ML082840670: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/14/2008
| issue date = 10/14/2008
| title = Transmittal Letter, Individual Notice of Consideration of Issuance of Amendment, 30-day Proposed No Significant Hazards Consideration Determination, Revise TS 3.4.12 to Extend Completion Time for Condition G
| title = Transmittal Letter, Individual Notice of Consideration of Issuance of Amendment, 30-day Proposed No Significant Hazards Consideration Determination, Revise TS 3.4.12 to Extend Completion Time for Condition G
| author name = Donohew J N
| author name = Donohew J
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Heflin A C
| addressee name = Heflin A
| addressee affiliation = Union Electric Co
| addressee affiliation = Union Electric Co
| docket = 05000483
| docket = 05000483

Revision as of 06:05, 12 July 2019

Transmittal Letter, Individual Notice of Consideration of Issuance of Amendment, 30-day Proposed No Significant Hazards Consideration Determination, Revise TS 3.4.12 to Extend Completion Time for Condition G
ML082840670
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/14/2008
From: Donohew J
Plant Licensing Branch IV
To: Heflin A
Union Electric Co
Donohew J N, NRR/DORL/LPL4, 415-1307
Shared Package
ML082840655 List:
References
TAC MD7516
Download: ML082840670 (3)


Text

October 14, 2008

Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING (TAC NO. MD7516)

Dear Mr. Heflin:

By your application dated November 29, 2007 (ULNRC-05459), you requested an amendment to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1. The proposed amendment revises Technical Specification (TS) 3.4.10, "Pressurizer Safety Valves," TS 3.4.11, "Pressurizer Power Operated Relief Valves (PORVs)," and TS 3.4.12, "Cold Overpressure Mitigation System (COMS)." In the Federal Register notice published on March 3, 2008 (73 FR 15791), the NRC staff inadvertently did not address the proposed change to TS 3.4.12 in the application to extend the completion time for Condition G. This additional proposed change in the application is addressed in the attached notice of consideration to be published as an individual notice in the Federal Register. A copy of the enclosed Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, And Opportunity For a Hearing will be published in the Federal Register. Sincerely, /RA/

Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosure:

Notice of Consideration of Issuance of Amendment

cc w/encl: Distribution via Listserv

PKG ML082840655, Transmittal Letter ML082840670, FR Notice ML082840682 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME JDonohew JBurkhardt MMarkley JDonohew DATE 10/14/08 10/14/08 10/12/08 10/14/08 Callaway Plant, Unit 1 (9/19/2008) cc: Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360 Certrec Corporation 4200 S. Hulen, Suite 422 Fort Worth, TX 76109 Technical Services Branch Chief FEMA Region VII 2323 Grand Blvd., Suite 900 Kansas City, MO 64108-2670

Additional Distribution via Listserv