ML18040A834: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'~~t REACTIVITY CONTROL SYSTBIS SURVEILLANCE RE UIRBlENTS Continued b.At least once per 24 hours when any control rod is immovable as a result of excessive friction or mechanical interference.
{{#Wiki_filter:'
4.1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of Surveillance Requirements 4.1.3.2, 4.1.3.4, 4.1.3.5,'4.1.3.6 and 4.1.3.7.-4.1.3.1.4 The scram discharge volume shall be determined OPERABLE by demonstrating:
  ~ ~
a.The scram discharge volume drain and vent valves OPERABLE~~
t REACTIVITY CONTROL SYSTBIS SURVEILLANCE RE UIRBlENTS       Continued
4 at least once per 18 months , by verifying that the drain and vent valves: 1.'1ose within 30 seconds after receipt of a signal for cont~ol rods to scram, and 2.Open when the scram signal is reset.b.Proper float response by verification of proper float switch actua-tion after each scram from a pressurized condition greater than or equal to 900 psig.70~~~0 0 05OO0~9 cy'7041b PDP PDQC pDR-suSQUEHANNA
: b. At least once per 24 hours when any control rod is immovable       as a result of excessive friction or mechanical interference.
-UNIT 1 3/4 1-5 Amendment No.36 REACTIVITY CONTROL SYSTEMS SURVEILLANCE RE UIRBIEHTS Continued 4.1.3.1.2 Ken above the low pawer setpofnt of the 50 and RSCS, all wfthdrawn control rods nat required ta have their dfrectfonal control valves dfsarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rad at least one notch: a.At least once per 7 days, and b.At least onc>>per 24 hours when any control rod fs faeovable as a result af excessive frfctfon or mechanical fnterference.
: 4. 1.3.1.3   All control rods shall be demonstrated OPERABLE by performance of Surveillance Requirements 4. 1.3.2, 4. 1.3.4, 4. 1.3.5,'4. 1.3.6 and 4. 1.3.7.-
4.1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of Survefllance Requirements 4.1.3.2, 4.1.3.4, 4.1.3.5, 4.1.3.6, and 4.'i.3.7.4, 1.3.1.4 The scram dfscharge volume shall be determfned OPERABLE by demonstratfng:
: 4. 1.3. 1.4   The scram   discharge volume shall be determined   OPERABLE by demonstrating:
a.The scram dfscharge volume drain and vent valves OPERABL4~hen-at least once per 18 months~by verifying that the drain and vent valves: '.Close within 30 seconds after receipt of a signal for control rods to scram, and ,2.Open when the scram signal fs reset.b.Proper float response by verification of proper float switch actuation after each scram fram a pressurized condftion greater than or equal to 900 psfg.SUS)UEHANNA-UNIT 2 3/4 1-5}}
: a. The scram   discharge volume drain and vent valves OPERABLE~~
4 at least once per 18 months ,
by   verifying that the drain     and vent valves:
: 1.   '1ose within 30     seconds after receipt of a signal for cont~ol rods to scram, and
: 2. Open when   the scram signal is reset.
: b. Proper   float response by verification of proper float switch actua-tion after   each scram from a pressurized condition greater than or equal to   900 psig.
70~~~0 0 cy'7041b 05OO0~9 PDP     PDQC           pDR
      -
suSQUEHANNA   - UNIT 1                   3/4 1-5                 Amendment No. 36
 
REACTIVITY CONTROL SYSTEMS SURVEILLANCE RE UIRBIEHTS       Continued 4.1.3.1.2 Ken above the low pawer setpofnt of the 50 and RSCS, all wfthdrawn control rods nat required ta have their dfrectfonal control valves dfsarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rad at least one notch:
: a. At least once per 7 days, and
: b. At least onc>> per 24 hours when any control rod fs faeovable as a result af excessive frfctfon or mechanical fnterference.
4.1.3.1.3     All control rods shall be demonstrated OPERABLE by performance of Survefllance Requirements 4. 1.3.2, 4. 1.3.4, 4. 1.3.5, 4. 1.3.6, and 4.'i. 3. 7.
4, 1.3. 1.4   The scram dfscharge volume shall be determfned     OPERABLE by demonstratfng:
: a. The scram dfscharge   volume drain and vent valves OPERABL4 ~hen-at least once per 18 months ~
by verifying that the drain   and vent valves:
          '.     Close within 30 seconds rods to scram, and after receipt of   a signal for control
            ,2. Open when the scram signal fs reset.
: b. Proper float response by   verification of proper float switch actuation after each scram fram   a pressurized condftion greater than or equal to 900 psfg.
SUS)UEHANNA     -UNIT 2                   3/4 1-5}}

Revision as of 21:49, 21 October 2019

Proposed Tech Spec 4.1.3.1.4(a) Changing Requirements for Surveillance of Scram Discharge Vol Vent & Drain Valves
ML18040A834
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/16/1987
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML18040A832 List:
References
NUDOCS 8704220209
Download: ML18040A834 (2)


Text

'

~ ~

t REACTIVITY CONTROL SYSTBIS SURVEILLANCE RE UIRBlENTS Continued

b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when any control rod is immovable as a result of excessive friction or mechanical interference.
4. 1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of Surveillance Requirements 4. 1.3.2, 4. 1.3.4, 4. 1.3.5,'4. 1.3.6 and 4. 1.3.7.-
4. 1.3. 1.4 The scram discharge volume shall be determined OPERABLE by demonstrating:
a. The scram discharge volume drain and vent valves OPERABLE~~

4 at least once per 18 months ,

by verifying that the drain and vent valves:

1. '1ose within 30 seconds after receipt of a signal for cont~ol rods to scram, and
2. Open when the scram signal is reset.
b. Proper float response by verification of proper float switch actua-tion after each scram from a pressurized condition greater than or equal to 900 psig.

70~~~0 0 cy'7041b 05OO0~9 PDP PDQC pDR

-

suSQUEHANNA - UNIT 1 3/4 1-5 Amendment No. 36

REACTIVITY CONTROL SYSTEMS SURVEILLANCE RE UIRBIEHTS Continued 4.1.3.1.2 Ken above the low pawer setpofnt of the 50 and RSCS, all wfthdrawn control rods nat required ta have their dfrectfonal control valves dfsarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rad at least one notch:

a. At least once per 7 days, and
b. At least onc>> per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when any control rod fs faeovable as a result af excessive frfctfon or mechanical fnterference.

4.1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of Survefllance Requirements 4. 1.3.2, 4. 1.3.4, 4. 1.3.5, 4. 1.3.6, and 4.'i. 3. 7.

4, 1.3. 1.4 The scram dfscharge volume shall be determfned OPERABLE by demonstratfng:

a. The scram dfscharge volume drain and vent valves OPERABL4 ~hen-at least once per 18 months ~

by verifying that the drain and vent valves:

'. Close within 30 seconds rods to scram, and after receipt of a signal for control

,2. Open when the scram signal fs reset.

b. Proper float response by verification of proper float switch actuation after each scram fram a pressurized condftion greater than or equal to 900 psfg.

SUS)UEHANNA -UNIT 2 3/4 1-5