0.29 520PP 1-B 236 73 52 SAA 2.16 UTE -0.43 520PP 1-B 237 100 50 MAA 2.14 UTE -0.25 520PP 1-B 238 100 56 SAA 1.73 UTE -0.23 520PP 1-B 239 119 9 SAA 1.83 UTE -0.35 520PP 1-B 240 100 49 SAA 0.96 UTE -0.29 520PP 1-B 241 112 48 SAA 0.93 UTE -0.21 520PP 1-B 242 113 46 SAA 1.56 UTE -0.21 520PP Page 10 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2

Davis-Besse 17 RFO May 2012 Top 10 Wear Calls By Bobbin Depth SG Row Tube Depth Volts TSP Inch1 Prev Depth 2-A 16 2 29 1.51 13S -0.70 21 1-B 67 1 26 1.71 12S -0.04 23 2-A 146 33 23 1.10 10S 0.64 17 2-A 13 1 23 1.06 13S -0.67 16 2-A 147 36 23 1.11 10S 0.66 23 2-A 12 2 21 0.84 13S -0.72 14 2-A 11 1 19 0.74 13S -0.76 12 2-A 52 1 19 1.00 13S -0.64 20 2-A 86 127 18 0.73 14S -0.70 12 2-A 15 2 18 0.72 13S -0.73 13 Page 11 of 11 Results as of : 6:57 AM,5/23/2012 Enclosure 2