| {{#Wiki_filter:TOPICAL QUALITY ASSURANCE REPORT T R 8.0 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS Rev.3 Draft A Date 10/09/96 Pa e 1 of 3 8.1 GENERAL RE UIREMENTS Materials, parts, and components, including partially fabricated assemblies, shall, be identified and controlled as required throughout fabrication, receipt, handling, storage, installation, and use of the item.The identification of the item shall be.maintained by heat number,, part number, serial number, assigned traceability number, or other suitable means, and shall bephysically marked on the item or on records traceable to the item.The object of these controls shall be to prevent the use of non-inspected, incorrect or defective materials, parts, and components. | | {{#Wiki_filter:TOPICAL QUALITYASSURANCE REPORT T R 8.0 Rev. 3 Draft A IDENTIFICATIONAND CONTROL OF MATERIALS, PARTS Date 10/09/96 AND COMPONENTS Pa e 1 of 3 8.1 GENERAL RE UIREMENTS Materials, parts, and components, including partially fabricated assemblies, shall, be identified and controlled as required throughout fabrication, receipt, handling, storage, installation, and use of the item. The identification of the item shall be. maintained by heat number,, part number, serial number, assigned traceability number, or other suitable means, and shall bephysically marked on the item or on records traceable to the item. The object of these controls shall be to prevent the use of non-inspected, incorrect or defective materials, parts, and components. |
| 8.2 IMPLEMENTATION Quality Instructions shall establish the responsibilities and requirements for the identification, and control of materials, parts and components. | | 8.2 IMPLEMENTATION Quality Instructions shall establish the responsibilities and requirements for the identification, and control of materials, parts and components. The procedures and instructions used by all organizations shall assure that identification and control is maintained throughout fabrication, receipt, handling, storage, installation and use of items. |
| The procedures and instructions used by all organizations shall assure that identification and control is maintained throughout fabrication, receipt, handling, storage, installation and use of items.This shall include welding material traceability to the point of consumption. | | This shall include welding material traceability to the point of consumption. Provisions include: |
| Provisions include: a.Physical identification shall be used to the maximum extent possible.When physical identification is impractical or insufficient, items shall be physically segregated and identified by batch, lots, etc.;b.When items are subdivided, their identification shall be maintained by transferring the identification to each of the subdivided parts or their container; c.Post-installation identification of items that cannot feasibly be physically marked d.shall be traceable by record verification;. | | : a. Physical identification shall be used to the maximum extent possible. When physical identification is impractical or insufficient, items shall be physically segregated and identified by batch, lots, etc.; |
| Items requiring identification, but whose identification was lost during storage, shall be segregated and documented as nonconforming and dispositioned in accordance with established procedures; 50297 tt70bi2 0 970b2 PDR ADOCK 05000250 le,''P'DR, 0 t l I 4I 0 s s f j'b TOPICAL QUALITY ASSURANCE REPORT T R 8.0 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS Rev.3 Draft A Date 10/09/96 Pa e 2 of 3 e.Requirements for traceability to appropriate documentation, such as: procurement documents, manufacturing documents, drawings, specifications, inspection and test records, nonconformance or deficiency reports or other Quality Assurance Records, in sufficient detail to preclude any possibility of doubt or confusion concerning the traceability of an item to the documentation, or, the documentation ef to the item;Controls to assure that the correct identification of an item is verified and documented prior to fabrication, receipt, handling, storage, installation and use;g.Requirements which assure that the method or location of markings are not detrimental to, and do not affect the function or quality of an item;are clear, unambiguous and indelible; are in plain unobstructed view;do not provide conflicts with other requirements; are not obliterated by any surface treatment unless other means of identification are substituted; withstand normal shipping, handling and environmental effects and are able to be retained;Establishment of identification requirements by specifications, drawings, procurement documents, instructions or procedures during initial, planning;Requirements to ensure that dedicated Commercial Grade Items are identifiable to the specific component or equipment for which they are dedicated. | | : b. When items are subdivided, their identification shall be maintained by transferring the identification to each of the subdivided parts or their container; |
| FPL may delegate any portion of the implementation of the identification and control program to the Architect/Engineer, Constructor, Nuclear Steam Supply System vendor or other contractors. | | : c. Post-installation identification of items that cannot feasibly be physically marked shall be traceable by record verification;. |
| If delegated, contracts shall require that the contractor establish an identification and control program which meets the requirements of this TQR. | | : d. Items requiring identification, but whose identification was lost during storage, shall be segregated and documented as nonconforming and dispositioned in accordance with established procedures; le,' 'P 'DR, 970b2 50297 tt70bi2 0 PDR ADOCK 05000250 |
| N r 0 TOPICAL UALITY ASSURANCE REPORT IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS TQR 8.0 Rev.3 Draft A Date 10/09/96 Pa e 3 ot 3 8.3 RESPONSIBILITIES 8.3.1 The Site Vice President has overall responsibility for: a.Assuring that an identification and control system: is developed and implemented for items to be utilized within the plant;b.Receiving, controlling and ensuring.the security of items;c.Segregating items until the required receipt inspection is performed; d.Assuring the placement of any necessary markings on the items as required by applicable procedures or as requested in accordance with applicable purchase orders, specifications or commercial grade dedication packages;and e.Incorporating applicable pre-installation and/or post-installation inspections, tests, and QC hold points (including Commercial Grade Item Dedication requirements) into applicable work control documents. | | |
| 8.3.2 The Vice President Nuclear Engineering.has overall responsibility for: a.Determining and specifying end use applications for items.}} | | t 0 |
| | l I |
| | 4I 0 |
| | f s s j |
| | 'b |
| | |
| | TOPICAL QUALITYASSURANCE REPORT T R 8.0 Rev. 3 Draft A IDENTIFICATIONAND CONTROL OF MATERIALS, PARTS Date 10/09/96 AND COMPONENTS Pa e 2 of 3 |
| | : e. Requirements for traceability to appropriate documentation, such as: procurement documents, manufacturing documents, drawings, specifications, inspection and test records, nonconformance or deficiency reports or other Quality Assurance Records, in sufficient detail to preclude any possibility of doubt or confusion concerning the traceability of an item to the documentation, or, the documentation ef to the item; Controls to assure that the correct identification of an item is verified and documented prior to fabrication, receipt, handling, storage, installation and use; |
| | : g. Requirements which assure that the method or location of markings are not detrimental to, and do not affect the function or quality of an item; are clear, unambiguous and indelible; are in plain unobstructed view; do not provide conflicts with other requirements; are not obliterated by any surface treatment unless other means of identification are substituted; withstand normal shipping, handling and environmental effects and are able to be retained; Establishment of identification requirements by specifications, drawings, procurement documents, instructions or procedures during initial,planning; Requirements to ensure that dedicated Commercial Grade Items are identifiable to the specific component or equipment for which they are dedicated. |
| | FPL may delegate any portion of the implementation of the identification and control program to the Architect/Engineer, Constructor, Nuclear Steam Supply System vendor or other contractors. If delegated, contracts shall require that the contractor establish an identification and control program which meets the requirements of this TQR. |
| | |
| | N r |
| | |
| | TOPICAL UALITYASSURANCE REPORT TQR 8.0 Draft A 0 |
| | Rev. 3 IDENTIFICATIONAND CONTROL OF MATERIALS, PARTS Date 10/09/96 AND COMPONENTS Pa e 3 ot 3 8.3 RESPONSIBILITIES 8.3.1 The Site Vice President has overall responsibility for: |
| | : a. Assuring that an identification and control system: is developed and implemented for items to be utilized within the plant; |
| | : b. Receiving, controlling and ensuring. the security of items; |
| | : c. Segregating items until the required receipt inspection is performed; |
| | : d. Assuring the placement of any necessary markings on the items as required by applicable procedures or as requested in accordance with applicable purchase orders, specifications or commercial grade dedication packages; and |
| | : e. Incorporating applicable pre-installation and/or post-installation inspections, tests, and QC hold points (including Commercial Grade Item Dedication requirements) into applicable work control documents. |
| | 8.3.2 The Vice President Nuclear Engineering .has overall responsibility for: |
| | : a. Determining and specifying end use applications for items.}} |
|
---|
Category:QUALITY ASSURANCE PROGRAM
MONTHYEARML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A5501997-04-30030 April 1997 Rev 52 to QA Manual, Table of Contents. ML17354A4881997-04-16016 April 1997 Rev 31 to Fpltqar 1-76A, Topical QA Rept, Consisting of Attachments A-D ML17354A5351997-03-27027 March 1997 Rev 29,Draft a of Topical QA Rept, Organization (R933). ML17354A5441996-12-21021 December 1996 Rev 5,Draft a of Topical QA Rept, Test Control. ML17354A5461996-10-21021 October 1996 Rev 11,Draft a of Topical QA Rept, Nonconforming Matls, Parts or Components. ML17354A5451996-10-21021 October 1996 Rev 9,Draft a of Topical QA Rept, Handling,Storage,Shipping Cleanness Control & Housekeeping. ML17354A5431996-10-21021 October 1996 Rev 12,Draft a of Topical QA Rept, Control of Special Processes. ML17354A5411996-10-21021 October 1996 Rev 8,Draft a of Topical QA Rept, Control of Purchased Items & Svcs. ML17354A5401996-10-21021 October 1996 Rev 10,Draft a of Topical QA Rept, Document Control. ML17354A5391996-10-21021 October 1996 Rev 11,Draft a of Topical QA Rept, Instructions,Procedures & Drawings. ML17354A5421996-10-0909 October 1996 Rev 3,Draft a of Topical QA Rept, Identification & Control of Matls,Parts & Components. ML17354A5481996-09-18018 September 1996 Rev 4,Draft B of Topical QA Rept, QA Records. ML17354A5341996-09-18018 September 1996 Rev 28,Draft B of Topical QA Rept, Organization (RR906). ML17354A5361996-09-18018 September 1996 Rev 14,Draft B of Topical QA Rept, QA Program (RR916). ML17354A5371996-09-18018 September 1996 Rev 12,Draft B of Topical QA Rept, Design Control (RR913). ML17354A5381996-09-18018 September 1996 Rev 8,Draft B of Topical QA Rept, Procurement Document Control (RR911). ML17354A5471996-09-18018 September 1996 Rev 9,Draft B of Topical QA Rept, Corrective Action (RR918). ML17354A5491996-09-18018 September 1996 Rev 14,Draft B of Topical QA Rept, Baseline Document Matrix (RR905). ML17353A7341996-06-0303 June 1996 Rev 44 to Topical QA Rept. ML17352B1951994-11-23023 November 1994 Rev 41 to Topical QA Rept. ML17352A6571994-06-0909 June 1994 Draft Topical QA Rept. ML17352A6581994-02-0101 February 1994 Rev 38 to Topical QA Rept. ML17349A8951993-06-30030 June 1993 Annual Update to Topical Rept Fpltqar 1-76A, QA Program. ML17227A7141993-01-11011 January 1993 Rev 24 to Topical QA Rept. ML17349A2571992-04-30030 April 1992 Rev 29 to Topical QA Rept. ML17348A9351991-06-0505 June 1991 Rev 25 to Topical QA Rept. ML17348A3001990-06-30030 June 1990 Rev 16 to Topical QA Rept. ML17345A7241989-06-0909 June 1989 Rev 15 to Topical QA Rept. ML17345A2381988-05-10010 May 1988 Rev 11 to, Topical QA Rept. ML20214W9231987-06-10010 June 1987 Rev 10 to Topical QA Rept ML17346B0761985-06-10010 June 1985 Rev 8 to Topical QA Rept. ML17342A2061985-06-10010 June 1985 Revised Rev 8 to Topical QA Rept. ML17301A0941984-02-10010 February 1984 Final Version of, Integrity & Stability of Internals- Conclusions & Findings. ML17341B2421982-05-0707 May 1982 QA Manual. ML17341A3801981-03-31031 March 1981 to Topical QA Rept ML19343B6511980-09-30030 September 1980 to QA Manual ML17207A8141980-02-0606 February 1980 QA Program for Operations Phase 1999-06-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
TOPICAL QUALITYASSURANCE REPORT T R 8.0 Rev. 3 Draft A IDENTIFICATIONAND CONTROL OF MATERIALS, PARTS Date 10/09/96 AND COMPONENTS Pa e 1 of 3 8.1 GENERAL RE UIREMENTS Materials, parts, and components, including partially fabricated assemblies, shall, be identified and controlled as required throughout fabrication, receipt, handling, storage, installation, and use of the item. The identification of the item shall be. maintained by heat number,, part number, serial number, assigned traceability number, or other suitable means, and shall bephysically marked on the item or on records traceable to the item. The object of these controls shall be to prevent the use of non-inspected, incorrect or defective materials, parts, and components.
8.2 IMPLEMENTATION Quality Instructions shall establish the responsibilities and requirements for the identification, and control of materials, parts and components. The procedures and instructions used by all organizations shall assure that identification and control is maintained throughout fabrication, receipt, handling, storage, installation and use of items.
This shall include welding material traceability to the point of consumption. Provisions include:
- a. Physical identification shall be used to the maximum extent possible. When physical identification is impractical or insufficient, items shall be physically segregated and identified by batch, lots, etc.;
- b. When items are subdivided, their identification shall be maintained by transferring the identification to each of the subdivided parts or their container;
- c. Post-installation identification of items that cannot feasibly be physically marked shall be traceable by record verification;.
- d. Items requiring identification, but whose identification was lost during storage, shall be segregated and documented as nonconforming and dispositioned in accordance with established procedures; le,' 'P 'DR, 970b2 50297 tt70bi2 0 PDR ADOCK 05000250
t 0
l I
4I 0
f s s j
'b
TOPICAL QUALITYASSURANCE REPORT T R 8.0 Rev. 3 Draft A IDENTIFICATIONAND CONTROL OF MATERIALS, PARTS Date 10/09/96 AND COMPONENTS Pa e 2 of 3
- e. Requirements for traceability to appropriate documentation, such as: procurement documents, manufacturing documents, drawings, specifications, inspection and test records, nonconformance or deficiency reports or other Quality Assurance Records, in sufficient detail to preclude any possibility of doubt or confusion concerning the traceability of an item to the documentation, or, the documentation ef to the item; Controls to assure that the correct identification of an item is verified and documented prior to fabrication, receipt, handling, storage, installation and use;
- g. Requirements which assure that the method or location of markings are not detrimental to, and do not affect the function or quality of an item; are clear, unambiguous and indelible; are in plain unobstructed view; do not provide conflicts with other requirements; are not obliterated by any surface treatment unless other means of identification are substituted; withstand normal shipping, handling and environmental effects and are able to be retained; Establishment of identification requirements by specifications, drawings, procurement documents, instructions or procedures during initial,planning; Requirements to ensure that dedicated Commercial Grade Items are identifiable to the specific component or equipment for which they are dedicated.
FPL may delegate any portion of the implementation of the identification and control program to the Architect/Engineer, Constructor, Nuclear Steam Supply System vendor or other contractors. If delegated, contracts shall require that the contractor establish an identification and control program which meets the requirements of this TQR.
N r
TOPICAL UALITYASSURANCE REPORT TQR 8.0 Draft A 0
Rev. 3 IDENTIFICATIONAND CONTROL OF MATERIALS, PARTS Date 10/09/96 AND COMPONENTS Pa e 3 ot 3 8.3 RESPONSIBILITIES 8.3.1 The Site Vice President has overall responsibility for:
- a. Assuring that an identification and control system: is developed and implemented for items to be utilized within the plant;
- b. Receiving, controlling and ensuring. the security of items;
- c. Segregating items until the required receipt inspection is performed;
- d. Assuring the placement of any necessary markings on the items as required by applicable procedures or as requested in accordance with applicable purchase orders, specifications or commercial grade dedication packages; and
- e. Incorporating applicable pre-installation and/or post-installation inspections, tests, and QC hold points (including Commercial Grade Item Dedication requirements) into applicable work control documents.
8.3.2 The Vice President Nuclear Engineering .has overall responsibility for:
- a. Determining and specifying end use applications for items.