ML17252B413: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,,.. ***.*.* ** . -'* CommonweM'I Edison Dresden Nucle-wer Station R.R. #1 Morris, Illinois *so450 Telephone 815/942-2920  
{{#Wiki_filter:,,.. ***.*.*
** .. -l:--,., . . *"' ___________
              **           .
LTR._/l-7_6-883 De_cembei;-.
                  ..-l:--,., .
19.79 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations  
                              -'*
,£?'Region TII U. S. Nuclear Regulatory Commission 799 Road Gien Ellyn, Illinois 60137 .SUBJECT.:
                                  .
Dresden Station Torus-to-Drywell Vacuum Breaker  
CommonweM'I Edison Dresden Nucle-wer Station R.R. #1 Morris, Illinois *so450 Telephone 815/942-2920
                                        *"'
                                                                                              **
___________ B~~? LTR._/l-7_6-883                                       De_cembei;-. l~_, 19.79 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations ,£?'Region TII U. S. Nuclear Regulatory Commission 799 Roo~eyelt Road Gien Ellyn, Illinois 60137
              .SUBJECT.:             Dresden Station Torus-to-Drywell Vacuum Breaker


==REFERENCES:==
==REFERENCES:==
: 1) Letter from B. B. Stephenson to J. F. O'Leary dated July 29, 1974 (Abnormal Occurrence report no. 50-237 /1974-27)
: 1)   Letter from B. B. Stephenson to J. F. O'Leary dated July 29, 1974 (Abnormal Occurrence report no.
: 2) Drawing number:* M-25. REPORT NUMBER: 50-237/1974-27A REPORT DATE: December 15, 1976 OCCURRENCE DATE: July 20, 1974 FACILITY:* .Dresden Nuclear Power Station,.
50-237 /1974-27)
Morris, Illinois . . / . The referenced Abnormal Occurrence report s:tat;ed that a study was in . progress to evaluate the possible(::iuse of phosphorus-bronze in place of teflon as a bushing material in the breakers on Units 2 and 3. .-* The vacuum breaker performance has been monitored for approximately three years. During this period three binding pi;-oblems h.;ive been experienced; two
: 2)   Drawing number:* M-25.
* with teflon bushings and one with phosphorus-bronze bushings.
REPORT NUMBER:                 50-237/1974-27A REPORT DATE:                 December 15, 1976 OCCURRENCE DATE:                   July 20, 1974 FACILITY:* .Dresden Nuclear Power Station,. Morris, Illinois
Based on the results far there is no justification for of the teflon with bushings.
                                                            .             .         /   .
Additionally, based on the reduced frequency of failures, no other action is planned at this time. Power St?tion BBS: CES :jo cc: Director of Inspection  
The referenced Abnormal Occurrence report s:tat;ed that a study was in               ....
& Enforcement Director*
              . progress to evaluate the possible(::iuse of phosphorus-bronze in place of teflon as a bushing material in the toru~~to-drywell vac~um breakers on Units 2 and 3.                                           .-
of Management Information  
* The vacuum breaker performance has been monitored for approximately three years. During this period three binding pi;-oblems h.;ive been experienced; two
& Program Control File/NRC DEC 2 3 1976 13044 ....}}
* with teflon bushings and one with phosphorus-bronze bushings. Based on the results th~s far there is no justification for replace~ent of the teflon bu~hings with phosphorus-bron~e bushings. Additionally, based on the reduced frequency of failures, no other action is planned at this time.
Power St?tion BBS: CES :jo cc:             Director of Inspection & Enforcement Director* of Management Information & Program Control File/NRC 13044 DEC 2 3 1976}}

Revision as of 19:09, 29 October 2019

Letter Regarding Dresden Station Units 2 and 3 Torus-To-Drywell Vacuum Breaker Bushings
ML17252B413
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/15/1976
From: Stephenson B
Commonwealth Edison Co
To: James Keppler
NRC/RGN-III
References
50-237/1974-27A, BBS Ltr. #76-883, LER 74-027-00, LER 74-027A-00
Download: ML17252B413 (1)


Text

,,.. ***.*.*

    • .

..-l:--,., .

-'*

.

CommonweM'I Edison Dresden Nucle-wer Station R.R. #1 Morris, Illinois *so450 Telephone 815/942-2920

  • "'

___________ B~~? LTR._/l-7_6-883 De_cembei;-. l~_, 19.79 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations ,£?'Region TII U. S. Nuclear Regulatory Commission 799 Roo~eyelt Road Gien Ellyn, Illinois 60137

.SUBJECT.: Dresden Station Torus-to-Drywell Vacuum Breaker

REFERENCES:

1) Letter from B. B. Stephenson to J. F. O'Leary dated July 29, 1974 (Abnormal Occurrence report no.

50-237 /1974-27)

2) Drawing number:* M-25.

REPORT NUMBER: 50-237/1974-27A REPORT DATE: December 15, 1976 OCCURRENCE DATE: July 20, 1974 FACILITY:* .Dresden Nuclear Power Station,. Morris, Illinois

. . / .

The referenced Abnormal Occurrence report s:tat;ed that a study was in ....

. progress to evaluate the possible(::iuse of phosphorus-bronze in place of teflon as a bushing material in the toru~~to-drywell vac~um breakers on Units 2 and 3. .-

  • The vacuum breaker performance has been monitored for approximately three years. During this period three binding pi;-oblems h.;ive been experienced; two
  • with teflon bushings and one with phosphorus-bronze bushings. Based on the results th~s far there is no justification for replace~ent of the teflon bu~hings with phosphorus-bron~e bushings. Additionally, based on the reduced frequency of failures, no other action is planned at this time.

Power St?tion BBS: CES :jo cc: Director of Inspection & Enforcement Director* of Management Information & Program Control File/NRC 13044 DEC 2 3 1976