Line 2: Line 2:
| number = ML16007A772
| number = ML16007A772
| issue date = 01/06/2016
| issue date = 01/06/2016
| title = Callaway Plant - NRC Emergency Preparedness Annual Inspection Report 05000483/2015501
| title = NRC Emergency Preparedness Annual Inspection Report 05000483/2015501
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Diya F
| addressee name = Diya F
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES ary 6, 2016
[[Issue date::January 6, 2016]]


Mr. Fadi Diya, Senior Vice President
==SUBJECT:==
 
CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2015501
and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
 
SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2015501


==Dear Mr. Diya:==
==Dear Mr. Diya:==
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000483/2015501. The inspection results associated with the 2015-501 reports are documented in Integrated Resident Inspection Reports 2015-001, 2015-002, 2015-003,  
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000483/2015501. The inspection results associated with the 2015-501 reports are documented in Integrated Resident Inspection Reports 2015-001, 2015-002, 2015-003, and 2015-004.
 
and 2015-004.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety


Docket No. 50-483 License No. NPF-30  
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 cc: Electronic Distribution


cc: Electronic Distribution ML16007A772 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 Letter to Fadi Diya from Mark S. Haire, dated January 6, 2016
ML16007A772 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/
DATE 12/14/15 1/6/16


SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2015501  
Letter to Fadi Diya from Mark S. Haire, dated January 6, 2016 SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2015501 DISTRIBUTION:
 
Regional Administrator (Marc.Dapas@nrc.gov)
DISTRIBUTION
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Shawn.Money@nrc.gov)
Project Engineer, DRP/B (Shawn.Money@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
CWY Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (John.Klos@nrc.gov)
CWY Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)
 
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
}}
}}

Latest revision as of 03:23, 31 October 2019

NRC Emergency Preparedness Annual Inspection Report 05000483/2015501
ML16007A772
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/06/2016
From: Mark Haire
Plant Support Branch-1
To: Diya F
Union Electric Co
References
IR 2015501
Download: ML16007A772 (3)


Text

UNITED STATES ary 6, 2016

SUBJECT:

CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2015501

Dear Mr. Diya:

On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000483/2015501. The inspection results associated with the 2015-501 reports are documented in Integrated Resident Inspection Reports 2015-001, 2015-002, 2015-003, and 2015-004.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 cc: Electronic Distribution

ML16007A772 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/

DATE 12/14/15 1/6/16

Letter to Fadi Diya from Mark S. Haire, dated January 6, 2016 SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2015501 DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Shawn.Money@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)