{{#Wiki_filter:REGULATOR NFORMATION DISTRIB'AGCY''<SION NBR: 8210150431 DOC, DATE;82/10/08 FACIL:50-389 St, Lucia P lant'niit 2, Florida AUTH~NAME AUTHOR AFFILIATION BLODGETT~T.HE Ebasco Services<Inc.(sub'HCIP~NAME RECIPIENT'AFFILIATION EISENHUT~D,G
{{#Wiki_filter:REGULATOR     NFORMATION DISTRIB UT ION                            EM  (R IDS)
~Division of Licensing  
'AGCY''<SION NBR: 8210150431       DOC, DATE; 82/10/08           NOTARIZED: NO                          DOCKET FACIL:50-389 St, Lucia       P lant'niit   2, Florida           Power L Light Co ~                      05000389 AUTH ~ NAME           AUTHOR   AFFILIATION BLODGETT~T.HE         Ebasco Services< Inc.                     of Enserch Corp,)
          ~ NAME         RECIPIENT 'AFFILIATION (sub'HCIP EISENHUT~D,G ~       Division of Licensing


==SUBJECT:==
==SUBJECT:==
For wards weekly status summary of Jo engineering verification program for DISTRIBUTION CODE: B001S COPIES RECEI>ED;LTR TITLE: Licensing Submittal:
For wards weekly status summary of             Jo int  Ebasco              L  C    E engineering verification program for 8?.1004"08                            ~
PSAR/FSAR Amdts 8 NOTES: UT ION EM (R IDS)NOTARIZED:
DISTRIBUTION CODE: B001S         COPIES RECEI>ED;LTR TITLE: Licensing Submittal: PSAR/FSAR Amdts                   8
NO Power L Light Co~of Enserch Corp,)int Ebasco L C E 8?.1004"08
                                                                    / ENCL             JSIZE:
~/ENCL JSIZE: Rel*ated Correspondence DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR 03 LA INTERKAL: ELD/HDS2 ,IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DS I/ETSB 12 NRR/DS I/PSB 19 23 G 04 RM/DDAMI/MIB EXTERNAL;ACRS 41 DMB/DSS (AMDTS)LPDR 05 NSIC 05 COPIES LTTR ENCL 1 0 1, 0 1 0 1 1 0 3 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 6 6 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LIC BR P3'BC NERSESrV~01 IE FILE IE/DEP/EPLB 36 NRR/DF/CEB 11 NRR/DE/GB'8 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SES
Rel*ated Correspondence NOTES:
'5 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DSI/CSB 09 NRR/DS I/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 BNL(AMDTS ONLY)'EMA<<REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 0 1 1 1',3 3 1 1 2'1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2?1 1 1.TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 ENCL 49 I Itth$f hll<<h'w<<ffh I'h h y h Iti hc)tip 1EI4IH)II ll ti f'fh>>E E f hl tt IC f Nt, p I t!$CI h<<<<I I','l h C, E<<II r I<<'E J'><<Itt<<,J, Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N.Y.10048 October 8,1982 Ltr No.EVP-119/SL-2 Office of Nuclear Reactor Regulation Attention:
RECIPIENT          COPIES                  RECIPIENT                         COPIES ID CODE/NAME         LTTR ENCL              ID CODE/NAME                      LTTR ENCL A/D LICENSNG             1    0    LIC          BR P3 'BC                                0 LIC BR 03 LA             1,    0    NERSESrV ~                          01          1      1 INTERKAL: ELD/HDS2                     1    0    IE FILE                                        1'
Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D.C.20555  
              ,IE/DEP EPDS   35                   IE/DEP/EPLB                        36
                                                                                '8 1    1                                                    ,3      3 NRR/DE/AEAB                   0    NRR/DF/CEB                          11          1      1 NRR/DE/EQB                           NRR/DE/GB                                      2    '
13             3 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB NRR/DHFS/HFEB40 24 2
1 1
1 2
1 1
1 NRR/DE/MEB NRR/DE/QAB NRR/DE/SES NRR/DHFS/LQB 32
                                                                              '5     18 21 1
1 1
1 1
1 1
1 NRR/DHFS/OLB 34          1    1    NRR/DHFS/PTRB20                                 1      1 NRR/DS I/AEB 26          1    1    NRR/DS I/ASB 27                                 1      1 NRR/DSI/CP8 10          1    1    NRR/DSI/CSB 09                                 1      1 NRR/DS I/ETSB 12        1          NRR/DS I/ICSB 16                               1      1 NRR/DS I/PSB    19      1    1    NRR/DS I/RAB 22                                 1      1 23      1    1    NRR/DST/LGB 33                                 1      1 G            04      1    1    RGN2                                           2      ?
RM/DDAMI/MIB            1    0 EXTERNAL; ACRS                41      6    6    BNL(AMDTS DMB/DSS (AMDTS)                                          DIV 39 ONLY)'EMA<<REP 1     1                                                           1 LPDR            05      1     1     NRC PDR                            02                1 NSIC            05      1     1     NTIS                                                  1.
TOTAL NUMBER OF COPIES       REQUIRED: LTTR     55           ENCL               49
 
                                                                          >>E I Itth $
f   hll <<h'w         << ffh I
                                          'h h y   h   Iti   hc) tip 1EI4IH     )II   ll ti f 'fh f
I hl tt           IC t!
                                                                        $
f                    CI h
E Nt, p
  <<<<I I','   l   h   C, E
                                <<II r I<<
                                            'E J   '> <<Itt   <<,J,
 
Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N. Y. 10048 October 8,1982 Ltr No. EVP-119/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555


==Dear Mr Eisenhut:==
==Dear Mr Eisenhut:==
Re: ST.LUCIE UNIT NO.2 DOCKET NO.50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS  
 
Re:                       ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS  


==SUMMARY==
==SUMMARY==
FOR PERIOD OCTOBER 4-OCTOBER 8 1982 Attached for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period October 4 through October 8,1982.Very truly yours, Mi'8 T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 8210150431 821008 PDR PDR ADOCK 0500038'P s
FOR PERIOD OCTOBER 4- OCTOBER 8   1982 Attached     for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period October   4   through October 8,1982.
ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS SKlMARY FOR PERIOD OCTOBER 4-OCTOBER 8,1982 l.Independent design packages for the following items were completed during the period: a.HEPA Filter.for the ECCS Area Ventilation System (Verification Item 8)b.Area Radiation Monitor GM-26-22 (Verification Item 5)c.Tornado Missile Shield Door RA-109 (Verification Item 6)Copies were transmitted/distributed to members of the Review Committee for review of packages for completeness,-Items 8 and 5 via Federal Express on October 4,and Item 6 by hand on October 6.Committee approval to release these existing designs for ETF comparison is anticipated by October 13.2.A request for additional existing design documents for the Hydrogen Recombiner (Item 4)was made on October 4.A portion has been transmitted from the Project Team to the ETF and the balance is being assembled for transmittal.
Very truly yours, Mi'8 T H Blodgett Joint Task Force Chairman THB/rob Attachment cc:     Robert   E Uhrig, FPL w/att D   L Christian, FPL w/att 821008 8210150431 0500038'P PDR ADOCK          PDR
3.K Comparison of the independent and existing designs continued for the Hydrogen Recombiner.
 
-4..Comparison of independent and existing designs for the Control Room Emergency Cleanup System Valve (Item 3)commenced following receipt of the first existing design documents from the Project Team.Receipt of the balance is expected early next period, including one additionally requested drawing.5.A response was received re two requested, design input items per ETF letter EVP-306/SL-2 of September 2.This is related to preparation of the.independent design package for Verification Item 7,'ain Steam-Isolation Valve.The completed design package is now scheduled for transmittal to Review Committee members on October'l.
s ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS SKlMARY FOR PERIOD OCTOBER 4-OCTOBER 8,1982
for package completeness review.6.A meeting of the FPL,C-E and Ebasco EVP Task Force Managers.was held October 6 in Juno Beach, Florida to review program progress.'.
: l.     Independent design packages     for the following items were completed during the period:
~On October 7, the Task Force Managers were at the,S't.Lucie jobsite t'o continu planning for the field installation verification phase of t: he program.1  
: a. HEPA Filter .for the ECCS Area Ventilation System (Verification Item 8)
: b. Area Radiation Monitor GM-26-22 (Verification Item 5)
: c. Tornado Missile Shield Door RA-109 (Verification Item 6)
Copies were transmitted/distributed to members of the Review Committee for review of packages for completeness,       Items 8 and 5 via Federal Express on October 4, and Item 6 by hand on October 6.
Committee approval to release these existing designs for ETF comparison is anticipated by October 13.
: 2. A   request for additional existing design documents for the Hydrogen Recombiner (Item 4) was made on October 4. A portion has been transmitted from the Project Team to the ETF and the balance is being assembled for transmittal.
existing designs continued for the K
: 3.     Comparison of the independent     and Hydrogen Recombiner.
-4.   . Comparison of independent and existing designs for the Control Room Emergency Cleanup System Valve (Item 3) commenced following receipt of the   first existing design documents from the Project Team. Receipt of the balance is expected early next period, including one additionally requested drawing.
: 5. A response   was received re two requested, design input items per ETF letter   EVP-306/SL-2 of September 2. This is related to preparation of the. independent design package for Verification Item 7,'ain Steam-Isolation Valve. The completed design package is now scheduled for transmittal to Review Committee members on October'l. for package completeness review.
: 6. A meeting   of the FPL,C-E and Ebasco EVP Task Force Managers. was held October 6 in Juno Beach, Florida to review program progress.'.
    ~ On October 7, the Task Force Managers were at the,S't. Lucie jobsite t'o continu planning for the field installation verification phase of t: he program.
1


ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS  
ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS  


==SUMMARY==
==SUMMARY==
OCTOBER 4-OCTOBER 8,1982 1.Portions of the existing design package for the Safety Injection Tank Isolation Valve (C-E Verification Item 2)have been received from the C-E Project Team.Comparison of the independent and existing designs has begun using a standard comparison form.Design comparison, planned for October 18 completion, is dependent on receipt of the balance of existing design information from the Ebasco Project Team by October 14.~2.The independent design package for the High Pressure Safety Injection Pump (C-E Verification Item 1)was completed and transmitted to Review Committee members on October 5.Release of the existing design package for'omparison is expected by October 11.3., On-site verification arrangements were discussed during an October 7 meeting of the Task Force Managers at the St.Lucie 2 construction site.
 
TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM-.SL2~~OF 10-4-82.DATE OF TELECON PARTICIPATING ORGANIZATIONS
OCTOBER 4-OCTOBER 8,1982
'GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD October 4 October 4 C-E/FPL/Ebasco/C-E Existing design info Program planning Transmittal via Fed.Exp.of Ind.Design Pkgs.to Review Committee;
: 1. Portions of the existing design package for the Safety Injection Tank Isolation Valve (C-E Verification Item 2) have been received from the C-E Project Team.
'Preparation for EVP Task Force Mgrs mtg.C-E EVP task Force Mgr Ebasco EVP Task Force Mgr October 4 FPL/Ebasco Response to September 2 request for MSIV design input Ebasco EVP.Task Force Mgr}}
Comparison of the independent and existing designs has begun using a standard comparison form. Design comparison, planned for October 18 completion, is dependent on receipt of the balance of existing design information from the Ebasco Project Team by October 14.
~
: 2. The independent   design package for the High Pressure Safety Injection Pump (C-E   Verification Item   1) was completed and transmitted to Review Committee members on October 5. Release     of the existing design package for is expected by October 11.                                       'omparison
: 3.   , On-site verification arrangements were discussed during an October 7 meeting of the Task Force Managers at the St. Lucie 2 construction site.
 
TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM -. SL2
                                                      ~~ OF   10-4-82.
DATE OF         PARTICIPATING           'GENERAL SUBJECT         PREPARER OF TELECON         ORGANIZATIONS              OF TELECON            TELECON RECORD October 4   C-E/FPL                 Existing design info        C-E EVP  task
                  /                 Program planning            Force Mgr October 4  Ebasco/C-E             Transmittal via Fed. Exp. Ebasco EVP Task of Ind. Design Pkgs.       Force Mgr to Review Committee;
                                    'Preparation for EVP Task Force Mgrs mtg.
October 4   FPL/Ebasco             Response to September 2   Ebasco EVP .Task request for MSIV design     Force Mgr input}}

Revision as of 23:23, 29 October 2019

Forwards Weekly Status Summary of Joint Ebasco & C-E Verification Program for 821004-08
ML17213A558
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/08/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-119-SL-2, NUDOCS 8210150431
Download: ML17213A558 (9)


Text

REGULATOR NFORMATION DISTRIB UT ION EM (R IDS)

'AGCY<SION NBR: 8210150431 DOC, DATE; 82/10/08 NOTARIZED: NO DOCKET FACIL:50-389 St, Lucia P lant'niit 2, Florida Power L Light Co ~ 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGETT~T.HE Ebasco Services< Inc. of Enserch Corp,)

~ NAME RECIPIENT 'AFFILIATION (sub'HCIP EISENHUT~D,G ~ Division of Licensing

SUBJECT:

For wards weekly status summary of Jo int Ebasco L C E engineering verification program for 8?.1004"08 ~

DISTRIBUTION CODE: B001S COPIES RECEI>ED;LTR TITLE: Licensing Submittal: PSAR/FSAR Amdts 8

/ ENCL JSIZE:

Rel*ated Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR P3 'BC 0 LIC BR 03 LA 1, 0 NERSESrV ~ 01 1 1 INTERKAL: ELD/HDS2 1 0 IE FILE 1'

,IE/DEP EPDS 35 IE/DEP/EPLB 36

'8 1 1 ,3 3 NRR/DE/AEAB 0 NRR/DF/CEB 11 1 1 NRR/DE/EQB NRR/DE/GB 2 '

13 3 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB NRR/DHFS/HFEB40 24 2

1 1

1 2

1 1

1 NRR/DE/MEB NRR/DE/QAB NRR/DE/SES NRR/DHFS/LQB 32

'5 18 21 1

1 1

1 1

1 1

1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DS I/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CP8 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DS I/ETSB 12 1 NRR/DS I/ICSB 16 1 1 NRR/DS I/PSB 19 1 1 NRR/DS I/RAB 22 1 1 23 1 1 NRR/DST/LGB 33 1 1 G 04 1 1 RGN2 2  ?

RM/DDAMI/MIB 1 0 EXTERNAL; ACRS 41 6 6 BNL(AMDTS DMB/DSS (AMDTS) DIV 39 ONLY)'EMA<<REP 1 1 1 LPDR 05 1 1 NRC PDR 02 1 NSIC 05 1 1 NTIS 1.

TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 ENCL 49

>>E I Itth $

f hll <<h'w << ffh I

'h h y h Iti hc) tip 1EI4IH )II ll ti f 'fh f

I hl tt IC t!

$

f CI h

E Nt, p

<<<<I I',' l h C, E

<<II r I<<

'E J '> <<Itt <<,J,

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N. Y. 10048 October 8,1982 Ltr No. EVP-119/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD OCTOBER 4- OCTOBER 8 1982 Attached for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period October 4 through October 8,1982.

Very truly yours, Mi'8 T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 821008 8210150431 0500038'P PDR ADOCK PDR

s ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS SKlMARY FOR PERIOD OCTOBER 4-OCTOBER 8,1982

l. Independent design packages for the following items were completed during the period:
a. HEPA Filter .for the ECCS Area Ventilation System (Verification Item 8)
b. Area Radiation Monitor GM-26-22 (Verification Item 5)
c. Tornado Missile Shield Door RA-109 (Verification Item 6)

Copies were transmitted/distributed to members of the Review Committee for review of packages for completeness, Items 8 and 5 via Federal Express on October 4, and Item 6 by hand on October 6.

Committee approval to release these existing designs for ETF comparison is anticipated by October 13.

2. A request for additional existing design documents for the Hydrogen Recombiner (Item 4) was made on October 4. A portion has been transmitted from the Project Team to the ETF and the balance is being assembled for transmittal.

existing designs continued for the K

3. Comparison of the independent and Hydrogen Recombiner.

-4. . Comparison of independent and existing designs for the Control Room Emergency Cleanup System Valve (Item 3) commenced following receipt of the first existing design documents from the Project Team. Receipt of the balance is expected early next period, including one additionally requested drawing.

5. A response was received re two requested, design input items per ETF letter EVP-306/SL-2 of September 2. This is related to preparation of the. independent design package for Verification Item 7,'ain Steam-Isolation Valve. The completed design package is now scheduled for transmittal to Review Committee members on October'l. for package completeness review.
6. A meeting of the FPL,C-E and Ebasco EVP Task Force Managers. was held October 6 in Juno Beach, Florida to review program progress.'.

~ On October 7, the Task Force Managers were at the,S't. Lucie jobsite t'o continu planning for the field installation verification phase of t: he program.

1

ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS

SUMMARY

OCTOBER 4-OCTOBER 8,1982

1. Portions of the existing design package for the Safety Injection Tank Isolation Valve (C-E Verification Item 2) have been received from the C-E Project Team.

Comparison of the independent and existing designs has begun using a standard comparison form. Design comparison, planned for October 18 completion, is dependent on receipt of the balance of existing design information from the Ebasco Project Team by October 14.

~

2. The independent design package for the High Pressure Safety Injection Pump (C-E Verification Item 1) was completed and transmitted to Review Committee members on October 5. Release of the existing design package for is expected by October 11. 'omparison
3. , On-site verification arrangements were discussed during an October 7 meeting of the Task Force Managers at the St. Lucie 2 construction site.

TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM -. SL2

~~ OF 10-4-82.

DATE OF PARTICIPATING 'GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD October 4 C-E/FPL Existing design info C-E EVP task

/ Program planning Force Mgr October 4 Ebasco/C-E Transmittal via Fed. Exp. Ebasco EVP Task of Ind. Design Pkgs. Force Mgr to Review Committee;

'Preparation for EVP Task Force Mgrs mtg.

October 4 FPL/Ebasco Response to September 2 Ebasco EVP .Task request for MSIV design Force Mgr input