ML17279B099: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/31/1988
| issue date = 05/31/1988
| title = Monthly Operating Rept for May 1988 for Wppss Unit 2. W/880610 Ltr
| title = Monthly Operating Rept for May 1988 for Wppss Unit 2. W/880610 Ltr
| author name = HUTCHISON L B, POWERS C M
| author name = Hutchison L, Powers C
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 00:51, 19 June 2019

Monthly Operating Rept for May 1988 for Wppss Unit 2. W/880610 Ltr
ML17279B099
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8806160370
Download: ML17279B099 (6)


Text

ACCRLERATED DIS1'SRUTI ON DEMONSTRAOON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8806160370 DOC.DATE: 88/05/31 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1988 for WNP-2.W/880610 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: 'RECIPIENT',ID'ODE/NAME PD5 LA SAMWORTH, R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR REP/RPB 10 EG F 01 l;I",COPIESLTTR ENCL 1 0 1 0 10 10 1 1 1'1 1 1 1 AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 1 1 2 2 1 1 1 1 1 l.*'RECIPIENT i'"t]'"~'.COPIES>I<ID CODE/NAME-LTTR ENCL PD5 PD 5 5 A EXTERNAL: EG&G WILLIAMS, S NRC PDR 1 1 1 1 LPDR NSIC 1 1 1 1 4 TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 29 0~~I H f~

~~r.OPERATING DATA REPORT WNP-2 01-Jun-88 il.DOCKET: 50-397 REPORTING PERIOD: UTILITY CONTACT: May-88 OUTAGE+QN-LINE HOURS LEONARD HUTCHISON (509)377-2486 744 5~0~7.3.LICENSED THERMAL POWER<MWt.): NAMEPLATE RATING<GROSS MWe): DESIGN ELECTRICAL RATING<NET MWe): MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): MAXIMUM DEPENDABLE CAPACITY<NET MWe): IF CHANGES OCCUR ABOVE SINCE LAST REPORT v GIVE REASONS 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY<NET MWe): 11 REASONS FOR RESTRICTIONS'F ANY 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY<MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23 UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH~744 0.0 0.0 0.0 0.0 0 0 0 0.0/0.0/0.0/0.0/0.0/0.0 YEAR CUMULATIVE 3647 30367.2 ,2223.2 22130.0 0'340.4 2176.1 21318 0 0.0 381 7 6719698 57102465 2244320 19061460 2166352 18334304 59.7/70.2%59.7%71.5/54.2/'5 1%54.0/54.9%24.6%9.9/709.3 2354.3 26.SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):

27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: 8806160370 880531 PDR ADOCK 05000307 R DCD gag+((,

BEKAT.PERIOD MAY 19 88 mcnth, year LNIT Sl IUTDONNS/BE'DUCTIONS DOCKET NO.50 397 UNIT t'lAl lf WNP-2 DATE 06/07/88 COMPLETED BY LB HUTCHISON TELEPllONE (509)377-2486 HQ.D~K TTTP Fi~n~~~7iSSH=~hf Tm 88-07 4/30/88 S 744 C=4&&I&&&&.&&&Y 1EII&&II%I&&&&

&&&&&&&&&&&&-V&""&'&&&&&:.RC FUELXX REFUEL OUTAGE CONTINUING SUl t lABY WNP-2 REMAINED SHUTDOWN IN MAY FOR SCHEDULED REFUELING OUTAGE TYPE F-Forced S-Scllcd A-Equip Failure 0-Maint or Test~C-Be f ue ling D-Begulatory Bestriction f-Operator Training h License Examination F-Admin 0-Oper Error l3-Other hlfTHOD 1-Manual 2-manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM k COhlPOM.:NT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Bepnrt (LER)File (NUBEG-0161) 4 o" AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT MHP-2 06/07/88 COMPLETED BY~0 TELEPHONE (509)377"2486 MONTH MAY 1988 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)1 0 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 0 18 20 21 0 0 24 12 13 0 INSTRUCTIONS Qn this form, list the average daily unit power level in MVe~Net for each day in the reporting month.Compute to the nearest whole megawatt.1hese Qgures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity~s used for the net electrical rating of the-unit, there may be occasions when the daily average power!eve!exceeds the 100%line (or the respected power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the ap parent anomaly.

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968'000 George 1Vashington 1Vay~Richland, 1Vashington 99352 June 10, 1988 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May l988 as required by our Technical Specifications 6.9.1.6.Very Truly Yours, C.M.Powers (M/D 927M)MNP-2 Plant Manager CMP/sl Enclosure cc: Mr.Mr.Ms.Mr.Mr,.J.B.Martin C.J.Bosted Dottie Sherman J.T.Wheelock M.H.Lovelace NRC Region V NRC Site Representative (901A)ANI, Farmington CT INPO NRC, Washington D.C.