ML17311A748: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/28/1995
| issue date = 03/28/1995
| title = Forwards Special Rept 2-SR-95-001,discussing SG Tube Plugging in PVNGS Unit 2 as Result of ISI Activities. Complete Results of SG Tube ISI Will Be Submitted by 960310
| title = Forwards Special Rept 2-SR-95-001,discussing SG Tube Plugging in PVNGS Unit 2 as Result of ISI Activities. Complete Results of SG Tube ISI Will Be Submitted by 960310
| author name = LEVINE J M
| author name = Levine J
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  

Revision as of 18:04, 18 June 2019

Forwards Special Rept 2-SR-95-001,discussing SG Tube Plugging in PVNGS Unit 2 as Result of ISI Activities. Complete Results of SG Tube ISI Will Be Submitted by 960310
ML17311A748
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/28/1995
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
192-00925-JML-B, 192-925-JML-B, 2-SR-95-001, 2-SR-95-1, NUDOCS 9504050265
Download: ML17311A748 (6)


Text

i)~E P R.IC3R.IMY'(ACCELERATED RIDS PROCESSIN REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9504050265 DOC.DATE: 95/03/28 NOTARIZED:

NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFXLIATION LEVINE,J.M.

Arizona Public Service Co.(formerly Arizona Nuclear Power p RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Special Rept 2-SR-95-001,discussing SG tube plugging in PVNGS Unit 2 as result of ISI activities.

Complete results of SG tube ISI will be submitted by 960310.DISTRIBUTION CODE S001D COPIES RECEIVED LTR ENCL SIZE: TITLE: Security Plans 0 NOTES:Standardized plant.05000529 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L INTERNAL: ACRS NRR/DOTS/TSGB EXTERNAL: NRC PDR COPXES LTTR ENCL 1 0 1 0 1 1 1 1 1 0 RECIPIENT XD CODE/NAME HOLIAN, B LE CENTER 01 COPIES LTTR ENCL 1 0 1 1 D 0 C U NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON', NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL 3

JAMES M.LEVINE VICE PRESIDENT NUCLEAR PRODUCTION Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 192-00925-JMLJBAG/KR March 28, 1995 U.S.Nuclear Regulatory Commission

'TlN: Document Control Desk Mail Station P1-37 Washington, D.C.20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529 (License No.NPF-51)Special Report 2-SR-95-001 Attached please find Special Report 2-SR-95-001 prepared and submitted pursuant to Technical Specification (TS)Surveillance Requirement 4.4.4.5.a and TS 6.9.2.This report discusses steam generator tube plugging in Unit 2.A copy of the Special Report is being forwarded to the Regional Administrator, NRC Region IV.If you have any questions, please contact B.A.Grabo, Section Leader, Nuclear Regulatory Affairs, at (602)393-6492.Sincerely, JlylL/BAG/KR/pv Attachment 9500050265 950328 PDR ADOCK 05000529 PDR cc: L.J.Callan (all with attachment)

K.E.Perkins K.E.Johnston

~K I PALO VERDE NUCLEAR GENERATING STATION UNIT 2 STEAM GENERATOR TUBE PLUGGING DOCKET NO.STN 50-529 LICENSE NO.NPF-51 SPECIAL REPORT NO.2-SR-95-001 This Special Report is being provided pursuant to Palo Verde Unit 2 Technical Specification (TS)Surveillance Requirement 4.4.4.5.a and TS 6.9.2 to report the number of steam generator tubes plugged as a result of inservice inspection activities.

On March 19, 1995, Unit 2 was in Mode 5 (COLD SHUTDOWN)during a refueling outage when an inservice inspection of both steam generators was completed.

The inspection resulted in the plugging of one hundred twenty-four (124)tubes in Steam Generator No.1 and two hundred ninety-three (293)tubes in Steam Generator No.2.Pursuant to Technical Specification 4.4.4.5.b, the complete results of the steam generator tube inservice inspection will be submitted by March 19, 1996.

-a A~~1j I~I I