IR 05000346/2017405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES ugust 17, 2017
[[Issue date::August 17, 2017]]


Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Co. Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop ADB3080 Oak Harbor, OH 434499760 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2017405
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2017405


==Dear Mr. Bezilla:==
==Dear Mr. Bezilla:==
On July 13, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Davis-Besse Nuclear Power Station, and the NRC inspector discussed the results of this inspection with Mr. L. Willis and other members of your staff. The results of this inspection are documented in the enclosed report. The NRC inspector did not identify any finding or violation of more than minor significance. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire re-Related InformationWithhold from public disclosure under 10 CFR in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
On July 13, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Davis-Besse Nuclear Power Station, and the NRC inspector discussed the results of this inspection with Mr. L. Willis and other members of your staff. The results of this inspection are documented in the enclosed report.


Sincerely,/RA/ Kenneth Riemer, Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Nonpublic
The NRC inspector did not identify any finding or violation of more than minor significance.


===Enclosure:===
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
 
Sincerely,
/RA/
Kenneth Riemer, Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Nonpublic Enclosure:
IR 05000346/2017405 cc: M. Bear, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV
IR 05000346/2017405 cc: M. Bear, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV
}}
}}

Latest revision as of 21:42, 29 October 2019

NRC Security Baseline Inspection Report 05000346/2017405 - Cover Letter (Nte)
ML17230A249
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/17/2017
From: Reimer K
Plant Support Branch II
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR 2017405
Download: ML17230A249 (3)


Text

UNITED STATES ugust 17, 2017

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2017405

Dear Mr. Bezilla:

On July 13, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Davis-Besse Nuclear Power Station, and the NRC inspector discussed the results of this inspection with Mr. L. Willis and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Kenneth Riemer, Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Nonpublic Enclosure:

IR 05000346/2017405 cc: M. Bear, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV