| issue date = 04/18/1980
| issue date = 04/18/1980
| title = Interim Deficiency Rept Re Omission of Rebar in Unit 1 Containment Bldg Exterior Wall,Adjacent to Const Opening for Equipment Hatch.Review Will Be Expanded to Include Drawing Review of Reinforcing Steel in Class I Structures
| title = Interim Deficiency Rept Re Omission of Rebar in Unit 1 Containment Bldg Exterior Wall,Adjacent to Const Opening for Equipment Hatch.Review Will Be Expanded to Include Drawing Review of Reinforcing Steel in Class I Structures
| author name = JONES J A
| author name = Jones J
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS)ACCESSION NBR:8004280561 DOC~DATE: 80/00/18 NOTARIZED:
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM                       (BIDS)
NO FACIL:50 400 Shearon Harris Nuclear Power Planti Unit 1E Carolina 50 Ool Shearon Harris Nuclear Power Plenty Unit 2i Carolina 50 402 Shearon Harris Nuclear Power Planti Unit 3i Carolina AUTH'AME AUTHOR AFFILIATION JONESiJ~A, Carolina Power 8 Light Co, REC IP~NAME RECIPIENT AFFILIATION DOCKET 05000400 05000<01 05000002
ACCESSION NBR:8004280561           DOC ~ DATE: 80/00/18   NOTARIZED:                 NO       DOCKET FACIL:50 400 Shearon Harris Nuclear Power Planti Unit 1E Carolina                               05000400 50 Ool Shearon Harris Nuclear Power Plenty Unit 2i Carolina                           05000<01 50 402 Shearon Harris Nuclear Power Planti Unit 3i Carolina                           05000002 AUTH'AME               AUTHOR AFFILIATION JONESiJ ~ A,           Carolina Power     8 Light Co, REC IP ~ NAME         RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Interim deficiency r ept re omission of rebar in Unit 1 containment bldg exterior walliadJacent to const opening for equipment hatch.Review will be expanded to include drawing review of reinforcing steel in Class I structures'I DISTRIBUTION CODE: S0190 COPIES RECE1YED:LTR
Interim deficiency r ept re omission of rebar in Unit 1 containment bldg exterior walliadJacent to const opening for equipment hatch. Review will be expanded to include drawing review of reinforcing steel in Class I             structures'I DISTRIBUTION CODE: S0190         COPIES RECE1YED:LTR     /ENCL       +             SIZE:
/ENCL+SIZE: TITLE: Construction Deficiency Report (10CFR50~55E)N ES PC~OTES.INTERNAL9 0 08 MPA 10 QAB 13FIELD COOR/I E 17 AD PLANT SYS 22 DIR DPM AD/RC I/IE AEOD GEOSC'IENCES BR IEC SYS BR MECH ENG BR STRUCT ENG BR 1 2 1 1 1 1 1 1 1 11 1 1 RECIPIENT COPIES ID CODE/NAMg LTTR ENCL ACTION: 14 PM W/~~4 1 20LA~gQQ 1 RECIPIENT ID CODE/NAME 15 BC 21 AD 02 NRC PDR 07 EDO L STAFF'9 DEPY DIR OPM 11 STANDROS DEV 16 AD FOR ENGR 17 AD REAC SFTY 23 OELD AD/SITE TECH DIRECTOR OSE HANAUERiS, MATL FNG BR POWER SYS BR COPIES LTTR ENCL EXTERNAL!03 LPDR 2Q ACRS 1 16 1 00 NSIC rPI dISA E.+8C g.gggLESXSQ~pg@4 48<J'R a0, t980 TOTAL NUMBER OF COPIES REQUIRED: LT R A8'NCL h ('I I'he V h I' ewe=~~Carolina Power&Light Company''" n-April 18, 1980 Mr'ames P.O'Reilly, Director Region II United States Nuclear Regulatory Commission 101 Marietta Street, Northwest Atlanta, Georgia 30303 RE: A)CP&L Letter, Jones to O'Reilly, Dated April 16, 1980 B)UiS.NRC Confirmation of Action Letter, O'Reilly to Jones Dated April 10, 1980 SHEARON HARRIS NUCLEAR POWER PLANT~UNIT NOS l~2, 3, AND 4 DOCKET NOSo 50<<400, 50-401, 50-402, AND 50-403 INVESTIGATION AND CORRECTIVE ACTIONS FOLLOWING OMMISSION OF REBAR IN UNIT 1 CONTAINMENT BUILDING EXTERIOR WALL ADJACENT TO THE CONSTRUCTION OPENING FOR THE E UIPMENT HATCH  
TITLE: Construction Deficiency Report (10CFR50 ~ 55E)
PC N OTES.
ES ~
RECIPIENT          COPIES            RECIPIENT                         COPIES ID CODE/NAMg       LTTR ENCL        ID CODE/NAME                      LTTR ENCL ACTION:       14 PM   W/~~4                         15 BC 20LA   ~gQQ             1 1            21 AD INTERNAL9                              1            02 NRC PDR 0                        2            07 EDO L STAFF'9 08 MPA                  1              DEPY DIR       OPM 10 QAB                  1            11 STANDROS DEV 13FIELD COOR/I E        1            16 AD FOR ENGR 17 AD PLANT SYS          1            17 AD REAC SFTY 22 DIR  DPM            1            23 OELD AD/RC I/IE              1            AD/SITE TECH AEOD                    1            DIRECTOR OSE GEOSC'IENCES  BR        1            HANAUERiS, IEC SYS BR              1            MATL FNG BR MECH ENG BR              1            POWER SYS BR STRUCT ENG BR            1 EXTERNAL! 03 LPDR                     1            00 NSIC 2Q ACRS               16     1 rPI dISA E.
                                                              +         8C
: g. gggLESXSQ
                                                      ~pg @4 48                                 <J'R a0,t980 TOTAL NUMBER OF COPIES         REQUIRED: LT   R A8'NCL
 
h
(
    'I I'he V
h I'
 
ewe=~                           ~
                            ''" nCarolina    Power & Light Company
                                          -April 18,     1980 Mr'ames     P. O'Reilly, Director Region   II United States Nuclear Regulatory Commission 101 Marietta Street, Northwest Atlanta, Georgia 30303 RE:   A) CP&L   Letter,   Jones to O'Reilly, Dated April 16, 1980 B) UiS. NRC Confirmation of Action Letter, O'Reilly to Jones Dated April 10, 1980 SHEARON HARRIS NUCLEAR POWER PLANT~ UNIT NOS                       l~ 2, 3, AND 4 DOCKET NOSo 50<<400, 50-401, 50-402, AND 50-403 INVESTIGATION AND CORRECTIVE ACTIONS FOLLOWING OMMISSION OF REBAR IN UNIT 1 CONTAINMENT BUILDING EXTERIOR WALL ADJACENT TO THE CONSTRUCTION OPENING FOR THE E UIPMENT HATCH


==Dear Mr,==
==Dear Mr,==
O'Reilly: Reference A)describes the circumstances surrounding the omission of rebar in the exterior wall of the Containment Building adjacent to the construction opening for the equipment hatch and includes proposed corrective actions.Confirming discussions held with your staff in your office on April 17, 1980, in which Messrs.Mi A.McDuffie, Sheldon Smith, P.W.Howe, Allen Cutter, and A.M.Lucas of Carolina Power&Light Company participated, the following proposed corrective actions are added to those enumerated in the referenced letter.1)Add to Item III B 4 of Reference A): In addition to the drawing review to identify similar problem areas on the exterior wall described in Item III.D of the referenced letter, Carolina Power&Light Company will expand the review to include a drawing review of reinforcing steel in highly stressed and complex areas of Class I structures 1~go/7 5M i/o 411 Fayetteville Street~P.O.Box 1551~Raleigh, N.C.27602 Mr James P.O'Reilly 2)Add as Item III.B 10 of Reference A): The proposed drawing review will be examined for possible application, to other disciplines.
O'Reilly:
Thank you for the timely opportunity to discuss this matter with your staff.Please let us know if further information is required, and it is hoped your concurrence with our proposed corrective actions will be forthcoming at your earliest convenience.
Reference A) describes the circumstances surrounding the omission of rebar in the exterior wall of the Containment Building adjacent to the construction opening for the equipment hatch and includes proposed corrective actions.
As discussed, CPSL expects to complete implementation of applicable corrective actions by April 22, 1980.urs very truly, J.A.Jone Senior ecutive Vi e President Chief Operating Officer JAJ/mf}}
Confirming discussions held with your staff in your office on April 17, 1980, in which Messrs. Mi A. McDuffie, Sheldon Smith, P. W. Howe, Allen Cutter, and A. M. Lucas of Carolina Power & Light Company participated, the following proposed corrective actions are added to those enumerated in the referenced   letter.
: 1)   Add to Item   III   B 4 of Reference A):             In addition to the drawing review to identify similar problem areas on the exterior wall described in Item III.D of the referenced letter, Carolina Power &
Light Company will expand the review to include a drawing review of reinforcing steel in highly stressed and complex areas of Class I structures                                                               1 ~
go/7 5M i/o 411 Fayetteville Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602
 
Mr   James P. O'Reilly
: 2)   Add as Item III.B 10 of Reference A):   The proposed drawing review will be examined for possible application, to other disciplines.
Thank you for the timely opportunity to discuss this matter with your   staff. Please let us know if further information is required, and   it is hoped your concurrence with our proposed corrective actions will be forthcoming at your earliest convenience. As discussed, CPSL expects to complete implementation of applicable corrective actions by April 22, 1980.
urs very truly, J. A. Jone Senior   ecutive Vi e President Chief Operating Officer JAJ/mf}}

Latest revision as of 04:09, 22 October 2019

Interim Deficiency Rept Re Omission of Rebar in Unit 1 Containment Bldg Exterior Wall,Adjacent to Const Opening for Equipment Hatch.Review Will Be Expanded to Include Drawing Review of Reinforcing Steel in Class I Structures
ML18017B044
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/18/1980
From: Jackie Jones
CAROLINA POWER & LIGHT CO.
To:
References
NUDOCS 8004280561
Download: ML18017B044 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS)

ACCESSION NBR:8004280561 DOC ~ DATE: 80/00/18 NOTARIZED: NO DOCKET FACIL:50 400 Shearon Harris Nuclear Power Planti Unit 1E Carolina 05000400 50 Ool Shearon Harris Nuclear Power Plenty Unit 2i Carolina 05000<01 50 402 Shearon Harris Nuclear Power Planti Unit 3i Carolina 05000002 AUTH'AME AUTHOR AFFILIATION JONESiJ ~ A, Carolina Power 8 Light Co, REC IP ~ NAME RECIPIENT AFFILIATION

SUBJECT:

Interim deficiency r ept re omission of rebar in Unit 1 containment bldg exterior walliadJacent to const opening for equipment hatch. Review will be expanded to include drawing review of reinforcing steel in Class I structures'I DISTRIBUTION CODE: S0190 COPIES RECE1YED:LTR /ENCL + SIZE:

TITLE: Construction Deficiency Report (10CFR50 ~ 55E)

PC N OTES.

ES ~

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAMg LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: 14 PM W/~~4 15 BC 20LA ~gQQ 1 1 21 AD INTERNAL9 1 02 NRC PDR 0 2 07 EDO L STAFF'9 08 MPA 1 DEPY DIR OPM 10 QAB 1 11 STANDROS DEV 13FIELD COOR/I E 1 16 AD FOR ENGR 17 AD PLANT SYS 1 17 AD REAC SFTY 22 DIR DPM 1 23 OELD AD/RC I/IE 1 AD/SITE TECH AEOD 1 DIRECTOR OSE GEOSC'IENCES BR 1 HANAUERiS, IEC SYS BR 1 MATL FNG BR MECH ENG BR 1 POWER SYS BR STRUCT ENG BR 1 EXTERNAL! 03 LPDR 1 00 NSIC 2Q ACRS 16 1 rPI dISA E.

+ 8C

g. gggLESXSQ

~pg @4 48 <J'R a0,t980 TOTAL NUMBER OF COPIES REQUIRED: LT R A8'NCL

h

(

'I I'he V

h I'

ewe=~ ~

" nCarolina Power & Light Company

-April 18, 1980 Mr'ames P. O'Reilly, Director Region II United States Nuclear Regulatory Commission 101 Marietta Street, Northwest Atlanta, Georgia 30303 RE: A) CP&L Letter, Jones to O'Reilly, Dated April 16, 1980 B) UiS. NRC Confirmation of Action Letter, O'Reilly to Jones Dated April 10, 1980 SHEARON HARRIS NUCLEAR POWER PLANT~ UNIT NOS l~ 2, 3, AND 4 DOCKET NOSo 50<<400, 50-401, 50-402, AND 50-403 INVESTIGATION AND CORRECTIVE ACTIONS FOLLOWING OMMISSION OF REBAR IN UNIT 1 CONTAINMENT BUILDING EXTERIOR WALL ADJACENT TO THE CONSTRUCTION OPENING FOR THE E UIPMENT HATCH

Dear Mr,

O'Reilly:

Reference A) describes the circumstances surrounding the omission of rebar in the exterior wall of the Containment Building adjacent to the construction opening for the equipment hatch and includes proposed corrective actions.

Confirming discussions held with your staff in your office on April 17, 1980, in which Messrs. Mi A. McDuffie, Sheldon Smith, P. W. Howe, Allen Cutter, and A. M. Lucas of Carolina Power & Light Company participated, the following proposed corrective actions are added to those enumerated in the referenced letter.

1) Add to Item III B 4 of Reference A): In addition to the drawing review to identify similar problem areas on the exterior wall described in Item III.D of the referenced letter, Carolina Power &

Light Company will expand the review to include a drawing review of reinforcing steel in highly stressed and complex areas of Class I structures 1 ~

go/7 5M i/o 411 Fayetteville Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602

Mr James P. O'Reilly

2) Add as Item III.B 10 of Reference A): The proposed drawing review will be examined for possible application, to other disciplines.

Thank you for the timely opportunity to discuss this matter with your staff. Please let us know if further information is required, and it is hoped your concurrence with our proposed corrective actions will be forthcoming at your earliest convenience. As discussed, CPSL expects to complete implementation of applicable corrective actions by April 22, 1980.

urs very truly, J. A. Jone Senior ecutive Vi e President Chief Operating Officer JAJ/mf