4 th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan) | 4 th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan) | ||
Page 2 of 4 No. Description Status Additional Comments Resp Org/Person 2. Instrumentation RAI List (Knuettel) | Page 2 of 4 No. Description Status Additional Comments Resp Org/Person 2. Instrumentation RAI List (Knuettel) | ||
: 1. GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11. | : 1. GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11. | ||
Draft scheduled for 9/9 is now TBD. | Draft scheduled for 9/9 is now TBD. | ||
: 2. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule. | : 2. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule. | ||
: 3. Revise GA-ESI procedure for CGI dedication to address NRC comments. | : 3. Revise GA-ESI procedure for CGI dedication to address NRC comments. | ||
: 4. Draft received for review 9/20/11. | : 4. Draft received for review 9/20/11. | ||
: 5. Non-props & affidavits | : 5. Non-props & affidavits | ||
: 6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item. 7. WEC to revise figure to remove connection from OM to printer to complete commitment. | : 6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item. 7. WEC to revise figure to remove connection from OM to printer to complete commitment. | ||
: 8. WEC to agreed to produce a test report for the incore IITA. | : 8. WEC to agreed to produce a test report for the incore IITA. | ||
: 9. WEC has the necessary documentation. WEC to produce a non-proprietary summary report and place the test reports in the WEC Rockville office for NRC audit. | : 9. WEC has the necessary documentation. WEC to produce a non-proprietary summary report and place the test reports in the WEC Rockville office for NRC audit. | ||
: 10. Submit I&C update letter | : 10. Submit I&C update letter | ||
: 1. 9/29/11A 2. Various - see status | : 1. 9/29/11A 2. Various - see status | ||
: 3. 9/26/11A 4. 10/4/11 5. 11/18/11 6. Various - see status | : 3. 9/26/11A 4. 10/4/11 5. 11/18/11 6. Various - see status | ||
: 7. 10/24/11A | : 7. 10/24/11A | ||
: 8. 10/27/11 9. 10/27/11A | : 8. 10/27/11 9. 10/27/11A | ||
: 10. 11/14/11 1. Draft response received and comments sent to GA. | : 10. 11/14/11 1. Draft response received and comments sent to GA. | ||
: 2. 04038903-1SP: 10/11/11 A 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11 04038903-QSR: 09/30/11 A Non-props and affidavits due 11/18/11 | : 2. 04038903-1SP: 10/11/11 A 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11 04038903-QSR: 09/30/11 A Non-props and affidavits due 11/18/11 | ||
: 3. OP-7.3-240: Complete | : 3. OP-7.3-240: Complete | ||
: 4. Create new bridge document 04038800-1SP: | : 4. Create new bridge document 04038800-1SP: | ||
10/11/11A | 10/11/11A | ||
: 5. Provide NRC non-prop and affidavit for all remaining documents | : 5. Provide NRC non-prop and affidavit for all remaining documents | ||
: 6. WEC to provide the following documents: | : 6. WEC to provide the following documents: | ||
WCAP for 0000-ICE-30156 11/9/11 CN-EQT-10-44: 11/9/11 DAR-ME-09-10: 10/11/11 A EQ-EV-62-WBT: 11/16/11 EQLR-171: 11/16/11 EQ-QR-33-WBT: 11/9/11 EQ-QR-64-GEN: 11/16/11 WNA-SD-00250-WBT: 11/2/11 WNA-SD-00248-WBT: 11/2/11 WNA-TP-02988-WBT: 10/26/11 WNA-VR-00279-WBT: Complete WNA-PT-00138-WBT: Complete | WCAP for 0000-ICE-30156 11/9/11 CN-EQT-10-44: 11/9/11 DAR-ME-09-10: 10/11/11 A EQ-EV-62-WBT: 11/16/11 EQLR-171: 11/16/11 EQ-QR-33-WBT: 11/9/11 EQ-QR-64-GEN: 11/16/11 WNA-SD-00250-WBT: 11/2/11 WNA-SD-00248-WBT: 11/2/11 WNA-TP-02988-WBT: 10/26/11 WNA-VR-00279-WBT: Complete WNA-PT-00138-WBT: Complete | ||
: 7. WNA-AR-00189-WBT:10/24/11A | : 7. WNA-AR-00189-WBT:10/24/11A | ||
: 8. IITA In-core EQ report | : 8. IITA In-core EQ report | ||
: 9. MI cable 600V test report Produce non-prop summary document A | : 9. MI cable 600V test report Produce non-prop summary document A | ||
: 10. Next I&C submittal update Eng/Hilmes (Smith) 3. Exemption to 10CFR50.49 for some Category II cables? | : 10. Next I&C submittal update Eng/Hilmes (Smith) 3. Exemption to 10CFR50.49 for some Category II cables? | ||
11/14/11 Determine if exemption required. NRC may need to establish a license condition. | 11/14/11 Determine if exemption required. NRC may need to establish a license condition. | ||
Line 75: | Line 75: | ||
Page 3 of 4 No. Description Status Additional Comments Resp Org/Person 4. Complete Implementation (Hemmer) | Page 3 of 4 No. Description Status Additional Comments Resp Org/Person 4. Complete Implementation (Hemmer) | ||
Pump Relocation 5/30/12 Bldg Plan 10/31/11 Inspection - June 2012 Table update - | Pump Relocation 5/30/12 Bldg Plan 10/31/11 Inspection - June 2012 Table update - | ||
TBD Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 5. Fire Protection Report Questions regarding OMA 1. 10/25-27/11 2.9/30/11A 3.9/30/11A 4. 10/31/11A 5. 11/30/11 | TBD Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 5. Fire Protection Report Questions regarding OMA 1. 10/25-27/11 2.9/30/11A 3.9/30/11A 4. 10/31/11A 5. 11/30/11 | ||
: 6. 9/30/11A | : 6. 9/30/11A | ||
: 7. TBD 1. Audit 2. Group 7 RAI response 3. Receive Group 8 RAIs - if needed 4. Response to Group 8 plus 2Qs on 9/30/11 letter 5. Submit As-designed U1/U2 FPR 6. Fire Protection Program Audit Frequency - add to group 7 response | : 7. TBD 1. Audit 2. Group 7 RAI response 3. Receive Group 8 RAIs - if needed 4. Response to Group 8 plus 2Qs on 9/30/11 letter 5. Submit As-designed U1/U2 FPR 6. Fire Protection Program Audit Frequency - add to group 7 response | ||
: 7. Follow-up meeting ENG/Hilmes (Arent) 6. Tech Spec Revisions from latest T/S markup and NRC Review comments | : 7. Follow-up meeting ENG/Hilmes (Arent) 6. Tech Spec Revisions from latest T/S markup and NRC Review comments | ||
: 1. 11/18/11 | : 1. 11/18/11 | ||
: 2. 11/18/11 | : 2. 11/18/11 | ||
: 3. 11/18/11 | : 3. 11/18/11 | ||
: 4. 11/18/11 | : 4. 11/18/11 | ||
: 5. 10/31/11A | : 5. 10/31/11A | ||
: 1. CSST A & B - discretionary | : 1. CSST A & B - discretionary | ||
: 2. I-131 DEI | : 2. I-131 DEI | ||
: 3. Diesel Generator Frequency | : 3. Diesel Generator Frequency | ||
: 4. Unit 1 AST FHA | : 4. Unit 1 AST FHA | ||
: 5. List of Unit 1 Changes Licensing/Elton (Bryan) 5. Shea 7. ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH? Arent/Bryan 8. SSER 22/23/24 Open Items Response As needed The expanded HH list and status is covered periodically. Licensing 9. Transient Analysis issues Boron dilution RAI response 10/31/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 10. FSAR A107 11/18/11 Current target date for A107 is 11/18/11. Lic/Stockton Page 4 of 4 No. Description Status Additional Comments Resp Org/Person 11. Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) 1. 11/18/11 2. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan) 12. Verify Tech Spec Setpoints match calcs TS certification | : 5. List of Unit 1 Changes Licensing/Elton (Bryan) 5. Shea 7. ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH? Arent/Bryan 8. SSER 22/23/24 Open Items Response As needed The expanded HH list and status is covered periodically. Licensing 9. Transient Analysis issues Boron dilution RAI response 10/31/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 10. FSAR A107 11/18/11 Current target date for A107 is 11/18/11. Lic/Stockton Page 4 of 4 No. Description Status Additional Comments Resp Org/Person 11. Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) 1. 11/18/11 2. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan) 12. Verify Tech Spec Setpoints match calcs TS certification | ||
: 1. TBD 2. Feb 2012 1. SSDs are complete. Six changes to the TSs will be submitted to NRC | : 1. TBD 2. Feb 2012 1. SSDs are complete. Six changes to the TSs will be submitted to NRC | ||
: 2. TS certification Eng/Hilmes (Bryan) 13. Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/ | : 2. TS certification Eng/Hilmes (Bryan) 13. Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/ | ||
Woods (Bryan) 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing 15. Submit final as-constructed FSAR figures 7/1/12 Licensing/ Stockton 16. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete. | Woods (Bryan) 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing 15. Submit final as-constructed FSAR figures 7/1/12 Licensing/ Stockton 16. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete. |
Revision as of 08:12, 30 April 2019
ML11318A191 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 11/01/2011 |
From: | - No Known Affiliation |
To: | Division of Operating Reactor Licensing |
References | |
Download: ML11318A191 (6) | |
Text
1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
Sent: Tuesday, November 01, 2011 9:29 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Rober t H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Subject:
NRC PM Open Items List 11-02-11.docx Attachments:
NRC PM Open Items List 11-02-11.docx For next phone call.
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services
dlboyd@tva.gov 423-365-8764 Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 575 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF24C68FA1)
Subject:
NRC PM Open Items List 11-02-11.docx Sent Date: 11/1/2011 9:28:42 AM Received Date: 11/1/2011 9:28:45 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients: "Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None
Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 234 11/1/2011 9:28:45 AM NRC PM Open Items List 11-02-11.docx 33871
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
Page 1 of 4 NRC PM Open Items List 11/2/11 (423) 751-7777 ID 4233658764#
No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Jan. 2012
Inspection
4 th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan)
Page 2 of 4 No. Description Status Additional Comments Resp Org/Person 2. Instrumentation RAI List (Knuettel)
- 1. GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
Draft scheduled for 9/9 is now TBD.
- 2. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
- 3. Revise GA-ESI procedure for CGI dedication to address NRC comments.
- 4. Draft received for review 9/20/11.
- 5. Non-props & affidavits
- 6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item. 7. WEC to revise figure to remove connection from OM to printer to complete commitment.
- 8. WEC to agreed to produce a test report for the incore IITA.
- 9. WEC has the necessary documentation. WEC to produce a non-proprietary summary report and place the test reports in the WEC Rockville office for NRC audit.
- 10. Submit I&C update letter
- 1. 9/29/11A 2. Various - see status
- 3. 9/26/11A 4. 10/4/11 5. 11/18/11 6. Various - see status
- 7. 10/24/11A
- 8. 10/27/11 9. 10/27/11A
- 10. 11/14/11 1. Draft response received and comments sent to GA.
- 2. 04038903-1SP: 10/11/11 A 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11 04038903-QSR: 09/30/11 A Non-props and affidavits due 11/18/11
- 3. OP-7.3-240: Complete
- 4. Create new bridge document 04038800-1SP:
10/11/11A
- 5. Provide NRC non-prop and affidavit for all remaining documents
- 6. WEC to provide the following documents:
WCAP for 0000-ICE-30156 11/9/11 CN-EQT-10-44: 11/9/11 DAR-ME-09-10: 10/11/11 A EQ-EV-62-WBT: 11/16/11 EQLR-171: 11/16/11 EQ-QR-33-WBT: 11/9/11 EQ-QR-64-GEN: 11/16/11 WNA-SD-00250-WBT: 11/2/11 WNA-SD-00248-WBT: 11/2/11 WNA-TP-02988-WBT: 10/26/11 WNA-VR-00279-WBT: Complete WNA-PT-00138-WBT: Complete
- 7. WNA-AR-00189-WBT:10/24/11A
- 8. IITA In-core EQ report
- 9. MI cable 600V test report Produce non-prop summary document A
- 10. Next I&C submittal update Eng/Hilmes (Smith) 3. Exemption to 10CFR50.49 for some Category II cables?
11/14/11 Determine if exemption required. NRC may need to establish a license condition.
Hilmes (Stockton)
Page 3 of 4 No. Description Status Additional Comments Resp Org/Person 4. Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan 10/31/11 Inspection - June 2012 Table update -
TBD Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 5. Fire Protection Report Questions regarding OMA 1. 10/25-27/11 2.9/30/11A 3.9/30/11A 4. 10/31/11A 5. 11/30/11
- 6. 9/30/11A
- 7. TBD 1. Audit 2. Group 7 RAI response 3. Receive Group 8 RAIs - if needed 4. Response to Group 8 plus 2Qs on 9/30/11 letter 5. Submit As-designed U1/U2 FPR 6. Fire Protection Program Audit Frequency - add to group 7 response
- 7. Follow-up meeting ENG/Hilmes (Arent) 6. Tech Spec Revisions from latest T/S markup and NRC Review comments
- 1. 11/18/11
- 2. 11/18/11
- 3. 11/18/11
- 4. 11/18/11
- 5. 10/31/11A
- 1. CSST A & B - discretionary
- 2. I-131 DEI
- 3. Diesel Generator Frequency
- 5. List of Unit 1 Changes Licensing/Elton (Bryan) 5. Shea 7. ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH? Arent/Bryan 8. SSER 22/23/24 Open Items Response As needed The expanded HH list and status is covered periodically. Licensing 9. Transient Analysis issues Boron dilution RAI response 10/31/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 10. FSAR A107 11/18/11 Current target date for A107 is 11/18/11. Lic/Stockton Page 4 of 4 No. Description Status Additional Comments Resp Org/Person 11. Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) 1. 11/18/11 2. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan) 12. Verify Tech Spec Setpoints match calcs TS certification
- 1. TBD 2. Feb 2012 1. SSDs are complete. Six changes to the TSs will be submitted to NRC
- 2. TS certification Eng/Hilmes (Bryan) 13. Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan) 14. Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing 15. Submit final as-constructed FSAR figures 7/1/12 Licensing/ Stockton 16. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon) 17. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR 18. ASME Section III N-3 report 8/1/12 0. Discretionary Actions
- 1. Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent) 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing 3. Status of GSI 199 Eastern Seismicity (Arent) Fall 2011 No action pending upcoming Generic Letter TVA/NRR 4. Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored. Lic/Arent 5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Waiting for NRC concurrence. When will the WEC analysis be submitted? NRC willing to review as a contingency.
Corp SG/ Webber ISI/Tinley