| title = Request for Additional Information Re Boraflex Remedy Implementation Extension Request | | title = Request for Additional Information Re Boraflex Remedy Implementation Extension Request | ||
| author name = Paige J | | author name = Paige J | ||
| author affiliation = NRC/NRR/DORL/LPLII-2 | | author affiliation = NRC/NRR/DORL/LPLII-2 | ||
| addressee name = Czaya P | | addressee name = Czaya P | ||
| Line 12: | Line 12: | ||
| document type = E-Mail, Request for Additional Information (RAI) | | document type = E-Mail, Request for Additional Information (RAI) | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = RAI | |||
}} | }} | ||
| Line 19: | Line 21: | ||
==Subject:== | ==Subject:== | ||
Request for Additional Information RE Boraflex Remedy Implementation Extension Request Paul, The NRC staff has reviewed the Turkey Point Unit 4 information regarding the Boraflex Remedy LAR implementation extension request and has determined that additional information is required to complete the review. Below are the RAIs. If a call is needed to discuss, please feel free to contact me. | Request for Additional Information RE Boraflex Remedy Implementation Extension Request Paul, The NRC staff has reviewed the Turkey Point Unit 4 information regarding the Boraflex Remedy LAR implementation extension request and has determined that additional information is required to complete the review. Below are the RAIs. If a call is needed to discuss, please feel free to contact me. | ||
: 1. At the end of the Westinghouse NSAL-00-015, the document states, "The affected plants received a plant-specific margin summary (rack up) as an attachment with the transmittal of this NSAL." Provide this attachment that was prepared for Turkey Point. | : 1. At the end of the Westinghouse NSAL-00-015, the document states, "The affected plants received a plant-specific margin summary (rack up) as an attachment with the transmittal of this NSAL." Provide this attachment that was prepared for Turkey Point. | ||
: 2. In FPL letter, L-2009-249, you state that, "a Turkey Point specific assessment of the impact was performed that concluded crediting some of the conservatisms in the Turkey Point analysis was sufficient to offset the effect of the penalty from the non-conservative application of the asial burnup shape bias." Provide this assessment that credited some of the conservatisms in the Turkey Point analysis. | : 2. In FPL letter, L-2009-249, you state that, "a Turkey Point specific assessment of the impact was performed that concluded crediting some of the conservatisms in the Turkey Point analysis was sufficient to offset the effect of the penalty from the non-conservative application of the asial burnup shape bias." Provide this assessment that credited some of the conservatisms in the Turkey Point analysis. | ||
Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 E-mail Properties Mail Envelope Properties () | Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 E-mail Properties Mail Envelope Properties () | ||
Revision as of 16:18, 11 July 2019
| ML093090241 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/03/2009 |
| From: | Jason Paige Plant Licensing Branch II |
| To: | Czaya P Florida Power & Light Co |
| paige, Jason, NRR/DORL,301-415-5888 | |
| References | |
| Download: ML093090241 (1) | |
Text
From: Paige, Jason Sent: Tuesday, November 03, 2009 3:18 PM To: Czaya, Paul Cc: Olga_Hanek@fpl.com
Subject:
Request for Additional Information RE Boraflex Remedy Implementation Extension Request Paul, The NRC staff has reviewed the Turkey Point Unit 4 information regarding the Boraflex Remedy LAR implementation extension request and has determined that additional information is required to complete the review. Below are the RAIs. If a call is needed to discuss, please feel free to contact me.
- 1. At the end of the Westinghouse NSAL-00-015, the document states, "The affected plants received a plant-specific margin summary (rack up) as an attachment with the transmittal of this NSAL." Provide this attachment that was prepared for Turkey Point.
- 2. In FPL letter, L-2009-249, you state that, "a Turkey Point specific assessment of the impact was performed that concluded crediting some of the conservatisms in the Turkey Point analysis was sufficient to offset the effect of the penalty from the non-conservative application of the asial burnup shape bias." Provide this assessment that credited some of the conservatisms in the Turkey Point analysis.
Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 E-mail Properties Mail Envelope Properties ()
Subject:
Request for Additional Information RE Boraflex Remedy Implementation Extension Request Sent Date: 11/3/2009 3:03:34 PM Received Date: 11/3/2009 3:17:00 PM From: Paige, Jason
Created By: Jason.Paige@nrc.gov
Recipients:
Paul.Czaya@fpl.com (Czaya, Paul)
Tracking Status: None Olga_Hanek@fpl.com (Olga_Hanek@fpl.com)
Tracking Status: None
Post Office:
Files Size Date & Time
MESSAGE 9461 11/3/2009
Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False
Sensitivity: olNormal Recipients received: