Please contact Nicholas Taylor at (817) 200-1141 with any questions you have regarding this letter.
Please contact Nicholas Taylor at (817) 200-1141 with any questions you have regarding this letter.


Sincerely,/RA/ Troy W. Pruett, Director Division of Reactor Projects Docket Nos.
Sincerely,
/RA/ Troy W. Pruett, Director Division of Reactor Projects Docket Nos.


50-482 License Nos.
50-482 License Nos.


NPF-42  
NPF-42 Enclosure:
 
===Enclosure:===
Wolf Creek Inspection Plan
Wolf Creek Inspection Plan


Line 83: Line 82:
SECURITY SOLO INSPECTION
SECURITY SOLO INSPECTION


1 1
1 09/10/2018
09/10/2018


09/14/2018
09/14/2018
Line 92: Line 90:
EP PROGRAM INSPECTION
EP PROGRAM INSPECTION


1 1
1 09/17/2018
09/17/2018


09/21/2018
09/21/2018
Line 101: Line 98:
000717 Alert and Notification System Testing
000717 Alert and Notification System Testing


1 09/17/2018
09/17/2018


09/21/2018
09/21/2018
Line 109: Line 106:
000718 Emergency Response Organization Staffing and Augmentation System
000718 Emergency Response Organization Staffing and Augmentation System


1 09/17/2018
09/17/2018


09/21/2018
09/21/2018
Line 117: Line 114:
000719 Emergency Action Level and Emergency Plan Changes
000719 Emergency Action Level and Emergency Plan Changes


1 09/17/2018
09/17/2018


09/21/2018
09/21/2018
Line 125: Line 122:
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies


1 09/17/2018
09/17/2018


09/21/2018
09/21/2018
Line 133: Line 130:
SECURITY TEAM INSPECTION
SECURITY TEAM INSPECTION


2 1
1 10/01/2018
10/01/2018


10/05/2018
10/05/2018
Line 142: Line 138:
000736 Equipment Performance, Testing, and Maintenance
000736 Equipment Performance, Testing, and Maintenance


1 10/01/2018
10/01/2018


10/05/2018
10/05/2018
Line 152: Line 148:
TI 2515/194
TI 2515/194


2 1
1 12/03/2018
12/03/2018


12/07/2018
12/07/2018
Line 168: Line 163:
SECURITY SOLO INSPECTION
SECURITY SOLO INSPECTION


1 1
1 04/01/2019
04/01/2019


04/05/2019
04/05/2019
Line 177: Line 171:
000734 Access Control
000734 Access Control


1 04/01/2019
04/01/2019


04/05/2019
04/05/2019
Line 185: Line 179:
WOLF CREEK 10CFR50.59 INSPECTION
WOLF CREEK 10CFR50.59 INSPECTION


3 1
1 04/29/2019
04/29/2019


05/03/2019
05/03/2019
Line 196: Line 189:
RP INSPECTION
RP INSPECTION


1 1
1 05/06/2019
05/06/2019


05/10/2019
05/10/2019
Line 205: Line 197:
000726 Occupational ALARA Planning and Controls
000726 Occupational ALARA Planning and Controls


1 05/06/2019
05/06/2019


05/10/2019
05/10/2019
Line 215: Line 207:
MAT'L CONTROL & ACCOUNTING
MAT'L CONTROL & ACCOUNTING


1 1
1 05/06/2019
05/06/2019


05/10/2019
05/10/2019
Line 226: Line 217:
EP EXERCISE AND PI INSPECTION
EP EXERCISE AND PI INSPECTION


4 1
1 06/03/2019
06/03/2019


06/07/2019
06/07/2019
Line 235: Line 225:
000716 Exercise Evaluation
000716 Exercise Evaluation


1 06/03/2019
06/03/2019


06/07/2019
06/07/2019
Line 243: Line 233:
000719 Emergency Action Level and Emergency Plan Changes
000719 Emergency Action Level and Emergency Plan Changes


1 06/03/2019
06/03/2019


06/07/2019
06/07/2019
Line 251: Line 241:
2/23/2018 11:09:46 AM
2/23/2018 11:09:46 AM


Page 2
Page  
of 4
 
of  
 
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.


Line 267: Line 259:
WOLF CREEK 3RD QTR REPORT
WOLF CREEK 3RD QTR REPORT


2 1
1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 276: Line 267:
000691 Adverse Weather Protection
000691 Adverse Weather Protection


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 284: Line 275:
000692 Equipment Alignment - 02.01 Partial Walkdown (Quarterly)
000692 Equipment Alignment - 02.01 Partial Walkdown (Quarterly)


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 292: Line 283:
000693 Equipment Alignment - 02.02 Complete Walkdown
000693 Equipment Alignment - 02.02 Complete Walkdown


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 300: Line 291:
000694 Fire Protection - Annual
000694 Fire Protection - Annual


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 308: Line 299:
000695 Fire Protection - Quarterly
000695 Fire Protection - Quarterly


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 316: Line 307:
000698 Flood Protection Measures
000698 Flood Protection Measures


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 324: Line 315:
000699 Heat Sink Performance - Annual
000699 Heat Sink Performance - Annual


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 332: Line 323:
000703 Licensed Operator Requalification Program and Licensed Operator Performance -  
000703 Licensed Operator Requalification Program and Licensed Operator Performance -  


Annual 1
Annual
 
07/01/2019
07/01/2019


Line 341: Line 333:
000705 Licensed Operator Requalification Program and Licensed Operator Performance -  
000705 Licensed Operator Requalification Program and Licensed Operator Performance -  


Quarterly 1
Quarterly
 
07/01/2019
07/01/2019


Line 350: Line 343:
000706 Maintenance Effectiveness
000706 Maintenance Effectiveness


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 358: Line 351:
000707 Maintenance Risk Assessments and Emergent Work Control
000707 Maintenance Risk Assessments and Emergent Work Control


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 366: Line 359:
000708 Operability Determinations and Functionality Assessments
000708 Operability Determinations and Functionality Assessments


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 374: Line 367:
000710 Plant Modifications
000710 Plant Modifications


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 382: Line 375:
000711 Post Maintenance Testing
000711 Post Maintenance Testing


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 390: Line 383:
000712 Refueling and Other Outage Activities
000712 Refueling and Other Outage Activities


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 398: Line 391:
000715 Surveillance Testing
000715 Surveillance Testing


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 406: Line 399:
000721 Drill Evaluation
000721 Drill Evaluation


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 412: Line 405:
IP 71151 000746 Performance Indicator Verification
IP 71151 000746 Performance Indicator Verification


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 418: Line 411:
IP 71152 000748 Problem Identification and Resolution
IP 71152 000748 Problem Identification and Resolution


1 07/01/2019
07/01/2019


09/30/2019
09/30/2019
Line 426: Line 419:
CYBER SECURITY INSPECTION
CYBER SECURITY INSPECTION


4 1
1 07/15/2019
07/15/2019


07/19/2019
07/19/2019
Line 435: Line 427:
000741 Cyber Security
000741 Cyber Security


1 07/29/2019
07/29/2019


08/02/2019
08/02/2019
Line 445: Line 437:
SECURITY TEAM INSPECTION
SECURITY TEAM INSPECTION


2 1
1 07/22/2019
07/22/2019


07/26/2019
07/26/2019
Line 456: Line 447:
WOLF CREEK HEAT SINK INSPECTION
WOLF CREEK HEAT SINK INSPECTION


2 1
1 08/26/2019
08/26/2019


08/30/2019
08/30/2019
Line 467: Line 457:
2/23/2018 11:09:46 AM
2/23/2018 11:09:46 AM


Page 3
Page  
of 4
 
of  
 
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.


Line 483: Line 475:
INSERVICE INSPECTION
INSERVICE INSPECTION


1 1
1 09/30/2019
09/30/2019


10/11/2019
10/11/2019
Line 494: Line 485:
RP INSPECTION
RP INSPECTION


3 1
1 09/30/2019
09/30/2019


10/04/2019
10/04/2019
Line 503: Line 493:
000725 Radiological Hazard Assessment and Exposure Controls
000725 Radiological Hazard Assessment and Exposure Controls


1 09/30/2019
09/30/2019


10/04/2019
10/04/2019
Line 511: Line 501:
000727 In-Plant Airborne Radioactivity Control and Mitigation
000727 In-Plant Airborne Radioactivity Control and Mitigation


1 09/30/2019
09/30/2019


10/04/2019
10/04/2019
Line 519: Line 509:
WOLF CREEK 4th QTR REPORT
WOLF CREEK 4th QTR REPORT


2 1
1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 528: Line 517:
000691 Adverse Weather Protection
000691 Adverse Weather Protection


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 536: Line 525:
000692 Equipment Alignment - 02.01 Partial Walkdown (Quarterly)
000692 Equipment Alignment - 02.01 Partial Walkdown (Quarterly)


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 544: Line 533:
000693 Equipment Alignment - 02.02 Complete Walkdown
000693 Equipment Alignment - 02.02 Complete Walkdown


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 552: Line 541:
000694 Fire Protection - Annual
000694 Fire Protection - Annual


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 560: Line 549:
000695 Fire Protection - Quarterly
000695 Fire Protection - Quarterly


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 568: Line 557:
000698 Flood Protection Measures
000698 Flood Protection Measures


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 576: Line 565:
000699 Heat Sink Performance - Annual
000699 Heat Sink Performance - Annual


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 584: Line 573:
000703 Licensed Operator Requalification Program and Licensed Operator Performance -  
000703 Licensed Operator Requalification Program and Licensed Operator Performance -  


Annual 1
Annual
 
10/01/2019
10/01/2019


Line 593: Line 583:
000705 Licensed Operator Requalification Program and Licensed Operator Performance -  
000705 Licensed Operator Requalification Program and Licensed Operator Performance -  


Quarterly 1
Quarterly
 
10/01/2019
10/01/2019


Line 602: Line 593:
000706 Maintenance Effectiveness
000706 Maintenance Effectiveness


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 610: Line 601:
000707 Maintenance Risk Assessments and Emergent Work Control
000707 Maintenance Risk Assessments and Emergent Work Control


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 618: Line 609:
000708 Operability Determinations and Functionality Assessments
000708 Operability Determinations and Functionality Assessments


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 626: Line 617:
000710 Plant Modifications
000710 Plant Modifications


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 634: Line 625:
000711 Post Maintenance Testing
000711 Post Maintenance Testing


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 642: Line 633:
000712 Refueling and Other Outage Activities
000712 Refueling and Other Outage Activities


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 650: Line 641:
000715 Surveillance Testing
000715 Surveillance Testing


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 658: Line 649:
000721 Drill Evaluation
000721 Drill Evaluation


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 664: Line 655:
IP 71151 000746 Performance Indicator Verification
IP 71151 000746 Performance Indicator Verification


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 670: Line 661:
IP 71152 000748 Problem Identification and Resolution
IP 71152 000748 Problem Identification and Resolution


1 10/01/2019
10/01/2019


12/31/2019
12/31/2019
Line 678: Line 669:
INITIAL EXAM
INITIAL EXAM


6 1
1 11/03/2019
11/03/2019


11/09/2019
11/09/2019
Line 685: Line 675:
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)


1 12/08/2019
12/08/2019


12/14/2019
12/14/2019
Line 693: Line 683:
2/23/2018 11:09:46 AM
2/23/2018 11:09:46 AM


Page 4
Page  
of 4
 
of  
 
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.



Revision as of 14:57, 9 May 2019

Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2017006)
ML18052A345
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/01/2018
From: Pruett T W
NRC/RGN-IV/DRP/RPB-B
To: Heflin A C
Wolf Creek
Taylor N H
References
ML16222A733, ML17311B223 IR 2017006
Download: ML18052A345 (6)


Text

March 1, 2018

Adam C. Heflin, President, Chief Executive Officer, and Chief Nuclear Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT: ANNUAL ASSESSMENT LETTER FOR WOLF CREEK GENERATI NG STATION (REPORT 05000 482/20 17 00 6)

Dear Mr. Heflin:

The U.S. Nuclear Regulatory Commission (NRC)

has completed its end

-of-cycle performance assessment of Wolf Creek Generating Station, reviewing performance indicators (PIs)

, inspection results

, and enforcement actions from January 1, 2017 , through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance of Wolf Creek Generating Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRC

's Reactor Oversight Process (ROP) Action Matrix

. This conclusion was based on one or more Greater-than-Green inspection findings (or PIs) in the Security cornerstone originating in the last quarter of 20 17. Wolf Creek Generating Station moved to the Regulatory Response Column on December 20, 2017.

Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 9500 1 , "Supplemental Inspection Response to Action Matrix Column 2 Inputs.

" The objective of this supplemental inspection will be to (1) assure that the root causes and contributing causes of significant performance issues are understood; (2) independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified; (3) assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective; and (4) assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues.

This inspection will be scheduled after you notify the NRC of your readiness.

The NRC identified a cross

-cutting theme in the safety conscious work environment (SCWE) area. Specifically, the NRC identified a finding with a documented cross

-cutting aspect related to the inconsistent implementation of SCWE policy (S.1) that was not isolated, as discussed in NRC Inspection Report 05000482/2017004 (Agencywide Documents Access and Management System (ADAMS) ML18043A114), dated February 12, 2018. The NRC determined that the impact on SCWE was not isolated because of concerns raised in other work groups, including the security department and maintenance support group, as discussed in NRC Inspection Report 05000482/2016009 (ADAMS ML16222A733), dated August 9, 2016 , and NRC Inspection Report 05000482/2017003 (ADAMS ML17311B223), dated November 7, 2017

, respectively. The NRC will continue to monitor your staff's effort and progress in determining the cause and implementing corrective actions for th is theme. The enclosed inspection plan lists the inspections scheduled through December 31

, 20 19. This updated inspection plan now includes planned security inspections

, which were formerly transmitted under separate correspondence.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.

The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact Nicholas Taylor at (817) 200-1141 with any questions you have regarding this letter.

Sincerely,

/RA/ Troy W. Pruett, Director Division of Reactor Projects Docket Nos.

50-482 License Nos.

NPF-42 Enclosure:

Wolf Creek Inspection Plan

Wolf Creek 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count MITIGATING STRATEGIES/SFP INST FOR BDBEE 4 1 01/22/2018 01/26/2018 TI 2515/191 000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 RAD SAFETY RFO 1,2 2 1 04/09/2018 04/13/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 04/09/2018 04/13/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 04/09/2018 04/13/2018 IP 71151 000746 Performance Indicator Verification INSERVICE INSPECTION 1 1 04/16/2018 04/27/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR BRQ 2 1 06/03/2018 06/09/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial BIENNIAL PI&R INSPECTION 4 1 06/11/2018 06/15/2018 IP 71152B 000747 Problem Identification and Resolution 1 06/25/2018 06/29/2018 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7 1 06/18/2018 06/22/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 07/09/2018 07/13/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing WC DESIGN BASES ASSURANCE TEAMS 7 1 07/16/2018 08/03/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

RAD SAFETY TEAM 5,6,7,8 4 1 08/20/2018 08/24/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 08/20/2018 08/24/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 08/20/2018 08/24/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program 1 08/20/2018 08/24/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation SECURITY SOLO INSPECTION 1 1 09/10/2018 09/14/2018 IP 71130.02 000734 Access Control Page 1 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report 2/23/2018 11:09:46 AM Wolf Creek

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

SECURITY SOLO INSPECTION

1 09/10/2018

09/14/2018

IP 71151 001338 Performance Indicator Verification

EP PROGRAM INSPECTION

1 09/17/2018

09/21/2018

IP 71114.02

000717 Alert and Notification System Testing

09/17/2018

09/21/2018

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

09/17/2018

09/21/2018

IP 71114.04

000719 Emergency Action Level and Emergency Plan Changes

09/17/2018

09/21/2018

IP 71114.05

000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

09/17/2018

09/21/2018

IP 71151 001397 Performance Indicator Verification

SECURITY TEAM INSPECTION

1 10/01/2018

10/05/2018

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

10/01/2018

10/05/2018

IP 71130.07

000739 Security Training

TI 2515/194

1 12/03/2018

12/07/2018

TI 2515/194

000512 Inspection of the Licensee

s Implementation of Industry Initiative Associated With the

Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin

2012-01)

SECURITY SOLO INSPECTION

1 04/01/2019

04/05/2019

IP 71130.02

000734 Access Control

04/01/2019

04/05/2019

IP 71151 001338 Performance Indicator Verification

WOLF CREEK 10CFR50.59 INSPECTION

1 04/29/2019

05/03/2019

IP 71111.17T

000709 Evaluations of Changes, Tests, and Experiments

RP INSPECTION

1 05/06/2019

05/10/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

05/06/2019

05/10/2019

IP 71124.04

000729 Occupational Dose Assessment

MAT'L CONTROL & ACCOUNTING

1 05/06/2019

05/10/2019

IP 71130.11

000742 Material Control and Accounting (MC&A)

EP EXERCISE AND PI INSPECTION

1 06/03/2019

06/07/2019

IP 71114.01

000716 Exercise Evaluation

06/03/2019

06/07/2019

IP 71114.04

000719 Emergency Action Level and Emergency Plan Changes

06/03/2019

06/07/2019

IP 71151 001397 Performance Indicator Verification

2/23/2018 11:09:46 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Wolf Creek

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

WOLF CREEK 3RD QTR REPORT

1 07/01/2019

09/30/2019

IP 71111.01

000691 Adverse Weather Protection

07/01/2019

09/30/2019

IP 71111.04

000692 Equipment Alignment - 02.01 Partial Walkdown (Quarterly)

07/01/2019

09/30/2019

IP 71111.04S

000693 Equipment Alignment - 02.02 Complete Walkdown

07/01/2019

09/30/2019

IP 71111.05A

000694 Fire Protection - Annual

07/01/2019

09/30/2019

IP 71111.05Q

000695 Fire Protection - Quarterly

07/01/2019

09/30/2019

IP 71111.06

000698 Flood Protection Measures

07/01/2019

09/30/2019

IP 71111.07A

000699 Heat Sink Performance - Annual

07/01/2019

09/30/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual

07/01/2019

09/30/2019

IP 71111.11Q

000705 Licensed Operator Requalification Program and Licensed Operator Performance -

Quarterly

07/01/2019

09/30/2019

IP 71111.12

000706 Maintenance Effectiveness

07/01/2019

09/30/2019

IP 71111.13

000707 Maintenance Risk Assessments and Emergent Work Control

07/01/2019

09/30/2019

IP 71111.15

000708 Operability Determinations and Functionality Assessments

07/01/2019

09/30/2019

IP 71111.18

000710 Plant Modifications

07/01/2019

09/30/2019

IP 71111.19

000711 Post Maintenance Testing

07/01/2019

09/30/2019

IP 71111.20

000712 Refueling and Other Outage Activities

07/01/2019

09/30/2019

IP 71111.22

000715 Surveillance Testing

07/01/2019

09/30/2019

IP 71114.06

000721 Drill Evaluation

07/01/2019

09/30/2019

IP 71151 000746 Performance Indicator Verification

07/01/2019

09/30/2019

IP 71152 000748 Problem Identification and Resolution

07/01/2019

09/30/2019

IP 71153 000749 Followup of Events and Notices of Enforcement Discretion

CYBER SECURITY INSPECTION

1 07/15/2019

07/19/2019

IP 71130.10P

000741 Cyber Security

07/29/2019

08/02/2019

IP 71130.10P

000741 Cyber Security

SECURITY TEAM INSPECTION

1 07/22/2019

07/26/2019

IP 71130.05

000737 Protective Strategy Evaluation

WOLF CREEK HEAT SINK INSPECTION

1 08/26/2019

08/30/2019

IP 71111.07T

000700 Heat Sink Performance -Triennial

2/23/2018 11:09:46 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Wolf Creek

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

INSERVICE INSPECTION

1 09/30/2019

10/11/2019

IP 71111.08P

000702 Inservice Inspection Activities - PWR

RP INSPECTION

1 09/30/2019

10/04/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

09/30/2019

10/04/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

09/30/2019

10/04/2019

IP 71151 000746 Performance Indicator Verification

WOLF CREEK 4th QTR REPORT

1 10/01/2019

12/31/2019

IP 71111.01

000691 Adverse Weather Protection

10/01/2019

12/31/2019

IP 71111.04

000692 Equipment Alignment - 02.01 Partial Walkdown (Quarterly)

10/01/2019

12/31/2019

IP 71111.04S

000693 Equipment Alignment - 02.02 Complete Walkdown

10/01/2019

12/31/2019

IP 71111.05A

000694 Fire Protection - Annual

10/01/2019

12/31/2019

IP 71111.05Q

000695 Fire Protection - Quarterly

10/01/2019

12/31/2019

IP 71111.06

000698 Flood Protection Measures

10/01/2019

12/31/2019

IP 71111.07A

000699 Heat Sink Performance - Annual

10/01/2019

12/31/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual

10/01/2019

12/31/2019

IP 71111.11Q

000705 Licensed Operator Requalification Program and Licensed Operator Performance -

Quarterly

10/01/2019

12/31/2019

IP 71111.12

000706 Maintenance Effectiveness

10/01/2019

12/31/2019

IP 71111.13

000707 Maintenance Risk Assessments and Emergent Work Control

10/01/2019

12/31/2019

IP 71111.15

000708 Operability Determinations and Functionality Assessments

10/01/2019

12/31/2019

IP 71111.18

000710 Plant Modifications

10/01/2019

12/31/2019

IP 71111.19

000711 Post Maintenance Testing

10/01/2019

12/31/2019

IP 71111.20

000712 Refueling and Other Outage Activities

10/01/2019

12/31/2019

IP 71111.22

000715 Surveillance Testing

10/01/2019

12/31/2019

IP 71114.06

000721 Drill Evaluation

10/01/2019

12/31/2019

IP 71151 000746 Performance Indicator Verification

10/01/2019

12/31/2019

IP 71152 000748 Problem Identification and Resolution

10/01/2019

12/31/2019

IP 71153 000749 Followup of Events and Notices of Enforcement Discretion

INITIAL EXAM

1 11/03/2019

11/09/2019

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

12/08/2019

12/14/2019

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

2/23/2018 11:09:46 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

ML18052A345 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: NHT/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP/SPE:B DRS/C:PSB1 DRS/D DRP/C:B DRP/D NAME DProulx JGroom AVegel NTaylor TPruett SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ DATE 2/22/18 2/22/18 2/26/18 2/26/18 2/27/18