ML19018A132: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:/RA/}} | {{#Wiki_filter:SOUTHERN NUCLEAR OPERATING COMPANY, INC. | ||
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 DOCKET NO. 52-025 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 157 License No. NPF-91 | |||
: 1. The Nuclear Regulatory Commission (the Commission) has found that: | |||
A. The application for amendment by Southern Nuclear Operating Company (SNC), | |||
dated November 29, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. | |||
: 2. Accordingly, the license is amended to authorize changes the Updated Final Safety Analysis Report (UFSAR) as described in the application dated November 29, 2018. | |||
The license is also amended by changes to Appendix C of the Facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of Facility Combined License No. NPF-91 is hereby amended to read as follows: | |||
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 157, are hereby incorporated into this license. | |||
: 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. SNC shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e). | |||
FOR THE NUCLEAR REGULATORY COMMISSION: | |||
/RA/ | |||
Jennifer L. Dixon-Herrity, Chief Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Date of Issuance: April 9, 2019 | |||
==Attachment:== | |||
Page 7 of the Facility Combined License and affected pages of Appendix C of the Facility Combined License}} |
Latest revision as of 06:37, 20 October 2019
ML19018A132 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 04/09/2019 |
From: | Jennifer Dixon-Herrity NRC/NRO/DLSE/LB2 |
To: | City of Dalton, GA, Georgia Power Co, MEAG Power, Oglethorpe Power Corp, Southern Nuclear Operating Co |
HABIB D/415-1035 | |
Shared Package | |
ML19018A130 | List: |
References | |
LAR 18-031, EPID L-2018-LLA-0497, VEGP 3&4-PSI/ISI-ALT-12 | |
Download: ML19018A132 (2) | |
Text
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 DOCKET NO.52-025 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 157 License No. NPF-91
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Southern Nuclear Operating Company (SNC),
dated November 29, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended to authorize changes the Updated Final Safety Analysis Report (UFSAR) as described in the application dated November 29, 2018.
The license is also amended by changes to Appendix C of the Facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of Facility Combined License No. NPF-91 is hereby amended to read as follows:
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 157, are hereby incorporated into this license.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. SNC shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e).
FOR THE NUCLEAR REGULATORY COMMISSION:
/RA/
Jennifer L. Dixon-Herrity, Chief Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Date of Issuance: April 9, 2019
Attachment:
Page 7 of the Facility Combined License and affected pages of Appendix C of the Facility Combined License