ML13029A673: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Final Simulator Scenarios (containing ES
{{#Wiki_filter:Final Simulator Scenarios (containing ES-D-1 and ES-D-2)
-D-1 and ES-D-2) There were no Final Simulator Scenarios for the North Anna 2012
There were no Final Simulator Scenarios for the North Anna 2012-302 Exam (the Simulator portion of the Operating Test was waived).}}
-302 Exam (the Simulator portion of the Operating Test was waived).}}

Latest revision as of 00:01, 5 November 2019

302 Final Simulator Scenarios
ML13029A673
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/24/2013
From:
NRC/RGN-II
To:
Virginia Electric & Power Co (VEPCO)
References
50-338/12-302, 50-339/12-302
Download: ML13029A673 (1)


Text

Final Simulator Scenarios (containing ES-D-1 and ES-D-2)

There were no Final Simulator Scenarios for the North Anna 2012-302 Exam (the Simulator portion of the Operating Test was waived).