ML12198A301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 07/12/2012
| issue date = 07/12/2012
| title = Revision to Limerick Physical Security Plan
| title = Revision to Limerick Physical Security Plan
| author name = Dougherty T J
| author name = Dougherty T
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name =  
| addressee name =  
Line 16: Line 16:
=Text=
=Text=
{{#Wiki_filter:THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED
{{#Wiki_filter:THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED
'Exelon Generation 1 0CFR50.54p July 12, 2012 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353  
'Exelon                 Generation 10CFR50.54p July 12, 2012 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353


==Subject:==
==Subject:==
Revision to Limerick Physical Security Plan  
Revision to Limerick Physical Security Plan


==Dear Sir:==
==Dear Sir:==
In accordance with 10 CFR 50.4 (b)(4) "Security plan and related submittals," enclosed are the original and three (3) copies of revision 9 to the Limerick Physical Security Plan, Safeguards Contingency Plan, and Plant Security Personnel Training and Qualification Plan. As required by 10 CFR 50.54(p)(2), we have concluded that the changes do not decrease the safeguards effectiveness of the Limerick Physical Security Plan, Safeguards Contingency Plan, and Plant Security Personnel Training and Qualification Plan.The enclosures and attachment to this letter are considered safeguard information and should, therefore, be withheld from public disclosure in accordance with 10CFR73.21 (b).There are no new commitments as a result of this correspondence.
 
If you have any questions or require additional information, please do not hesitate to contact us.Since~relY'--/  
In accordance with 10 CFR 50.4 (b)(4) "Security plan and related submittals," enclosed are the original and three (3) copies of revision 9 to the Limerick Physical Security Plan, Safeguards Contingency Plan, and Plant Security Personnel Training and Qualification Plan. As required by 10 CFR 50.54(p)(2), we have concluded that the changes do not decrease the safeguards effectiveness of the Limerick Physical Security Plan, Safeguards Contingency Plan, and Plant Security Personnel Training and Qualification Plan.
-
The enclosures and attachment to this letter are considered safeguard information and should, therefore, be withheld from public disclosure in accordance with 10CFR73.21 (b).
d Thomas J.D ugherty Site Vice President  
There are no new commitments as a result of this correspondence.
-LOS7 Exelon Generation Co. LLC  
Ifyou have any questions or require additional information, please do not hesitate to contact us.
Since~relY'--/ d  -      /*-a,*J._-.
Thomas J.D ugherty Site Vice President - LOS7 Exelon Generation Co. LLC


==Enclosures:==
==Enclosures:==
Limerick Physical Security Plan (Safeguards Information)
Limerick Physical Security Plan (Safeguards Information)
Safeguards Contingency Plan (Safeguards Information)
Safeguards Contingency Plan (Safeguards Information)
Line 35: Line 36:


==Attachment:==
==Attachment:==
Justification of Changes to Limerick Physical Security Plan (Safeguards Information) cc:    W. Dean, Administrator, Region I, USNRC (w/o enclosure/attachment)
E. DiPaolo, LGS USNRC Senior Resident Inspector (w/o enclosure/attachment)
THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED


Justification of Changes to Limerick Physical Security Plan (Safeguards Information) cc: W. Dean, Administrator, Region I, USNRC (w/o enclosure/attachment)
THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED bcc: T. Dougherty, GML 5-1 (w/o enclosure/attachment)
E. DiPaolo, LGS USNRC Senior Resident Inspector (w/o enclosure/attachment)
THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED bcc: T. Dougherty, GML 5-1 (w/o enclosure/attachment)
P. Gardner, GML 5-1 (w/o enclosure/attachment)
P. Gardner, GML 5-1 (w/o enclosure/attachment)
C. Gerdes, TSC 1-1 (w/o enclosure/attachment)
C. Gerdes, TSC 1-1 (w/o enclosure/attachment)

Latest revision as of 01:54, 12 November 2019

Revision to Limerick Physical Security Plan
ML12198A301
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/12/2012
From: Dougherty T
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12198A301 (2)


Text

THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

'Exelon Generation 10CFR50.54p July 12, 2012 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Revision to Limerick Physical Security Plan

Dear Sir:

In accordance with 10 CFR 50.4 (b)(4) "Security plan and related submittals," enclosed are the original and three (3) copies of revision 9 to the Limerick Physical Security Plan, Safeguards Contingency Plan, and Plant Security Personnel Training and Qualification Plan. As required by 10 CFR 50.54(p)(2), we have concluded that the changes do not decrease the safeguards effectiveness of the Limerick Physical Security Plan, Safeguards Contingency Plan, and Plant Security Personnel Training and Qualification Plan.

The enclosures and attachment to this letter are considered safeguard information and should, therefore, be withheld from public disclosure in accordance with 10CFR73.21 (b).

There are no new commitments as a result of this correspondence.

Ifyou have any questions or require additional information, please do not hesitate to contact us.

Since~relY'--/ d - /*-a,*J._-.

Thomas J.D ugherty Site Vice President - LOS7 Exelon Generation Co. LLC

Enclosures:

Limerick Physical Security Plan (Safeguards Information)

Safeguards Contingency Plan (Safeguards Information)

Plant Security Personnel Training and Qualification Plan (Safeguards Information)

Attachment:

Justification of Changes to Limerick Physical Security Plan (Safeguards Information) cc: W. Dean, Administrator, Region I, USNRC (w/o enclosure/attachment)

E. DiPaolo, LGS USNRC Senior Resident Inspector (w/o enclosure/attachment)

THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED bcc: T. Dougherty, GML 5-1 (w/o enclosure/attachment)

P. Gardner, GML 5-1 (w/o enclosure/attachment)

C. Gerdes, TSC 1-1 (w/o enclosure/attachment)

C. Kelly, Cantera (w/o enclosure/attachment)

R. Dickinson, SSB 2-4 (w/o enclosure/attachment)

W. Trump, KSA (w/o enclosure/attachment)

K. Kemper, TSC 1-1 (w/o enclosure/attachment)

A. Columbus, SSB 4-1 (w/o enclosure/attachment)

M. Murphy, SSB 2-4 Site PADEP BRP Inspector-LGS (w/o enclosure/attachment)

THE ENCLOSURE AND ATTACHMENT CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED