ML18178A353: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = Dixon-Herrity J | | author name = Dixon-Herrity J | ||
| author affiliation = NRC/NRO/DNRL/LB4 | | author affiliation = NRC/NRO/DNRL/LB4 | ||
| addressee name = Corletti | | addressee name = Corletti M | ||
| addressee affiliation = Westinghouse Electric Co, LLC | | addressee affiliation = Westinghouse Electric Co, LLC | ||
| docket = PROJ0811 | | docket = PROJ0811 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:/RA Chandu Patel for:/}} | {{#Wiki_filter:June 29, 2018 Mr. Michael Corletti, Director New Plant Technologies and Licensing Westinghouse Electric Company, LLC 1000 Westinghouse Drive Cranberry Township, PA 16066 | ||
==SUBJECT:== | |||
VERIFICATION LETTER OF THE APPROVAL VERSION OF WESTINGHOUSE ELECTRIC COMPANYS TOPICAL REPORT WCAP-17938-P/NP, REVISION 3, AP1000 IN-CONTAINMENT CABLES AND NON-METALLIC INSULATION DEBRIS INTEGRATED ASSESSMENT | |||
==Dear Mr. Corletti:== | |||
By letter dated June 21, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18172A009), Westinghouse Electric Company (Westinghouse) submitted an approval (-A) version of topical report (TR) WCAP-17938-P/NP, Revision 3, AP1000 In-Containment Cables and Non-Metallic Insulation Debris Integrated Assessment, to the U.S. Nuclear Regulatory Commission (NRC) staff. Westinghouse has done so in accordance with our request to publish approval proprietary and non-proprietary versions of this TR, as detailed in the transmittal letter of the NRC staffs final safety evaluation (ADAMS Accession No. ML18128A155) for the WCAP-17938-P/NP, Revision 3 (ADAMS Accession No. ML18121A237) and LIC-500, Topical Report Process, Revision 5 (ADAMS Accession No. ML13158A296). | |||
The NRC staff has completed its review of the approval version of the TR. The NRC staff verified that Westinghouse has met the requirements and determined that the submitted -A versions are acceptable for referencing in licensing applications for nuclear power plants to the extent specified, and under the limitations delineated in the accepted versions of the TR. | |||
WCAP-17938-P-A/WCAP-17938-NP-A, Revision 3, AP1000 In-Containment Cables and Non-Metallic Insulation Debris Integrated Assessment, is now approved for use in future licensing actions. | |||
M. Corletti Please contact Donald Habib of my staff at (301) 415-1035 if you have any questions on this subject. | |||
Sincerely, | |||
/RA Chandu Patel for:/ | |||
Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Project No. 0811 | |||
ML18178A353; *concurred via e-mail NRO-008 OFFICE DLSE/LB4:PM DLSE/LB4:LA DLSE/LB4:BC NAME DHabib RButler JDixon-Herrity DATE 6/28/18 6/28/18 6/28/18}} |
Latest revision as of 21:40, 20 October 2019
ML18178A353 | |
Person / Time | |
---|---|
Site: | PROJ0811 |
Issue date: | 06/29/2018 |
From: | Jennifer Dixon-Herrity NRC/NRO/DNRL/LB4 |
To: | Corletti M Westinghouse |
HABIB D/415-1035 | |
References | |
WCAP-17938-NP, WCAP-17938-P | |
Download: ML18178A353 (3) | |
Text
June 29, 2018 Mr. Michael Corletti, Director New Plant Technologies and Licensing Westinghouse Electric Company, LLC 1000 Westinghouse Drive Cranberry Township, PA 16066
SUBJECT:
VERIFICATION LETTER OF THE APPROVAL VERSION OF WESTINGHOUSE ELECTRIC COMPANYS TOPICAL REPORT WCAP-17938-P/NP, REVISION 3, AP1000 IN-CONTAINMENT CABLES AND NON-METALLIC INSULATION DEBRIS INTEGRATED ASSESSMENT
Dear Mr. Corletti:
By letter dated June 21, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18172A009), Westinghouse Electric Company (Westinghouse) submitted an approval (-A) version of topical report (TR) WCAP-17938-P/NP, Revision 3, AP1000 In-Containment Cables and Non-Metallic Insulation Debris Integrated Assessment, to the U.S. Nuclear Regulatory Commission (NRC) staff. Westinghouse has done so in accordance with our request to publish approval proprietary and non-proprietary versions of this TR, as detailed in the transmittal letter of the NRC staffs final safety evaluation (ADAMS Accession No. ML18128A155) for the WCAP-17938-P/NP, Revision 3 (ADAMS Accession No. ML18121A237) and LIC-500, Topical Report Process, Revision 5 (ADAMS Accession No. ML13158A296).
The NRC staff has completed its review of the approval version of the TR. The NRC staff verified that Westinghouse has met the requirements and determined that the submitted -A versions are acceptable for referencing in licensing applications for nuclear power plants to the extent specified, and under the limitations delineated in the accepted versions of the TR.
WCAP-17938-P-A/WCAP-17938-NP-A, Revision 3, AP1000 In-Containment Cables and Non-Metallic Insulation Debris Integrated Assessment, is now approved for use in future licensing actions.
M. Corletti Please contact Donald Habib of my staff at (301) 415-1035 if you have any questions on this subject.
Sincerely,
/RA Chandu Patel for:/
Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Project No. 0811
ML18178A353; *concurred via e-mail NRO-008 OFFICE DLSE/LB4:PM DLSE/LB4:LA DLSE/LB4:BC NAME DHabib RButler JDixon-Herrity DATE 6/28/18 6/28/18 6/28/18