Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:RKGUL'A Y INFORMATION DISTR I BUT I 0" SYSTEM (RIDS)ACCESSION NBR:80091,70295 DOC~DA7K: 80/07/18 NOTARIZED:, NO DOCKET¹FRCIL!50 204 Rober t Emmet Ginna Nucl ear Pl ant g Unit 1P Rochester G 0500024<i AUTH BYNAME AUTHOR AFFILIATION NOONKFHestinghouse Electric Corps RKC IP~NAME RECIPIENT AFFILIATION LILLKY~M.P., Rochester Gas 8 E)ectric Corp. | | {{#Wiki_filter:RKGUL'A Y INFORMATION DISTR I BUT I 0" SYSTEM (RIDS) |
| | ACCESSION NBR:80091,70295 DOC ~ DA7K: 80/07/18 NOTARIZED:, NO DOCKET ¹ FRCIL!50 204 Rober t Emmet BYNAME Ginna Nucl ear Pl ant g Unit 1P Rochester G 0500024<i AUTH AUTHOR AFFILIATION NOONKF Hestinghouse Electric Corps RKC IP ~ NAME RECIPIENT AFFILIATION LILLKY~M.P., Rochester Gas 8 E) ectric Corp. |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Forwards"Piping Stress Analysis ReptPRHR Sys/Section 250." Analysis results L support loads reflect layout arrangement shown on encl Isometric,C 381 350~Sheet 1KRevision DE Any mods to la'yout of sys rrlll rrsrrsnt nasnalysls of oiplns sys, trtorrmrrLMw P.s.dr'rrSryo+A DISTRIBUTION CDDE: ADO fs COPIES RECEIYED:LTR g ENCL V SIZE: lg fJg, TITLE!General Distribution for after-Issuance of Operating Lic NOTES: 1 copy:SEP Sect.Ldr~05000204 RECIPIENT ID COOK/NAME ACTI'ONs CRUTCHFIELD 00 INTERNAL'/DIRgHUM FAC08 ILK 06 OELD 11 01 COPIES LfTTR ENCL 13 13 1 1'2 2 1 0 1 1 RECIPIENT ID CODK/NAME DIRPHUM FAC 07 NRC PDR 02 OR ASSESS BR 10 COPIES LTTR ENCL 1 1 1 1 1 0 EXTERNAL.ACRS NSIC 09 05 16 16 1 1 LPDR 03 sE'p 18))80 gd DS TOTAL NUMBER OF COPIES REQUIRED: LTTR~ENCL i'l 4 0 4 n tl Westinghouse Electric Corporation Water Rea'ctor Divisions'Nuclear Technology Olvision Box 355 PmsburghPonrzylvanla15230 July 18, 1980 ST-SST-103 RGE-80-97 Mr.M.P.Lilley Rochester Gas tl Electric 89 East Avenue Rochester, New York 14649 | | Forwards "Piping Stress Analysis ReptPRHR Sys/Section 250." |
| | Analysis results L support loads reflect layout arrangement shown on encl Isometric,C 381 350~Sheet 1KRevision DE Any mods to la'yout of sys rrlll rrsrrsnt nasnalysls of oiplns sys, trtorrmrrLMw P. s. dr'rrSryo+A DISTRIBUTION CDDE: ADO fs COPIES RECEIYED:LTR g ENCL V SIZE: |
| | TITLE! General Distribution for after- Issuance of Operating Lic lg fJg, NOTES: 1 copy:SEP Sect. Ldr ~ 05000204 RECIPIENT COPIES RECIPIENT COPIES ID COOK/NAME LfTTR ENCL ID CODK/NAME LTTR ENCL ACTI'ONs CRUTCHFIELD 00 13 13 INTERNAL'/DIRgHUM FAC08 1 1 DIRPHUM FAC 07 1 1 ILK 06 '2 2 NRC PDR 02 1 1 OELD 11 1 0 OR ASSESS BR 10 1 0 01 1 1 EXTERNAL. ACRS 09 16 16 LPDR 03 NSIC 05 1 1 sE'p 18 ))80 TOTAL NUMBER OF COPIES REQUIRED: LTTR ~gd ENCL DS |
|
| |
|
| ==Dear Mr.Lilley:== | | i'l 4 0 |
| r ROBERT EMMETT GINNA NUCLEAR GENERATING STATION R.E.Ginna Seismic Upgrading Program Residual Heat Removal S stem, Section 250 Transmitted herein is the piping stress report for the.R.E.Ginna Nuclear Generating Station Unit No.1, Residual Heat Removal Systerc, Section 250, SDTAR-80-05-05. | | 4 n |
| Analysis results arid support loads contained herein reflect the layout arrangement shown on marked isometric C-381-354, Sheet 1,.Revision.o Any significant modifications to the layout of this system of piping and or its restraints will w'arrant reanalysis of this piping system.Minor design changes or construction modifications will generally not affect stress results and support recommendations. | | tl |
| However, case by case review of the discrepancies can be used to determine. | | |
| overall sjstem behavior and effects.If any questions exist relative to the above transmittal, please contact W.A.Massie of Westinghouse. | | Nuclear Technology Olvision Westinghouse Water Rea'ctor Electric Corporation Divisions Box 355 |
| Yery truly yours, W.A.t assie/dj Attachment F.Noon,,lanager Eastern Region WNI Support cc: R.E.R.C.M.P.T.R.B.H.P.l"l.'g.D.A.J.C.Smi th-1L, 1A Mecredy, RGE-1L, lA Lilley, RGE-1L, 1A lleis, RGE-ll., iA Bell, CAI-1L, lA Cameron, SA-1L, 1A Snow, RGE-''lL, lA Hutton, RGE-1L, lA 80097yp Qg5 0,~j aj}} | | ' |
| | PmsburghPonrzylvanla15230 July 18, 1980 ST-SST-103 RGE-80-97 Mr. M. P. Lilley Rochester Gas tl Electric 89 East Avenue Rochester, New York 14649 |
| | |
| | ==Dear Mr. Lilley:== |
| | |
| | r ROBERT EMMETT GINNA NUCLEAR GENERATING STATION R. E. Ginna Seismic Upgrading Program Residual Heat Removal S stem, Section 250 Transmitted herein is the piping stress report for the .R. E. Ginna Nuclear Generating Station Unit No. 1, Residual Heat Removal Systerc, Section 250, SDTAR-80-05-05. |
| | Analysis results arid support loads contained herein reflect the layout arrangement shown on marked isometric C-381-354, Sheet 1,. Revision .o Any significant modifications to the layout of this system of piping and or its restraints will w'arrant reanalysis of this piping system. |
| | Minor design changes or construction modifications will generally not affect stress results and support recommendations. However, case by case review of the discrepancies can be used to determine. overall sjstem behavior and effects. |
| | If any questions exist relative to the above transmittal, please contact W. A. Massie of Westinghouse. |
| | Yery truly yours, F. Noon,,lanager Eastern Region WNI Support W. A. t assie/dj Attachment cc: R. E. Smi th - 1L, 1A R. C. Mecredy, RGE - 1L, lA M. P. Lilley, RGE - 1L, 1A T. R. lleis, RGE - ll., iA B. H. Bell, CAI - 1L, lA P. l"l. Cameron, SA - 1L, 1A |
| | 'g. D. A. Snow, RGE - ''lL, lA J. C. Hutton, RGE - 1L, lA 80097yp Qg5 |
| | |
| | 0, |
| | ~j aj}} |
Similar Documents at Ginna |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated IR 05000244/19990081999-10-14014 October 1999 Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs IR 05000244/19992011999-09-24024 September 1999 Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date 1999-09-30
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML17251A3371988-07-20020 July 1988 Forwards 1988 Ginna Station Emergency Preparedness Exercise Scenario for 881018 Exercise. ML17250A5961980-07-18018 July 1980 Forwards Piping Stress Analysis Rept,Rhr Sys,Section 200. Analysis Results & Support Loads Reflect Layout Arrangement Shown in Encl Isometric C-381-354,Sheet 1,Revision D.Any Mods to Layout Will Warrant Reanalysis of Piping Sys ML17250A5871980-07-18018 July 1980 Forwards Re Ginna Nuclear Power Plant,Seismic Upgrading Program Piping Stress Analysis,Main Steam Sys,Section 200. Minor Design Changes or Const Mods Will Generally Not Affect Stress Results & Support Recommendations ML17250A5841980-07-18018 July 1980 Forwards Piping Stress Analysis Rept,Rhr Sys,Section 250. Analysis Results & Support Loads Reflect Layout Arrangement Shown on Encl Isometric C-381-354,Sheet 1,Revision D.Any Mods to Layout of Sys Will Warrant Reanalysis of Piping Sys 1988-07-20
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML17251A3371988-07-20020 July 1988 Forwards 1988 Ginna Station Emergency Preparedness Exercise Scenario for 881018 Exercise. ML17250A5961980-07-18018 July 1980 Forwards Piping Stress Analysis Rept,Rhr Sys,Section 200. Analysis Results & Support Loads Reflect Layout Arrangement Shown in Encl Isometric C-381-354,Sheet 1,Revision D.Any Mods to Layout Will Warrant Reanalysis of Piping Sys ML17250A5841980-07-18018 July 1980 Forwards Piping Stress Analysis Rept,Rhr Sys,Section 250. Analysis Results & Support Loads Reflect Layout Arrangement Shown on Encl Isometric C-381-354,Sheet 1,Revision D.Any Mods to Layout of Sys Will Warrant Reanalysis of Piping Sys 1988-07-20
[Table view] |
Text
RKGUL'A Y INFORMATION DISTR I BUT I 0" SYSTEM (RIDS)
ACCESSION NBR:80091,70295 DOC ~ DA7K: 80/07/18 NOTARIZED:, NO DOCKET ¹ FRCIL!50 204 Rober t Emmet BYNAME Ginna Nucl ear Pl ant g Unit 1P Rochester G 0500024<i AUTH AUTHOR AFFILIATION NOONKF Hestinghouse Electric Corps RKC IP ~ NAME RECIPIENT AFFILIATION LILLKY~M.P., Rochester Gas 8 E) ectric Corp.
SUBJECT:
Forwards "Piping Stress Analysis ReptPRHR Sys/Section 250."
Analysis results L support loads reflect layout arrangement shown on encl Isometric,C 381 350~Sheet 1KRevision DE Any mods to la'yout of sys rrlll rrsrrsnt nasnalysls of oiplns sys, trtorrmrrLMw P. s. dr'rrSryo+A DISTRIBUTION CDDE: ADO fs COPIES RECEIYED:LTR g ENCL V SIZE:
TITLE! General Distribution for after- Issuance of Operating Lic lg fJg, NOTES: 1 copy:SEP Sect. Ldr ~ 05000204 RECIPIENT COPIES RECIPIENT COPIES ID COOK/NAME LfTTR ENCL ID CODK/NAME LTTR ENCL ACTI'ONs CRUTCHFIELD 00 13 13 INTERNAL'/DIRgHUM FAC08 1 1 DIRPHUM FAC 07 1 1 ILK 06 '2 2 NRC PDR 02 1 1 OELD 11 1 0 OR ASSESS BR 10 1 0 01 1 1 EXTERNAL. ACRS 09 16 16 LPDR 03 NSIC 05 1 1 sE'p 18 ))80 TOTAL NUMBER OF COPIES REQUIRED: LTTR ~gd ENCL DS
i'l 4 0
4 n
tl
Nuclear Technology Olvision Westinghouse Water Rea'ctor Electric Corporation Divisions Box 355
'
PmsburghPonrzylvanla15230 July 18, 1980 ST-SST-103 RGE-80-97 Mr. M. P. Lilley Rochester Gas tl Electric 89 East Avenue Rochester, New York 14649
Dear Mr. Lilley:
r ROBERT EMMETT GINNA NUCLEAR GENERATING STATION R. E. Ginna Seismic Upgrading Program Residual Heat Removal S stem, Section 250 Transmitted herein is the piping stress report for the .R. E. Ginna Nuclear Generating Station Unit No. 1, Residual Heat Removal Systerc, Section 250, SDTAR-80-05-05.
Analysis results arid support loads contained herein reflect the layout arrangement shown on marked isometric C-381-354, Sheet 1,. Revision .o Any significant modifications to the layout of this system of piping and or its restraints will w'arrant reanalysis of this piping system.
Minor design changes or construction modifications will generally not affect stress results and support recommendations. However, case by case review of the discrepancies can be used to determine. overall sjstem behavior and effects.
If any questions exist relative to the above transmittal, please contact W. A. Massie of Westinghouse.
Yery truly yours, F. Noon,,lanager Eastern Region WNI Support W. A. t assie/dj Attachment cc: R. E. Smi th - 1L, 1A R. C. Mecredy, RGE - 1L, lA M. P. Lilley, RGE - 1L, 1A T. R. lleis, RGE - ll., iA B. H. Bell, CAI - 1L, lA P. l"l. Cameron, SA - 1L, 1A
'g. D. A. Snow, RGE - lL, lA J. C. Hutton, RGE - 1L, lA 80097yp Qg5
0,
~j aj