{{#Wiki_filter:,,.. ***.*.* ** . -'* CommonweM'I Edison Dresden Nucle-wer Station R.R. #1 Morris, Illinois *so450 Telephone 815/942-2920 | {{#Wiki_filter:,,.. ***.*.* | ||
** | ** . | ||
LTR._/l-7_6-883 De_cembei;-. | ..-l:--,., . | ||
19.79 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations | -'* | ||
,£?'Region TII U. S. Nuclear Regulatory Commission 799 Road Gien Ellyn, Illinois 60137 .SUBJECT.: | . | ||
Dresden Station Torus-to-Drywell Vacuum Breaker | CommonweM'I Edison Dresden Nucle-wer Station R.R. #1 Morris, Illinois *so450 Telephone 815/942-2920 | ||
*"' | |||
** | |||
___________ B~~? LTR._/l-7_6-883 De_cembei;-. l~_, 19.79 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations ,£?'Region TII U. S. Nuclear Regulatory Commission 799 Roo~eyelt Road Gien Ellyn, Illinois 60137 | |||
.SUBJECT.: Dresden Station Torus-to-Drywell Vacuum Breaker | |||
==REFERENCES:== | ==REFERENCES:== | ||
: 1) Letter from B. B. Stephenson to J. F. O'Leary dated July 29, 1974 (Abnormal Occurrence report no. 50-237 /1974-27) | : 1) Letter from B. B. Stephenson to J. F. O'Leary dated July 29, 1974 (Abnormal Occurrence report no. | ||
: 2) Drawing number:* M-25. REPORT NUMBER: 50-237/1974-27A REPORT DATE: December 15, 1976 OCCURRENCE DATE: July 20, 1974 FACILITY:* .Dresden Nuclear Power Station,. | 50-237 /1974-27) | ||
Morris, Illinois . . / . The referenced Abnormal Occurrence report s:tat;ed that a study was in . progress to evaluate the possible(::iuse of phosphorus-bronze in place of teflon as a bushing material in the breakers on Units 2 and 3. .-* The vacuum breaker performance has been monitored for approximately three years. During this period three binding pi;-oblems h.;ive been experienced; two | : 2) Drawing number:* M-25. | ||
* with teflon bushings and one with phosphorus-bronze bushings. | REPORT NUMBER: 50-237/1974-27A REPORT DATE: December 15, 1976 OCCURRENCE DATE: July 20, 1974 FACILITY:* .Dresden Nuclear Power Station,. Morris, Illinois | ||
Based on the results far there is no justification for of the teflon with bushings. | . . / . | ||
Additionally, based on the reduced frequency of failures, no other action is planned at this time. Power St?tion BBS: CES :jo cc: Director of Inspection | The referenced Abnormal Occurrence report s:tat;ed that a study was in .... | ||
& Enforcement Director* | . progress to evaluate the possible(::iuse of phosphorus-bronze in place of teflon as a bushing material in the toru~~to-drywell vac~um breakers on Units 2 and 3. .- | ||
of Management Information | * The vacuum breaker performance has been monitored for approximately three years. During this period three binding pi;-oblems h.;ive been experienced; two | ||
& Program Control File/NRC DEC 2 3 1976 | * with teflon bushings and one with phosphorus-bronze bushings. Based on the results th~s far there is no justification for replace~ent of the teflon bu~hings with phosphorus-bron~e bushings. Additionally, based on the reduced frequency of failures, no other action is planned at this time. | ||
Power St?tion BBS: CES :jo cc: Director of Inspection & Enforcement Director* of Management Information & Program Control File/NRC 13044 DEC 2 3 1976}} | |||
Revision as of 19:09, 29 October 2019
| ML17252B413 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 12/15/1976 |
| From: | Stephenson B Commonwealth Edison Co |
| To: | James Keppler NRC/RGN-III |
| References | |
| 50-237/1974-27A, BBS Ltr. #76-883, LER 74-027-00, LER 74-027A-00 | |
| Download: ML17252B413 (1) | |
Text
,,.. ***.*.*
- .
..-l:--,., .
-'*
.
CommonweM'I Edison Dresden Nucle-wer Station R.R. #1 Morris, Illinois *so450 Telephone 815/942-2920
- "'
___________ B~~? LTR._/l-7_6-883 De_cembei;-. l~_, 19.79 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations ,£?'Region TII U. S. Nuclear Regulatory Commission 799 Roo~eyelt Road Gien Ellyn, Illinois 60137
.SUBJECT.: Dresden Station Torus-to-Drywell Vacuum Breaker
REFERENCES:
- 1) Letter from B. B. Stephenson to J. F. O'Leary dated July 29, 1974 (Abnormal Occurrence report no.
50-237 /1974-27)
- 2) Drawing number:* M-25.
REPORT NUMBER: 50-237/1974-27A REPORT DATE: December 15, 1976 OCCURRENCE DATE: July 20, 1974 FACILITY:* .Dresden Nuclear Power Station,. Morris, Illinois
. . / .
The referenced Abnormal Occurrence report s:tat;ed that a study was in ....
. progress to evaluate the possible(::iuse of phosphorus-bronze in place of teflon as a bushing material in the toru~~to-drywell vac~um breakers on Units 2 and 3. .-
- The vacuum breaker performance has been monitored for approximately three years. During this period three binding pi;-oblems h.;ive been experienced; two
- with teflon bushings and one with phosphorus-bronze bushings. Based on the results th~s far there is no justification for replace~ent of the teflon bu~hings with phosphorus-bron~e bushings. Additionally, based on the reduced frequency of failures, no other action is planned at this time.
Power St?tion BBS: CES :jo cc: Director of Inspection & Enforcement Director* of Management Information & Program Control File/NRC 13044 DEC 2 3 1976