| issue date = 09/13/2013 | | issue date = 09/13/2013 | ||
| title = Ltr 9/13/13 Byron Fire Protection Request for Information | | title = Ltr 9/13/13 Byron Fire Protection Request for Information | ||
| author name = Daley R | | author name = Daley R | ||
| author affiliation = NRC/RGN-III/DRS/EB3 | | author affiliation = NRC/RGN-III/DRS/EB3 | ||
| addressee name = Pacilio M | | addressee name = Pacilio M | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000454, 05000455 | | docket = 05000454, 05000455 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 13, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | ||
==SUBJECT:== | ==SUBJECT:== | ||
BYRON STATION | BYRON STATION - NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000454/2013008; 05000455/2013008 | ||
- NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000454/2013008; 05000455/2013008 Dear Mr. Pacilio | |||
==Dear Mr. Pacilio:== | |||
. During this inspection, the B.5.b requirements review will be performed during the first onsite week of the inspection starting on November 18, 2013 | On November 18, 2013, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial Fire Protection Baseline Inspection at your Bryon Station. This inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs Baseline Fire Protection Inspection Procedure. | ||
Changes were made to the IP 71111.05T which now requires the fire protection inspection to review your actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. This requirement was implemented by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements of 10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b requirements review will be performed during the first onsite week of the inspection starting on November 18, 2013. | |||
Information Gathering Visit: | The schedule for the onsite inspection activity is as follows: | ||
- 20, 2013; | Information Gathering Visit: November 18 - 20, 2013; B.5.b Requirements: November 20 - 22, 2013; and Fire Protection Inspection: December 2 - 13, 2013. | ||
: | The purpose of the information gathering visit is: (1) to obtain information and documentation needed to support the inspection; (2) to become familiar with the Byron Station Fire Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges. | ||
- 22, 2013; and | Experience has shown that the baseline fire protection inspections are extremely resource intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been | ||
: | |||
- 13, 2013. The purpose of the information gathering visit is: | M. Pacilio divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to the lead inspector via mail or electronically no later than (November 4, 2013). The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit (November 18, 2013). The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week (December 2, 2013). The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. | ||
The lead inspector for this inspection is Mr. Ronald A. Langstaff. We understand that our regulatory contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov. | |||
-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details | This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | ||
, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Experience has shown that the baseline fire protection inspections are extremely resource intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been M. Pacilio divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus | Sincerely, | ||
). The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit (November 18, 2013 | /RA/ | ||
). The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week (December 2, 2013). The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. | Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 | ||
The lead inspector for this inspection is Mr. Ronald A. Langstaff. We understand that our regulatory contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829 | |||
-9747 or via e-mail at Ronald.Langstaff@nrc.gov | |||
Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html (the Public Electronic Reading Room) | |||
50-454; 50-455 License Nos. NPF-37; NPF-66 | |||
==Enclosure:== | ==Enclosure:== | ||
Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ' | |||
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS Inspection Report: 05000454/2013008; 05000455/2013008 Onsite Inspection Dates: November 18 - 20, 2013 (Information Gathering Visit) | |||
November 20 - 22, 2013 (B.5.b Requirements) | |||
December 2 - 13, 2013 (Fire Protection Inspection) | |||
- 22, 2013 (B.5.b Requirements | Inspection Procedures: IP71111.05T, Fire Protection (Triennial) | ||
IP71152, "Identification and Resolution of Problems" Inspectors: Ronald A. Langstaff, Senior Reactor Inspector, lead (630) 829-9747 Ronald.Langstaff@nrc.gov Mohammad Munir, Reactor Inspector (630) 829-9797 Mohmmad.Munir@nrc.gov Robert A. Winter, Reactor Engineer (630) 829-9758 Robert.Winter@nrc.gov I. Information Requested Prior To the Information Gathering Visit The following information is requested by November 4, 2013. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to Ronald A. Langstaff (e-mail address Ronald.Langstaff@nrc.gov). | |||
- 13, 2013 (Fire Protection Inspection | Electronic media is preferred. The preferred file format is a searchable pdf file on a compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible. Please provide three copies of each CD submitted (one for each inspector). | ||
: 1. The most risk significant fire areas as determined by probabilistic risk analyses, if available. Otherwise, the reactor plant's Individual Plant Examination for External Events (IPEEE) for fire and results of any post-IPEEE reviews for fire. | |||
: IP71111.05T, | : 2. A copy of the current version of the Fire Protection Program (FPP), fire hazards analysis (FHA), safe shutdown analysis (SSA), updated safety analysis report (USAR), | ||
IP71152, "Identification and Resolution of Problems" Inspectors | Technical Specifications, license (including the fire protection license condition), and Technical Requirements Manual (TRM) or equivalent for fire protection structures, systems, and components. | ||
: | : 3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which 10 CFR Part 50, Appendix R, Section III G requirements are satisfied under Section III.G.3), or where both safe shutdown trains can be affected. | ||
-9747 | 1 Enclosure | ||
-9797 | |||
-9758 | |||
. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to Ronald A. Langstaff (e-mail address Ronald.Langstaff@nrc.gov). Electronic media is preferred. The preferred file format is a searchable | |||
-linked to facilitate ease of use, if possible. Please provide three copies of each CD submitted (one for each inspector). | |||
: 1. The most risk significant fire areas as determined by probabilistic risk analyses, if available | |||
. Otherwise, the reactor plant's Individual Plant Examination for External Events (IPEEE) for fire and results of any post-IPEEE reviews for fire. | |||
: 2. A copy of the current version of the Fire Protection Program (FPP), fire hazards analysis (FHA), safe shutdown analysis (SSA), updated safety analysis report (USAR), Technical Specifications | |||
, license (including the fire protection license condition), and Technical Requirements Manual (TRM) or equivalent for fire protection structures, systems, and | |||
those areas for which 10 CFR Part 50, Appendix R, Section III G requirements are satisfied under Section III.G.3), or where both safe shutdown trains can be affected. | |||
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | ||
Only those procedures with actions specific to shutdown in the event of a fire need be included. | : 4. Plant operating procedures which would be used and describe shutdown for a postulated fire (for both areas requiring alternative shutdown and areas which do not require alternative shutdown). Only those procedures with actions specific to shutdown in the event of a fire need be included. In addition, please include those procedures which operators would use for initial response to a fire, such as annunciator or alarm response procedures, the procedure used for activating the fire brigade, and the procedure which directs operators to the applicable safe shutdown procedure. | ||
In addition, please include those procedures which operators would use for initial response to a fire, such as annunciator or alarm response procedures | II. Information Requested During the Information Gathering Visit (November 18, 2013) | ||
, the procedure used for activating the fire brigade, and the procedure which directs operators to the applicable safe shutdown procedure | The following information is requested to be provided to the inspection team during the onsite information gathering visit. Except for Item 8, it is requested that the following information be provided on three sets of CDs (searchable, if possible) with the B.5.b Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD. In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d. | ||
: 1. One set of hard-copy documents for facility layout drawings which identify plant fire area delineation; areas protected by automatic fire suppression and detection; and locations of fire protection equipment. | |||
) with the B.5.b Mitigating Strategies information (Items 8.a through 8. | : 2. Licensing Information: | ||
h) provided on one separate CD | : a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs) applicable to fire protection (specifically including those SERs referenced by the plant fire protection license condition) and all licensing correspondence referenced by the SERs; | ||
. In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d. 1. One set of hard | : b. All licensing correspondence associated with the comparison to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes; | ||
-copy documents for facility layout drawings which identify plant fire area delineation; areas protected by automatic fire suppression and detection; and locations of fire protection equipment. | : c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated licensing correspondence; | ||
: 2. Licensing Information | : d. For pre-1979 Plants, all licensing correspondence associated with those Sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with those fire protection features proposed or implemented by the licensee that have been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection features, which were accepted by the NRC staff in comprehensive fire protection SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and | ||
: a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs) applicable to fire protection (specifically including those SERs referenced by the plant fire protection license condition) and all licensing correspondence referenced by the SERs | : e. The final safety analysis report (FSAR) sections applicable to fire protection, FHA, and SSA in effect at the time of original licensing. | ||
2 Enclosure | |||
-0800), Section 9.5.1 or equivalent for licensing purposes | |||
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | |||
: d. For pre-1979 Plants, all licensing correspondence associated with those Sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with those fire protection features proposed or implemented by the licensee that have been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection features | : 3. Fire Protection Program: | ||
, which were accepted by the NRC staff in comprehensive fire protection SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); | : a. A listing of changes made to the FPP since the last triennial fire protection inspection; | ||
: b. For pre-1979 plants, a listing of the protection methodologies identified under 10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected fire zones/areas (to be determined during information gathering visit). That is, please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot separation along with detection and suppression; (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression; (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a strategy for each selected fire zone/area; | |||
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | |||
: a. A listing of changes made to the FPP since the last triennial fire protection inspection | |||
-hour rated fire barriers; (Section III.G.2.a), 20 foot separation along with detection and suppression; (Section III.G.2.b), 1 | |||
-hour rated fire barriers with detection and suppression; (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a strategy for each selected fire zone/area; | |||
: c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown evaluations); | : c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown evaluations); | ||
: d. A list of applicable codes and standards related to the design of plant fire protection features. The list should include National Fire Protection Association (NFPA) code versions committed to (i.e., the NFPA Codes of Record); and e. List of plant deviations from code commitments and associated evaluations. | : d. A list of applicable codes and standards related to the design of plant fire protection features. The list should include National Fire Protection Association (NFPA) code versions committed to (i.e., the NFPA Codes of Record); and | ||
: e. List of plant deviations from code commitments and associated evaluations. | |||
: 4. Facility Information: | : 4. Facility Information: | ||
: a. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for fires outside the control room, those components used for those areas requiring alternative shutdown capability, and systems relied upon for B.5.b mitigation strategies. These can be of the type that are used for training | : a. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for fires outside the control room, those components used for those areas requiring alternative shutdown capability, and systems relied upon for B.5.b mitigation strategies. These can be of the type that are used for training; | ||
: b. One-line schematic drawings of the electrical distribution system for 4160 Volts alternating current (Vac) down to 480Vac; | |||
: c. One-line schematic drawings of the electrical distribution system for 250 Volts direct current (Vdc) and 125Vdc systems as applicable; | |||
: d. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown; and | : d. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown; and | ||
: e. Safe shutdown cable routing database (requested electronically | : e. Safe shutdown cable routing database (requested electronically, such as on compact disc, if available). | ||
, such as on compact disc, if available | : 5. Operations Response for Fire Protection: | ||
). 5. Operations Response for Fire Protection | : a. Pre-fire plans for selected fire zones/areas (to be determined during information gathering visit); | ||
: a. Pre-fire plans for selected fire zones/areas (to be determined during information gathering visit | : b. Plant operating procedures which specify the initial operations response to a fire alarm or annunciator; and 1 Enclosure | ||
); b. Plant operating procedures which specify the initial operations response to a fire alarm or annunciator; and FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | |||
-site assistance. | FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | ||
: 6. Corrective Actions | : c. Procedure for calling out the fire brigade and requesting off-site assistance. | ||
: a. Listing of open and closed fire protection condition reports (i.e., problem identification forms and their resolution reports) since the date of the last Triennial Fire Protection Inspection | : 6. Corrective Actions: | ||
; and | : a. Listing of open and closed fire protection condition reports (i.e., problem identification forms and their resolution reports) since the date of the last Triennial Fire Protection Inspection; and | ||
: b. List of current fire impairments, including duration. | |||
: a. A listing of abbreviations and/or designators for plant systems | : 7. General Information: | ||
: a. A listing of abbreviations and/or designators for plant systems; | |||
: b. Organization charts of site personnel down to the level of fire protection staff personnel; and | |||
: c. A phone list for onsite licensee personnel. | : c. A phone list for onsite licensee personnel. | ||
: 8. B.5.b Mitigating Strategies | : 8. B.5.b Mitigating Strategies: | ||
: a. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2); | : a. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2); | ||
: b. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. | : b. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.; | ||
These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc. | : c. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy; | ||
-12 and the site | |||
-specific procedures or guidelines | |||
: d. A listing of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies; | : d. A listing of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies; | ||
: e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) | : e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) | ||
required to be used to implement the mitigation strategies; | required to be used to implement the mitigation strategies; | ||
: f. A list of B.5.b mitigating strategies, if any, which have implementing details that differ from that documented in the submittals and the safety evaluation report; | : f. A list of B.5.b mitigating strategies, if any, which have implementing details that differ from that documented in the submittals and the safety evaluation report; | ||
: g. Copies of Memoranda of Understanding (MOUs) | : g. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies; and | ||
: h. A list of changes made to B.5.b mitigating strategies and associated procedures since the previous NRC inspection of B.5.b mitigating strategies (December 2010). | : h. A list of changes made to B.5.b mitigating strategies and associated procedures since the previous NRC inspection of B.5.b mitigating strategies (December 2010). | ||
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | 2 Enclosure | ||
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | |||
: 9. Onsite Discussions: | |||
In addition, during the information gathering visit, it is requested that licensee staff be available for the following: | |||
: a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology; | : a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology; | ||
: b. Informal discussion on the | : b. Informal discussion on the plants safe shutdown cable routing database and the plant-wide cable routing database, as applicable; and | ||
: c. A tour of alternative shutdown and risk significant fire areas. | |||
: d. A discussion of scheduling of fire drills which may occur during the inspection so that the inspectors may be able to observe a fire drill, if possible. | |||
III. Information Requested to be Available on First Day of the Second ONSITE Inspection Week (DECEMBER 2, 2013) | |||
It is requested that | The following information is requested to be provided on the first day of inspection. It is requested that this information be provided on three sets of CDs (searchable, if possible). | ||
: 1. Program Procedures: | : 1. Program Procedures: | ||
: a. Procedures for: | : a. Procedures for: | ||
: i. Administrative controls (such as allowed out of service times and compensatory measures) for fire protection systems and components ii. Control of transient combustibles iii. Control of hot work | : i. Administrative controls (such as allowed out of service times and compensatory measures) for fire protection systems and components ii. Control of transient combustibles iii. Control of hot work | ||
: b. List of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps, and suppression systems; and c. List of maintenance procedures which routinely verify fuse breaker coordination in accordance with the post | : b. List of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps, and suppression systems; and | ||
-fire safe shutdown coordination analysis. | : c. List of maintenance procedures which routinely verify fuse breaker coordination in accordance with the post-fire safe shutdown coordination analysis. | ||
: 2. Design and Equipment Information: | : 2. Design and Equipment Information: | ||
: a. Coordination calculations and/or justifications that verify fuse/breaker coordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train; | : a. Coordination calculations and/or justifications that verify fuse/breaker coordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train; | ||
: b. Copies of significant fire protection and post | : b. Copies of significant fire protection and post-fire safe shutdown related design change package descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations; 3 Enclosure | ||
-fire safe shutdown related design change package descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations; | |||
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | FIRE PROTECTION INSPECTION DOCUMENT REQUESTS | ||
-operational testing, if applicable, for selected fire zones/areas (to be determined during information gathering visit | : c. Gaseous suppression system pre-operational testing, if applicable, for selected fire zones/areas (to be determined during information gathering visit); | ||
); d. Hydraulic calculations and supporting test data which demonstrate operability for water suppression systems, if applicable, for selected fire zones/areas (to be determined during information gathering visit | : d. Hydraulic calculations and supporting test data which demonstrate operability for water suppression systems, if applicable, for selected fire zones/areas (to be determined during information gathering visit); | ||
); e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac electrical | : e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac electrical systems; and | ||
: 3. Assessment and Corrective Actions | : f. List of all fire protection or Appendix R calculations. | ||
: 3. Assessment and Corrective Actions: | |||
-assessments. | The three most recent fire protection Quality Assurance (QA) audits and/or fire protection self-assessments. | ||
: 4. Any updates to information previously provided. | : 4. Any updates to information previously provided. | ||
IV. Information Requested to Be Provided Throughout the Inspection | IV. Information Requested to Be Provided Throughout the Inspection | ||
: 1. Copies of any corrective action documents generated as a result of the inspection | : 1. Copies of any corrective action documents generated as a result of the inspection teams questions or queries during this inspection. | ||
: 2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member). | : 2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member). | ||
If you have questions regarding the information requested, please contact the lead inspector. | If you have questions regarding the information requested, please contact the lead inspector. | ||
M. Pacilio divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to the lead inspector via mail or electronically no later than (November 4, 2013). The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit (November 18, 2013). The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week (December 2, 2013). The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. | 4 Enclosure | ||
The lead inspector for this inspection is Mr. Ronald A. Langstaff. We understand that our regulatory contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829 | |||
-9747 or via e | M. Pacilio divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to the lead inspector via mail or electronically no later than (November 4, 2013). The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit (November 18, 2013). The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week (December 2, 2013). The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. | ||
-mail at Ronald.Langstaff@nrc.gov | The lead inspector for this inspection is Mr. Ronald A. Langstaff. We understand that our regulatory contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov. | ||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | |||
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | Sincerely, | ||
/RA/ | |||
-454; 50-455 License Nos. NPF | Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 | ||
-37; NPF-66 | |||
==Enclosure:== | ==Enclosure:== | ||
Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ' DISTRIBUTION: | |||
See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 9 13 Byron Fire Protection RFI RAL.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RLangstaff:ls RDaley DATE 9/12/13 9/13/13 OFFICIAL RECORD COPY | |||
Letter to Mr. Michael J. Pacilio from Mr. Robert C. Daley dated September 13, 2013. | |||
==SUBJECT:== | ==SUBJECT:== | ||
BYRON STATION | BYRON STATION - NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000454/2013008; 05000455/2013008 DISTRIBUTION: | ||
- NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000454 | Daniel Rich RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak Patricia Buckley}} | ||
/2013008; 05000455/2013008 DISTRIBUTION | |||
-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak Patricia Buckley}} |
Latest revision as of 13:29, 4 November 2019
ML13256A423 | |
Person / Time | |
---|---|
Site: | Byron |
Issue date: | 09/13/2013 |
From: | Robert Daley Engineering Branch 3 |
To: | Pacilio M Exelon Generation Co, Exelon Nuclear |
Ronald Langstaff | |
References | |
IR-13-008 | |
Download: ML13256A423 (10) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 13, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON STATION - NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000454/2013008; 05000455/2013008
Dear Mr. Pacilio:
On November 18, 2013, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial Fire Protection Baseline Inspection at your Bryon Station. This inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs Baseline Fire Protection Inspection Procedure.
Changes were made to the IP 71111.05T which now requires the fire protection inspection to review your actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. This requirement was implemented by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements of 10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b requirements review will be performed during the first onsite week of the inspection starting on November 18, 2013.
The schedule for the onsite inspection activity is as follows:
Information Gathering Visit: November 18 - 20, 2013; B.5.b Requirements: November 20 - 22, 2013; and Fire Protection Inspection: December 2 - 13, 2013.
The purpose of the information gathering visit is: (1) to obtain information and documentation needed to support the inspection; (2) to become familiar with the Byron Station Fire Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.
Experience has shown that the baseline fire protection inspections are extremely resource intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been
M. Pacilio divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to the lead inspector via mail or electronically no later than (November 4, 2013). The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit (November 18, 2013). The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week (December 2, 2013). The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Mr. Ronald A. Langstaff. We understand that our regulatory contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosure:
Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ'
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS Inspection Report: 05000454/2013008; 05000455/2013008 Onsite Inspection Dates: November 18 - 20, 2013 (Information Gathering Visit)
November 20 - 22, 2013 (B.5.b Requirements)
December 2 - 13, 2013 (Fire Protection Inspection)
Inspection Procedures: IP71111.05T, Fire Protection (Triennial)
IP71152, "Identification and Resolution of Problems" Inspectors: Ronald A. Langstaff, Senior Reactor Inspector, lead (630) 829-9747 Ronald.Langstaff@nrc.gov Mohammad Munir, Reactor Inspector (630) 829-9797 Mohmmad.Munir@nrc.gov Robert A. Winter, Reactor Engineer (630) 829-9758 Robert.Winter@nrc.gov I. Information Requested Prior To the Information Gathering Visit The following information is requested by November 4, 2013. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to Ronald A. Langstaff (e-mail address Ronald.Langstaff@nrc.gov).
Electronic media is preferred. The preferred file format is a searchable pdf file on a compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible. Please provide three copies of each CD submitted (one for each inspector).
- 1. The most risk significant fire areas as determined by probabilistic risk analyses, if available. Otherwise, the reactor plant's Individual Plant Examination for External Events (IPEEE) for fire and results of any post-IPEEE reviews for fire.
- 2. A copy of the current version of the Fire Protection Program (FPP), fire hazards analysis (FHA), safe shutdown analysis (SSA), updated safety analysis report (USAR),
Technical Specifications, license (including the fire protection license condition), and Technical Requirements Manual (TRM) or equivalent for fire protection structures, systems, and components.
- 3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which 10 CFR Part 50, Appendix R, Section III G requirements are satisfied under Section III.G.3), or where both safe shutdown trains can be affected.
1 Enclosure
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
- 4. Plant operating procedures which would be used and describe shutdown for a postulated fire (for both areas requiring alternative shutdown and areas which do not require alternative shutdown). Only those procedures with actions specific to shutdown in the event of a fire need be included. In addition, please include those procedures which operators would use for initial response to a fire, such as annunciator or alarm response procedures, the procedure used for activating the fire brigade, and the procedure which directs operators to the applicable safe shutdown procedure.
II. Information Requested During the Information Gathering Visit (November 18, 2013)
The following information is requested to be provided to the inspection team during the onsite information gathering visit. Except for Item 8, it is requested that the following information be provided on three sets of CDs (searchable, if possible) with the B.5.b Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD. In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.
- 1. One set of hard-copy documents for facility layout drawings which identify plant fire area delineation; areas protected by automatic fire suppression and detection; and locations of fire protection equipment.
- 2. Licensing Information:
- a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs) applicable to fire protection (specifically including those SERs referenced by the plant fire protection license condition) and all licensing correspondence referenced by the SERs;
- b. All licensing correspondence associated with the comparison to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;
- c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated licensing correspondence;
- d. For pre-1979 Plants, all licensing correspondence associated with those Sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with those fire protection features proposed or implemented by the licensee that have been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection features, which were accepted by the NRC staff in comprehensive fire protection SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and
- e. The final safety analysis report (FSAR) sections applicable to fire protection, FHA, and SSA in effect at the time of original licensing.
2 Enclosure
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
- 3. Fire Protection Program:
- a. A listing of changes made to the FPP since the last triennial fire protection inspection;
- b. For pre-1979 plants, a listing of the protection methodologies identified under 10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected fire zones/areas (to be determined during information gathering visit). That is, please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot separation along with detection and suppression; (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression; (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a strategy for each selected fire zone/area;
- c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown evaluations);
- d. A list of applicable codes and standards related to the design of plant fire protection features. The list should include National Fire Protection Association (NFPA) code versions committed to (i.e., the NFPA Codes of Record); and
- e. List of plant deviations from code commitments and associated evaluations.
- 4. Facility Information:
- a. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for fires outside the control room, those components used for those areas requiring alternative shutdown capability, and systems relied upon for B.5.b mitigation strategies. These can be of the type that are used for training;
- b. One-line schematic drawings of the electrical distribution system for 4160 Volts alternating current (Vac) down to 480Vac;
- c. One-line schematic drawings of the electrical distribution system for 250 Volts direct current (Vdc) and 125Vdc systems as applicable;
- d. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown; and
- e. Safe shutdown cable routing database (requested electronically, such as on compact disc, if available).
- 5. Operations Response for Fire Protection:
- a. Pre-fire plans for selected fire zones/areas (to be determined during information gathering visit);
- b. Plant operating procedures which specify the initial operations response to a fire alarm or annunciator; and 1 Enclosure
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
- c. Procedure for calling out the fire brigade and requesting off-site assistance.
- 6. Corrective Actions:
- a. Listing of open and closed fire protection condition reports (i.e., problem identification forms and their resolution reports) since the date of the last Triennial Fire Protection Inspection; and
- b. List of current fire impairments, including duration.
- 7. General Information:
- a. A listing of abbreviations and/or designators for plant systems;
- b. Organization charts of site personnel down to the level of fire protection staff personnel; and
- c. A phone list for onsite licensee personnel.
- 8. B.5.b Mitigating Strategies:
- a. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2);
- b. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.;
- c. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy;
- d. A listing of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies;
- e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.)
required to be used to implement the mitigation strategies;
- f. A list of B.5.b mitigating strategies, if any, which have implementing details that differ from that documented in the submittals and the safety evaluation report;
- g. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies; and
- h. A list of changes made to B.5.b mitigating strategies and associated procedures since the previous NRC inspection of B.5.b mitigating strategies (December 2010).
2 Enclosure
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
- 9. Onsite Discussions:
In addition, during the information gathering visit, it is requested that licensee staff be available for the following:
- a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology;
- b. Informal discussion on the plants safe shutdown cable routing database and the plant-wide cable routing database, as applicable; and
- c. A tour of alternative shutdown and risk significant fire areas.
- d. A discussion of scheduling of fire drills which may occur during the inspection so that the inspectors may be able to observe a fire drill, if possible.
III. Information Requested to be Available on First Day of the Second ONSITE Inspection Week (DECEMBER 2, 2013)
The following information is requested to be provided on the first day of inspection. It is requested that this information be provided on three sets of CDs (searchable, if possible).
- 1. Program Procedures:
- a. Procedures for:
- i. Administrative controls (such as allowed out of service times and compensatory measures) for fire protection systems and components ii. Control of transient combustibles iii. Control of hot work
- b. List of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps, and suppression systems; and
- c. List of maintenance procedures which routinely verify fuse breaker coordination in accordance with the post-fire safe shutdown coordination analysis.
- 2. Design and Equipment Information:
- a. Coordination calculations and/or justifications that verify fuse/breaker coordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train;
- b. Copies of significant fire protection and post-fire safe shutdown related design change package descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations; 3 Enclosure
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
- c. Gaseous suppression system pre-operational testing, if applicable, for selected fire zones/areas (to be determined during information gathering visit);
- d. Hydraulic calculations and supporting test data which demonstrate operability for water suppression systems, if applicable, for selected fire zones/areas (to be determined during information gathering visit);
- e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac electrical systems; and
- f. List of all fire protection or Appendix R calculations.
- 3. Assessment and Corrective Actions:
The three most recent fire protection Quality Assurance (QA) audits and/or fire protection self-assessments.
- 4. Any updates to information previously provided.
IV. Information Requested to Be Provided Throughout the Inspection
- 1. Copies of any corrective action documents generated as a result of the inspection teams questions or queries during this inspection.
- 2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).
If you have questions regarding the information requested, please contact the lead inspector.
4 Enclosure
M. Pacilio divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to the lead inspector via mail or electronically no later than (November 4, 2013). The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit (November 18, 2013). The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week (December 2, 2013). The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Mr. Ronald A. Langstaff. We understand that our regulatory contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9747 or via e-mail at Ronald.Langstaff@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosure:
Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ' DISTRIBUTION:
See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 9 13 Byron Fire Protection RFI RAL.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RLangstaff:ls RDaley DATE 9/12/13 9/13/13 OFFICIAL RECORD COPY
Letter to Mr. Michael J. Pacilio from Mr. Robert C. Daley dated September 13, 2013.
SUBJECT:
BYRON STATION - NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000454/2013008; 05000455/2013008 DISTRIBUTION:
Daniel Rich RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak Patricia Buckley