ML17205A112: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/23/2017
| issue date = 05/23/2017
| title = 2017 Point Beach Nuclear Plant Initial License Examination Form Es 301-3
| title = 2017 Point Beach Nuclear Plant Initial License Examination Form Es 301-3
| author name = Seymour J L
| author name = Seymour J
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301OperatingTest Quality ChecklistForm ES-301-3Facilitv: PBNPDate of Examination: Mav B - 19,2017Test Number: 2017L General Criterialnitialsab.c#a.ThesamoperatingtestconformswiththeprevrouslyapprovedoutlinchangesareconSIstentwithuirements10cFRmdistributl4f\-{/b.There is no day{o-day repetition between this and other operating tests to be administereddurithis examination/rrThetest shall noticate items from theauditSection D.1.a.cálfr9/dOverlap with the written examination and between different parts of the operating test is withinlimits4TLre.It appears that the operating test will differentiate between competent and less-than-competentaicants at thenated license levelf\-r2. Walk-Throh Criteriaa.Each JPM includes the following, as applicable:initial conditionsinitiating cuesreferences and tools, including associated proceduresreasonable and validated time limits (average time allowed for completion) and specificdesignation if deemed to be time-critical by the facilty licenseeoperationally imporlant specific performance criteria that include:detailed expected actions wth exact criteria and nomenclaturesystem response and other examiner cuesstatements describing important observations to be made by the applicantcriteria for successful completion of the taskidentification of critical steps and their associated performance standardsrestrictions on the sequence of steps, if applicable,/-/b.Ensure that any changes from the previously approved systems and administrative walk{hroughoutlines (Forms ES-301-1 and2) have not caused the test to deviatecriteria (e.9., item distribution, bank use, repetition from the last 2from any ofthe acceptancenations) specifiedNonforms and Form ES-201-2./TL//3. Simulator CriteriaThe assocated simulator operating tests (scenario sets) have beenin accordance wth Form ES-301-4 and ais attached.4rLre / SignDate,t/zx/t ta. Authorb. Facility Reviewe(.)c. NRC Chief Examiner (#)üs\d. NRC Supervisor ,r*\.r"rTJ¿sçco4rs/tl').\-\¿ ) tlNOTE: . The faclity signature is not applicable for NRC-developed tests# lndependentNRC reviewer initial items in Column "c"chief examner concurrencered.}}
{{#Wiki_filter:ES-301                                            Operating Test Quality Checklist                                          Form ES-301-3 Facilitv: PBNP                                                Date of Examination: M av B - 19,2017                Test Number: 2017 lnitials L  General Criteria a      b.     c#
: a.           The ope rating test conforms with the prevrous ly a pproved outlin sam              uirements          1 0 cFR                      m changes are con SI stent with distri butl      4 f\- {/
: b.           There is no day{o-day repetition between this and other operating tests to be administered duri    this examination
                                                                                                                              / r r test shall not      icate items from the            audit              Section D.1.a.     ál fr            9/
r c            The d            Overlap with the written examination and between different parts of the operating test is within limits 4      TL
: e.           It appears that the operating test will differentiate between competent and less-than-competent a    icants at the          nated license level f\-     r
: 2. Walk-Thro      h Criteria
: a.           Each JPM includes the following, as applicable:
initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facilty licensee operationally imporlant specific performance criteria that include:
detailed expected actions wth exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable
                                                                                                                              ,/ -         /
: b.           Ensure that any changes from the previously approved systems and administrative walk{hrough outlines (Forms ES-301-1 and2) have not caused the test to deviate from any of the acceptance criteria (e.9., item distribution, bank use, repetition from the last 2 N              nations) specified on          forms and Form ES-201-2
                                                                                                                              ./ TL //
4 rL r
: 3. Simulator Criteria The assocated simulator operating tests (scenario sets) have been                        in accordance wth Form ES-301-4 and a            is attached.
e / Sign                                            Date
: a. Author                                                                                                          ,t/zx/t t
: b. Facility Reviewe(.)                 T
: c. NRC Chief Examiner (#)             J¿sçc                o4r                                                      s/t    l')
                              üs\
: d. NRC   Supervisor
                              ,r*\.r"r
                                                .\-\                                                                 ¿     ) tl NOTE:     . The faclity signature is not applicable for NRC-developed tests
        # lndependent NRC reviewer initial items in Column "c" chief examner concurrence                    red.}}

Latest revision as of 00:51, 30 October 2019

2017 Point Beach Nuclear Plant Initial License Examination Form Es 301-3
ML17205A112
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/23/2017
From: Jesse Seymour
Operations Branch III
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML16319A344 List:
References
Download: ML17205A112 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: PBNP Date of Examination: M av B - 19,2017 Test Number: 2017 lnitials L General Criteria a b. c#

a. The ope rating test conforms with the prevrous ly a pproved outlin sam uirements 1 0 cFR m changes are con SI stent with distri butl 4 f\- {/
b. There is no day{o-day repetition between this and other operating tests to be administered duri this examination

/ r r test shall not icate items from the audit Section D.1.a. ál fr 9/

r c The d Overlap with the written examination and between different parts of the operating test is within limits 4 TL

e. It appears that the operating test will differentiate between competent and less-than-competent a icants at the nated license level f\- r
2. Walk-Thro h Criteria
a. Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facilty licensee operationally imporlant specific performance criteria that include:

detailed expected actions wth exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable

,/ - /

b. Ensure that any changes from the previously approved systems and administrative walk{hrough outlines (Forms ES-301-1 and2) have not caused the test to deviate from any of the acceptance criteria (e.9., item distribution, bank use, repetition from the last 2 N nations) specified on forms and Form ES-201-2

./ TL //

4 rL r

3. Simulator Criteria The assocated simulator operating tests (scenario sets) have been in accordance wth Form ES-301-4 and a is attached.

e / Sign Date

a. Author ,t/zx/t t
b. Facility Reviewe(.) T
c. NRC Chief Examiner (#) J¿sçc o4r s/t l')

üs\

d. NRC Supervisor

,r*\.r"r

.\-\ ¿ ) tl NOTE: . The faclity signature is not applicable for NRC-developed tests

  1. lndependent NRC reviewer initial items in Column "c" chief examner concurrence red.